    Skardu and Gilgit Airports

    1

    Works & Development Directorate (21/04/2010)

  • 8/6/2019 Visit Skardu and Gilgit

    2/31

    NAME OF THE PRESENTING OFFICE

    2

    Works & Development Directorate

    BIRD EYE VIEW OF SKARDU AIRPORT

  • 8/6/2019 Visit Skardu and Gilgit

    3/31

    NAME OF THE PRESENTING OFFICE

    3

    Works & Development Directorate

    Proposed CarParking and the Land Constraint

  • 8/6/2019 Visit Skardu and Gilgit

    4/31

    NAME OF THE PRESENTING OFFICE

    4

    Works & Development Directorate

    A Closer Look at the Car Parking

    CAPACITY > 100 cars

  • 8/6/2019 Visit Skardu and Gilgit

    5/31

    NAME OF THE PRESENTING OFFICE

    5

    Works & Development Directorate

    The proposed lay out by APM Skardu

    CAPACITY > 80 CARS

  • 8/6/2019 Visit Skardu and Gilgit

    6/31

    NAME OF THE PRESENTING OFFICE

    6

    Works & Development Directorate

    Existing portionNew extended portion

  • 8/6/2019 Visit Skardu and Gilgit

    7/31

    NAME OF THE PRESENTING OFFICE

    7

    Works & Development Directorate

    Material dumped in front of terminal building

  • 8/6/2019 Visit Skardu and Gilgit

    8/31

    NAME OF THE PRESENTING OFFICE

    8

    Works & Development Directorate

    Landscaping yet to be planned and developed

  • 8/6/2019 Visit Skardu and Gilgit

    9/31

    NAME OF THE PRESENTING OFFICE

    9

    Works & Development Directorate

    Proposed extensions for the roof to cover the steps

    Also ramp required on the other side too

  • 8/6/2019 Visit Skardu and Gilgit

    10/31

    NAME OF THE PRESENTING OFFICE

    10

    Works & Development Directorate

    Legends:

    Complete except door shutters and conveyor belt

    Area Yet to be Constructed

    Only Shell constructed

    Demarcation of Areas

  • 8/6/2019 Visit Skardu and Gilgit

    11/31

    NAME OF THE PRESENTING OFFICE

    11

    Works & Development Directorate

    Overlapping of work yet to perform ..

  • 8/6/2019 Visit Skardu and Gilgit

    12/31

    NAME OF THE PRESENTING OFFICE

    12

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    13/31

    NAME OF THE PRESENTING OFFICE

    13

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    14/31

    NAME OF THE PRESENTING OFFICE

    14

    Works & Development Directorate

    Inset pic here

    Ply Door shutters being pressed for Formica sheets pasting

  • 8/6/2019 Visit Skardu and Gilgit

    15/31

    NAME OF THE PRESENTING OFFICE

    15

    Works & Development Directorate

    Insert pic here paint

    Good floor and ceiling tile work in Arrival Poor back box support for electrical outlets

  • 8/6/2019 Visit Skardu and Gilgit

    16/31

    NAME OF THE PRESENTING OFFICE

    16

    Prevailing Key Concerns

    1. User Move-In to the new area not done because Door shutters not installed.2. Ply Doors are on hold, apparently weather being reason.

    3. Pressing Formica Sheets to Ply Sheets tried manually with poor workmanship.

    4. No immediate work plan for contractor.

    5. Some quality issues, like paint, wall tiles, and door shutters

    6. No landscaping works planned

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    17/31

    NAME OF THE PRESENTING OFFICE

    17

    Measures for efficiency now onwards

    1. Proper site management.2. Ownership of the project by the Works Directorate ( less power to APM )

    3. Better communication and planning for the user to vacate the existing areas.

    4. Encourage / Push contractor for speedy works.

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    18/31

    NAME OF THE PRESENTING OFFICE

    18

    Measures for better aesthetics

    1. Its never too late to incorporate some of the basic features as beautifullyworked out by GM Arch.

    1. Roof trusses should have been raised or Else proper RCC structure.

    2. A dedicated plan and proposal for the Landscape

    3. Main gates needs replacement,

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    19/31

    NAME OF THE PRESENTING OFFICE

    GILGIT AIRPORT

    19

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    20/31

    NAME OF THE PRESENTING OFFICE

    20

    Works & Development Directorate

    The Existing Building

    The site of new terminal building

    Lay down area

  • 8/6/2019 Visit Skardu and Gilgit

    21/31

    NAME OF THE PRESENTING OFFICE

    21

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    22/31

    NAME OF THE PRESENTING OFFICE

    22

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    23/31

    NAME OF THE PRESENTING OFFICE

    23

    Works & Development Directorate

    layers yet to be placed

  • 8/6/2019 Visit Skardu and Gilgit

    24/31

    NAME OF THE PRESENTING OFFICE

    24

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    25/31

    NAME OF THE PRESENTING OFFICE

    25

    Works & Development Directorate

    3600 ft of running water channel work

  • 8/6/2019 Visit Skardu and Gilgit

    26/31

    NAME OF THE PRESENTING OFFICE

    26

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    27/31

    NAME OF THE PRESENTING OFFICE

    27

    Works & Development Directorate

    3600 ft of running water channel work

  • 8/6/2019 Visit Skardu and Gilgit

    28/31

    NAME OF THE PRESENTING OFFICE

    28

    Works & Development Directorate

  • 8/6/2019 Visit Skardu and Gilgit

    29/31

    NAME OF THE PRESENTING OFFICE

    GILG

    ITAIRP

    ORT

    Whats appreciable is

    Proper site and material management by Works Staff

    Quality of Runway carpet

    Good command over drawings, and projects data by works staff.

    29

  • 8/6/2019 Visit Skardu and Gilgit

    30/31

    NAME OF THE PRESENTING OFFICE

    GILG

    ITAIRP

    ORT

    Areas of Improvement

    Schedule of activities be developed with contractor.

    Quantity of Reinforcement Steel.

    Contractor be pushed for timely start of works (esp. after

    winters)

    More economical solutions for steel reinforcement should beworked.

    30

  • 8/6/2019 Visit Skardu and Gilgit

    31/31

    NAME OF THE PRESENTING OFFICE

    THANK YOU