Partnering for Success!DAS Systems

Vision Technologies

Page 2: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Agenda

• Intro• Technology Overview• Solutions Deployment

Page 3: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Vision Technologies• Revenue exceeding $90 Million in 2014• Design & Engineering Services:

• Certified: CIBET, RCDD, PMP, RCWD, CM-BIM• In-house CAD Team• “Company Behind the Company” Business Model

– We only succeed when you succeed!• National Delivery• 350+ Employees, 22 states• Service-Disabled Veteran-Owned• GSA Connections II Prime Contractor,

Schedules 70 and 58i, Sch. 84 pending

DAS IP Surveillance PON Audio Visual Wireless Structured Cabling

Page 4: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Partner Opportunities• Don’t pass up new or additional opportunities• Expand your portfolio• Maintain account control• Continue to provide your core services• Vision becomes your RF Engineering bench!• Vision Technologies provides:

– RF Engineering and Design Services– Site Surveys– DAS Commissioning (System Activation)– WSP/Carrier Coordination– Documentation

Page 5: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Distributed Antenna Systems• DAS Function

– RF Transportation System• DAS Applications

– Public Safety– Land Mobile Radios– Cellular / Commercial

• Cellular /Commercial DAS is “Special” / Different– Regulated– Monitored by FCC and WSPs– Requires WSP Approvals

Page 6: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

A distributed antenna system, or DAS, is a network of spatially separated antenna nodes connected to a common source via a transport medium that provides wireless service within a geographic area or structure.

~ Wikipedia

DAS 101DAS Terminology• IBW: In-building Wireless• Neutral Host: Multi Carrier DAS• HetNet: Heterogeneous Network• Technology; 2G, 3G, 4G, LTE, 5G• RF Signal Source Cellular Repeater aka BDA

(Bi-Directional Amplifier) BTS = Base Transceiver Station Small Cell

• DAS Cellular Enhancement Cell Booster Radio Frequency Repeater System

Funding Models• Enterprise• Carrier• 3rd Party / NHP

DAS Solutions• Cellular Voice and Data

2G/3G/4G• Land Mobile Radios/2-way

First Responder Security/Facilities

• Paging • WMTS – Medical Telemetry• WiFi / WLAN; RTLS –

Location Systems• Next Generation

Device to Device Internet of Things

Page 7: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Regulated• FCC Auctioned Spectrum• Conditions

– Licensee Responsible for Performance Metrics • FCC Definitions

– Consumer Booster• Register with your local WSP

– Industrial Booster• Requires Express Consent of FCC Licensee (WSP)

– wireless.fcc.gov/signal-boosters/index.html

Page 8: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

DAS Architecture - Passive

8

Page 9: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

DAS Architecture – Active (Hybrid)Fiber & 50 Ohm Coax

9

Page 10: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

DAS Architecture – Active Fiber & 75 Ohm Coax

10

Page 11: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

DAS Architecture – ActiveFiber Only

11

Page 12: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

DAS Architecture – ActiveFiber & Cat6A/Cat7

12

Page 13: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Solution Deployment

Page 14: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Project DeploymentRequirements

Gathering

Survey & Design

Proposal & Pricing

System Installation

Carrier Coordination

DAS Activation& Integration

System Test& Verification

Project Documentation

& Close Out

Warranty & Maintenance

Page 15: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

• Current Needs– Mission Critical, Desired, ROI/Budgeting– Public Safety? Which Commercial Providers? – Mobility Services (Which frequencies, Voice, Data, WiFi offloading) – Venue Occupants/Wireless Users?– Coverage Requirements? (Partial Building; Entire Building; Campus

(Elevators; Stairwells; Mechanical Spaces)• Future Expectations

– Additional Coverage Areas– Additional Carriers, New Services (MIMO, New Licensed Spectrum)

• Facility-Based Considerations– New Construction, Renovation, or Expansion– Aesthetic and Architectural Requirements– Working Hours; Daytime, After Hours– Preferred Low Voltage Contractor?– Union/Non Union, Prevailing Wages

Understanding Customer Requirements

Page 16: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Site SurveySite Features to Evaluate• Cable Pathways• Equipment Locations• RF Propagation Characteristics• Ambient RF Environment• Macro Serving Cell Sites• Aesthetics

Page 17: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Site Survey• Preparation• Physical Characteristics • RF Characteristics• Tools

Page 18: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Site Survey Preparation• Obtain Electronic copies of Floor Plans• Create a Preliminary Design• Pre-configure Survey Tools

– Insert Floor Plans– Charge Batteries

• Site Access– Site POC Information – Working Hours– Arrange Escorts if needed– Access into Existing Equipment Locations– Access onto the Roof

Page 19: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Site Survey - Physical Characteristics

• Cable Pathways – Plenum, Non-Plenum – Conduit fill ratios

• Existing Fiber • Wall Types, Ceiling Types• Equipment Locations

– Space, Grounding, Electrical, HVAC• Document Aesthetically Sensitive Areas

Page 20: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Site Survey – RF Characteristics• Building Propagation Characteristics

– Transmitter / Receiver

• RF Benchmarking• Macro Serving Cell Sites• Critical Areas

– VIP Areas– Meeting Rooms

Page 21: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Survey Tools• Collection Tools

– PC/Tablets connected to Multiple UEs– Scanners

• Continuous Wave Transmitters• Spectrum Analyzers / BTS Analyzers• Check List / Task List• Camera

Page 22: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Survey Results Analysis • Physical

– Cable pathways: Existing/Create– Equipment Locations– Interior Build-out

• Walls, Ceilings• Aesthetic and Structural

• RF – Ambient– DAS Dominance– Soft Handoff – Elevators/Stairwell Locations

Page 23: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Survey Summary• Preparation

– Client Expectations & Site Access– Preliminary DAS Design– Pre-configuration of Tools– Survey Checklist

• Ensure Data Collection During Survey• Take Plenty of Pictures and Notes• Analyze Data soon after Survey Completion

23

Page 24: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Link Budget

Frequency750 750 880 880 880 1960 1960 1960 MHz

TechnologyLTE LTE CDMA UMTS GSM CDMA UMTS GSM

Composite Power Output

# of Channels1 1 4 4 4 4 4 4

Power per Channel 27.0 27.0 21.0 23.2 13.2 21.0 21.7 11.7 dBm

Splitter/combiner Losses -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 dB

1/2-inch Cable Length 150 150 150 150 150 150 150 150 feet

1/2-inch Cable Loss -3.0 -3.0 -3.3 -3.3 -3.3 -5.3 -5.3 -5.3 dB

Antenna Gain1.5 1.5 1.5 1.5 1.5 2.9 2.9 2.9 dBi

Antenna Output15.5 15.5 9.2 11.4 1.4 8.6 9.3 -0.7 dBm

Distance (Radius)65 65 65 65 65 65 65 65 feet

Free Space Path Loss -55.9 -55.9 -57.3 -57.3 -57.3 -64.3 -64.3 -64.3 dB

Body Loss-3.0 -3.0 -3.0 -3.0 -3.0 -3.0 -3.0 -3.0 dB

Wall/Clutter Loss-10.0 -10.0 -10.0 -10.0 -10.0 -10.0 -10.0 0.0 dB

Fade Margin-5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 -5.0 dB

Pilot-27.8 -27.8 -8.2 -10.0 0.0 -8.2 -10.0 0.0 dB

DL Pilot RSSI Level -86.2 -86.2 -74.3 -73.9 -73.9 -81.8 -82.9 -72.9 dBm

Link Budget Calculations - 1 Watt OEM Remote Hub Unit

3030

30

DesignRF Considerations• Active or Passive DAS• OEM Selection• RF Signal Source for the DAS• In-Building Antenna

Placement• RF Link Budgets• Carrier Approvals - Required Construction Considerations

• Defined Scope of Work • Pricing/Proper Budgeting• Project Schedule• Staffing Plan• Material Storage

Page 25: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Design

• Design Tools• Design Process• Design Creation• Incorporate

Survey Data

Page 26: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Design Tools

• iBwave - Industry Standard Design S/W– Certification Level 1: Enterprise Design

• Import and size floor plans• Add RF signal sources• Add DAS equipment and materials

– Certification Level 2: Propagation, Data Collection, Optimization

• Create “Walls” onto floor plans• Modify and adjust propagation characteristics• Create Predictive Analysis (2D and 3D)

Page 27: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Design Tools• iBwave (Continued)

– Certification Level 3: MIMO, Complex Venues, Capacity Planning

• Stadium environments• MIMO and WiFi offloading• Capacity considerations for data throughput

• Link Budget• “Dixie Cup”

– Preliminary approach only

Page 28: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Design Process• Initial Setup is Critical

– Scaling of Floor Plans– Reference Point – RF Signal Sources

• Channel Loading• RSSI vs. RSRP vs. RSCP

– Wall Type, Composition and Placement

– Coverage Requirements

Page 29: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Creating the Design• Neatness Counts!!

– Design doc installer’s instruction manual• Where antennas are installed• Interconnection diagrams

– Install manual as-built documentation• Used for maintenance, repair and upgrades

• Generate Bill of Materials– S/W auto-calculates % for waste– Per system, per building, per floor

• Database of Parts

Page 30: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Incorporate Survey Data

• Wall Types– Concrete Block, Drywall, Cubical

• Cable Pathways – Vertical, Horizontal– DAS Requirements

• Critical Areas– CEO’s office– Meeting Rooms

Page 31: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Survey vs. Predictive

• Import Survey Results into iBwave– Overlay onto Floor Plans

• Predictive vs. Survey – DAS Dominance– Soft Handoff Areas– “What if” Scenarios

• Make Design Adjustments• Generate Heat Maps

Page 32: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Design Summary• Preparation

– Understanding the Big Picture • Customer Requirements• Venue Characteristics• Equipment Capabilities

• Software does not replace knowledge– Garbage In = Garbage Out– Pay attention to the details

• Fine tune the design using predictive analysis • Build upon previous work

– Design Installation As-built

32

Page 33: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

ProposalProposal Elements• Design Information

– Bill of Materials• Construction

– Labor of Effort– Schedule

• Solution Description– Coverage

• Pricing

Page 34: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

System InstallationDisciplined Project Management• Responsibilities Matrix;

Prime/Subcontractors/Installation team• Stakeholder Management• Regular/Weekly Status Reports• In-Process Quality ReviewsInstallation• Stage Delivery to Match Installation

Schedule (Lead-time issues)• Cable Rough-in and Termination• Equipment Mounting, Interconnections,

Setup & Testing

Page 35: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Carrier Coordination - WhyThe Carriers must always be involved!• DAS Solutions Rebroadcast Licensed & Regulated Spectrum• Carriers own their Spectrum (Licensed from the FCC)• Carriers must Approve the Design to Ensure their Participation• Carriers Issue Rebroadcast Agreements /Letter of Authorizations

If the Carriers are not Involved• Right & Authority to shutdown the DAS & keep it off• DAS Owner left with a costly and non-functional system• There is usually no recourse; a system redesign resolving deficiencies

and meeting Carrier approval must be performed, or remain off air

Page 36: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Carrier Coordination – Activities• Submit Design, BoM, Link Budgets & Predictive Analysis

for Technical Approval• Follow up with Carrier on Approval Status• Modify Design or Provide Clarification as Required• Provide Client/Venue Information for Legal Agreements• Follow up to Ensure Approval Process Moves Forward• Coordinate Signal Source & DAS Activation Activities• Provide As-Built Documentation upon Project Completion

Page 37: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Testing and Verification• Component & Cable Testing Return loss, DTF, PIM Optical loss, Reflections Antenna Testing

• DAS Equipment Configuration & Testing• Continuous Wave/RF Testing• Signal Source Activation• Optimization and Fine Tuning Power, UL/DL, Antenna Direction

• System Verification Survey & Verify Performance Metrics

Specialized Tools & Expertise Required

• Design• Survey• Testing

Page 38: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Project Documentation• Cabling Pathways• Antenna Placements• Equipment Configuration• Survey Results

Manufacturer Description Part Number Unit QTYTE Conectivity Spectrum-Prism - Host Unit - No DARTS FWP-00000HUII ea 2TE Conectivity Spectrum-Prism - Host Unit - 850 CELL, Classic DART FWU-20000HUDART ea 2TE Conectivity Spectrum-Prism - Host Unit - 1900 PCS, SuperDART FWU-86000HUDART ea 4TE Conectivity Spectrum-Prism - Host Unit - 2100 AWS, SuperDART FWU-A6000HUDART ea 3TE Conectivity Spectrum-Prism - Host Unit - 700 LTE, SuperDART FWU-L6000HUDART ea 2TE Conectivity Spectrum DART Remote Unit SPT-0000DRUII ea 4TE Conectivity Spectrum, 850 CELL, IF DART SPT-000000850IFD ea 4TE Conectivity Spectrum, 1900 PCS, IF DART SPT-000001900IFD ea 4TE Conectivity Spectrum, 2100 AWS, IF DART SPT-002100AWSIFD ea 4TE Conectivity Spectrum, 700LTE DART (SISO) SPT-00700UPC1IFD ea 4TE Conectivity Spectrum, 700LTE DART (MIMO) SPT-00700UPC2IFD ea 4TE Conectivity Spectrum IF Expansion Unit SPT-00000IFEU-1 ea 6TE Conectivity Spectrum Power Supply SPT-2400ACDC-1 6TE Conectivity Spectrum Fiber Transceiver FWU-SMCW1470XVR ea 8TE Conectivity Spectrum, 850-1900 Main Remote Access Unit (RAU) SPT-8519-1 ea 8TE Conectivity Spectrum, 700 MIMO Secondary RAU SPT-S1-7070-1-MIMO ea 8TE Conectivity Spectrum, 1900-2100AWS Main RAU SPT-M1-19AWS-1 ea 8TE Conectivity Spectrum, 700 SISO-2100AWS Secondary RAU SPT-S1-70AWS-1-SISO ea 8TE Conectivity Omni Antenna, (3) 72" pigtails, 700/800-2100/2400-2500 4214-M727 ea 16

TE ConectivityRG-6/U, 75 Ohm, Plenum, Hub to RAU distances up to 450 feet (1000ft) 862733 ea 5

Belden RG-11/U, 75 Ohm, Plenum, Hub to RAU, distances up to 650 feet 7732A ea 5

Page 39: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Warranty & Maintenance• Service Level Agreements

– Severity Levels– Response Times

• Site Access• Remote Access

– Monitoring– Maintenance

• Annual Performance Inspection

Page 40: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Integrator / Partner Selection• Key Attributes

– Solutions Focus– Technology Focused Engineering– Project Management Experience– Program Management Experience– Partnership Mentality– Service and Support Capabilities

Page 41: Vision Technologies - BICSI · PDF fileVision Technologies ... • Link Budget ... • Submit Design, BoM, Link Budgets & Predictive Analysis for Technical Approval

Contact Information

Thank YouWilliam Foy RCDD, NTS, OSP, WD, ESS

– Solutions Architect– 443-370-9258– [email protected]