Virtual Statistical System
Misha Belkindas
Development Data GroupWorld Bank
June 2008
2
Overview
1. Background
2. Objectives
3. Proposed approach
4. Activities and responsibilities
5. Timeline
6. Resource requirement
7. Discussion points
3
Background Modern technology, esp. internet and websites,
can play an important role in disseminating relevant knowledge for statistical development
World Bank originally proposed the development of a Virtual Statistical System
The word “virtual” refers to a situation where one can visit organizations and meet people – who are not real but displays the qualities of being real - who can provide relevant information
4
Background – cont’d PARIS21 Task Team on the Virtual Statistical
System was formed for VSS development TT Comprises representatives of the Central
Statistical Office of India, the Development Gateway Foundation, the Federal Statistical Office Germany, EUROSTAT, Ghana Statistical Services, the International Monetary Fund, PARIS21, the United Nations Statistics Division, and the World Bank
TT held its first meeting in March 2008 in Washington, DC to prepare a project proposal
5
Objectives WHAT: VSS will be a knowledge center that
takes into account the information needs of different user types and will focus on the development of statistical systems
WHY: VSS will be a tool that supports the preparation and implementation of NSDS and national efforts to design, build and maintain national statistical systems
HOW: VSS will be implemented through a user-friendly IT platform that provides standardized and structured information
6
Proposed approach A portal will be created to serve as an entry
point for accessing VSS content VSS content will be categorized into:
Activities (based on processes of production, dissemination and use of statistics)
Themes (based on the perspectives of thematically oriented users)
The portal will be constructed based on a modular approach (a harmonized set of information)
7
Proposed approach – cont’d User interface will include interactive
functions that will facilitate the retrieval of information
Language issues: English will be the primary language Reference materials will be available in the
original languages Content can optionally be translated into 6 UN
languages
8
How will it look like?
9
10
Activities and responsibilities
The project will be developed in three phases: Phase 1: Preparation of proposal Phase 2: Development of portal
Phase 2A: completion of website structure Phase 2B: development of websites Phase 2C: creation of pilot modules Phase 2D: provision of basic content Phase 2E: completion of modules
Phase 3: Maintenance of portal
11
Activities and responsibilities
Activity Agency ResponsibilityPhase 1Proposal
TT Preparation of proposal
WB Convener
Phase 2Development
TT Oversight body
UNSD/WB Joint leadership
WB Convener
DGF Portal design
Partner agencies Information providers
Phase 3Maintenance
UNSD orPartner agencies
OwnershiporShared ownership
12
TimelineYear Month Activity
2008 June P21 SC decisions
Sep—Oct Phase 2 starts
Oct—Dec Testing with potential users
2009 Jan Completion of web structure
Feb Completion of 4-5 pilot modules
July Release 1: 20% modules completed
Aug ISI presentation
2010 Feb Release 2: 60% modules completed
July Release 3: 100% modules completed
Nov Final version of portal completed
Dec Project completed
13
Resource requirement
Human resources required: A project coordinator based at WB A consultant supporting the coordinator A web developer Content coordinators who will oversee the
content development of a specific domain A review group who will review the materials
developed for specific domains Content providers who will contribute to the
content
14
Resource requirement
Financial resources required: The cost estimate is US$430,000, which
includes consultant fees for the website development, management, coordination, evaluation, and promotion and marketing
US$80,000 has already been made available for website testing with potential users
Additional US$350,000 will be required for the development phase
15
Discussion points Does the Committee agree on the
proposed work plan of the Virtual Statistical System Task Team?
Does the Committee agree to allocate the required resources (US$350,000)?