Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
Unit 1 Assignment 2 – Film production
Vibe productions has been commissioned by ITV 2 to produce THREE prime time TV series to rival the BBC.As the BBC have always lead the way in costume dramas so ITV are commissioning for a new series to be aired in their prime time Sunday evening slot. Undecided on the genre they have asked Vibe Productions to produce 3 promos which cover the genres of Western, Film Noir and Period drama. Each promo will be aired on ITV2.COM with the viewers being asked to pick their favourite production. This production will then be commissioned as a 6-part series which will run from Christmas to the end of January to replace The X Factor.
3 different briefs have been sent to us for you to choose.
Each production must have the following elements 1. Shot reverse shot2. Excellent 180-degree rule filming3. It must have NO continuity errors4. The setting and costumes must match that of the genre to the best
of your ability5. The music and sounds must add emotion and effect (do not just add
a song for no reason) 6. A montage (either Hitchcock or Modern MUST be added to the
production) 7. Sound quality must be near perfect8. Shots must create meaning – with the focus on angles
All planning and productions must be submitted to ITV 2 by Friday 21st October 2016 (full edited production)with interim deadlines onWeek of Monday 10th October (focus on planning, idea generation and script)Week of Monday 17th October (focus on sound and filming)
Checklist
Planning and idea generation
Name of production Friday 14th October
Research into genre – this MUST be referenced using the Harvard referencing and have primary and secondary research in itSlug lineBrief outlineNarrative in 3 ACTS and 5 stages (Todorov)Character Development (Propps characters and the development of the two main characters)Setting the scene – generating and research props and clothing
Script and filming
Location recces / H&S Friday 14th October
Storyboarding 5 – 7 page script Start filming
Filmed production
Finished filming Friday 21st October
Edited soundEdit
Please make sure that all planning and pre-production is completed on VIBE headed paper and is water marked with ITV 2 log and looks professional – Images can be downloaded from Vibe