WATER RESOURCES
(Demand No. 74)
Organizational Structure and Objectives:
The Water Resources Department, formerly known as Irrigation Department was a part of
the Public Works Department (PWD) even prior to liberation of the State of Goa from Portuguese
rule. Eventually, vide Government Notification No.7/17/1/80-WET, dated 25/06/1981, certain
Divisions/Circles were carved out from the earlier composite Public Works Department and the
Department started functioning as an independent department after re-organization with effect
from 01/07/1981. Subsequently, the Irrigation Department was renamed as Department of Water
Resources vide Government Notification No. 23/1/87-GA & C- (i), dated 12.12.2000.
Administrative Structure:
The department is headed by the Chief Engineer, who is assisted in his office by sections:
i) Engineering Officer, ii) Director of Administration iii) Accounts Officer iv) Technical wing
headed by Superintending Engineer, Central Planning Organisation. The Chief Engineer has
under his control Circle I which is headed by Superintending Engineer having works divisions I,
II, XI, XII, XIII, Circle IV which is headed by Superintending Engineer having works divisions X
and XIV and Circle V is headed by Superintending Engineer having works division III.
Intermediate in grade between the Chief Engineer and Superintending Engineers there are
two posts of Additional Chief Engineers; namely Additional Chief Engineer (Madei Basin) (MB)
and Additional Chief Engineer (Irrigation Project) (IP). The Additional Chief Engineer (IP) is in
charge of the Tillari Irrigation Project (TIP) assisted in his office by the Surveyor of Works with
his own subordinate staff and Circle Office II headed by Superintending Engineer having Works
Division VI, VII and VIII under his control. The Additional Chief Engineer (MB), having Circle
Office III headed by Superintending Engineer having Works Divisions V and IX, with its
subordinate Sub Divisions.
1
The Administrative unit of each Circle Office is headed by a Superintending Engineer.
Each Circle has under its control a Works Divisions, which is the executive unit of the
department, headed by an Executive Engineer. The field units directly in charge of the works at
site under the Division are Sub Divisions lead by an Assistant Engineer. The department has 6
sanctioned posts of Superintending Engineers, 20 posts of Executive Engineers / Engineering
Officer / Surveyor of Works and 73 Assistant Engineers / Assistant Surveyors of Works.
The total strength of the Department is 983.
Functions and Responsibilities:
The Water Resources Department is in-charge of management and development of the
water resources in the State of Goa in the sweet water zone. The main function of the Department
is optimum, integrated development of the available water resources and its judicious utilization
in a scientific and sustainable manner as well as to provide infrastructure facilities.
The activities of the Water Resources Department are broadly classified as under:
Major & Medium Irrigation including Water Development, maintenance etc.
Minor Irrigation including Water Resources Development and Water Conservation and
maintenance thereof.
Command area Development (CAD).
Flood Control, Anti-sea Erosion and Drainage including anti-landslide and maintenance
works.
Western Ghats Development Programme (WGDP) i.e. Hill Area Development in the
talukas of Sattari, Sanguem, Dharbondora and Canacona.
Supplying raw water to industrial estates and water supply treatment plants.
2
Organisational Chart of Water Resources Department:
Personnel/ Staff in the office of Chief Engineer, WRD
3
Superintending Engineer, C.P.O, H.Q. Porvorim
Superintending Engineer, Circle I,
H.Q. Porvorim
Superintending Engineer, Circle IV, H.Q. Gogal, Margao
Additional Chief Engineer (Madei Basin) H.Q Porvorim
Surveyor of Works, H.Q.
Porvorim
Executive Engineer,W.D. V,
H.Q. Sanquelim
Executive Engineer,
W.D. X, H.Q. Pajimol,
Sanguem
Executive Engineer,W.D. XIV,
H.Q. Gogal, Margao
Superintending Engineer, Circle III, H.Q. Gogal,
Margao
Executive Engineer,W.D. IX,
H.Q. Gogal, Margao
Executive Engineer,W.D. XIII,
H.Q. Gogol, Margao
Executive Engineer,W.D. XII,
H.Q. Gogal, Margao
Executive Engineer,W.D. XI,
H.Q. Rawanfond,
Margao
Executive Engineer,
W.D. II, H.Q. Rawanfond,
Margao
Executive Engineer,
W.D. I, H.Q.
Porvorim
Statistical Cell, WRD,Porvorim
Engineering Officer, H.Q. Porvorim
Dy. Director of Admn, H.Q. Porvorim
Accounts Officer, H.Q. Porvorim
Special Land Acquisition
Officer (South), H.Q. Gogal,
Margao
Chief Engineer, Water Resources, H.Q. Porvorim
Additional Chief Engineer (Irrigation Project) H.Q
Porvorim
Surveyor of Works.H.Q. Porvorim
Superintending Engineer, Circle IIH.Q. Karaswada,
Mapusa
Special Land Acquisition
Officer (North), H.Q.
Colvale, Karaswada
Executive Engineer,W.D. VI,CADAH.Q.
Bicholim
Executive Engineer,W.D. VII,RBMCH.Q.
Dhargal
Executive Engineer,W.D. VIII,
LBMCH.Q. Colvale,Karaswada
Superintending Engineer, Circle V, H.Q. Gogol, Margao
Executive Engineer,W.D. III,
H.Q. Ponda
Director (Admn), H.Q. Porvorim
Programmes and Activities:
The water resources of the State have been assessed at 8,570 MCM by the Central
Water Commission (CWC). However, due to topographical, geological and other constraints
the level of utilization of water resources is expected to be about 1,465 MCM (1,125 MCM
surface + 340 MCM ground water). An estimated 89,660 ha of agricultural area can be brought
under irrigation as indicated in the Master Plan of the State Water Resources, out of which
82,260 ha will be by surface water and 7,400 ha by ground water.
It is estimated that the State’s total water requirement by 2051 A.D. could be about
8,030 MCM. As against this requirement, the total surface water resources that can be
conserved is projected as 1,585 MCM. The Central Ground Water Board (CGWB), in their
report on ‘Dynamic Ground Water Resources of Goa State – March 2011, has estimated the
available ground water sources in the State as 145.43 mcm and the gross annual draft is 41.14
mcm. The stage of ground water development is 28%. Hence Goa is safe from ground water
development point of view.
Two Panels of Experts have prepared Master Plans for use of water resources of 4 river
basins in the State viz. Mandovi, Zuari, Talpona and Galgibag covering about 77% of the
geographical area of the State. Feasibility studies of the water development projects identified
in the Master Plans have been initiated in a phased manner. These projects have been accorded
priority in view of the flourishing tourism industry and the increasing domestic and industrial
water supply needs of the State up-to 2051. However, some of the projects are facing delays in
implementation for reasons such as the reservoir area, dams/canal area required for construction
purpose falling in wild life sanctuaries, reserved forest areas, areas resembling forests in nature
etc. Efforts are being made to obtain the required clearances from the competent authorities.
The break-up of the total budget for water resources during the years 2016-17 and 2017-
18 is as under:
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Water Resources Department Non-Plan Plan TotalBudget Estimate 2016-17 9,810.75 23,874.19 33,684.94Revised Estimate 2016-17 9,810.75 23,874.19 33,684.94Expenditure 2016-17 8,882.16 20,629.13 29,511.29Budget Estimate 2017-18 9,125.69 24,434.32 33,560.01
4
I MAJOR AND MEDIUM IRRIGATION
Under Major and Medium Irrigation, the Salaulim, Tillari and Anjunem Irrigation
Projects and Water Development works are provided for. While Hydrology Project Phase- II
and National Cyclone Risk Mitigation project, is a World Bank funded project of the
Government of India. All the works of this sector are being executed under the budget heads,
2701- Revenue & 4701 – Capital Outlays.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 4,399.10 5,751.69 10,150.79Revised Estimate 2016-17 4,399.10 5,751.69 10,150.79Expenditure 2016-17 3,677.00 3,789.43 7,466.43Budget Estimate 2017-18 4,084.31 9,768.54 13,852.85
The total irrigation potential created under major and medium irrigation is 35,548 ha
(ultimate) including 486 ha created during 2016-17. A target of 197.00 ha of potential creation
is fixed for the year 2017-18.
1. Salaulim Irrigation Project
The Salaulim Irrigation Project is located on river Guleli, a tributary of river Zuari in
Sanguem Taluka, South Goa District. The project was completed in May 2007 and a total
irrigation potential of 9,538 Ha (CCA) i.e. 14,106 Ha (Ultimate) has been created. The project
caters to the irrigation needs of Sanguem, Quepem and Salcete Talukas. In addition, the scheme
also provides water for domestic and industrial use to Mormugao, Sanguem, Quepem and
Salcete Talukas to the extent of 160 MLD. Permission has also been granted to the PWD for
use of 220 MLD of water over and above the present utilization of 160 MLD for expansion of
the Salaulim water supply scheme. Beginning about February, when the overflow over the Opa
weir of the Opa Water Works on the Khandepar river ceases, 50 MLD water is transferred by
pumping from the Salaulim main canal to Kalay river, a tributary of the Khandepar to make up
the shortage of water at Opa. The pumping continues till the arrival of the monsoons. The
Salaulim project is being operated successfully with 28 Water Users’ Associations having been
formed in the command to take over the charge of water distribution networks. Funds are
proposed towards maintenance, modernization and strengthening of the entire canal system (in
phases) to restore efficiency and ensure better irrigation coverage.
5
Improvement and Re-lining to SIP main canal from Ch.3.100 kms to 4.100 kms,
Ch.4.100 kms to 5.170 kms and Ch.10.10 kms to 11.10 kms in Sanguem Taluka is in process.
The works proposed are foundation exploration for proposed construction of jackwell
for Naikaband at Vaddem Rehabilitation site in Sanguem Taluka at Rs.711.00 lakhs, providing
and laying parallel 500 mm dia ductile iron pipeline for gravity main from Tank No.II at Lift
Irrigation Scheme Naikaband, Vaddem Rehabilitation Site at Rs.131.00 lakh.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 1,916.10 1,344.60 3,260.70Revised Estimate 2016-17 1,916.10 1,344.60 3,260.70Expenditure 2016-17 1,554.01 1,244.53 2,798.54Budget Estimate 2017-18 1,670.42 1,516.52 3,186.94
The SIP rehabilitation programme for the Project Affected People (PAP) is almost
complete with provision of all basic amenities. Based on initial surveys the number of project
affected families had been determined as 643 nos. Out of these identified PAP families, 552
nos. of families opted for the rehabilitation facilities offered by the Government. They were
rehabilitated at two rehabilitation sites at Vaddem and Valkinim in Sanguem taluka - 412 nos.
of families at Vaddem and 140 nos. at Valkinim. Out of the remaining 91 nos. of families that
did not opt for rehabilitation, 19 nos. were weeded out as being families whose names had got
repeated or who had already availed rehabilitation facilities. The claims for rehabilitation
facilities of the remaining 72 nos. of PAP families were being considered by a Sub-Committee
set up by the Government on the recommendation of the Rehabilitation Committee and have
been allotted a plot of 400 sq.mtr for housing purpose.
When the reservoir was filled to capacity, agricultural plots allotted to PAPs at Vaddem
were found to fall under partial or full submergence. Several measures have been instituted to
compensate these PAPs for their loss. One of these is the payment of a one-time cash
compensation of Rs.4.00 lakh in lieu of the one Ha agricultural plot as a full and final
settlement. Orders have been issued for payment of the compensation to 90 PAPs, among
whom 81 have already been paid the compensation. Claims of the remaining 9 PAPs were
pending for want of proper documents.
6
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 50.00 50.00Revised Estimate 2016-17 - 50.00 50.00Expenditure 2016-17 - 50.52 50.52Budget Estimate 2017-18 - 100.00 100.00
2. Tillari Irrigation Project
The Tillari Irrigation Project, an inter-State joint venture of the Governments of
Maharashtra and Goa across river Tillari near village Tillari Wadi, in Sawantwadi Taluka of
Sindhudurg District in the State of Maharashtra is aimed at creating an ultimate irrigation
potential of 21,056 Ha for Goa State and is planned for completion by 2018, subject to
completion of land acquisition proceeding. This project will also provide 111.46 mcm of water
to meet the domestic, industrial and other non agricultural requirements of 73 villages in
Pernem, Bardez, Bicholim and Tiswadi talukas.
The latest estimated cost of the project based on 2008-09 rates is 1,612.15 crore and the
liability of Goa Government works out to Rs.1,051.69 crore . The cost of canal network in Goa
is Rs.524.24 crore. The total expenditure incurred by the Government of Goa up-to March,
2017 is Rs.1214.95 crore which includes an amount of Rs.470.02 crore advanced to the
Government of Maharastra towards the share cost for common works. The total irrigation
potential created is 16,822 ha ult. Potential utilized is 4,653 ha. 42 nos. of Water Users’
Associations have been formed under this project to utilize the benefits under Command Area
Development. Funds are proposed towards completion of balance canal network in Goa, land
acquisition for construction of distributaries and payment of Goa’s share cost to the
Government of Maharashtra towards common works as well as to clear the backlog of payment
etc. Creation of 197 ha of irrigation potential is contemplated during the year 2017-18.
The works of construction of Pilgao Narva Distributory of LBMC of TIP from
ch.4.825km to ch.8.670km and ch.8.670km to ch.10.72km of Pilgao village in Bicholim Taluka
amounting to Rs.876.00 lakh, construction of Pilgao Narva Distributory of LBMC of TIP from
ch.1470m to ch.2020m at Bicholim and Pilgao village in Bicholim Taluka amounting to
Rs.388.00 lakh and construction of Sanquelim distributory from ch.7.36km to ch.10.48km of
7
LBMC of TIP at village Bordem and Sarvan in Bicholim Taluka amounting to Rs.248.00 lakh
are in progress.
The present work status of the project is as follows:Sl. No. Component of the Project % of Completion
I - in MaharashtraI Head Works 100 %1 Main Dam (Earthen) 100 %2 Masonry Dam 100%3 Tail Channel 100%4 Irrigation cum Power Outlet 100%5 Terwanmedhe Pick up Weir 100%6 Left Bank Main Canal 100%7 Right Bank Main Canal 100%8 Banda Branch Canal 51% (earthwork)
II – In GoaSl. No. Name of Canal Progress
1 Right Bank Main Canal 100 %2 Left Bank Main Canal 100 %3 Sanquelim Branch Canal 100%4 Distributaries on LBMC 77%5 Distributaries on RBMC 92%
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 840.00 1,547.80 2,387.80Revised Estimate 2016-17 840.00 1,547.80 2,387.80Expenditure 2016-17 594.70 790.94 1,385.64Budget Estimate 2017-18 671.68 1,347.40 2,019.08
The rehabilitation programme of TIP is dealt by Maharashtra project authorities as per
the Maharashtra Rehabilitation and Re-settlement Act 1986. An area of 20.58 Ha. in Sal
village, Bicholim Taluka of Goa has been acquired and handed over to the Collector,
Sindhudurg District, Government of Maharashtra for rehabilitation purpose. After development
and demarcation of plots, at present, 95 families are residing in the colony and the asphalting of
internal road was recently completed at a cost of Rs.1.08 crore. Individual power connections
have been released to all the 95 households by depositing connection charges by GTIDC. A
proposal for issue of form I and XIV to the PAPs is under process. It was agreed to pay a
onetime settlement by way of payment of compensation of an amount of Rs.5.00 lakh per
family (Rs.3.665 lakh by Government of Goa and Rs.1.335 lakh by Government of
Maharashtra to the PAP’s of TIP in lieu of service in Government sector. As on 27.12.2016
8
Goa has released payments to 288 PAP’s out of the 504 whose PAN details have been received
from the Collector, Sindhudurg.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 0.50 0.50Revised Estimate 2016-17 - 0.50 0.50Expenditure 2016-17 - - -Budget Estimate 2017-18 - - -
Compensation to the Affected Persons of Tillari Irrigation Project
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 1,000.00 1,000.00Revised Estimate 2016-17 - 1,000.00 1,000.00Expenditure 2016-17 - 1,407.36 1,407.36Budget Estimate 2017-18 - 600.00 600.00
a) Accelerated Irrigation Benefit Programme (AIBP)
The Tillari Irrigation Project is included for central assistance under the programme of
Accelerated Irrigation Benefit Programme (AIBP) of Ministry of Water Resources,
Government of India, in the form of grants to the tune of 25% of the annual allocation made in
the State Budget for the project. The State has received Central assistance to the tune of
Rs.255.42 crore so far (i.e. loan assistance of Rs.113.30 crore and grants of Rs.142.12 crore).
Balance amount of grant of Rs.8.18 crore was proposed to be availed in 2016-17.
Year-wise details of Loan/grants released by GoI (Rs. in Crore)Year CLA/Grants
released Expenditure incurred on AIBP components
Total Works Estt. TotalExp upto 1999-2000 -- 175.08 7.06 182.142000-01 58.30 68.84 3.16 72.002001-02 55.00 59.16 2.95 62.112002-03 - 11.14 3.27 14.412003-04 - 3.17 3.00 6.172004-05 - 6.06 2.74 8.802005-06 - 64.37 3.19 67.562006-07** 20.25 90.57 4.08 94.652007-08** 29.25 94.19 4.98 99.172008-09** 24.12 97.79 6.66 104.452009-10** 20.25 86.63 8.85 95.482010-11** 20.00 80.52 12.04 92.562011-12** 20.25 62.68 10.69 73.372012-13** 8.00 48.94 1.65 50.592013-14** - 22.92 9.34 32.262014-15** - 19.37 9.24 28.612015-16** (Proposed - 8.40) - 3.40 6.79 10.192016-17** (Proposed - 8.18) - 4.73 6.86 11.59Total 255.42 999.56 106.55 1106.11
9
** Assistance is in the form of grants
b) Command Area Development and Water Management (CAD&WM) Programme
CAD works under the Tillari Irrigation Project have been approved for central
assistance under the CAD&WM Programme of Ministry of Water Resources, beginning from
the year 2007- 08 and grants to the tune of Rs.397.38 lakh have been received as under:
(Rs. in lakh) Year Expenditure
incurred by the State
Central Assistance expected
Central Assistance received
2006-07 173.88 - -2007-08 220.47 29.93
131.552008-09 388.67 93.912009-10 816.82 94.012010-11 1,300.00 115.09 80.562011-12 1,669.68 180.55 6.422012-13 500.00 225.24 178.85 2013-14 1500.00 249.76 -2014-15 748.09 337.00 -2015-16 726.92 337.62 -2016-17 523.02 108.00 -Total 397.38
c) Loan from NABARD
Status of sanction and disbursement of loan of the Project under Rural Infrastructure
Development fund from NABARD is as under:
Amount in CroreRIDF LOAN FROM NABARD BALANCE
AMOUNTREMARK
AMOUNT SANCTIONED
AMOUNT RECEIVED
1 2 3 4 5XIV 85.50 85.50 -- Loan amount received from
NABARD has been fully utilized and work have been completed 100% against which it was raised
XV 64.13 64.13 --XVI 57.00 57.00 --XVII 64.12 64.12 --XVIII 70.65 65.84 4.81 Loan amount of Rs.313.33 crore
is drawn against expenditure incurred up to February, 2017 during 2016-17
XIX 51.30 28.35 22.95 Loan amount of Rs.108.85 crore will be drawn against expenditure incurred up to February 2017 during 2016-17.
XXI 51.06 10.21 40.85 Loan amount of Rs.10.21 crore will be drawn against expenditure incurred up to January 2017 during
10
2016-17.
3. Anjunem Irrigation Project
This medium irrigation project has been completed in 1989 with a full irrigation
potential of 2,100 Ha CCA i.e. 4,620 Ha Ult. and is now under successful operation. The
project caters to the irrigation and water supply needs of Sattari and Bicholim Talukas. The
entire command area of the project has been covered under Participatory Irrigation
Management (PIM) and 16 Water Users’ Associations (WUAs) have been formed and given
charge of water distribution networks.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 589.00 200.10 789.10Revised Estimate 2016-17 589.00 200.10 789.10Expenditure 2016-17 482.67 87.83 570.50Budget Estimate 2017-18 513.33 182.82 696.15
Funds are proposed towards construction of office building for 2 Sub-Divisional Offices
(WD-V) of the Water Resources Department at Kerim, Sattari, providing chain-link fencing of
dam site and construction of watch tower for the dam, providing concrete protection wall
beyond the silting basin of the pick-up weir of the dam and the work of improvement to
approach road for the dam and providing railing from entrance gate to masonry dam.
Funds are proposed towards extension of compound wall to the office complex of (WD-
V), Water Resources Department, the drilling and grouting for seepage control of the body of
the dam, improving the approach road to the drainage gallery. Comprehensive Seismic
Tomography Test for the Anjunem Dam at Keri, Sattari to determine the weak zones is in
progress. Maintenance Contract of Reservoir Operation and management system for inflow
forecasting, flood routing, water accounting and gallery pump control for A.I.P. Dam at Kerim
in Sattari Taluka for the period of 5 years from December, 2015 to December, 2020, is done
and is operating.
Besides, routine works such as renovation, development, maintenance of infrastructure
created under the project and weeding/clearing of wild vegetation/ grass/ trees will be carried
out to restore efficiency of the canal system as the project is situated in rugged and hilly terrain.
4. Water Development
11
Water Development activities cover implementation of (a) Hydrology Project Phase II
(b) Survey and Investigation, Training, Research and Others.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 1,054.00 1,602.49 2,656.49Revised Estimate 2016-17 1,054.00 1,602.49 2,656.49Expenditure 2016-17 1,045.62 208.25 1,253.87Budget Estimate 2017-18 1,228.88 6,021.60 7,250.48
a) Hydrology Project Phase – II:
This Rs.22.64 crore project of Ministry of Water Resources, Government of India is
being implemented in the State, by availing external aid from World Bank where in along with
other States and central agencies, Goa is one of the participants. The project commenced on
05/04/2006 and the closing date was 31/05/2014. The project has set up infrastructure to
improve and strengthen the institutional and technical capability of the Department to collect,
measure, analyze, disseminate and use data of various hydrological parameters viz. surface
water, ground water, hydrometeorology, water quality for the establishment of a well
developed and reliable information system for water resources planning in the State.
Utilization of funds under the Project (Rs. in lakh) Year State Outlay Expenditure
State Share
IBRD Assistance
Total State Share
IBRD Assistance
Total
Estimated cost of the project (Original) 393.00 1871.00 2264.002006-07 No provision was made during this year 4.45 18.76 23.212007-08
70.00 280.00 350.00 10.52 31.68 42.202008-09 94.31 377.26 471.57 29.23 122.99 152.052009-10 156.50 469.50 626.00 71.36 280.20 344.422010-11 111.25 333.75 445.00 60.05 274.93 332.012011-12 70.37 460.63 531.00 58.89 385.48 444.372012-13 103.73 414.92 518.65 54.29 217.18 271.472013-14 165.80 663.20 829.00 49.36 197.44 246.802014-15 49.80 199.20 249.00 39.51 158.03 197.54
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 645.00 645.00Revised Estimate 2016-17 - 645.00 645.00Expenditure 2016-17 - 143.80 143.80Budget Estimate 2017-18 - 716.88 716.88
(b) National Hydrology Project (NHP):
12
Goa’s performance under HP-II has been remark able. As a sequence to HP-II, the
World Bank has introduced HP-III named as National Hydrology Project (NHP). The
National Hydrology Project would not only provide additional financial support but also offer
excellent opportunity to introduce new technologies into water resource sector planning &
management. National & international technical expertise would be available to further
strengthen the HIS network. Exposure of stakeholders by way of National and International
study tours, updating of skills through various training courses conducted by experts from
Central Government Agencies, World Bank Experts will also reflect in improved efficiency of
staff leading to better delivery of service and development of human resource.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 340.00 340.00Revised Estimate 2016-17 - 340.00 340.00Expenditure 2016-17 - 1.78 1.78Budget Estimate 2017-18 - 2,440.00 2,440.00
(c) Survey and Investigation, Training, Research and Others:
Provision is made for creation of infrastructure for development of water resources,
survey and investigation, training, research and evaluation studies of projects identified for
implementation as envisaged in the Master Plans prepared for Talpona and Galgibag river
basins as also other non-master plan projects identified in the State.
Details of Plan / Non- Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 802.50 86.50 889.00Revised Estimate 2016-17 802.50 86.50 889.00Expenditure 2016-17 705.44 29.91 735.35Budget Estimate 2017-18 874.96 76.70 951.66
(d) Mandovi Medium Irrigation Project:
This irrigation project had been envisaged way back in the nineties. Survey,
investigations and foundation exploration works had been carried out. Since then, the project
has been grounded for want of environmental clearance. A token provision of Rs.0.10 lakh is
proposed for this project.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 0.50 0.50Revised Estimate 2016-17 - 0.50 0.50
13
Expenditure 2016-17 - - -Budget Estimate 2017-18 - 0.10 0.10
(e) Mandovi River Basin Irrigation Project:
There are 61 nos. of irrigation projects identified in the Mandovi river basin for
implementation and the same will be taken up in phases depending upon the needs and techno
economic feasibility. Detailed survey and investigation of 8 projects is underway and one
project is in progress and awaiting forest clearance.
Provision is made to continue survey & investigation, foundation exploration works of
the identified projects depending upon the needs and techno economic feasibility. Provision
also includes incidental expenditure involved in the Madei interstate river water dispute
tribunal (court fees for sittings before the Tribunal, salary of staff of Office of Addl. Chief
Engineer, Madei basin).
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 251.50 80.00 331.50Revised Estimate 2016-17 251.50 80.00 331.50Expenditure 2016-17 340.18 0.00 340.18Budget Estimate 2017-18 353.92 0.10 354.02
(f) Zuari River Basin Irrigation Project:
A token provision is made to take up survey & investigation of irrigation projects in the
Zuari River Basin. A total of 119 nos. of projects have been identified in the Zuari basin and
are proposed to be taken up in a phased manner after completing the survey, investigation and
preparation of feasibility studies.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 0.50 0.50Revised Estimate 2016-17 - 0.50 0.50Expenditure 2016-17 - - -Budget Estimate 2017-18 - 0.10 0.10
(g) The National Cyclone Risk Mitigation Project (NCRMP):
It is a flagship program, the first World Bank funded project in India exclusively
focusing on ex-ante disaster risk mitigation. It is being implemented by the National Disaster
Management Authority (NDMA), New Delhi with support from the Ministry of Home Affairs
14
(MHA), Government of India, focusing on cyclone prone coastal States and UTs. The NCRMP
is structured in phases, based on the risk levels of the states and their implementation
readiness. Phase I, under implementation since 2010, includes the states of Odisha and Andhra
Pradesh. In Phase II, the states of Gujarat, Maharashtra, Kerala, West Bengal, Karnataka, and
Goa are being included. Government of India approved Phase - II of NCRMP in July, 2015
with an outlay of Rs.140.00 Crore for Goa and closure by March, 2020.
The project has the following four components: A) Early Warning Dissemination
Systems; B) Cyclone Risk Mitigation Infrastructure; C) Technical Assistance for Multi-Hazard
Risk Management; D) Project Management and Implementation Support.
Components A and C will be implemented by NDMA with support from the states.
Component B will be implemented by the different departments of Government of Goa as
below:
Sl. No.
Cyclone Risk Mitigation Infrastructure
No. to be constructed
Department executing the infrastructure
1 Multi Purpose Cyclone Shelter 40 Nos Water Resources Department2 Underground Cabling 25 LT Electricity Department3 Saline Embankment 30 Kms Water Resources Department
(Rs. In Crore)Year Total Projected Outlay Funds Released upto
31.03.2017Expenditure upto 31.03.2017
State Share
IBRD Assistance / GOI Share
Total State Share
IBRD Assistance / GOI Share
Total State Share
IBRD Assistance / GOI Share
Total
2015-16 27.75 112.25 140.00 0.00 0.41 0.41
2016-17 0.00 24.16 24.16 0.00 0.33 0.33
Total 0.00 24.16 24.16 0.00 0.74 0.74
Present Progressi. Early Warning Dissemination System: Contract has been signed with consultancy
firm.
ii. Cyclone Risk Mitigation Infrastructure: Multipurpose cyclone shelter (MPCS): 12
sites have been handed over to WRD for construction of MPCS. Model Detailed
Project Report submitted to World Bank for approval. The works for 7 sites have
been tendered.
iii. Saline Embankment: For Diwar Bund Hydrological study is completed and design
report Volume I is reviewed by World Bank. Order for Appointment of TERI as a 15
firm for carrying out Environment and Social Impact Assessment (ESIA) study for
saline embankment is issued on 18/11/16 and the study is in progress.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 449.99 449.99Revised Estimate 2016-17 - 449.99 449.99Expenditure 2016-17 - 32.76 32.76Budget Estimate 2017-18 - 2,787.72 2,787.72
II. MINOR IRRIGATION
The total irrigation potential that can be created under Minor Irrigation is 32,900 ha
C.C.A. (25,500 ha by surface water and 7,400 ha by ground water) i.e. 49,350 ha.ult. The total
potential created in the State under minor irrigation up-to March 2017 is 30,584 ha ult. (26,632
ha by surface water and 3,952 ha by ground water) and the corresponding utilization is to the
tune of 25,813 ha.ult. All the works of this sector are being executed under the budget heads
2702 - Revenue & 4702 – Capital Outlay.
Towards covering maximum cultivable land under irrigation, Surface Water schemes
such as storage tanks, canals, diversion structures/bandharas, lift irrigation schemes and
interlinking of rivers are implemented. So also, Ground Water schemes like bore wells, open
irrigation wells, tube wells, subsidy to farmers for construction of new open wells/bore wells,
post monsoon water as well as roof top rain water harvesting scheme etc are implemented to
achieve optimum water potential to augment water supply needs of the State. Other works
include conservation of water resources and water shed development. It is proposed to create an
irrigation potential of 170 ha during 2017-18.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 4,326.05 8,215.00 12,541.05Revised Estimate 2016-17 4,326.05 8,215.00 12,541.05Expenditure 2016-17 4,173.49 8,559.23 12,732.72Budget Estimate 2017-18 4,238.03 6,695.11 10,933.14
16
1. Direction and Administration
All minor irrigation schemes including those implemented under the Western Ghats
Development Programme as well as flood control, drainage and anti-sea erosion works are
being implemented through the Minor Irrigation Circle - I of the Department. These schemes
are wide spread all over the State even to its remote areas. Since provision for establishment is
not available for Flood Control and Western Ghats Development Programme, funds are
provided under this unit of appropriation for construction of tube wells, purchase of vehicles,
machinery and equipment, survey and investigation, establishment and centage charges,
salaries of staff, office expenditure, travel, rent, rates and taxes etc.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 1,127.95 502.50 1,630.45Revised Estimate 2016-17 1,127.95 502.50 1,630.45Expenditure 2016-17 982.16 516.74 1498.90Budget Estimate 2017-18 1,133.42 902.63 2,036.05
Funds earmarked for machinery and equipment component are as under:
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 55.00 51.50 106.50Revised Estimate 2016-17 55.00 51.50 106.50Expenditure 2016-17 51.17 55.37 106.54Budget Estimate 2017-18 31.41 93.38 124.79
GROUND WATER:
2. Investigation and Development of Ground Water Resources
This scheme covers monitoring of water levels, quality of ground water with special
emphasis on coastal areas and industrial estates, research studies on dynamic ground water
potential in the coastal belts, ground water contamination, water pollution, artificial recharge of
ground water, working out representative infiltration rate of different soils, storage capacities
and ground water draught for different areas. Provision also includes salary component of the
Sr. Hydro-geologist.
Besides, it is proposed to lift water from ground aquifers to the surface by providing
pumps to benefit small and marginal farmers in the remote areas by constructing open dug 17
wells. For this purpose, it is proposed to strengthen the Ground Water Organization to look
after this programme.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 528.10 82.50 610.60Revised Estimate 2016-17 528.10 82.50 610.60Expenditure 2016-17 480. 44 59.89 540.33Budget Estimate 2017-18 535.20 72.84 608.04
3. Construction of Irrigation Wells Subsidy Scheme
This is a beneficiary oriented scheme under which subsidy is provided on a re-
imbursement basis to individuals/groups of farmers for construction of new open wells/bore
wells with a view to create additional ground water potential and boost agriculture including
horticulture in the State. The proportion of subsidy for shallow wells is 50% of the cost of the
well or Rs. 10,000/- whichever is less and in case of deep wells and bore wells it is 50% of the
cost or Rs. 75,000/- whichever is less. New works will be taken up as per the applications
received from the farmers.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 20.00 20.00Revised Estimate 2016-17 - 20.00 20.00Expenditure 2016-17 - 3.42 3.42Budget Estimate 2017-18 - 10.00 10.00
4. Water Shed Development and Ground Water Re-charge
Basically, this scheme is implemented by the Agriculture Department to take up water
shed development/ management and renovation/ improvement of existing traditional ponds to
cater to irrigation needs of the farmers. Hence, a token provision is made in the budget.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 1.00 1.00Revised Estimate 2016-17 - 1.00 1.00Expenditure 2016-17 - - -Budget Estimate 2017-18 - 0.05 0.05
5. Grants to Zilla Panchayat for Minor Irrigation Works
Under this scheme, financial assistance by way of grants is given to Zilla Panchayats to
take up minor irrigation works such as construction of wells, improvement of tanks and
18
providing distribution network of irrigation water from bandharas and LIS in their respective
areas. However, there is no progress under this scheme for want of proposals from the ZPs.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 1.00 1.00Revised Estimate 2016-17 - 1.00 1.00Expenditure 2016-17 - - -Budget Estimate 2017-18 - 0.10 0.10
6. Repairs and Renovation of Existing Wells
This is a beneficiary oriented programme to benefit the multi-users of the well, for
drinking or irrigation purpose which helps in promoting the conjunctive use of water and also
maintain the ground water structures in the state by individuals or farmers by extending them
grant-in-aid in the form of subsidy to maintain ground water structures and also the quality of
ground water in the state. Repairs of wells/electric pump and cleaning/dewatering of well will
be reimbursement up to a maximum of Rs.50000/-.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - - -Revised Estimate 2016-17 - - -Expenditure 2016-17 - - -Budget Estimate 2017-18 50.00 - 50.00
SURFACE WATER:
7. Construction and Deepening of Minor Irrigation Tanks
This scheme aims to create additional irrigation potential through construction of minor
irrigation tanks. It also covers renovation and repairs/ improvement and development/ de-silting
and maintenance of the existing tanks. During the year 2016-17, irrigation potential to the tune
of 72 ha has been created under this scheme and it is proposed to create another 60 ha during
2017-18.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 200.00 164.00 364.00Revised Estimate 2016-17 200.00 164.00 364.00Expenditure 2016-17 201.76 86.86 288.62Budget Estimate 2017-18 194.85 37.42 232.27
19
8. Construction of Lift Irrigation Schemes
This scheme is aimed at creation of additional irrigation potential by lifting water from
the existing surface water sources through electric water pumps and distributing it through
canal networks. Funds have been provided to complete on-going schemes and to construct new
ones. This also includes upkeep, repairs, renovation, up-gradation and improvement of the
existing lift irrigation schemes in the State and installation of pump-sets. During the year 2017-
18 it is proposed to create 80 ha.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 2,100.00 908.00 3,008.00Revised Estimate 2016-17 2,100.00 908.00 3,008.00Expenditure 2016-17 2,072.23 605.40 2,677.63Budget Estimate 2017-18 1,942.95 745.60 2,688.55
9. Other Diversion Schemes (Bandharas)
This scheme involves creation of additional irrigation potential through construction of
diversion schemes such as bandharas, weirs and micro canal networks to utilize the dry weather
base flows. These cost effective structures yield quick benefits to the farmers. During the year
2017-18 it is proposed to create 20 ha.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 70.00 531.00 601.00Revised Estimate 2016-17 70.00 531.00 601.00Expenditure 2016-17 79.26 362.32 441.58Budget Estimate 2017-18 68.31 326.37 394.68
10. Development of Water Resources for Domestic and Industrial Use (Inter-linking of
Rivers and Post-Monsoon Water Harvesting Structures)
The State has been successfully implementing the Water Resources Development
Programme, through post monsoon water harvesting by constructing a series of bandharas
across Khandepar, Assonora, Valvanti and Madei rivers as well as other rivers/rivulets to meet
the water requirement of the State in rural as well as urban areas. The programme aims at
augmenting water supply to water treatment plants especially during the lean season and also to
boost agriculture. Considering the success of the programme, the same is being continued as
these schemes help in augmentation of the future water requirement in the State. The State also
20
undertakes inter-linking of rivers by transferring/diverting water from surplus rivers to deficient
rivers to attain stability.
A total number of 404 bandharas have been completed on various rivers / nallahs holding
a total storage of 388.20 lakh cum. Work on 02 bandharas are in progress and another 14
bandharas are planned for implementation during the year 2017-18. Other works planned for
implementation are:
Proposed construction of protection wall to the side of river near bandhara L.I. Scheme
at Vaddem in Sanguem Taluka.
Construction of Open Type Bandhara cum Footbridge at ambe across Khandepar river
V.P. Dharbandora in Sanvodem Constituency.
Construction of raw water pumping station at Guirim for augmentation of multipurpose
tank at Housing Board Porvorim in Bardez Taluka is in progress.
The work of supplying raw water to the proposed 30 MLD Water Treatment Plant at
Tuem of PWD and to irrigate 165 Ha of command in Pednem, Tuem, Korgao and
Paliyem villages by pumping water from Chainage 22.00 km. of R.B.M.C. of T.I.P. at
Dhargal in Pernem Taluka, amounting to Rs.6288.51 lakh is in progress.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 300.00 5,000.00 5,300.00Revised Estimate 2016-17 300.00 5,000.00 5,300.00Expenditure 2016-17 357.64 6,174.49 6,532.13Budget Estimate 2017-18 313.30 4,000.00 4,313.30
11. Roof-Top Rainwater Harvesting Scheme
The Government has introduced the Roof Top Rainwater Harvesting Scheme during the
year 2008-09. Under the scheme assistance is provided in the form of subsidy on re-
imbursement basis for different User Groups for incorporating the roof-top rain water
harvesting system. Rates of subsidy to different users are: (i) individual households/residential
houses – upto 50% of cost incurred or Rs.50,000/- whichever is less (ii) residential complexes
and apartment buildings - up to 50% of the cost of the structures, or Rs.2.50 lakh, whichever is
less. (iii) commercial complexes and hospitality business - up to 50% of the cost of the
structures, or Rs.2.50 lakh, whichever is less and an additional incentive of 10% rebate in the
license fee. The Government of India, CGWB also institutes an annual award carrying a
21
citation and cash prize for the best rainwater harvesting practice. A Token Provision of funds is
made towards subsidies.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh) Non-Plan Plan TotalBudget Estimate 2016-17 - 5.00 5.00Revised Estimate 2016-17 - 5.00 5.00Expenditure 2016-17 - - -Budget Estimate 2017-18 - 0.10 0.10
III. COMMAND AREA DEVELOPMENT PROGRAMME (CAD)
The State has been implementing the CAD programme since 1980 in the command
areas of Salaulim Irrigation Project (SIP), and Anjunem Irrigation Project (AIP). The CAD
work of Anjunem is completed and that of Salaulim is almost completed. The objective of this
programme is to improve the utilization of the potential created and to optimize agricultural
production and productivity by integrating all the functions related to irrigation through a
multi-disciplinary team under Command Area Development Authority.
Provision is made for construction of field channels and water courses in the area where
potential has been created, so that maximum benefits are obtained from irrigation water.
Provision also covers farmers’ training, creation of infrastructure like rural roads in the
command areas of the projects and participatory irrigation management by forming Water
Users’ Associations (WUAs). The CAD work of Anjunem is completed and Salaulim is almost
completed. All the works of this sector are being executed under the budget heads 2705 -
Revenue & 4705 – Capital Outlays.
Details of Plan / Non-Plan Outlays and Expenditure (SIP & AIP) (Rs. in lakh)
Non-Plan Plan TotalBudget Estimate 2016-17 105.60 1003.00 1108.60Revised Estimate 2016-17 105.60 1003.00 1108.60Expenditure 2016-17 84.28 799.91 884.19Budget Estimate 2017-18 103.35 973.51 1,076.86
The CAD works of the Tillari Irrigation Project (TIP) are executed as per mapped
command area. From the year 2010-11, a separate provision has been made in the State budget
for implementation of CAD works of the Tillari irrigation project. During the year 2016-17, an
22
area of 22 ha has been covered under field channels and it is proposed to cover an area of
900.00 ha during 2017-18. It is also proposed to train 60 farmers in the command of Tillari.
Details of Plan / Non-Plan Outlays and Expenditure (TIP) (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 1,749.50 1,749.50Revised Estimate 2016-17 - 1,749.50 1,749.50Expenditure 2016-17 - 523.02 523.02Budget Estimate 2017-18 - 1,044.39 1,044.39
IV – FLOOD CONTROL, ANTI SEA EROSION & DRAINAGE
This scheme provides for works to prevent damage to property against floods and
destructive sea-erosion and drainage congestion especially during the monsoons. There are 3
components under this scheme. Viz. (1) Flood control (2) Anti-sea erosion and (3) Drainage.
All the works of this sector are being executed under the budget heads 2711 - Revenue & 4711
– Capital Outlays.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 980.00 6,930.00 7,910.00Revised Estimate 2016-17 980.00 6,930.00 7,910.00Expenditure 2016-17 947.39 6,768.72 7,716.11Budget Estimate 2017-18 700.00 5,750.05 6,450.05
Physical Targets and Achievements
Name of the Scheme/Sub-Schemes UnitAnnual Plan
2016-17 Achievement
Annual Plan 2017-18 Target
Length Protecteda) Flood Control Kms. 4.900 3.000b) Anti-Sea Erosion Kms. 1.091 0.800c) Drainage Kms. 3.831 4.200Total Kms. 9.822 8.000
1. Flood Control
In order to minimize the adverse impact of floods in highly susceptible areas of the
State during the monsoons, flood protection and preventive measures are being implemented
for protection of property, life and crops. These include strengthening, heightening and 23
improvement of existing flood protection bunds, de-silting and improvement of water ways of
the nallahs, construction of flood embankments, concrete retaining walls, installation of pump
sets at critical locations to evacuate the flood waters so as to control and regulate the water
levels, widening of the rivers at bottlenecks, regulation of discharge through reservoirs etc.
The warning levels and high flood levels/ danger levels on all the main rivers and its
tributaries during the monsoons have been marked to monitor the flood situation in highly
prone areas like Sanquelim, Bicholim, Ponda and Cuncolim to ensure that flooding does not
pose danger to life and property. Besides, flood forecasting and warning services like sirens
and lighting masts are installed at crucial locations such as Sanquelim and Bicholim to warn the
residents of impending floods. During 2017-18, it is also proposed to implement flood
protection measures for a length of 3.000 km.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 800.00 3,400.00 4,200.00Revised Estimate 2016-17 800.00 3,400.00 4,200.00Expenditure 2016-17 775.89 3,118.25 3,894.14Budget Estimate 2017-18 600.00 2,700.00 3,300.00
ii) Anti Landslide Measures
An amount of Rs.50.00 lakh is earmarked for implementing anti-landslide measures.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 100.00 100.00Revised Estimate 2016-17 - 100.00 100.00Expenditure 2016-17 - 98.93 98.93Budget Estimate 2017-18 - 50.00 50.00
iii) Anti-Sea-Erosion Works
Goa has a long coastline admeasuring 105 kms from Terakol in Pernem, North Goa, to
Polem in Canacona, South Goa. About 25.02 kms of Goa’s coastline is severely affected by sea
erosion especially the beaches in Pernem, Bardez, Tiswadi, Quepem, Canacona and Salcete
talukas. Out of the affected length, a length of 7.180 Kms is critically damaged.
In order to tackle this problem, the State is implementing a number of anti-sea erosion
measures like stepped sea walls, concrete blocks, revetments, dykes, earthen embankments/
sand bag embankments, rubble wall protected by geo-grid nets, rubble mounds, tetrapods,
rubble sausages, concrete/ granite blocks, sloping apron walls, gabions and use of geo-tubes etc 24
to reduce damages along the seashore in the affected areas. Based on the recommendations of
the Central Water Power and Research Station (CWPRS) Pune, and considering the site
specific conditions of waves, bathometry, currents, beach profile etc., the Government is
implementing remedial anti-sea erosion measures in a phased manner.
During the year 2016-17, anti-erosion works have been taken up and a length of 1.091
km has been covered during the year. It is proposed to protect a length of 0.800 km. during
2017-18.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 180.00 1,130.00 1,310.00Revised Estimate 2016-17 180.00 1,130.00 1,310.00Expenditure 2016-17 171.50 1,086.50 1,258.00Budget Estimate 2017-18 100.00 900.00 1,000.00
Under Goa’s Golden Jubilee package for anti-sea erosion and beach nourishment,
proposals have been prepared for protecting about 7.18 Kms of affected coastline involving a
financial outlay of about Rs.85.67 crore with recommendations from Central Water and Power
Research Station, Kadakwasla. During the period from 2012 to 2017, an amount of Rs.
2,912.17 lakh has been utilized to take up works of urgent nature to protect a stretch of 2.50
km. of coastline in Keri (Pernem), Anjuna (Bardez) and Candolim (Bardez).
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 450.00 450.00Revised Estimate 2016-17 - 450.00 450.00Expenditure 2016-17 - 415.85 415.85Budget Estimate 2017-18 - 500.00 500.00
iv) Drainage
Various measures are adopted to improve the drainage system in the State by removing
congestion from the rivers and nallahs by desilting, river training, etc. not only in the coastal
belts but also in urban areas which get flooded due to congestion of the drains particularly
during the monsoons. Outlay is proposed to take up construction, extension, covering of
nallahs, land acquisition for improvement of nallahs, development and desilting of nallahs,
maintenance, repairs and renovations of retaining walls of nallahs, removal of drainage
congestion etc. in a phased manner and on a mission mode. During the year 2016-17,
25
improvement works have been implemented for a length of 3.831 km. and a target of 4.200 km.
is fixed for the year 2017-18.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 1,100.00 1,100.00Revised Estimate 2016-17 - 1,100.00 1,100.00Expenditure 2016-17 - 1,652.04 1,652.04Budget Estimate 2017-18 - 1100.00 1100.00
V. INTEGRATED HILL AREA DEVELOPMENT PROGRAMME (WESTERN GHATS
DEVELOPMENT PROGRAMME)
Sattari, Sanguem, Dharbondora and Canacona are the 4 talukas covered under WGDP
in Goa comprising 46% of the total area of the State. The total area of these 4 talukas is
1,678.32 sq. kms of which the cultivable area is 398.11 sq. kms. All minor irrigation works
implemented under this sector are executed under the budget heads 2551 - Revenue & 4551 –
Capital Outlays.
Appropriate planning of irrigation infrastructure is essential to improve the economic
status of the farming community of these hill areas. Hence, minor irrigation schemes with
smaller gestation period are adopted to ensure regular irrigation for the farming community to
optimize their agricultural production.
Schemes such as open wells, bore wells and tube wells are taken up under Ground Water
by tapping water from the ground aquifers and lifting the same to the surface by providing
pumps. Schemes such as tanks, bandharas, canals and lift irrigation are implemented under
Surface Water. Bandharas are constructed across flowing nallahs and rivulets to create
additional irrigation potential. They also help improve the perennial springs by creating storage
on the up-streams. Distribution of water to the fields is also improved by providing half round
pipe canals. Under lift irrigation schemes (LIS), water is lifted from the existing surface sources
such as rivulets/nallahs and distributed through canal networks. Total irrigation potential created
is 4,224 ha of which 5 ha have been created during 2016-17. Irrigation potential of 16 ha is
expected to be created during 2017-18.26
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 225.00 225.00Revised Estimate 2016-17 - 225.00 225.00Expenditure 2016-17 - 188.82 188.82Budget Estimate 2017-18 - 202.62 202.62
Scheduled Caste and Scheduled Tribes Sub-Plan Component
VI. DEVELOPMENT OF SCHEDULE CASTES SCHEME
Provision is made for implementation of the SC Sub-plan under the budget sub-head
789.
Details of Plan / Non-Plan Outlays and Expenditure (Rs. in lakh)Non-Plan Plan Total
Budget Estimate 2016-17 - 50.00 50.00Revised Estimate 2016-17 - 50.00 50.00Expenditure 2016-17 - - -Budget Estimate 2017-18 - 0.20 0.20
The scheme-wise break-up of outlay and target proposed for the year 2016-17 is as
follows:
(Rs. in lakh)Schemes Proposed Outlay
2017-181. Major & Medium Irrigation 0.102. Minor Irrigation -3. Command Area Development 0.054. Flood Control, Anti- sea Erosion & Drainage 0.05 TOTAL 0.20
Schemes Achievement 2016-17
Physical Targets 2017-18
1. Major & Medium Irrigation
- -
2. Minor Irrigation - -3. Command Area Development
- -
4. Flood Control, Anti- sea Erosion & Drainage
- 0.050 km.
27
VII. DEVELOPMENT OF SCHEDULE TRIBES SCHEME
Provision is made for implementation of the ST Sub-plan under the budget sub-head
796.
Non-Plan Plan TotalBudget Estimate 2016-17 - 1,706.20 1,706.20Revised Estimate 2016-17 - 1,706.20 1,706.20Expenditure 2016-17 - 1,147.26 1,147.26Budget Estimate 2017-18 - 1,100.15 1,100.15
The scheme-wise break-up of financial and physical targets for the year 2017-18 are as
follows:
(Rs. in lakh)Schemes Proposed Outlay
2017-181. Major & Medium Irrigation 0.102. Minor Irrigation 600.003. Command Area Development 0.054. Flood Control, Anti- sea Erosion & Drainage 500.00TOTAL 1,100.15
Schemes Achievement 2016-17
Physical Targets 2017-18
1. Major & Medium Irrigation
- -
2. Minor Irrigation 1. Embankment completed of Minor Irrigation Tank at Gavnem
2. 53 ha.3. 0.267 km.(Improvement to waterway of River Ragada at Mardando in V.P. Sancordem of Dharbandora taluka under Madei Basin – 0.150 km, Construction of retaining wall Udalshem in Survey No.119/6,7 & 8 along river Ragada in Aglote village under the jurisdiction V.P. Sancordem of Dharbandora Taluka – 0.050 km, Improvement to the existing tank at Murguem adjoining to S.No 79/3 9 in V.P. Sancordem of Dharbandora taluka under Madei Basin – 0.067 km)
100.00 ha.
3. Command Area - -
28
Development4. Flood Control, Anti- sea Erosion & Drainage
1.248 km. 1.400 km.
P E R F O R M A N C E B U D G E T
FOR THE YEAR
2 0 17 – 2 0 1 8
S T A T E M E N T SF R O M
29
P A G E S – 30 TO 38
30