MINISTRY OF INDUSTRYGENERAL DIRECTORATE OF ENERGY

OVERVIEW

VIETNAM ENERGYOVERVIEW

VIETNAM ENERGYOVERVIEW

VIETNAM ENERGYOVERVIEW

VIETNAM ENERGY

November 2015

Page 2: VIETNAM ENERGY

OVERVIEW OF SOCIO-ECONOMIC

NATIONAL ENERGY STRATEGIES

1

2

CONTENTCONTENT

2

NATIONAL ENERGY STRATEGIES

ENERGY POLICIES BY SECTOR

2

3

Page 3: VIETNAM ENERGY

OVERVIEW OF SOCIO-ECONOMIC1

3

Page 4: VIETNAM ENERGY

OVERVIEW OF SOCIO-ECONOMICOVERVIEW OF SOCIO-ECONOMIC

GENERAL INFORMATION

- Area: 331,698 km2

- Population: 90 mil (2014); Urban/rural percentage : 20%/80%

- Number of provinces: 63 provinces and cities

- Member of WTO, APEC and ASEAN

VIETNAM ECONOMY

- GDP period 1990-2010: 7.3%/pa

- GDP 2010: 6.78%; 2011: 5.89%; 2012: 5.5%; 2013: 5.4% and 2014: 5.98%

- GDP per capita in 2014: 2028 USD/per person

ECONOMY ORIENTATION

- 2015-2020: average GDP per annum 6-7%.

- GDP per capita 3000 USD/per person

GENERAL INFORMATION

- Area: 331,698 km2

- Population: 90 mil (2014); Urban/rural percentage : 20%/80%

- Number of provinces: 63 provinces and cities

- Member of WTO, APEC and ASEAN

VIETNAM ECONOMY

- GDP period 1990-2010: 7.3%/pa

- GDP 2010: 6.78%; 2011: 5.89%; 2012: 5.5%; 2013: 5.4% and 2014: 5.98%

- GDP per capita in 2014: 2028 USD/per person

ECONOMY ORIENTATION

- 2015-2020: average GDP per annum 6-7%.

- GDP per capita 3000 USD/per person

Page 5: VIETNAM ENERGY

NATIONAL ENERGY STRATEGIES2

5

Page 6: VIETNAM ENERGY

GeneralDirectorate of

Energy

GeneralDirectorate of

Energy

INTRODUCTION OF ENERGY SECTOR

GOVERNMENT OFVIETNAM

GOVERNMENT OFVIETNAM

Ministry ofIndustry andTrade (MOIT)

Ministry ofIndustry andTrade (MOIT)

Ministry ofFinance (MOF)

Ministry ofFinance (MOF) PVN

Oil & Gas

Management

Planning, Orientation

Management, Regulatory

6

ElectricityRegulatoryAuthority of

Vietnam (ERAV)

ElectricityRegulatoryAuthority of

Vietnam (ERAV)

GeneralDirectorate of

Energy

GeneralDirectorate of

EnergyMinistry of

Finance (MOF)Ministry of

Finance (MOF)

Ministry ofPlanning &Investment

(MPI)

Ministry ofPlanning &Investment

(MPI)

OtherMinistries

OtherMinistries

VINACOMINCoal & Mining

PVNOil & Gas

OTHERS

Con

trac

ts

Planning, Orientation

6

Page 7: VIETNAM ENERGY

EXISTING POWER SYSTEM OF VIETNAMOverview

Total capacity: 33,964 MW* Statistical data in 2014

7

Item Quantity Unit

Total length of 500kV transmission lines 6.611 km

Total length of 220kV transmission lines 12.941 km

Number of 500kV transformers (unit) 40 -

Number of 220kV transformers (unit) 192 -

Total capacity of 500kV transformers 21,900 MVA

Total capacity of 220kV transformers 35,041 MVA

National power network - EVN (2014)

Total capacity: 33,964 MW* Statistical data in 2014

7

Page 8: VIETNAM ENERGY

HydroPower plants

Coal – firedPower plants

Import - China

Import- Laos

(Quang Ninh,Pha Lai,

Hai Phong, etc.)

Buying from CSG of China

(220/110kV) (through Ha Giang,Lao Cai, Quang Ninh), Pmax = 900MW

Total: 33,964 (MW)

EXISTING POWER SYSTEM OF VIETNAMPower source – Power trading

Oil fired: 2.9%

* Statistical data in 2014

8

HydroPower plants

Gas/oil – firedPower plants

Export -Cambodia

Import- Laos

(Phu My, Nhon Trach,Ca Mau, O Mon)

(Hoa Binh, Son La,Ialy, Tri An, etc.) Import from Laos

(220kV from Xe

Kaman 3

hydropower

plant): Pmax =

375 MW;

Selling to Cambodia, Pmax = 200 MW through the 220

kV Chau Doc – Takeo T/L

Oil fired: 2.9%

8

* Statistical data in 2014

Coal – firedPower plants

(Formosa, Vinh Tan,Duyen Hai etc.)

Page 9: VIETNAM ENERGY

EXISTING POWER SYSTEM OF VIETNAMPower source – Power trading

9

Total capacity: 33,964 MW* Statistical data in 2014

9

Page 10: VIETNAM ENERGY

COAL SECTOR OVERVIEWCOAL SECTOR OVERVIEW

Figures as of 2014

Coal production : 39.8 mil. tons

Of which:

+ Domestic consumption: 32.6 mil. tons

+ Coal export: 7.2 mil. tons

10

Figures as of 2014

Coal production : 39.8 mil. tons

Of which:

+ Domestic consumption: 32.6 mil. tons

+ Coal export: 7.2 mil. tons

Page 11: VIETNAM ENERGY

OIL AND GAS SECTOR OVERVIEWOIL AND GAS SECTOR OVERVIEW

Figures as of 2014

- Crude oil exploitation: 15.5 mil. tons

- Gas exploitation: 10.2 bil. m3(Around 90% of the gas is for power generation and 10% of thegas for other consumers)

11

Figures as of 2014

- Crude oil exploitation: 15.5 mil. tons

- Gas exploitation: 10.2 bil. m3(Around 90% of the gas is for power generation and 10% of thegas for other consumers)

Page 12: VIETNAM ENERGY

LPG Facilities

Domestic Production:

Dung Quat Refinery Plant: 400,000 ton/year

Dinh Co GPP at capacity of 300,000 ton/year. Storage and trading:

More than 100 LPG trading companies.

PVGas is the main player with 70% accounted for market share andfacilities.

Existing Gas InfrastructuresExisting Gas Infrastructures

12

Storage and trading:

More than 100 LPG trading companies.

PVGas is the main player with 70% accounted for market share andfacilities.

CNG Plants

Total capacity: 135 million cubic meter per year .

Page 13: VIETNAM ENERGY

Power Generation: Demand: 10.3 bcm in 2020.

Forecasted of supplying source: 10.1 bcm in 2020.

Fertilizer Production: ~ 11%

Other End-User: 4%

Dry Gas Consumption:

Gas ConsumptionGas Consumption

Power85%

Fertilizer11%

Industrial4%

13

Other End-User: 4%

Power85%

Fertilizer11%

Industrial4%

Dry Gas Comsumption

Page 14: VIETNAM ENERGY

CoalTotal coal reserves: about 48.7bill. tons, of which:

- Dong bac Basin: 8.8 bill. tons

- Song Hong Basin: 39.3 bill. tons

- Others: 0.6 biii. tons

Dong bac Basin:- Quangninh

- Bacgiang

- Haiduong

Song Hong Basin:

- Hanoi

- Hungyen

- Thaibinh

VIETNAM ENERGY RESOURCESVIETNAM ENERGY RESOURCES

14

CoalTotal coal reserves: about 48.7bill. tons, of which:

- Dong bac Basin: 8.8 bill. tons

- Song Hong Basin: 39.3 bill. tons

- Others: 0.6 biii. tons

Song Hong Basin:

- Hanoi

- Hungyen

- Thaibinh

Page 15: VIETNAM ENERGY

Oil &Gas2P reserves discovered: 1,436mill. m3 oil equivalent, of which:

- Oil: 711 mill. m3 (49,5%).

- Gas: 725 tỷ m3 (50,5%).

VIETNAM ENERGY RESOURCESVIETNAM ENERGY RESOURCES

15

Oil &Gas2P reserves discovered: 1,436mill. m3 oil equivalent, of which:

- Oil: 711 mill. m3 (49,5%).

- Gas: 725 tỷ m3 (50,5%).

Page 16: VIETNAM ENERGY

OIL&GAS FIELD DISTRIBUTION MAPOIL&GAS FIELD DISTRIBUTION MAP

16

Page 17: VIETNAM ENERGY

VIETNAM ENERGY RESOURCESWind power

MeanSpeed at 80m Height

(m/s)

EstimatedDevelopableLand Area

(km2)

Percentageof

Developable Land

Approximate

MegawattPotential

Wind energy theoretical potential based on the WindResource Atlas of Vietnam

(assumed an average density of 10 MW/km2)(Source: WB report 2011)

17

MeanSpeed at 80m Height

(m/s)

EstimatedDevelopableLand Area

(km2)

Percentageof

Developable Land

Approximate

MegawattPotential

<4 95,916 45.7% 959,161

4-5 70,868 33.8% 708,678

5-6 40,473 19.3% 404,732

6-7 2,435 1.2% 24,351

7-8 220 0.1% 2,202

8-9 20 0.01% 200

>9 1 0.00% 10

Total 209,933 100.00% 2,099,333

Page 18: VIETNAM ENERGY

VIETNAM ENERGY RESOURCESSolar power

Area Annual average of daily GlobalHorizontal Irradiation

(kWh/m2/day)

Solar radiation map of VietnamAnnual average of daily Global Horizontal

Irradiation(Source: CIEMAT report, 2014)

18

Annual average of daily GlobalHorizontal Irradiation

(kWh/m2/day)North 3.4

North centralcoast

3.8

South, centralhighlands andsouth central

coast

4.8

Page 19: VIETNAM ENERGY

VIETNAM ENERGY SECTOR DEVELOPMENT STRATEGIESVIETNAM ENERGY SECTOR DEVELOPMENT STRATEGIES

• Gradually introducing the energy market; diversifying theownership and business approaches; Abolishing subsidies,monopoly and forwarding eventually to the comprehensiveelimination of social policy implementation through energy prices.

• Electricity, coal and oil and gas sectors will be operated complyingwith the competitive market mechanism and under State regulation.Coal and oil and gas market will be set up in the period up to 2015.

• Focusing intensively on the clean energy, prioritizing the new andrenewable energy development with the target of reaching 4.5% ofthe total installed capacity in 2020 and around 11% in 2050.

• Protecting the ecology and environment will be tied to the energydevelopment.

• Boosting the international relation in the energy sector andshaping the power and gas interconnection among ASEANcountries.

19

• Gradually introducing the energy market; diversifying theownership and business approaches; Abolishing subsidies,monopoly and forwarding eventually to the comprehensiveelimination of social policy implementation through energy prices.

• Electricity, coal and oil and gas sectors will be operated complyingwith the competitive market mechanism and under State regulation.Coal and oil and gas market will be set up in the period up to 2015.

• Focusing intensively on the clean energy, prioritizing the new andrenewable energy development with the target of reaching 4.5% ofthe total installed capacity in 2020 and around 11% in 2050.

• Protecting the ecology and environment will be tied to the energydevelopment.

• Boosting the international relation in the energy sector andshaping the power and gas interconnection among ASEANcountries.

Page 20: VIETNAM ENERGY

ENERGY PLANNING BY SECTOR3

20

Page 21: VIETNAM ENERGY

ELECTRICITY SECTOR DEVELOPMENTELECTRICITY SECTOR DEVELOPMENT

• Improving the electricity quality.• Reducing the power system technical losses. Encouraging the application of

new and modern technologies.• Focusing on the nuclear energy development (4,000MW in 2020-2030 and

10,700MW after 2030).• Making the new and renewable energy percentage reach 4.5% in 2020 and 6%

in 2030.• Equitizing electricity sector's enterprises• Electricity tariff will be followed the market mechanism under State regulatory

which ensures the cost recovery and acceptable benefit.• Restructuring the electricity sector for the sake of shaping the transparent

competitive market.• Protecting the ecology and environment and reaching the sustainability are the

utmost goals for the electricity sector development. Spurring power projects inaccordance with the CDM mechanism.

• Encouraging and boosting the application of saving-energy and efficiencyprograms...

21

• Improving the electricity quality.• Reducing the power system technical losses. Encouraging the application of

new and modern technologies.• Focusing on the nuclear energy development (4,000MW in 2020-2030 and

10,700MW after 2030).• Making the new and renewable energy percentage reach 4.5% in 2020 and 6%

in 2030.• Equitizing electricity sector's enterprises• Electricity tariff will be followed the market mechanism under State regulatory

which ensures the cost recovery and acceptable benefit.• Restructuring the electricity sector for the sake of shaping the transparent

competitive market.• Protecting the ecology and environment and reaching the sustainability are the

utmost goals for the electricity sector development. Spurring power projects inaccordance with the CDM mechanism.

• Encouraging and boosting the application of saving-energy and efficiencyprograms...

Page 22: VIETNAM ENERGY

VIETNAM POWER MARKET DEVELOPMENTThe Roadmap of the Power Market

Electricity Retail Market(VREM)

Electricity Retail Market(VREM)

Competitive Generation Market(VCGM)

Competitive Generation Market(VCGM)

Electricity Wholesale Market(VWEM)

Electricity Wholesale Market(VWEM)

2012 2015 2017 2021 20232005

22

Electricity Retail Market(VREM)

Competitive Generation Market(VCGM)

Electricity Wholesale Market(VWEM)

PilotOperation

FullOperation

PilotOperation

FullOperation

PilotOperation

FullOperation

Preparationfor VCGM

Preparation for VWEM Preparation for VREM

Phase 1 – Vietnam Competitive Generation Market (2005 – 2015) Phase 2 – Vietnam Competitive Wholesale Market (2015 – 2021) Phase 3 – Vietnam Competitive Retail Market (2021 onwards)

Page 23: VIETNAM ENERGY

RENEWABLE ENERGY

RE type Status Level NoteExisting Proposing

Smallhydro

Avoidedcost

By year, by season (about 5UScents/kWh)

Windpower

FIT revising 7.8 UScents/kWh Underrevising

Biomass FIT - CHP: 5.8 UScent/kWh- Generation Cost from imported coalpower plant

2323

Biomass FIT - CHP: 5.8 UScent/kWh- Generation Cost from imported coalpower plant

Understudying

MSW FIT - Land fill gas:7.28UScent/kWh- Direct combustion:10.05UScent/kWh

Biogas FIT Under studying

Solar PV FIT Under studying

Geothermal FIT Under studying

Page 24: VIETNAM ENERGY

COAL SECTOR DEVELOPMENTCOAL SECTOR DEVELOPMENT

• Speeding up the coal exploitation and estimating coal resourceand volume.

• Coal business will be active complying with the marketmechanism under State regulatory.

• Meeting the maximum domestic consumption. Exporting onlydomestic coal that domestic consumption has not required.

• Protecting the ecology and environment is the utmost goal forthe sustainable coal sector development.

24

• Speeding up the coal exploitation and estimating coal resourceand volume.

• Coal business will be active complying with the marketmechanism under State regulatory.

• Meeting the maximum domestic consumption. Exporting onlydomestic coal that domestic consumption has not required.

• Protecting the ecology and environment is the utmost goal forthe sustainable coal sector development.

Page 25: VIETNAM ENERGY

OIL AND GAS SECTOR DEVELOPMENTOIL AND GAS SECTOR DEVELOPMENT

• Prioritizing the search, survey and exploitation in the deepoffshore water.• Establishing the competitive gas market mechanism underState regulatory. Coorporating for the implementation of inter-regional gas pipeline system.• Developing imported LNG projects; Increasing the capacity ofLNG storages in the Southern region with the size of 7-10 bil. cubicmeter per annum.• Developing the refining and petrochemical projects to meet 50-70% domestic demad.• Striving the stock pilling of crude oil and petroleum productsreached a minimum of 90 days net import (to meet the criteria of theInternational Energy Agency - IEA).• Protecting the ecology and environment.

25

• Prioritizing the search, survey and exploitation in the deepoffshore water.• Establishing the competitive gas market mechanism underState regulatory. Coorporating for the implementation of inter-regional gas pipeline system.• Developing imported LNG projects; Increasing the capacity ofLNG storages in the Southern region with the size of 7-10 bil. cubicmeter per annum.• Developing the refining and petrochemical projects to meet 50-70% domestic demad.• Striving the stock pilling of crude oil and petroleum productsreached a minimum of 90 days net import (to meet the criteria of theInternational Energy Agency - IEA).• Protecting the ecology and environment.

Page 26: VIETNAM ENERGY

MASTER PLAN FOR POWER DEVELOPMENT

26

MASTER PLAN FOR POWER DEVELOPMENT

Page 27: VIETNAM ENERGY

POWER GENERATION & GRID DEVELOPMENTPERIOD 2011-2020

POWER GENERATION & GRID DEVELOPMENTPERIOD 2011-2020

PERIOD 2011-2015

- Power generation:New installed capacity: 18,152 MWOf which:

+ Thermal: 9,600 MW+ Hydro: 8,552 MW

- Grid500kV:

+ Transmission line: 3,833 km+ Substation: 17.,00 MVA

220kV:+ Transmission line: 10,635 km+ Substation: 35,988 MVA

PERIOD 2016-2020

- Power generation:New installed capacity: 29,350 MWOf which

+ Thermal: 24,210 MW+ Hydro: 5,140 MW

- Grid :500kV:

+ Transmission line: 4,889 km+ Substation: 26,750 MVA

220kV:+ Transmission line: 5,305 km+ Substation: 39,063 MVA

27

PERIOD 2011-2015

- Power generation:New installed capacity: 18,152 MWOf which:

+ Thermal: 9,600 MW+ Hydro: 8,552 MW

- Grid500kV:

+ Transmission line: 3,833 km+ Substation: 17.,00 MVA

220kV:+ Transmission line: 10,635 km+ Substation: 35,988 MVA

PERIOD 2016-2020

- Power generation:New installed capacity: 29,350 MWOf which

+ Thermal: 24,210 MW+ Hydro: 5,140 MW

- Grid :500kV:

+ Transmission line: 4,889 km+ Substation: 26,750 MVA

220kV:+ Transmission line: 5,305 km+ Substation: 39,063 MVA

Page 28: VIETNAM ENERGY

POWER GENERATION & GRID DEVELOPMENTPERIOD 2021-2030

POWER GENERATION & GRID DEVELOPMENTPERIOD 2021-2030

PERIOD 2021-2025

- Power generation:New installed capacity: 32,600 MWOf which:

+ Thermal: 29,380 MW+ Hydro: 3,220 MW

- Grid:500kV:

+ Transmission line : 2,234 km+ Substation: 24,400 MVA

220kV:+ Transmission line: 5,552 km+ Substation: 42,775 MVA

PERIOD 2026-2030

- Power generation:New installed capacity: 33,500 MWOf which:

+ Thermal 30,900 MW+ Hydro: 2,600 MW

- Grid:500kV:

+ Transmission line: 2,724 km+ Substation: 20,400 MVA

220kV:+ Transmission line: 5,020 km+ Substation: 53,250 MVA

28

PERIOD 2021-2025

- Power generation:New installed capacity: 32,600 MWOf which:

+ Thermal: 29,380 MW+ Hydro: 3,220 MW

- Grid:500kV:

+ Transmission line : 2,234 km+ Substation: 24,400 MVA

220kV:+ Transmission line: 5,552 km+ Substation: 42,775 MVA

PERIOD 2026-2030

- Power generation:New installed capacity: 33,500 MWOf which:

+ Thermal 30,900 MW+ Hydro: 2,600 MW

- Grid:500kV:

+ Transmission line: 2,724 km+ Substation: 20,400 MVA

220kV:+ Transmission line: 5,020 km+ Substation: 53,250 MVA

Page 29: VIETNAM ENERGY

TOTAL INVESTMENT BY PERIODTOTAL INVESTMENT BY PERIOD

Period2011-2015

2016-2020

2021-2025

2026-2030

2011-2030

I- Generation 22,076/

4,415

28,830/

5,766

27,005/

5,401

32,441/

6,482

110,322/

5,516

TOTAL CAPITAL INVESTMENT NEEDED/AVERAGE CAPITAL INVESTMENT PER YEAR TO 2030

(Million USD)

29

I- Generation 22,076/

4,415

28,830/

5,766

27,005/

5,401

32,441/

6,482

110,322/

5,516

II- Grid 7,245/

1,449

10,523/

2,105

12,345/

2,469

15,868/

3,174

45,981/

2,299

Total 29,321/

5,864

39,353/

7,871

39,349/

7,870

48,280/

9,656

156,303/

7,815

Page 30: VIETNAM ENERGY

RENEWABLE ENERGY PLANNINGRENEWABLE ENERGY PLANNING

Total Grid - connected installed capacity (MW)

- Period 2011-2015: 1,198 MW

- Period 2016-2020: 2,408 MW

- Period 2021-2030: 9,588 MW

30

Total Grid - connected installed capacity (MW)

- Period 2011-2015: 1,198 MW

- Period 2016-2020: 2,408 MW

- Period 2021-2030: 9,588 MW

Page 31: VIETNAM ENERGY

COAL SECTOR DEVELOPMENT

PLANNING

31

Page 32: VIETNAM ENERGY

PLANNING TARGETSPLANNING TARGETS

Planned Annual coal production

- Period 2011-2015: 40-43 mil. tons

- Period 2016-2020: 50-53 mil. tons

- Period 2021-2025: 55-57 mil. tons

- Period 2026-2030: above 60 mil. Tons

32

Planned Annual coal production

- Period 2011-2015: 40-43 mil. tons

- Period 2016-2020: 50-53 mil. tons

- Period 2021-2025: 55-57 mil. tons

- Period 2026-2030: above 60 mil. Tons

Page 33: VIETNAM ENERGY

COAL DEMANDCOAL DEMAND

Item 2015 2016 2017 2018 2019 2020 2025 2030 2015-2030

Domestic CoalDemand (forPower Plants)

21.9 26.8 29.1 33.2 35.9 37.5 44.5 48.0 639.9

Sales coal 40.4 41.9 43.0 44.5 46.7 47.4 50.6 52.6 767.9

Unit: Mil TonsUnit: Mil Tons

33

OtherSectors’Demand 11.2 9.8 9.8 9.8 10.3 10.8 10.8 10.8 170.9

Import Coal 0.75 1.1 3.4 5.5 11.0 17.4 43.9 78.3 516.9

Page 34: VIETNAM ENERGY

GAS SECTOR DEVELOPMENT

PLANNING

34

GAS SECTOR DEVELOPMENT

PLANNING

Page 35: VIETNAM ENERGY

PLANNING TARGETSPLANNING TARGETS

Period up to 2015- Natural gas exploitation above 14 bil. m3/year- Expansion of existing LPG storage to meet the demand of

1,6-2,2 bil. m3/year.- Expected gas market size: 17-21 bil. m3/year.

Period 2016-2025- Natural gas exploitation above 15-19 bil. m3/year.- Expansion of existing LPG storage to meet the demand of

2,5-4,6 bil. m3/year.- Developing imported LNG projects with the size of 7-10 bil.

m3/year.- Expected gas market size: 22-29 bil. m3/year.

35

Period up to 2015- Natural gas exploitation above 14 bil. m3/year- Expansion of existing LPG storage to meet the demand of

1,6-2,2 bil. m3/year.- Expected gas market size: 17-21 bil. m3/year.

Period 2016-2025- Natural gas exploitation above 15-19 bil. m3/year.- Expansion of existing LPG storage to meet the demand of

2,5-4,6 bil. m3/year.- Developing imported LNG projects with the size of 7-10 bil.

m3/year.- Expected gas market size: 22-29 bil. m3/year.

Page 36: VIETNAM ENERGY

FORMS OF COOPERATIONFORMS OF COOPERATION

1. Investors

2. Consultation

3. EPC Contractors

4. Equipment suppliers

5. Other forms

1. Investors

2. Consultation

3. EPC Contractors

4. Equipment suppliers

5. Other forms

36

1. Investors

2. Consultation

3. EPC Contractors

4. Equipment suppliers

5. Other forms

1. Investors

2. Consultation

3. EPC Contractors

4. Equipment suppliers

5. Other forms