    An analysis of the Quality of Delivery

    Commitment in finished products with special

    Reference to Lapp India, Bangalore

    Lapp India private Limited

    ( August 7th to September 20th )

    Date: 2nd February 2011

    B. Vetrivel

    (09p35f1213)

    Guided by,

    Ms. Krishnan Hemamala

  • 8/7/2019 vetrivel

    2/11

    Lapp India Private Limited

    Lapp groups was formed in 1957 in Germany by OskarLapp.

    Lapp India Pvt

    Ltd deals with the production of cables and

    connectors.

    Major competitors are Finolex, Pura Cables, Azjazeera Cables.

  • 8/7/2019 vetrivel

    3/11

    Introduction to the study

    Lapp India, Bangalore has a coordinated and effective mode of supply

    chain management which controls the entire process from procurement of

    raw material to dispatch of finished goods to the end users.

    But still finds a serious difficulty in dispatching its finished products to the

    end users even after the material is in hand. And hence to minimize this gap

    to lessen its inventory cost and to increase profitability.

    Month of study is September - October

  • 8/7/2019 vetrivel

    4/11

    Objectives

    Lapp India, Bangalore found dispatching the materials at the

    committed date a difficult feat to achieve. In order to analyse

    the sources for delay the objectives of this study were defined as

    follows:

    To analyse the gap in the actual material delivery and committed

    dates.

    To identify reasons attributable to this delay

  • 8/7/2019 vetrivel

    5/11

    Scope of the study

    Lapp officials refused to disclose the entire resources and hence

    limited resources are available for the study and Inadequate time.

    Very narrow study as it is limited only to the analysis ofTime gap

    between Material Available Date and Delivery Date.

    Sample Size is also limited because officials are not able to disclose

    entire information (busy schedule) due to time limits.

  • 8/7/2019 vetrivel

    6/11

    Research Methodology Research type

    Descriptive and Diagnostic study- There occurs consistent delay in delivering the

    materials to end consumers. The problem in hand is described as delay between

    MAD and DEV date and data is given. The reasons are found based upon the data.

    Sampling plan

    Data type Primary data

    Sample size 473 sale orders

    Data collection sources Observation and Interview method.

    Sampling mode Probability Random sampling

    Data analysis tools

    Test ofSignificance->Z test to test the hypothesis of causal relationships between

    the variable -> material available date and committed date.

  • 8/7/2019 vetrivel

    7/11

    Findings1. Payment block - delay in the payment from the customer

    2. Customer block - customer not ready to get the material

    3. One lot order - requires complete delivery

    4. Road permit - no proper license and documents

    5. Letter of credit

    6. Lack of space in warehouse - because of consistency in delay in dispatching

    7. Unavailability of truck when needed

    8. Lack of communication with the dealers

    and suppliers

    And other reasons are considered to be very minor like Manual faults, Strikes of

    Truck owners, Festival Holidays etc.. The probability of occurrence of such cases is

    very minimal.

  • 8/7/2019 vetrivel

    8/11

    Conclusion

    The major reason for the gap lies in payment block

    because of which most of the stocks were held up in the

    warehouse.

    Specifically, the reason for the holdup is payment, one

    lot order ie., waiting for the entire materials to get

    dispatched at the same time. The major problem lies withthe customer and therefore the profit or amount is locked in

    the inventory in the form finished goods.

  • 8/7/2019 vetrivel

    9/11

    Suggestions

    Lapp India Pvt ltd may take the customer perspective

    by having a regular follow-up with the customers about

    their payments and update them on the availability of finished products

    Lapp India can make sure to receive the letter of credit

    from the customers

    Lapp India Pvt ltd can take effective measures to reducethe risks in one lot order

  • 8/7/2019 vetrivel

    10/11

    Learning during Internship

    As a supply chain manager , the major to be taken

    parameters to minimize the delay

    Discipline and coordination to handle pressures

    How to behave and communicate with officials