vestas.com WMI Concept at Vestas

Vestas.com WMI Concept at Vestas. 2 | Presentation title, January 21, 2014 Challenges to the project The plan What is the long- and short term objectives

Embed Size (px)

Citation preview

Page 1: Vestas.com WMI Concept at Vestas. 2 | Presentation title, January 21, 2014 Challenges to the project The plan What is the long- and short term objectives

vestas.com

WMI Concept at Vestas

Page 2: Vestas.com WMI Concept at Vestas. 2 | Presentation title, January 21, 2014 Challenges to the project The plan What is the long- and short term objectives

2 | Presentation title, April 10, 2023

Challenges to the project

• The plan• What is the long- and short term objectives• Who are the decision makers• Who sets the directions for the project

• Roles• Who owns the scope• Who own the three areas of the concepts ?

Page 3: Vestas.com WMI Concept at Vestas. 2 | Presentation title, January 21, 2014 Challenges to the project The plan What is the long- and short term objectives

3 | Presentation title, April 10, 2023

Contents of the VMI concept

• Product• Supply Web and / or other supporting product

• Technical competences surrounding the solution• Covered by Architecture and Business consultancy• Hand over to support is needed

• Business knowledge• To be gained by being an active part in the implementation of the

pilot. Decisions pending on who owns a roll-out template ?

Page 4: Vestas.com WMI Concept at Vestas. 2 | Presentation title, January 21, 2014 Challenges to the project The plan What is the long- and short term objectives

4 | Presentation title, April 10, 2023

• Item segmentation• Decision making tool for sourcing strategy – to be verified during pilot

• Set-up• VMI

• Calculating tool (stand alone or integrated): Min/max/daily consumption• Order policy

• MRP:• Order Policy• Re-order point• EOQ

• Project approach:• Best practice processes x sourcing strategies• Differentiated (depending of sourcing strategy) monitoring of performance• PartnerNet integration

• Activities• Master data clean-up

• Business process documentation• Manuals for Suppliers and Vestas,• Master data requirements

• VOI decision• Multisourcing recommendation

Page 5: Vestas.com WMI Concept at Vestas. 2 | Presentation title, January 21, 2014 Challenges to the project The plan What is the long- and short term objectives

vestas.com

Thank you for your attention

Copyright NoticeThe documents are created by Vestas Wind Systems A/S and contain copyrighted material, trademarks, and other proprietary information. All rights reserved. No part of the documents may be reproduced or copied in any form or by any means—such as graphic, electronic, or mechanical, including photocopying, taping, or information storage and retrieval systems without the prior written permission of Vestas Wind Systems A/S. The use of these documents by you, or anyone else authorized by you, is prohibited unless specifically permitted by Vestas Wind Systems A/S. You may not alter or remove any trademark, copyright or other notice from the documents. The documents are provided “as is” and Vestas Wind Systems A/S shall not have any responsibility or liability whatsoever for the results of use of the documents by you.