Version 2 - 05/08/2008
The AQ calculation and The AQ calculation and validation processvalidation process
Compiled and delivered from the xoserve AQ Team for Review Group 209
Susan Prosser & Steve Nunnington.
Version 2 - 05/08/2008
System Calc process
AQ Review - System Calc
Re
jec
tio
n x
os
erv
eS
ys
tem
Ca
lcx
os
erv
e A
QT
ea
mS
hip
pe
r
Has AQ beencalculated?
All Live Meterpoints start to be
calculated
Is AQ<73,200kWh?
Receive AQvalues via IX.NRQ (31st May).
Warnings reportproduced. (see
Appendix 1) CurrentAQs carried
forward.
Site >73,200.(I&C+ Threshold
Crossers)
AQ Analysis.(see Appendix 2)
New AQCalculated?
xoserveproposed AQvalue derived
Receive AQvalues via IX.
NRM / NRS (31stMay -SSP, 30th June-
LSP).
Current AQcarried forward.
Yes
No
Yes
No
Yes
No
G0 to 3.
G0 to 11.
G0 to 5. G0 to 6.
Version 2 - 05/08/2008
Warnings ReportAppendix 1
No
No
No
No
No
Yes
No
No
Warnings Report.
Warnings Report.MPQ00031
Warnings Report.MPQ00028
Warnings Report.MPQ00029
Warnings Report.RCN00001
All Live Meter Pointsstart to be calculated
Has MeterPoint been recently
re-connected - is thereenough data to
calculate?
Is there sufficient reads /consumption?
Has the Meter Point gota RSU?
Does Meter Point belongto xoserve?
Next Validation...etc.
AQ Value is calculatedfor MPRN
No AQ calculation.MPRN's AQ's isCarried Forward
No AQ calculation.MPRN's AQ's isCarried Forward
No AQ calculation.MPRN's AQ's isCarried Forward
No AQ calculation.MPRN's AQ's isCarried Forward
No AQ calculation.MPRN's AQ's isCarried Forward
Yes
Yes
Yes
No
Yes
This is an example of how M Numbers appear within the Warnings Report as part of the AQ Review.
Not all Warnings listed within this example
Version 2 - 05/08/2008
Warning Report Reasons
Reason Code and Message Text MPQ 00031 - Meter Point is owned by xoserve. AQ not calculated MPQ 00028 - Meter Point is not a part of Live Confirmation. AQ not calculated MPQ 00029 - AQ not calculated due to the application of backstop date RCN 00001 - Reconnection does not exist MPQ 00030 - Reconnection Effective date is in the relevant metered period. AQ not calculated MPQ 00025 - Meter Point not DM for whole of DM AQ Calculation Period. AQ not Calculated GNT 00001 - Gas Nomination Type does not exist MRF 00001 - Meter Reading Frequency does not exist MPQ 00015 - Calculated annual quantity is negative MRR 00001 - Meter read request does not exist CPN 00323 - Consumption starts before earliest possible start meter read date CPN 00320 - Consumption overlap. AQ not calculated MRE 00480 - AQ not calculated due to the absence of reads since the previous AQ calculation MRE 00481 - AQ not calculated due to the absence of reads since competition effective date CPN 00304 - Consumptions for Meter Point are not contiguous CPN 00321 - Negative consumption during metered period. AQ not calculated CPN 00305 - Consumption start read more than three years before Target Opening Date or less than six months before
Target End date LCV 00001 - LDZ Calorific Value does not Exist CPN 00322 - Insufficient Consumption Data to Calculate AQ (New MPRN) CPN 00318 - Consumption gap. AQ not calculated CPN 00303 - Consumption Start Date not equal to start Meter Reading date SPO 00020 - Supply Point History not contiguous over whole of relevant metered period MPC 00001 - Meter Point Configuration not found
G0 to 2.
Version 2 - 05/08/2008
AQ Team ValidationsAppendix 2
I&C Exclusions Domestic Exclusions
Remove MPRN's with Revised AQ within 20% of current AQ. (System AQ is applied)Remove MPRN's that have an MP Status of "P" Prime (Prime & Sub Manual Validation)
Remove MPRN's with Revised AQ within 50,000kwhof current AQ (System AQ is applied)Remove MPRN's that have an MP Status of "P" Prime (Prime & Sub Manual Validation)
If Spec calc AQ is within 20% of current AQ, Spec calc AQ is appliedWhere the System Calc AQ is within 20,000 kwh of Current AQ, System AQ is applied
If Spec calc AQ is within 50000kwh of current AQ, Spec calc AQ is appliedWhere the System Calc AQ is within 35% kwh of Current AQ, System AQ is applied
If FLAT stated within Meter Point address and Spec calc AQ is below 73,200kwh, System AQ is applied
Where the Spec Calc AQ is within 20,000 kwh of Current AQ, Spec calc AQ is applied
If FLAT stated within Meter Point address and both Spec and System calc AQ is less than 73,200kwh, Current AQ is carried forward
Where the Spec Calc AQ is within 35% kwh of Current AQ, Spec calc AQ is applied
If FLAT stated within Meter Point address and both Spec and System calc AQ is greater than 73,200kwh, Current AQ is carried forward Where the Spec Calc is less than 73,200kwh, Spec calc AQ is appliedWhere Meter Point has a live ETM as an asset and the Current AQ is lower than both the Spec and System calc AQ, then Current AQ is carried forward
Where Meter Point has multiple meter exchanges, the Current AQ is carried forward
Where Meter Point has a live ETM as an asset and the System AQ is lower than both the Current and Spec calc AQ, then System calc AQ is applied
Where Meter Point has a live asset that has Reading Units of 10000, the current AQ is Carried Forward
Where Meter Point has a live ETM as an asset and the Spec calc AQ is lower than both the Current and System calc AQ, then Spec calc AQ is applied
Where Meter Point has a live exchanged asset that has Reading Units of 10000, the Current AQ is carried Forward
Where Meter Point has a live ETM as an asset and both the Current and System calc AQ is less than 73,200kwh, then System calc AQ is applied
Where Meter Point has a live ETM as an asset, the Current AQ is carried forward
Where Meter Point has a live ETM as an asset and both the Current and Spec calc AQ is less than 73,200kwh, then Spec calc AQ is applied
Where Meter Point has a live echanged ETM as an asset, the Current AQ is carried forward
If both the Current AQ and System AQ has an AQ less than 150,000kwh, System AQ is applied
Where Meter Point has erroneous readings (o's, 9999, 99999), Current AQ is carried forward
If both the Current AQ and Spec Calc AQ has an AQ less than 150,000kwh, Spec calc AQ is applied
If both the System and Spec Calc AQ is greater than 500% of the Current AQ, the Current AQ is carried forward
Where Meter Point has a 4dial asset and the System AQ is greater than 1,000,000kwh, Current AQ is carried forward
Where Meter Point has an Imperial 4 dial asset and the System and Spec Calc AQ has increased by more than 150,000kwh, the Current AQ is carried forward
Where Meter Point has a 4dial asset and the Spec calc AQ is greater than 1,000,000kwh, Current AQ is carried forward
Where Meter Point has an Metricl 5 dial asset and the System and Spec Calc AQ has increased by more than 150,000kwh, the Current AQ is carried forward
If the current AQ is greater than 1,000,000kwh and the System AQ is lower than 1,000,000kwh, System AQ is applied If FLAT stated within Meter Point address, Current AQ is carried forwardIf the current AQ is greater than 1,000,000kwh and the Spec calc AQ is lower than 1,000,000kwh, Spec calc AQ is applied
Where Meter Point has a 3 digit Start Read and a 5 digit End Read, Current AQ is carried forward
Where the System AQ has an AQ of 1 the System AQ will be appliedWhere Meter Point has a 4 digit Start Read and a 5 digit End Read, Current AQ is carried forward
Where the System AQ has an AQ of 1 and the reads appear erroneous (O's and 9999's) Current AQ is carried forward
If both the System AQ is greater than 500% and the Spec calc AQ is 0, the Current AQ is carried forward
Where the System AQ is less than the Current AQ, the System AQ will be appliedWhere both the System and Spec Calc AQ's result in a change of 500% or greater of the Current AQ the Current AQ is carried forward
Domestic Allocated DecisionsI&C Allocated Decisions
Where Meter Point has a Start read of 0 and no meter exchange has occurred, the Current AQ is carried forward
G0 to2.
Version 2 - 05/08/2008
Spec Calc
AQ Review - Spec Calc
Sys
tem
- S
pec
Cal
cR
ejec
tion
Shi
pper
RSU re-calculates AQ
values
Alternative Reads/ Asset Detailssubmitted to
Spec Calc via ASIfile
Valid MPRN AQ > 1kwh
Request rejectedwith reasonMPQ00001
Request rejectedwith reasonMPQ00010
Validation onintegrity ofInformation
provided
Rejections (See
Appendix 3).
Revised AQgenerated
Shipperreceives
revised AQ /Rejectiondetails viaASO file
Rejection Response sent to Shipper
Y Y Y
N NN
Version 2 - 05/08/2008
Spec Calc Validations
ASI – AQ Spec calc requests. When the supply point AQ for the provided MPRN is less than 1, it would be rejected with MPQ 00010 If all exchange details are provided and meter serial number is not provided, then STD 00137 If all exchange details are provided and imperial indicator is not provided, then STD 00139 If all exchange details are provided and exchange start reading date is null date, then STD 00143 If all exchange details are provided and exchange end reading date is null date, then STD 00145 If the start reading date is less than 01.03.1996, then it would be rejected with STD 00149 If the end reading date is less than 01.03.1996, then it would be rejected with STD 00150 If the exchange start reading date is less than 01.03.1996, then it would be rejected with STD 00151 If the exchange end reading date is less than 01.03.1996, then it would be rejected with STD 00152 Invalid Imperial Indicator (other than Y/N), rejects with STD 00154 Invalid Reading Units (other than 1,10,100,1000,10000), rejects with STD 00155 Invalid Exchange Reading Units (other than 1,10,100,1000,10000), rejects with STD 00156 Invalid Reading factor (other than 0.01,0.1,1,10,100), rejects with STD 00157 Invalid Exchange Reading factor (other than 0.01,0.1,1,10,100), rejects with STD 00158 Start reading is greater than processing date, reject with STD 00159 End reading is greater than processing date, reject with STD 00160 Exchange Start reading is greater than processing date, reject with STD 00161 Exchange End reading is greater than processing date, reject with STD 00162 Number of dials out of permitted range (ideal range is 4 to 12), reject with STD 00182 If the meter is Imperial, then reading factor and reading units must be in either of the following combinations: (0.01, 1), (0.1, 10), (1, 100), (10, 1000), (100, 10000).
Reject if otherwise with MMO 00553 If the meter is metric, then reading factor and reading units must be in either of the following combinations: (1, 1), (10, 10). Reject if otherwise with MMO 00553 If the exchanged meter is Imperial, then reading factor and reading units must be in either of the following combinations: (0.01, 1), (0.1, 10), (1, 100), (10, 1000),
(100, 10000). Reject if otherwise with MMO 00554 If the exchanged meter is metric, then reading factor and reading units must be in either of the following combinations: (1, 1), (10, 10). Reject if otherwise with MMO
00554 If the end reading is less than start reading, then reject with STD 00166 If the start reading date is less than the earliest supply point start date, then reject with STD 00183 If the supply point is end dated and if the end date is greater than the supply point end date, then reject with STD 00183 If the exchange start reading date must be equal to end reading date, otherwise reject with STD 00164 If the exchange end reading date is less than or equal to exchange start reading date, otherwise reject with STD 00165 Sum of read TTZ and exchange read TTZ count should not go beyond 99, otherwise reject with STD 00193 All the reading except the start reading date should be greater than competition effective date, otherwise reject with MRE 471 If the provided MPRN does not exist on the system, then reject with MPO 00001.
Appendix 3
Version 2 - 05/08/2008
Is An AQ Amendme
nt Required?
Is An AQ Amendme
nt Required?
Is An AQ Amendme
nt Required?
Is An AQ Amendme
nt Required?
AQ Amendments: Process Flow
Xoserve Releases Notification Files To Shipper SSP (NRQ) Threshold Crossers (NRS)
LSP (NRM)
Xoserve Releases Notification Files To Shipper SSP (NRQ) Threshold Crossers (NRS)
LSP (NRM)
Shipper Analyses Information To Determine If Amendment is Required / Can Be Actioned
Shipper Analyses Information To Determine If Amendment is Required / Can Be Actioned
Shipper Takes No Further Action
Shipper Takes No Further Action
xoserve Notifies Shipper of Revised AQ by 14th Sept: ( NRL NRO)
xoserve Notifies Shipper of Revised AQ by 14th Sept: ( NRL NRO)
1st OCTOBER AQ BECOMES EFFECTIVE1st OCTOBER AQ BECOMES EFFECTIVE
Shipper Submits Speculative Calculator
Request File: ASI File
T19 Record
Shipper Submits Speculative Calculator
Request File: ASI File
T19 Record
Spec Calc File Rejected with Rejection Reason: ASO File will include S72 Rejection Record
Spec Calc File Rejected with Rejection Reason: ASO File will include S72 Rejection Record
Shipper Receives
Recalculated AQ Value
Shipper Receives
Recalculated AQ Value
Is AQ Acceptable
and in Uniform Network
Code Tolerances?
Is AQ Acceptable
and in Uniform Network
Code Tolerances?
Shipper Submits Amendment File as
Per Spec Calc Response File:
AAI File T17 Record
Shipper Submits Amendment File as
Per Spec Calc Response File:
AAI File T17 Record
xoserve Responds to Amendment File to
Shipper: AAO File
T18 Record AC, RJ or RF
Outcome
xoserve Responds to Amendment File to
Shipper: AAO File
T18 Record AC, RJ or RF
Outcome
Amendment File Rejected with Rejection Reason: AAO File will include S72 Rejection Record
Amendment File Rejected with Rejection Reason: AAO File will include S72 Rejection Record
Amendment File Accepted
Amendment File Accepted
NONO
YESYES
xoserve Responds with Speculative
Calculation Response File to Shipper:
ASO File T20 Record
AC or RJ Outcome
xoserve Responds with Speculative
Calculation Response File to Shipper:
ASO File T20 Record
AC or RJ Outcome
NONO
YESYES
Is AQ Acceptable
and in Uniform Network
Code Tolerances?
Is AQ Acceptable
and in Uniform Network
Code Tolerances?
REJECTREJECT
AC
CE
PT
AC
CE
PT
REJECTREJECT
ACCEPTACCEPT
Version 2 - 05/08/2008
Amendment Validations
AAI – AQ Amendment requests. If the Meter Point is not part of any confirmation OR if the Shipper is not responsible for the provided MPRN, it would be rejected with SHI 00010. If the provided confirmation reference is not the current live confirmation of the MPRN, it would be rejected with MPO 00024. If smaller supply meter point is not eligible for AQ/WC amendment, then reject with STD 00177 If an outstanding amendment referral exists for an MPRN, it would be rejected with AQA 00018 If the requested AQ is less than 1, it would reject with STD 00178 If the start reading date is less than 01.03.1996, then it would be rejected with STD 00149 If the end reading date is less than 01.03.1996, then it would be rejected with STD 00150 If the exchange start reading date is less than 01.03.1996, then it would be rejected with STD 00151 If the exchange end reading date is less than 01.03.1996, then it would be rejected with STD 00152 Invalid Imperial Indicator (other than Y/N), rejects with STD 00153 Invalid Reading Units (other than 1, 10, 100, 1000, 10000), rejects with STD 00155 Invalid Exchange Reading Units (other than 1, 10, 100, 1000, 10000), rejects with STD 00156 Invalid Reading factor (other than 0.01, 0.1, 1, 10, 100), rejects with STD 00157 Invalid Exchange Reading factor (other than 0.01, 0.1, 1, 10, 100), rejects with STD 00158 Start reading is greater than processing date, reject with STD 00159 End reading is greater than processing date, reject with STD 00160 Exchange Start reading is greater than processing date, reject with STD 00161 Exchange End reading is greater than processing date, reject with STD 00162 Invalid Manual check flag (other than Y/N), reject with STD 00163 Number of dials out of permitted range (ideal range is 4 to 12), reject with STD 00182 If reading unit, reading factor and imperial indicator are inconsistent, then reject with MMO 00533 If exchange reading unit, reading factor and imperial indicator are inconsistent, then reject with MMO 00534 If the end reading is less than start reading, then reject with STD 00166 If the start reading date is less than the earliest supply point start date, then reject with STD 00183 If the supply point is end dated and if the end date is greater than the supply point end date, then reject with STD 00183 If the exchange start reading date must be equal to end reading date, otherwise reject with STD 00164 If the exchange end reading date is less than or equal to exchange start reading date, otherwise reject with STD 00165 If exchange TTZ is 0 and if the exchange end reading date is less than exchange start reading date, otherwise reject with STD 00167 Sum of read TTZ and exchange read TTZ count should not go beyond 99, otherwise reject with STD 00193 If the shipper is not responsible for the MPRN, it would be rejected with SHI 0010
Version 2 - 05/08/2008
Amendment Validations
All the readings except the start reading date should be greater than competition effective date, otherwise reject with MRE 471 If the current and proposed market sector is Domestic, then 20% amendment tolerance rule is applied. Meter AQ changes will be accepted only if it
lies beyond the tolerance range with respect to xoserve calculated initial AQ. Reject reason provided is AQA 00019 The requested AQ value (provided in the file) and the derived AQ (using the parameters in the file) should match, otherwise reject with STD 00179 If the MPRN is primary and if either the current or proposed market sectors is I&C, then refer the amendment, otherwise reject it with MPO 00587. If the provided MPRN does not exist on the system, then reject with MPO 00001. If the start read date is not later than AQ-WC backstop date, then reject with STD 00217 If the end read date is earlier than xoserve calculated end read date, then reject with STD 00216 Outstanding AQ/WC Appeal referral exists for this meter point, then reject with AML 00018 Insufficient information to calculate AQ, then reject with AQA 00016 Consumption period less than 6 month, then reject with MRE 00470 Post code not found, then reject with POC 00011 Start reading/date not consistent with UKLink, then reject with RRR 00010 End reading/date not consistent with UKLink, then reject with RRR 00011 Exchange start read/date not consistent with UKLink, then reject with RRR 00012 Exchange end read/date not consistent with UKLink, then reject with RRR 00013 TTZ count incorrect, then reject with RRR 00014 Meter exchange not identified on amendment/appeal, then reject with RRR 00015 Manual referral with insufficient supporting information, then reject with RRR 00016 Appeal window not currently open for request, then reject with RRR 00017 Exchange meter serial number not provided, then reject with STD 00137 Exchange start reading date not provided, then reject with STD 00143 Exchange end reading date not provided, then reject with STD 00145 Occurrence of DM since start reading date, then reject with STD 00171 Invalid value for number of dials or digits, then reject with STD 00181 Meter point was not part of a live supply point for entire consumption period, then reject with STD 00183 DM meter point cannot be appealed/amended to an AQ below the domestic threshold, reject with SPO 00013
G0 to 2.
Version 2 - 05/08/2008
Can An AQ
Appeal Be Raised?
Can An AQ
Appeal Be Raised?
Can an AQ
Appeal be raised?
Can an AQ
Appeal be raised?
AQ Appeals: Process Flow
Shipper determines current AQ value is not reflective of actual consumption
Shipper determines current AQ value is not reflective of actual consumption
Shipper unable to raise AQ Appeal – AQ will be recalculated during next AQ Review – Shipper
will have opportunity to raise Amend
Shipper unable to raise AQ Appeal – AQ will be recalculated during next AQ Review – Shipper
will have opportunity to raise Amend
Shipper Submits Speculative Calculator
Request File: ASI File
T19 Record
Shipper Submits Speculative Calculator
Request File: ASI File
T19 Record
Spec Calc File Rejected with Rejection Reason: ASO File will include S72 Rejection Record
Spec Calc File Rejected with Rejection Reason: ASO File will include S72 Rejection Record
Shipper Receives
Recalculated AQ Value
Shipper Receives
Recalculated AQ Value
Is AQ Acceptable?
Is AQ Acceptable?
Shipper Submits Appeal File as Per
Spec Calc Response File:
API File T17 Record
Shipper Submits Appeal File as Per
Spec Calc Response File:
API File T17 Record
xoserve Responds to Appeal File to Shipper:
• APO File • T18 Record
• AC, RJ or RF Outcome
xoserve Responds to Appeal File to Shipper:
• APO File • T18 Record
• AC, RJ or RF Outcome
Amendment File Rejected with Rejection Reason: APO File will include S72 Rejection Record
Amendment File Rejected with Rejection Reason: APO File will include S72 Rejection Record
Shipper Receives Appeal File and submits
re-nomination & confirmation using Appeal Reference
Shipper Receives Appeal File and submits
re-nomination & confirmation using Appeal Reference
NONO
YESYES
xoserve Responds with Speculative
Calculation Response File to Shipper:
• ASO File • T20 Record
• AC or RJ Outcome
xoserve Responds with Speculative
Calculation Response File to Shipper:
• ASO File • T20 Record
• AC or RJ Outcome
NONO
YESYES
Is AQ Acceptable?
Is AQ Acceptable?
REJECTREJECT
AC
CE
PT
AC
CE
PT
REJECTREJECT
ACCEPTACCEPT
AQ Goes live on xoserve System on Confirmation
Effective Date
AQ Goes live on xoserve System on Confirmation
Effective Date
Version 2 - 05/08/2008
Appeal Validations
Appeal process specific Validations Reject with AML 00017 error in case there is a mismatch between provided appeal level (T41/T43) and detail level (T17/T21) confirmation reference
numbers If the Meter Point does not belong to the confirmation reference identified on the T41/T43 record, reject with AML 00015. If the provided confirmation reference number does not exist on the system, reject with CNF 00001 If duplicate T17/T21 records are sent under a same T41/T43 record. Reject with AML 00016 If any of the meter point are rejected on the appeal then, the appeal is rejected with AML 00012 There must be at least one T17 / T21 records to process the appeal, otherwise reject with APL 00014 If the current and the proposed market sectors are Domestic, then reject the appeal with APL 00015 If the WC appeal start date does not fall into the winter period, reject with WTC 00014 If the WC appeal end date does not fall into the winter period, reject with WTC 00015 If the current and proposed market sector is Domestic, then 20% appeal tolerance rule is applied. Meter WC changes will be accepted only if it lies
beyond the tolerance range with respect to xoserve calculated initial AQ. Reject reason provided is WTC 00016 Reject all AQ appeals between the period 01-AUG to 15-SEP as part of AQ review process. The appeals received during this period are rejected with
STD 00192 WC Appeals from Shippers are rejected with APL 00012 If the provided confirmation is not in either LI or CO status, reject with CNF 00003 If the Shipper is not the current registered owner of the MPRN, reject with SHI 00010 If the provided nomination shipper reference is not valid, reject with CNF 00010 DM meter point cannot be appealed/amended to an AQ below the domestic threshold, reject with SPO 00013