DSC Delivery Sub-Group 01/10/2018

DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

DSC Delivery Sub-Group

01/10/2018

Page 2: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Agenda (1)

Item Title Document Ref Lead

1. Welcome and Introductions Verbal Chair

2. Meeting’s Minutes

For Approval Verbal Chair

3. AQ Defects

For Information

DSC Delivery Sub Group 1st

October 2018 Michele Downes

4. Release 2 update

For Information

DSC Delivery Sub Group 1st

October 2018 Christina Francis

5. Release 3

5a. Release 3 update

For Information

DSC Delivery Sub Group 1st

October 2018 Padmini Duvvuri/ Neil Morgan

5b. Release 3 Track 1 Implementation

For Discussion

DSC Delivery Sub Group 1st

October 2018 Padmini Duvvuri/ Neil Morgan

5c. Release 3 Track 2 Customer Day

For Information

DSC Delivery Sub Group 1st

October 2018 Padmini Duvvuri/ Neil Morgan

6. June 2019 Release Scope

Support for ChMC Approval

DSC Delivery Sub Group 1st

October 2018 Emma Smith

7. New Change Proposals

7a. XRN4747 - Smart Meter Upgrade Notification Report

For Discussion

DSC Delivery Sub Group 1st

October 2018 Rachel Hinsley

Page 3: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Agenda (2)

Item Title Document Ref Lead

8. Change Proposal Initial View Representations

8a. 4752 – Meter Read Performance

For Discussion

DSC Delivery Sub Group

1st October 2018 Rachel Hinsley

9. Undergoing Solution Options Impact Assessment Review

9a. 4690 - Actual read following estimated transfer read calculating AQ of 1

For Discussion

DSC Delivery Sub Group

1st October 2018 Simon Harris

9b. 4691 - CSEPs: IGT and GT File Formats (CGI Files)

For Discussion Verbal Update Paul Orsler

9c. 4692 - CSEPs: IGT and GT File Formats (CIN Files)

For Discussion Verbal Update Paul Orsler

9d.

4693 - CSEPs: IGT and GT File Formats

Files Affected: CIC, CIR, CAI, CAO, DCI, DCO, CIN, CCN, CUN.

For Discussion

Verbal Update Paul Orsler

9e. 4694 - CSEPs: IGT and GT File Formats (Create new data validations )

For Discussion Verbal Update Paul Orsler

10. Solution Options Impact Assessment Review Completed

10a.

4670 - Reject a Replacement Read, where the read provided is identical to that already held in UK Link for

the same read date

For Discussion

DSC Delivery Sub Group

1st October 2018 Simon Harris

11. Defect Dashboard

For Information

DSC Delivery Sub Group

1st October 2018 Mark Tullett

12. Miscellaneous

12a. MIS/JMDG Overview

For Discussion

DSC Delivery Sub Group

1st October 2018 Mark Pollard

12b. Defect 838 RGMA on Transfer Date (AML Impacting)

For Discussion

DSC Delivery Sub Group

1st October 2018 Simon Harris

12c. Replacement/Insertion Reads (a negative consumption scenario)

For Discussion

DSC Delivery Sub Group

1st October 2018 Simon Harris

12d. Action Updates

For Discussion

DSC Delivery Sub Group

1st October 2018

Various

13. AOB

For Discussion Verbal Various

Page 4: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

3. AQ Defects

Page 5: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Background

• Currently 14 issues affecting AQ

• 280K MPRN’s are impacted from incorrect AQ calculation

• For Class 3 and 4 meter point the ‘rolling AQ’ is used to determine the Formula Year AQ (FYAQ) effecting from 1st April,

• All impacted MPRN’s belong to class 3 and 4 category, with the exception of one defect which looks to influence class-1

and 2 MPRN’s, doesn’t impact FYAQ process

Key S

tats

12

Defects

2 CR’s

Curr

ent

Sta

tus

6 Defect Fixed

4 In Progress

2 unallocated

2 – Waiting Delivery Date

New tool for AQ

recalculation being

built

Page 6: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Consumption

and AQ

Incorrect

AQ Calc.

Tool

Delivered

15/10

AQ Calc

Tool

Testing

16/10 –

31/10

AQ Calc Tool

Implemented

01/11

Shipper

read

Accepted

Revised AQ

Updated in

UK Link

19/11

NRL Files

Issued

22-23/11

AQ Goes

Live

01/12

AQ

Calculation

using AQ Calc

Tool 12-13/11

FYAQ

Snapshot

Defects

Profiled

15/10 Consumption

correct, AQ

Incorrect Yes

No

Correct &

Update

Consumption

AQ

Calculation

12/11

AQ Defects Activity Plan – Plan A

Gemini

Updated

29/11

Shipper AQ

Correction

Accepted 21/11

Defect Profiling

Shipper Activity

AQ Calculation Tool

UKLink Processes

Key:

Page 7: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

AQ Defects Activity Plan – Plan B

Initiation of Formula Year AQ

Run

Job Completion

Outcome Validation

Notification to Industry

1st Dec’18

5th Dec’18

8th Dec’18

20th Mar’19

Whilst we try to close

as much issues as

possible, can we

consider to utilise time

until 20th March to

correct AQ values via

data update script / tool

Formula Year AQ

is effective from 1st

April and used for

transportation

charges

Note: For any meter points where AQ

has not been corrected, any AQ

reporting issued to Networks will show

the incorrect AQ value. A corrected

aggregate ‘ball-park’ value by LDZ will

be issued to relevant networks on or

soon after the 1st December.

Page 8: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

AQ Defects

The following spreadsheet contains analysis information on the AQ defects:

Page 9: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

4. Release 2 Update

Page 10: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

XRN4361 – UK Link Release 2 - Delivery

11th September

2018

Overall Project RAG Status G

Plan/Time Risks and Issues Cost Resources

RAG Status G G G G

Status Explanation

Objective Full project delivery of UK Link Future Release 2 Scope

Plan/Time

Post Implementation Support

• 14 changes have successfully achieved their PIS Exit Criteria and are now handed over into BAU operations

• 1 defect has been identified on XRN4316 which is currently being fixed

• XRN4299 – The report has been delivered successfully. We are awaiting formal sign off from Business and IS Ops on this

change

• Close down activities are progressing as per plan

Risks &

Issues • There is a risk that PIS exit is not achieved by the re-planned milestone date

Cost • Project delivery costs are tracking to approved budgets

Resources • Weekly monitoring of SME resources supporting multiple demands (e.g. BAU defects, Future Releases, etc) and all

requirements are able to be met

Page 11: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

UK Link Release 2 - Plan

Primary

Scope Scoping Initiation Delivery Realisation

Stage Scope

Prioritisation

Scope

Defined Funding Initiation

Analysis

and HLD

Detailed

Design Build

Acceptance

Test

Performance

Test

Regression

Test Imp. PIS

Baseline

Plan 07/06/17 25/07/17 09/08/17 Aug 17 Aug 17 20/11/17 29/01/18 18/05/18 18/05/18 22/06/18 29/06/18 30/07/18

Current Plan 07/06/17 11/10/17 10/01/18 13/12/17 16/01/18 29/01/18

(12/01/18) 16/02/18 18/05/18

18/05/18

23/05/18 22/06/18 29/06/18 02/11/18*

RAG Key – Milestones are end dates:

Milestone date forecast to be missed Milestone date forecast to be at risk Milestone date forecast to be met Milestone completed Planning/Milestone date to be confirmed

* PIS extended due to delivery of change variation on XRN4299

Page 12: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

5. Release 3

Page 13: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

5a. Release 3 Update

Page 14: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

XRN4572 – UK Link Release 3 01st Oct

2018

Overall Project RAG Status A

Plan/Time Risks and Issues Cost Resources

RAG Status G R A G

Status Explanation

Objective Full project delivery of UK Link Future Release 3 Scope

Plan/Time

Extraordinary Change Management Committee on 23rd of July approved the split delivery of Release 3 scope into 13 CRs on 2nd of

November and XRN 4454 to be delivered on 1st February 2019

• The progress against each track is as below:-

• Track 1 (13 Changes) – MT ongoing and on track to complete latest by w/c 08th October. Regression testing tracking slightly

behind plan , no impact envisaged to milestones for all changes except XRN 4534 which is RED due to issues found (see

below issue section), IDR planning and preparation underway.

• Track 2 (XRN 4454) – System Testing is now underway with some delays within plan due to complexity of testing – revised

plan now in place along with a synergised Acceptance Testing.

• Issue XRN 4534 : a number of observations on XRN 4534 as part of Regression suite– these issues have dependency on Production

teams to understand and work up options; Issues are being worked through with Xoserve Operations team to understand root cause

and solutions – This places XRN 4534 in RED status and at risk for Go Live on 2nd November.

• Clear resolution plan on XRN 4534 is being prioritised and outcome of this resolution plan will be communicated to all by 10th October

ChMC meeting.

• The Market Trials progress update available on Xoserve website, MT on track to complete as per planned timeframes, MT Closedown

w/c 08th October

• Implementation approach and file level transition plan published to participants. Implementation plan approval sought at E- ChMC on 2nd

October. Follow-on Track 1 training sessions are planned in October before Go-Live.

• Cadent MT registration to open shortly, parties are requested to register interest for Cadent MT starting 19th November. MT information

Inc. high level scenarios to be presented at next DSG onwards.

Risks and

Issues

• Issue against XRN 4534 places its delivery at risk for 2nd November Go Live – resolution being prioritised within Xoserve Project and

Production teams.

• Go Live date dependent on close management of parallelism in plan (this is being managed)

• Complete All System and Acceptance Testing on time to ensure Cadent MT entry on time

Cost • Full Delivery costs approved at ChMC in April 2018. Revision expected to accommodate XRN 4454 delivery date (ongoing discussions)

Resources • Greater resource needed for XRN4454 (both technical & SME) for fulfilling the need for extended track 2. Daily tracking of plan in place

to ensure progressing to revised timelines and additional resource support to deliver XRN 4454

• SME resource requirements for Build, ST and AT phases is being managed weekly with internal Xoserve teams.

Page 15: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

UK Link Release 3 - Plan

Primary

Scope Scoping Initiation Delivery Realisation

Stage Scope

Prioritisati

on

Scope

Defined Funding

Initiatio

n

Analysis

and HLD

Detailed

Design

Build &

System

Test

Acceptance

Test

Performance

Test

Market

Trials

Regression

Test Imp. PIS

Track 1

Baseline

Plan

10/01/18 07/02/18 11/04/1

8

13/04/1

8 13/04/18 04/06/18 13/08/18 07/09/18 1910/18 08/10/18* 22/10/18 02/11/18 04/01/18

Track 1

Current

Plan

10/01/8 07/02/18 11/04/1

8

13/12/1

7 13/04/18 04/06/18* 13/08/18 07/09/18 19/10/18 08/10/18* 22/10/18 02/11/18 04/01/18

Track 2

Baseline

Plan

10/01/18 07/02/18 11/04/1

8

13/04/1

8 13/04/18 30/06/18* 24/09/18 05/11/18 N/A 14/12/18* 18/01/18 01/02/19 08/03/19

Track 2

Current

Plan

10/01/8 07/02/18 11/04/1

8

13/12/1

7 13/04/18 30/06/18*

Build

Complete

ST

synergised

with AT

19/11/18** N/A 14/12/18* 18/01/18 01/02/19 08/03/19

RAG Key – Milestones are end dates;

*Closedown expected to finish this week ** Synergised ST and AT date

Milestone date forecast to be missed Milestone date forecast to be at risk Milestone date forecast to be met Milestone completed Planning/Milestone date to be confirmed

Page 16: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

5b. Release 3 Track 1 Implementation

Page 17: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Background

• At the Delivery Sub Group (DSG) on 17rd Sept, there was an

action on the Release 3 Implementation Plan to confirm file

exchange and processing

• This pack presents the File Level Transition plan where

changes are introduced as part of Future Release 3

• This will be published to the industry on 21st Sept

Page 18: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

High Level Transition Plan

19:00 20:00 21:00 22:00 23:00 00:00 01:00 02:00 03:00 04:00 05:00 06:00 07:00 08:00 09:00 10:00 11:00 12:00 13:00 14:00 15:00 16:00 17:00 18:00 19:00 20:00

CP CP CP CP CP

CP Check Point

3rd Nov 20182nd Nov 018

F

i

x

F

o

r

w

a

r

d

C

o

m

p

l

e

t

e

G

o

L

i

v

e

System: SAP PO, SAP ISU,

Marketflow Activity: Code Transport

System: SAP BWActivity: Code

Transport

Implementation Starts

System: AllActivity:

Technical QA

Stop inbound flow from EFT until implementation completion - 21:30

Start inbound / outbound file flow from EFT

Stop outbound flow from EFT until implementation completion

Implementation Ends

System: SAP PO, SAP ISU, Marketflow

Activity: Inbound File Processing

Page 19: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

File Format – Transition plan

5:00-9:00

Code

Movement

10:00 file

catch up

GT/iGT portfolio files sent in old format

GT/iGT portfolio files sent in new format

4th November

23:59 Response and final

old outbound file sent

21:30 Last inbound file

received

**Daily File formats live

2nd November 3rd November

21:30 EFT Inbound Channels Closed

09:00 EFT InboundChannels Open

Page 20: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

File Transactions 2nd November 2018

Current file formats ‘as is’ will be accepted until 21:30pm.

CNF and WAO files submitted after 21:30pm and time constrained may cause this to fail. Need to

plan accordingly.

Adhoc batch job will be run (21:31pm) to process all ‘in flight’ transactions

received and not processed up to 21.30pm

Responses will be sent from additional batch run up to and including 23:59pm

Response files from batch job will be issued out ‘as is’ current file formats up to

23:59pm

Files received after 21:30pm will be held at Xoserve gateway and processed after

implementation of Release 3 code charges.

New file formats can be sent from 21:31pm

Please note all inbound files are affected by the new file level rejection change

XRN4356, this is the reason we are closing the EFT inbound channels

Page 21: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Implementation 3rd November 2018 Release 3

GT & iGT Portfolio files will be sent in current ‘as is’ old file formats by

5:00am due to generation, starting on the 2nd November, completes early

3rd November. New formats will be received on the 4th November.

Code deployment for Release three completed by 9.00am

Catch up jobs completed from 02/11/2018 and daily jobs for 03/11/2018

Response files from 02/11/2018 and any files processed on 03/11/2018

will be issued during the day.

Where applicable with new file formats – see separate spreadsheet - with

the exception of network portfolios

Page 22: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

File format effective/First Usage

File

Type

Description File Format

Effective

Date

First Usage

of file

Additional

Comments

Change

DDR DDR_DMSP_READINGS 03/11/2018 03/11/2018 XRN4453

DLC DLC_DAILY_READ_EQUIPMENT_

READS 03/11/2018 03/11/2018 XRN4453

ECO ECO_Entry_Commodity_Invoice 03/11/2018 26/11/2018 Monthly process XRN4453

IDB ENERGY BALANCING INVOICE 03/11/2018 03/12/2018 Monthly process XRN4453

NTE NTS Entry Capacity Invoice File 03/11/2018 05/11/2018 Monthly process XRN4453

NXC NTS Exit (Flat) Capacity Invoice

File 03/11/2018 05/11/2018 Monthly process XRN4453

OTA

OPTIONAL NTS COMMODITY TARIFF ADJUSTMENT INVOICE

FILE 03/11/2018 27/11/2018 Monthly process XRN4453

RD1 RD1 03/11/2018 05/11/2018 XRN4453

Page 23: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

File format effective/First Usage

File

Type

Description File Format

Effective

Date

First Usage

of file

Additional

Comments

Change

AIR AIR_Ancillary_invoice_Response 03/11/2018 Adhoc Trigger By request - Business days XRN4453

FSG Failure_To_Supply_Gas_Submission 03/11/2018 12/11/2018 bi monthly process and adhoc by request XRN4453

FSR Failure_To_Supply_Gas_Response 03/11/2018 08/11/2018 bi monthly process and adhoc by request XRN4453

LPG LPG_Supporting_Information 03/11/2018 28/11/2018 Monthly process XRN4453

ORD LDZ Energy Adjustment Submission 03/11/2018 Adhoc Trigger Adhoc requests XRN4453

RTB Request_To_Bill_Template 03/11/2018 Adhoc Trigger Adhoc requests XRN4453

SIF Accounts_Receivable 03/11/2018 03/11/2018 Daily XRN4453

TSI Transporter_Site_Visit_Submission 03/11/2018 16/11/2018 Monthly process XRN4453

TSR Transporter_Site_Visit_Response 03/11/2018 05/11/2018 Adhoc requests XRN4453

TDS TDS Transporter Site Visit Invoice

Supporting Information 03/11/2018 29/11/2018 Monthly process XRN4453

Page 24: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

File format effective/First Usage

File

Type

Description File Format

Effective

Date

First Usage

of file

Additional

Comments

Change

CID CID_CONTRACT_INFORMATION_TO_DNS 03/11/2018

Will only be sent once the DNI schedule is

agreed XRN4453

EDL EDL_DAILY_LOAD 03/11/2018 04/11/2018 XRN4453 XRN4486

EPD Preliminary Supply Meter Point list to

DNs 03/11/2018

Will only be sent once the DNI schedule is

agreed XRN4453

EQL EQL_RESYNC_DATA_LOAD 03/11/2018 Jan 2019 – Depending on Business Request

XRN4453 XRN4486

ESP ESP: Eligible Supply Meter Point list to

DNs 03/11/2018

Will only be sent once the DNI schedule is

agreed XRN4453

GSR GSR_GAS_SAFETY_REGISTER 03/11/2018 Adhoc Trigger XRN4453

EWS EWS FILE TO EMWS 03/11/2018 04/11/2018 XRN4486

RCI Interconnector Confirmation Request File 03/11/2018 Adhoc Trigger XRN3656

ANT SSMP Agent Notification Template 03/11/2018 05/11/2018 Adhoc requests XRN4443

Indicates files will be in the old format on the 3rd as mentioned

Page 25: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

File format effective/First Usage

File

Type

Description File Format

Effective

Date

First Usage

of file

Additional

Comments

Change

IDL iGT_Daily_Delta_File 03/11/2018 04/11/2018 XRN4486 XRN4453

IGR IGR_REFERRAL_NOTIFICATION 03/11/2018 03/11/2018 XRN4453

IQL iGT_Quarterly_Load_File 03/11/2018 Jan 2019 – Depending on Business Request

XRN4486 XRN4453

CCN IGT_CSEP_CREATION_NOTFN 03/11/2018 05/11/2018 XRN4453

CIN IGT_CSEP_INCONSISTENCY_NOTIFIC

ATION 03/11/2018 05/11/2018 XRN4453

CUN CUN_CSEP_AMENDMENT_NOTIFICA

TION_FILE 03/11/2018 05/11/2018 XRN4453

Indicates files will be in the old format on the 3rd as mentioned

Page 26: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

File format effective/First Usage

File

Type

Description File Format

Effective

Date

First Usage

of file

Additional

Comments

Change

URS Unbundled Meter Read

Response 03/11/2018 03/11/2018

It depends on if we process any inbound read files on a

weekend XRN4495

MDR Daily datalogged readings

03/11/2018 03/11/2018 XRN4453

MBR Billed Reads 03/11/2018 03/11/2018 XRN4453

UMR Unbundled Meter Reads 03/11/2018 03/11/2018 Depends on if we process

read files on weekend XRN4453

URN Final unbundled read notice 03/11/2018 03/11/2018 Depends on if we process

read files on weekend XRN4453

UDR Class 2 meter read 03/11/2018 03/11/2018 XRN4453

UBR Class 3 Meter Reads 03/11/2018 03/11/2018 XRN4453

UBR Class 3 Meter Reads 03/11/2018 03/11/2018 XRN4453

SFR Site visit and asset fault response 03/11/2018 03/11/2018

It depends on if we process any inbound SFN files on a

weekend XRN4453 XRN4495

SFN Site visit detail notification 03/11/2018 03/11/2018 XRN4453

Page 27: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

File format effective/First Usage

File Type Description File Format

Effective

Date

First Usage

of file

Additional

Comments

Change

NRL AQ WC NOTIFICATIONS (.NRL) 03/11/2018 22/11/2018 XRN4337

AQI AQ Correction 03/11/2018 05/11/2018 XRN4431

AQR AQ CORRECTION RESPONSE

(.AQR) 03/11/2018 05/11/2018

XRN4431 XRN4453 XRN4495

ONJOB ONJOB Dataset 03/11/2018 03/11/2018 XRN4273 XRN4486

ONUPD ONUPD Dataset 03/11/2018 03/11/2018 XRN4273 XRN4486

PAC Shared Supply Pre Transfer Asset

change Notification Template 03/11/2018 05/11/2018 XRN4273

TAP Meter Point Asset Details (Asset

Portfolio Detail) 03/11/2018 Adhoc Trigger Adhoc requests XRN4486

CDJ Connection and Disconnection

Job 03/11/2018 03/11/2018 XRN4486

DRS Dataset read notification 03/11/2018 03/11/2018 XRN4453

Page 28: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

File format effective/First Usage

File Type Description File Format

Effective Date

First Usage of

file

Additional

Comments

Change

AML AML Amendments Invoice SMP Supporting

Information 03/11/2018 09/12/2018 Monthly process XRN4453 XRN4458

ASP Core Amendment Invoice Supporting Information 03/11/2018 26/11/2018 Monthly process XRN4453

COI COI Core Commodity Individual SMP Supporting

Information 03/11/2018 19/11/2018 Monthly process XRN4453 XRN4481

COM COM Core Commodity Invoice Supporting

Information 03/11/2018 12/11/2018 Monthly process XRN4453 XRN4481

CZI Core_Capacity_Individual_SMP_Supporting_

Information 03/11/2018 13/11/2018 Monthly process XRN4453 XRN4481

EOI EOI DNI Exercise & Option Invoice Supporting

Information 03/11/2018 09/11/2018 Monthly process XRN4453

FSI FSI Failure To Supply Gas Invoice Supporting

Information 03/11/2018 12/11/2018 bi monthly process and adhoc by request XRN4453

IIS IIS Interest Invoice Supporting Information 03/11/2018 29/11/2018 Monthly process XRN4453

LIA LIA Service Standard Liabilities Invoice Supporting

Information 03/11/2018 03/12/2018 Monthly process XRN4453

MIF MIF Meter Assets Invoice Supporting Information 03/11/2018 16/11/2018 Monthly process XRN4453

NCS NSC Compression Supporting Information 03/11/2018 28/11/2018 Monthly process XRN4453

OSG OSG Own Use Gas Supporting Information 03/11/2018 12/11/2018 Monthly process XRN4453

PNS PNS Prime And Subs Invoice Supporting Information 03/11/2018 13/11/2018 Monthly process XRN4453

TSR Interconnector Tariff Switch Change & Cancellation

Response.File 03/11/2018 05/11/2018 Adhoc requests XRN4453

UPI UPI User Pays Type1 Invoice Supporting Information 03/11/2018 15/11/2018 Monthly process XRN4453

ZCS ZCS Core Capacity Invoice Supporting Information 03/11/2018 06/11/2018 Monthly process XRN4453 XRN4481

Page 29: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

File format effective/First Usage

File Type Description File Format

Effective Date

First Usage of file Additional

Comments

Change

MID Meter Inspctn Date Notice 03/11/2018 03/11/2018 XRN4538

BND Bids Information to Shipper 03/11/2018 Will only be sent once the

DNI schedule is agreed XRN4453

CFR Confirmation Response File 03/11/2018 05/11/2018 XRN4273 XRN4486

CNF Confirmation Request 03/11/2018 05/11/2018 XRN4453

CRS Shared Supply Meter Point

Confirmation Response Template 03/11/2018 Adhoc Trigger XRN4273

MRI Shared Supply Meter Reading Access

Instruction Notification File 03/11/2018 05/11/2018 XRN4273

NMR Nomination Response 03/11/2018 05/11/2018 XRN4273 XRN4486

NRF Nomination Referrals Response 03/11/2018 03/11/2018 XRN4273 XRN4486

PPN Periodic Portfolio Notification File 03/11/2018 Adhoc Trigger Adhoc requests XRN4486

SNR Shared Supply Meter Point Nomination

Response Template 03/11/2018 05/11/2018 XRN4273 XRN4486

TNI Interconnector Transfer of Ownership

File 03/11/2018 Adhoc Trigger Adhoc requests XRN4453

TRF Supply Meter Point Ownership

notification 03/11/2018 05/11/2018

XRN4273 XRN4453 XRN4486

TRS Shared Supply Meter Point Transfer of

Ownership Notification Template 03/11/2018 05/11/2018 XRN4273

TSF Interconnector Tariff Switch Referral

Response.File 03/11/2018 Adhoc Trigger XRN4453

Page 30: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

5c. Release 3 Track 2 Customer Day

Page 31: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Release 3 Track 2 Customer Awareness session

Following the success of the Release 3 Customer Awareness Day held on 5th

September we have scheduled a Customer Awareness session for Release 3 Track 2

- XRN4454 ‘DN Sales Requirements for UKLP enduring solution’

Date: Wednesday 10th October 2018

Time: 1pm to 4pm via WebEx

The session will comprise of: Background to XRN4454

Overview of the change and its impact on customers

Question and answer session with Xoserve Subject matter experts

Invitation issued on 24/09/2018

Click here to register for the session (https://www.eventbrite.co.uk/e/xoserve-release-3-track-2-awareness-session-tickets-50594114358)

Page 32: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

6. June 2019 Release Scope

Page 33: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

June 19 Headlines

Of the 12 changes originally allocated to June 2019:

• 9 changes have completed ‘capture’ phase

• 6 changes are out for solution option review

• 1 change with Xoserve to complete HLSOIA (XRN4690)

• 2 changes have had the preferred solution options agreed (XRN4670, 4687)

• A further 3 changes (XRNs 4642, 4645 & 4679) are now proposed for November 2019.

• As the preferred solution option for each change needs to be agreed prior to being formally assigned to a

June 19 release, there is a tight timeframe to ensure that all changes are in a position to be agreed in

October 10th ChMC.

• An extraordinary ChMC may also be required, following October’s ChMC, to approve the EQR for the

progression of Design.

Page 34: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Change Index

June

19

XRN Change Title Current Capture

Status Complexity

Impacted

Parties HLSOIA Due

Target Issue

Date for

Solution

Packs

Target DSG

Session to Confirm

Preferred Option

Target Close-Out

Date for Solution

Packs

Target ChMC

Session to Confirm

Preferred Option &

inclusion in June ‘19

release

4670

Reject a replacement read, where

the read provided is identical to that

already held in UK Link for the same

read date

Undertaking

HLSOIA Low Xoserve 10/09/18 14/09/18 17/09/18 28/09/18 10/10/18

4690 Actual read following estimated

transfer read calculating AQ of 1

Undertaking

HLSOIA Medium Shippers 12/09/18 14/09/18 17/09/18 28/09/18 10/10/18

4687 PSR updates for large domestic

sites

Undertaking

HLSOIA Low Shippers 14/09/18 14/09/18 17/09/18 17/09/18 10/10/18

4691 CSEPs: IGT and GT File Formats

(CGI Files)

Undertaking

HLSOIA Medium DN 19/09/18 21/09/18 - 05/10/18 10/10/18

4692 CSEPs: IGT and GT File Formats

(CIN Files)

Undertaking

HLSOIA Medium DN 19/09/18 21/09/18 - 05/10/18 10/10/18

4693

CSEPs: IGT and GT File Formats

Files Affected: CIC, CIR, CAI, CAO,

DCI, DCO, CIN, CCN, CUN.

Undertaking

HLSOIA High DN 19/09/18 21/09/18 - 05/10/18 10/10/18

4694 CSEPs: IGT and GT File Formats

(Create new data validations )

Undertaking

HLSOIA High DN 19/09/18 21/09/18 - 05/10/18 10/10/18

4676 Reconciliation issues with reads

recorded between D-1 to D-5. Completed HLSOIA Medium Xoserve Completed 23/09/18 07/09/18 20/08/18 12/09/18

4044 Extension of ‘Must Read’ process to

include Annual Read sites Completed HLSOIA Low Cadent Gas Completed N/A 17/09/18 N/A 10/10/18

4642 Address Maintenance Solution Capture Workshops

in Progress Medium Xoserve

Current Status: This is suggested to move to November 2019 as the requirements are not

mature enough to progress to HLSOIA at present.

4645

The rejection of incrementing reads

submitted for an Isolated Supply

Meter Point (RGMA flows)

Capture Workshops

in Progress High Shipper/DN

Current Status: This is suggested to move to November 2019 as the requirements are not

mature enough to progress to HLSOIA at present.

4679

Requiring a Meter Reading following

a change of Local Distribution Zone

or Exit Zone

Capture Workshops

in Progress Medium Xoserve

Current Status: This is suggested to move to November 2019 as the requirements are still being

ratified with customers.

* Italics indicate that the funding has not been formally agreed at ChMC **Extraordinary DSG meeting required

Page 35: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

7. New Changes Proposals

Page 36: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

New Change Proposals

The objective of this slide is to inform DSG attendees of one new Change

Proposal and its respective prioritisation score.

7a. 4747 – Smart Meter Upgrade Notification Report:

Page 37: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

8. Change Proposal Initial Review

Representations

Page 38: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

8.a. 4752 – Meter Read Performance

Page 39: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

8.a. 4752 – Meter Read Performance

The objective of this slide is to explain the purpose of this change

The Change Proposal is attached for reference

Page 40: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

9. Solution Options Impact

Assessment Review Completed

Page 41: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

9a. 4690 – Actual read following estimated transfer read

calculating AQ of 1

Page 42: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 42

Change Overview

XRN4690 – Actual read following estimated transfer read calculating AQ of 1

Change was raised to look at options surrounding mitigating the AQ’s of 1 as a result of an lower Cyclic Actual Read

being submitted following an Estimated Transfer Read causing a negative consumption. DSG/ChCM confirmed 2

solution options to move forward with. 1) Roll over previous AQ where an AQ of 1 is being calculated as a result of

actual following estimated transfer reading (to be progressed via XRN4690) 2) Re-estimate Estimated Transfer Read

following a Cyclic Actual Read (to be progressed under a separate XRN)

Delivery of the agreed solution can be delivered via a number of ways, each variant are outlined and impact assessed in

the up-coming slides.

Solution Options

Roll over previous AQ where an AQ of 1 is being calculated as a result of actual following estimated transfer reading

Identification of an estimated transfer scenario in the AQ Calculation process (by bringing in the read type etc) to target only the negative consumption following estimated transfer to roll over the AQ.

Where either the First (oldest) variance period considered in the AQ Calculation process is a negative then roll over the existing AQ (by rejecting the calc and sending appropriate rejection code in NRL)

1

2

3

Page 43: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 43

Option 1 - High Level Impact Assessment

Assumptions

• Existing rejection code will be

used in the NRL file

Impacted Systems

Marketflow SAP PO SAP ISU

GEMINI

SAP BW

CMS

DES API

1 - Roll over previous AQ where an AQ of 1 is being calculated as a result of actual following

estimated transfer reading

With the changes to be implemented, when an actual read is submitted following an estimated transfer reading, the

system will load the reads successfully. However if the Actual reading is less than the estimated reading there will be

negative consumption. if any negative consumption is there in the AQ period then AQ will not be any re-calculated in the

system and will continue the previous AQ. In addition to this, the NRL file will contain the rejection code CPN00321

(Negative Consumption during metered period. AQ not calculated) for the records in it.

Overall Impact Release Type High Level Cost Estimate

Low Major or Minor 10,000 - 20,000 GBP

Impact

1

Page 44: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 44

Option 1 - System Impact Assessment

SAP ISU SAP ISU

Process Code Process Code

Configuration Configuration

Shipper n/a

Existing Existing

To ensure where a

negative

consumption is

present a revised

AQ is not

calculated

To ensure that the

NRL is populated

with an existing

appropriate

rejection code of

AQ Calculation not

carried out

G G

G G

G G

G G

G G

G G

G G

Application:

System Component:

Development Type:

Impacted User(s):

Build Type:

Change Description:

Requirement Clarity:

Change Complexity:

Integration Complexity:

Test Data Prep Complexity:

Test Execution:

Regression Testing Impact:

Performance Impact:

1

Page 45: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 45

Option 1 - Process Impact Assessment

Process Area Complexity File

Formats Exceptions

External

Screens

Batch

Jobs

Performance

Test?

SPA n/a n/a n/a n/a n/a n/a

Metering (Reads) n/a n/a n/a n/a n/a n/a

Reconciliation n/a n/a n/a n/a n/a n/a

Invoicing –

Capacity n/a n/a n/a n/a n/a n/a

Invoicing –

Commodity n/a n/a n/a n/a n/a n/a

Invoicing –

Amendment n/a n/a n/a n/a n/a n/a

Invoicing –

Other n/a n/a n/a n/a n/a n/a

Rolling AQ Low No No No Yes No

Formula Year AQ n/a n/a n/a n/a n/a n/a

RGMA n/a n/a n/a n/a n/a n/a

DSC Service n/a n/a n/a n/a n/a n/a

Other (Specify) n/a n/a n/a n/a n/a n/a

1

Page 46: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 46

Option 2 - High Level Impact Assessment

Assumptions

• New or existing rejection code to

be used in the NRL file

• AQ recalculation changes will be

limited to Transfer read scenario

• Market Trials efforts / costs are

not included

Impacted Systems

Marketflow* SAP PO* SAP ISU

GEMINI

SAP BW

CMS

DES API

2 - Identification of an estimated transfer scenario in the AQ Calculation process (by bringing in

the read type etc) to target only the negative consumption following estimated transfer to roll

over the AQ.

With the changes to be implemented, when an actual read is submitted following an estimated transfer reading, the

system will load the reads successfully. However if the Actual reading is less than the estimated transfer reading there

will be negative consumption. If any negative consumption is there in the AQ period then AQ will not be any re-

calculated in the system and will continue the previous AQ.

In addition to this, the NRL file can contain a new rejection code outlining the reason for rejection or use an existing.

Overall Impact Release Type High Level Cost Estimate

Medium Major or Minor 35,000 – 45,000 GBP (New)

30,000 – 40,000 GBP (Existing)

Impact

2

* Not applicable if existing rejection code is used

Page 47: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 47

Option 2 - System Impact Assessment

SAP ISU SAP ISU SAP ISU * SAP PO * Marketflow *

Process Code Process Code Process Code Process Code File Format

Configuration Configuration Configuration Interface Configuration

Shipper n/a n/a Shipper Shippers

Existing Existing Existing New New

To ensure where

an actual following

estimated transfer

read results in an

negative

consumption a

revised AQ is not

calculated

To ensure that the

NRL is populated

with an existing

appropriate

rejection code of

AQ Calculation not

carried out

To ensure that the

NRL is populated

with a new

rejection code of

AQ Calculation in

the instances of the

change scenario

To ensure that the

NRL is populated

with a new

rejection code of

AQ Calculation in

the instances of

the change

scenario

System needs to

be configured to

allow the flow of

the .NRL file

containing the new

rejection

code/reason

G G G G G

A G A G G

G G G G G

A G A G G

A G A G G

A G A G G

G G G G G

Application:

System Component:

Development Type:

Impacted User(s):

Build Type:

Change Description:

Requirement Clarity:

Change Complexity:

Integration Complexity:

Test Data Prep Complexity:

Test Execution:

Regression Testing Impact:

Performance Impact:

2

* Not applicable if existing rejection code is used

Page 48: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 48

Option 2 - Process Impact Assessment

Process Area Complexity File

Formats Exceptions

External

Screens

Batch

Jobs

Performance

Test?

SPA n/a n/a n/a n/a n/a n/a

Metering (Reads) n/a n/a n/a n/a n/a n/a

Reconciliation n/a n/a n/a n/a n/a n/a

Invoicing –

Capacity n/a n/a n/a n/a n/a n/a

Invoicing –

Commodity n/a n/a n/a n/a n/a n/a

Invoicing –

Amendment n/a n/a n/a n/a n/a n/a

Invoicing –

Other n/a n/a n/a n/a n/a n/a

Rolling AQ Medium Yes* No No Yes No

Formula Year AQ n/a n/a n/a n/a n/a n/a

RGMA n/a n/a n/a n/a n/a n/a

DSC Service n/a n/a n/a n/a n/a n/a

Other (Specify) n/a n/a n/a n/a n/a n/a

2

* Would be NO if existing rejection code is used

Page 49: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 49

Option 3 - High Level Impact Assessment

Assumptions

• The optimum and sub optimum

periods will be considered for the

validations.

• New or existing rejection code to

be used in the NRL file

• Market Trials efforts / costs are

not included

Impacted Systems

Marketflow* SAP PO* SAP ISU

GEMINI

SAP BW

CMS

DES API

3 - Where either the First (oldest) variance period considered in the AQ Calculation process is a

negative then roll over the existing AQ (by rejecting the calculation and sending appropriate

rejection code in NRL)

With the changes to be implemented, any read received in the system resulting into a negative consumption in the first

variance considered for AQ calc, the AQ will not get recalculated and the rollover will take place. Any further read

received in the system with an outcome as a positive consumption being seen in the first variance will trigger the AQ

recalculation.

In addition to this, the NRL file can contain a new rejection code outlining the reason for rejection or use an existing.

Overall Impact Release Type High Level Cost Estimate

Medium Major or Minor 25,000 – 35,000 GBP (New)

20,000 – 30,000 GBP (Existing)

Impact

3

* Not applicable if existing rejection code is used

Page 50: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 50

Option 3 - System Impact Assessment

SAP ISU SAP ISU SAP ISU * SAP PO * Marketflow *

Process Code Process Code Process Code Process Code File Format

Configuration Configuration Configuration Interface Configuration

Shipper n/a n/a Shipper Shippers

Existing Existing Existing New New

To ensure where a

negative

consumption in the

first variance , the

AQ will not get

recalculated and

the rollover will

take place.

To ensure that the

NRL is populated

with an existing

appropriate

rejection code of

AQ Calculation not

carried out

To ensure that the

NRL is populated

with a new

rejection code of

AQ Calculation in

the instances of the

change scenario

To ensure that the

NRL is populated

with a new

rejection code of

AQ Calculation in

the instances of

the change

scenario

System needs to

be configured to

allow the flow of

the .NRL file

containing the new

rejection

code/reason

G G G G G

A G A G G

G G G G G

A G A G G

A G A G G

A G A G G

G G G G G

Application:

System Component:

Development Type:

Impacted User(s):

Build Type:

Change Description:

Requirement Clarity:

Change Complexity:

Integration Complexity:

Test Data Prep Complexity:

Test Execution:

Regression Testing Impact:

Performance Impact:

3

* Not applicable if existing rejection code is used

Page 51: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 51

Option 3 - Process Impact Assessment

Process Area Complexity File

Formats Exceptions

External

Screens

Batch

Jobs

Performance

Test?

SPA n/a n/a n/a n/a n/a n/a

Metering (Reads) n/a n/a n/a n/a n/a n/a

Reconciliation n/a n/a n/a n/a n/a n/a

Invoicing –

Capacity n/a n/a n/a n/a n/a n/a

Invoicing –

Commodity n/a n/a n/a n/a n/a n/a

Invoicing –

Amendment n/a n/a n/a n/a n/a n/a

Invoicing –

Other n/a n/a n/a n/a n/a n/a

Rolling AQ Medium Yes* No No No No

Formula Year AQ n/a n/a n/a n/a n/a n/a

RGMA n/a n/a n/a n/a n/a n/a

DSC Service n/a n/a n/a n/a n/a n/a

Other (Specify) n/a n/a n/a n/a n/a n/a

3

* Would be NO if existing rejection code is used

Page 52: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

9b. 4691 – CSEPs: IGT and GT File Formats (CGI Files)

Verbal update to be provided by Paul Orsler

Page 53: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

9c. 4692 – CSEPs: IGT and GT File Formats (CIN Files)

Verbal update to be provided by Paul Orsler

Page 54: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

9d. 4693 – CSEPs: IGT and GT File Formats

Files Affected: CIC, CIR, CAI, CAO, DCI, DCO, CIN, CCN,

CUN

Verbal update to be provided by Paul Orsler

Page 55: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

9e. 4694 – CSEPs: IGT and GT File Formats (Create new

data validations)

Verbal update to be provided by Paul Orsler

Page 56: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

10. Solution Options Impact

Assessment Review Completed

Page 57: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

10a. 4670 – Reject a Replacement Read, where the read

provided is identical to that already held in UK Link for the

same read date

Page 58: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

4670 - Reject a Replacement Read, where the read provided is identical

to that already held in UK Link for the same read date

For DSG’s information only, Xoserve issued this change within a Change Pack

on 17th September (2076.2 – RJ – RH) for industry consultation on the solution

options

Please note that this was a reissue of 2074.3 – RJ – RH

Xoserve received five responses from the industry:

Four responses approved Xoserve’s and DSG’s preferred solution option

(Option 2)

One rejected and suggested an alternative solution (Option 1)

A description of the change and the solution options are on the next slide

This will be taken to Change Managers Committee on 10th October for

approval of a solution option

Page 59: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

© 2017 Wipro wipro.com confidential 59

Change Overview and Solution Options

XRN4670 – Read Replacement creating unnecessary exceptions

Shippers are currently submitting replacement readings, with a read which is identical to the previously submitted read

recorded in UK Link for the same read date. Current validation and business processes do not consider this scenario

and therefore as a result is leading to an increase in the number of exceptions received and manual intervention taken

to resolve. Where a replacement reading is submitted to ISU (via NDM read files) that has the same read value and

read date it creates a zero billable consumption, something that at present is not expected and therefore generates a

MN09 exception to be looked at. The current processing of the exception requires a manual consumption adjustment

to be completed by the business ops team for an adjustment to be released and the read to be re-processed.

Solution Options

Reject “duplicate” replacement reads and provide a new rejection code/reason

Reject “duplicate” replacement reads and provide an existing rejection code/reason

Amend SAP ISU to process the replacement read but the zero consumption is not processed

Amend SAP ISU to process the replacement read with the zero consumption being processed

Education piece to the Shipper community to mitigate the submission of such readings

1

2

3

4

5

Page 60: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

11. Defect Dashboard

Page 61: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Defect Summary Stats Stats as per HPQC extract taken on

Wednesday 26th September 2018

Defect Landscape (Open/Closed vrs PGL/New)

PGL Defects Newly Discovered Defects GRAND RELEASE TOTALS

D1 D2 D3 D4 D5 TOTAL D1 D2 D3 D4 D5 Not Set TOTAL

Urgent Fix (D1/D2) 0 0 0 0 0 0 0 1 0 0 0 0 1 1 Amendment Invoice Task Force

0 0 0 0 0 0 0 0 19 5 1 1 26 26

R2.07- 5th October 0 0 0 0 0 0 0 0 3 0 0 1 4 4

On Hold 0 0 0 0 0 0 0 0 1 0 0 0 1 1

Requires CR 0 0 0 0 0 0 0 0 4 2 0 0 6 6

Release Planning 0 0 0 0 0 0 0 0 3 4 0 0 7 7

Currently Unallocated 0 0 0 1 1 2 0 0 33 34 1 1 69 71

TOTAL OPEN 0 0 0 1 1 2 0 1 63 45 2 3 114 116

Closed as Rejected 0 0 3 14 6 23 0 11 29 23 0 2 65 88

Closed as CR 0 0 3 8 0 11 0 0 5 3 0 0 8 19

Closed - Deployed to Production

0 7 28 58 9 102 9 211 370 156 12 7 765 867

TOTAL CLOSED 0 7 34 80 15 136 9 222 404 182 12 9 838 974

GRAND TOTAL 0 7 31 73 16 138 9 223 462 224 14 12 952 1090

Page 62: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

R2.06

The below defects were deployed as part of R2.06 on Friday 21st September.

The next planned release (R2.07) is scheduled for Friday 5th October.

Defect ID Status Description Release

1027

Closed - Deployed to

Production SAP: INV file contains the incorrect RTB comments R2.06

1039

Closed - Deployed to

Production MUST read response not sent for prime sites R2.06

1056

Closed - Deployed to

Production UKLink Query :Withdraw reqest receipt not provided in IDL file R2.06

1058

Closed - Deployed to

Production SAP: AQ Tracker - exception date180618 R2.06

1059

Closed - Deployed to

Production E23 segment issue EWS file R2.06

1110

Closed - Deployed to

Production

Meter Link Code sent out incorrectly in the Nomination Enquiry

Response R2.06

The below defects were deployed as Urgent.

Defect ID Status Description Date Deployed

925 Closed - Deployed to Production linked with 961 AP - GSR Issues 10th September

961 Closed - Deployed to Production linked with 925. GSR process is creating duplicate entry. 10th September

1152 Closed - Deployed to Production SAP-Long Running Job in EP1

13th September

1147 Closed - Deployed to Production SPA: Incorrect EUC Reference in TRF 14th September

Page 63: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Amendment Invoice Impacting Defects – Open 1

There is currently 1 D1/D2 defect which are Amendment Invoice impacting: 1146.

Once this is assured, we will deploy the fix and inform you.

Key:

Amendment Invoice Task Force Defects

Standard Defect

Defect ID Status Primary Business Process Description

720 DRS in progress READS Linked to 761 - Prime and Sub - Billing Changes

743 Ready for Internal Testing READS Suppression of Bill Orders

761 Awaiting CAB INV Linked to 720 - Billing and Invocing - Unable to perform rec billing on Prime Sub sites with coterminous read

838 Assigned READS FINX and O (22 and 06) on same date and shipper sends replacement read for shipper transfer date

859 Assigned OTHER - BW Reporting BW Reporting - Missing records in AML , ASP

906 Fix In Progress RGMA SAP - No Billing Triggers Provided for Capped/ Clamp Sites

920 Assigned OTHER - BW Reporting Linked to 859 - SAP BW - AML Extractor Issue identified while testing Defect 837

947 Fix In Progress READS SAP-variances volume for a rec it creates a last variance as a negative volume in cases involving one day rec

958 DRS Needed READS Unable to upload reads for Class 4 Prime site using read entry screen in case of device removal/change

982 Awaiting CAB INV SAP-Not all MPRNs with mismatches are being captured.

1000 Clarification Required READS Linked with 720 and 761 - Class 4 prime rec checking co-terminus reads on sub site which was isolated/no devices allocated

1015 Assigned READS SAP: Deemed variance energy incorrectly populated in ASP file

1016 DRS completed INV SAP - Incorrect Deemed energy values being populated in ASP files.

1048 DRS Needed INV SAP - ASP mismatch January 2018 amendments invoice

1052 Ready for Internal Testing READS

1052 - SAP - System has generated an incorrect positive/ Negative volume when there is estimated read in rec calculation. TTZ being considered as -1

1054 New RGMA SAP- LM Scenario - Bill order not created

1065 Fix In Progress INV SAP - Non-genuine errors being reported in error log table.

Page 64: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Amendment Invoice Impacting Defects – Open 2

Key:

Amendment Invoice Task Force Defects

Standard Defect

Defect ID Status Primary Business Process Description

1075 DRS Needed RGMA SAP- Capacity trigger start dates differing by 2 days in PTS

1085 Ready for Internal Testing INV

SAP- ASP/AML issue - Reversed migrated data not being picked up in net-off process resulting in 0 prevailing energy

1086 DRS completed INV SAP- ASP/AML issue - Duplicate consumption adjustments causing net-off issues

1109 Assigned READS SAP: Problem with REC INTERFACE Deemed Volume and Energy and Netoff incorrect in ASP(October)

1116 New INV Stranded 8 Series document

1122 Assigned READS Incorrect consumption on RGMA removal MRO when there is an RGMA update for the removal date.

1123 Ready for Internal Testing READS SFN Process - Class change estimated read incorrectly being considered for tolerance validation.

1124 DRS Needed READS Consumption adjustment - in particular scenario bill doc is not getting created

1125 Fix In Progress READS SAP - Incorrect reconciliation whenever site visit read is received between two actual reads

1136 Assigned RGMA - INV SAP: Incorrect entry in BILL ADJUST table for BC Trigger

1137 Assigned READS SAP - TTZ Issue in case of next actual as 1 in RGMA

1138 DRS completed INV SAP- Net-off for the RGMA replacement post UMR not working for the last variance in the billing period.

1145 Assigned INV SAP - Invalid BI54 exceptions being raised. Requires analysis

1146 Ready for Internal Testing READS Invalid Bill Doc Reversals : Class3 Read

1153 Assigned RGMA - INV SAP-CMS reference number missing in AML

1154 Fix In Progress READS Bill Blocks Not Applied for All MR07s (2 Scenarios Described with Examples

Page 65: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Amendment Invoice Impacting Defects - Closed

The below defects were deployed / closed since the last slides were issued.

Key:

Amendment Invoice Task Force Defects

Standard Defect

Defect ID Status Description Date fix deployed

1152 Closed - Deployed to Production SAP-Long Running Job in EP1 13th September

863 Closed - Deployed to Production

Linked to 886 - SAP - Incorrect volume & energy following replacement read 18th September

886 Closed - Deployed to Production

Linked to 863 - Read Screen issue for FINX read 18th September

1045 Closed - Deployed to Production

1045 - SAP-UMR processing picking incorrect next read 18th September

1049 Closed - Deployed to Production SAP- Bill doc automatic calculation 18th September

1108 Closed as Rejected Contract change between CA period is not working as expected N/A

1114 Closed as Rejected SAP - Bill docs not created N/A

Page 66: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

12. Miscellaneous

Page 67: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

12a. Market Intelligence Service (MIS) /JMDG Overview

Page 68: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

MIS Origins

Ofgem set out 4 reform packages:

1. Do nothing

2. Enhance existing

3. CSS

4. CSS and MIS

As a result of the consultation Ofgem refined option 2 and the new option became 2A, and

determined that the industry was best placed to develop and fund the MIS services

Ofgem then asked Xoserve and Gemserv to take forward the MIS initiative

MIS is a suite of Data Products and services that support improvement in the reliability of

switching, and enhanced consumer experience

RP0 RP1 RP2 RP3 No system or process changes. No Improvement to reliable switching. 21 day switch.

Use existing systems. Address matching to improve reliability. Key Process changes (harmonised where possible) to deliver 3 to 7 day switch.

New central switching service (core data). Enduring reliability improvement to data quality. Harmonised and simplified next day switching process.

New central switching service and market intelligence services. Enduring reliability improvement, and improved access to broader range of switching data. Harmonised and simplified next day switching process.

Page 69: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

MIS Governance

Page 70: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Industry Consultation

• Open Letter published 4th January

• The Open Letter was the first stage of an ongoing consultation approach

• Over 20 responses: range of stakeholders: suppliers, networks, metering

organisations, water/business customer, Citizens Advice, medium/large suppliers, as

well as from Alt Han Co

• Wide spread support

• Broad consensus for an unconstrained approach

• Initial priorities focusing on extending the API service to energy suppliers and support

for Ofgem’s Faster and More Reliable Switching Programme (switching programme)

• Over 55 Use Cases identified, more Use Cases are evolving

Page 71: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

MIS Governance

Brendan McGarry

Page 72: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Get involved!

The Joint Market Intelligence Service Development Group (JMDG) is open to all energy

participants

Page 73: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

12b. Defect 838 RGMA on Transfer Date (AML Impacting)

Page 74: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Story so far…

Defect 838 was raised to look into issues faced when an RGMA update is

received for an effective date that is D+1 of the Shipper Transfer Effective

Date and the Transfer Effective Read is then being replaced

Reconciliation issues are being experienced that cannot be processed

correctly and therefore being excluded from the amendment invoice

This defect (and exclusions) are in scope of the AML Taskforce so has

been given a high priority to resolve

DSG Members are asked to review the upcoming slides and provide input

on potential solutions that can be moved forward to resolve the defect

(enduring solution)

Please also consider the exclusions that are pending (solution may

require an alternative fix)

A number of scenarios have been identified that would need to be

considered

Page 75: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Considerations (how the system works)

3. Once D+10 has passed we will estimate a Transfer Read as per normal

NDM logic (RGMA read is not used in any capacity for Transfer Read

processing)

D-5 D+5

Shipper Transfer Effective Date

Transfer Read Window

D+10

2. If an RGMA comes in between D+6 to D+10 (effective date can be back

to D+1) then we will use the RGMA read (FINX) in calculating a

estimated Transfer read

1. If an RGMA comes in between D+1 to D+5 then the RGMA read (FINX)

will be used as the Transfer Read (but loaded as an estimate)

RGMA

12345

12345 11132

RGMA

12345

10000

Cyclic Read

RGMA

12345

10045

D

Page 76: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Considerations

In all 3 of the scenarios on the previous slide, the RGMA Effective Date

can be at D+1 of the Transfer Effective Date

From our interpretation of UNC (M4.2.10), we are able to reject an

“Agreed Opening Meter Reading” (5.13.12) where an RGMA read is

received via UPD (Meter Information Update Notification) and has been

used as the transfer read or if it has been used to estimate an opening

transfer read

UNC is silent on the use of JOB (Meter Information Notification) flows in

the same way

This issue is only being experienced where a replacement transfer

reading is being received (first time Reconciliation is accurate)

Approx. 260 have been affected by a replacement transfer reading

However there are approx. 164k potential sites where we have had an

RGMA at D+1 (not yet received a replacement reading)

Where UPD is estimated, the replacement transfer read could be greater

than the FINX and cause a negative consumption

Page 77: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Scenario 1

Shipper Transfer occurs

Opening Read provided by Incoming Shipper within Transfer Read

Window (non RGMA)

RGMA received and processed at a later date

RGMA Effective Date on D+1 of Shipper Transfer Date

Transfer Read Replaced Later date

Page 78: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Scenario 1

Outgoing Shipper

Incoming Shipper

Xoserve

D-5 D+5

Shipper Transfer Effective Date

Transfer Read Window

31.08.2017

Cyclic Read

25.04.2016

A

30.08.2017

FINT

A

OPNT

A

FINX

A

01.09.2017

OPNX

A

06.11.2017

Cyclic Read

A JOB

28.09.2017

RGMA

14.05.2018

Replacement

Read

R

R

5000 1000 0

2000

-3000

Replacement Read leads

to missing consumption

between new OPNT

(05612) & FINX (08071)

that is not considered

3000

1st Time

Rec

2nd Time

Rec

Page 79: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Scenario 2

Shipper Transfer occurs

RGMA received between D to D+5

RGMA Read Used as Estimate Shipper Transfer Read

RGMA Effective Date on D+1 of Shipper Transfer Date

Transfer Read Replaced at a later date

Page 80: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Scenario 2

Outgoing Shipper

Incoming Shipper

Xoserve

D-5 D+5

Shipper Transfer Effective Date

Transfer Read Window

13.09.2017 12.09.2017

UPD

18.09.2017

RGMA

23.01.2018

Replacement

Read

1000 0

2000

+1000

Replacement Read leads to

missing negative

consumption between new

OPNT (02064) & FINX

(01870) that is not

considered, a good thing in

this instance!

-1000

Cyclic Read

10.09.2016

A

OPNT

E

FINT

E

14.09.2017

OPNX

E

FINX

E

R

R

1st Time

Rec

2nd Time

Rec

Page 81: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Scenario 3

Shipper Transfer occurs

No Opening Reading provided by Incoming Shipper

System estimates Shipper Transfer Reading

RGMA received and processed at a later date

RGMA Effective Date on D+1 of Shipper Transfer Date

Transfer Read Replaced at a later date

Page 82: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Scenario 3

Outgoing Shipper

Incoming Shipper

Xoserve

D-5 D+5

Shipper Transfer Effective Date

Transfer Read Window

25.05.2017 24.05.2017

UPD

07.08.2017

RGMA

16.05.2018

Replacement

Read

1500 0

1000

-500

Replacement Read leads

to missing consumption

between new OPNT

(54297) & FINX (54478)

that is not considered

500

1st Time

Rec

2nd Time

Rec

500 1000

FINX

E

26.05.2017

OPNX

E

OPNT

E

FINT

E

07.09.2017

Cyclic Read

A

06.03.2018

Cyclic Read

A

R

R

Cyclic Read

31.03.2017

A

Page 83: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Potential Solution Options

1. Reject the replacement transfer reading as per UNC

Could we also include Meter Information Notification (JOB) flows?

Solution would not resolve all scenarios covered

2. Reject replacement transfer reading only where we have an RGMA

present at D+1

Would need to look if this requires a UNC change

Shipper would need to submit Consumption Adjustment to reapportion

the consumption

3. Reject RGMA’s with effective date of D+1 of a Transfer Effective Date

(forcing the Shipper to submit them for D+2)

4. No system change, Shipper to submit a Consumption Adjustment to

account for the missing consumption, when required

Process needed for identification of sites where this is required

Page 84: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

12c. Replacement/Insertion Reads (a negative consumption

scenario)

Page 85: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Overview

As part of the data analysis relating to XRN4690 (Actual Read following

Estimated Transfer Read Calculating AQ of 1) it was identified that

negative consumption is being seen in instances other than what is

specified within the CP

New scenarios are assumed to be rare (profiling in progress)

Solution has already been selected for XRN4690 however variants of this

solution are currently out for Impact Assessment

2 main scenarios are present

Inserting a read (before or after) an Estimated Transfer Read

Replacing a read (before or after) an Estimated Transfer Read

Page 86: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Replacement Reading Without Cyclic

Shipper Transfer Effective Date

21.08.2018

E

OPNT

FINT

E

22.08.2018

Outgoing Shipper

Incoming Shipper

Xoserve

Cyclic Read

05.01.2018

A

10.04.2018

Cyclic Read

A

Tolerance Check

Tolerance Check

R

Replacement Read

+ 2000

+ 3000

+ 1000

- 1000

+ 2000

Tolerance Check

Tolerance Check

Cyclic Read

22.12.2018

A

This Cyclic Read

could also be

replaced!

Paired Consumption for AQ

Page 87: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Replacement Reading With Cyclic

Shipper Transfer Effective Date

21.08.2018

E

OPNT

FINT

E

22.08.2018

Outgoing Shipper

Incoming Shipper

Xoserve

Cyclic Read

05.01.2018

A

10.04.2018

Cyclic Read

A

Tolerance Check

Tolerance Check

R

Replacement Read

+ 2000

+ 3000

+ 1000

- 1000

+ 2000

Tolerance Check Tolerance Check

Cyclic Read

22.12.2018

A

This Cyclic Read

could also be

replaced!

Paired Consumption for AQ

Page 88: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Inserted Reading Without Cyclic

Shipper Transfer Effective Date

21.08.2018

E

OPNT

FINT

E

22.08.2018

Outgoing Shipper

Incoming Shipper

Xoserve

Cyclic Read

05.01.2018

A

10.04.2018

Cyclic Read

A

Tolerance Check Tolerance Check

A

Inserted Reading

+ 2000 + 1000

+ 2000

+ 2000

Tolerance Check

Tolerance Check

Cyclic Read

22.12.2018

A

28.06.2018

- 1000

Paired Consumption for AQ

A

Inserted Reading

02.10.2018

Inserted Read could also

be this side of the

Estimated Transfer Date

Page 89: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

Inserted Reading With Cyclic

Shipper Transfer Effective Date

21.08.2018

E

OPNT

FINT

E

22.08.2018

Outgoing Shipper

Incoming Shipper

Xoserve

Cyclic Read

05.01.2018

A

10.04.2018

Cyclic Read

A

Tolerance Check Tolerance Check

A

Inserted Reading

+ 2000 + 1000

- 1000

+ 2000

Tolerance Check Tolerance Check

Cyclic Read

22.12.2018

A

+2000

28.06.2018

Paired Consumption for AQ

A

Inserted Reading

02.10.2018

Inserted Read could also

be this side of the

Estimated Transfer Date

Page 90: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

DSG Considerations

New variants of the preferred solution option for XRN4690 discussed in

the last DSG would not resolve these instances (however the original IA

would - Blanket rollover of AQ where negative is present)

Consideration needed to either…

Look into additional variant(s) for XRN4690 to include these scenarios

Progress with XRN4690 and work up solutions under a new CP

Do nothing (depending on numbers) live with the risk

Page 91: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

12d. Action Updates

All DSG related actions are listed on the following spreadsheet:

Page 92: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

13. AOB

Page 93: DSC Delivery Sub-Group - Xoserve · Background • Currently 14 issues affecting AQ • 280K MPRN’s are impacted from incorrect AQ calculation • For Class 3 and 4 meter point

13a. How can we improve the method by which we distribute Change

Packs?

Within Change Pack 2008.2 – ER – DA, we asked for the industry’s suggestions

on how we could improve the method by which we distribute Change Packs

We received some responses but there wasn’t consensus so we require further

discussions

Can DSG members discuss the suggestions we received so we can form some

actions for improving the method of distribution?

The following Rep Matrix contains the 2008.2 – ER – DA Change Pack and its

associated responses: