7
BUILDING CODE ROOM CODE DESCRIPTION 0030 A LEGEND KEY FOR BUILDING E NORTH ROOM IDENTIFICATION A E 0160 0170 0100 0110 0150 0060 0220 0070 0080 0090 0020 0120 0130 0140 0180 0010 0190 0200 0210 Chilled Water Buffer Tank Installations at Various Sites Sheet Index T-1 Cover, Sheet Index M-1 Leavenworth, Greenberg, Thomas, and Cooper M-2 Anthony, Storey, Fort Miller, and Fremont M-3 Aynesworth, Terronez, Ayer, and Balderas M-4 Easterby, Fresno High, Yosemite, and Wawona M-5 Edison and Addams M-6 Details and Schedules Various Sites 3/01/2021 Scale None T-1 General Project Notes 1. Drawings are a general representation of work to be accomplished, contractor shall verify existing conditions, dimensions, and quantity of materials. 2. Buffer tanks will be owner provided. 3. Clean new tank and piping according to specifications. 4. Add closed loop treatment to supplement increase in system size from new tank and piping. 5. Anchor tanks to existing concrete slab U.N.O. 6. Water balancing will be performed by FUSD Legend Existing Piping New Piping Butterfly Valve CMU Wall Chainlink Fence

Various Sites Chilled Water Buffer Tank Installations at

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Various Sites Chilled Water Buffer Tank Installations at

BUILDING CODE

ROOM CODE DESCRIPTION

0030

A

LEGEND

KEY FOR BUILDING E

NORTH

ROOM IDENTIFICATION

A

E

0160

0170

0100

0110

0150

0060

0050

0220

0030

0040

0070

0080

0090

0020

0120

0130

0140 0180

0010

0190

0200

0210

AYER

ELEMENTARY SCHOOL

Chilled Water Buffer Tank Installations atVarious Sites

Sheet IndexT-1 Cover, Sheet IndexM-1 Leavenworth, Greenberg, Thomas, and CooperM-2 Anthony, Storey, Fort Miller, and FremontM-3 Aynesworth, Terronez, Ayer, and BalderasM-4 Easterby, Fresno High, Yosemite, and WawonaM-5 Edison and AddamsM-6 Details and Schedules

Various Sites

3/01/2021Scale

None T-1

General Project Notes1. Drawings are a general representation of work to be accomplished, contractor shall verify existing conditions, dimensions, and quantity of materials.2. Buffer tanks will be owner provided.3. Clean new tank and piping according to specifications.4. Add closed loop treatment to supplement increase in system size from new tank and piping.5. Anchor tanks to existing concrete slab U.N.O.6. Water balancing will be performed by FUSD

LegendExisting Piping

New Piping

Butterfly Valve

CMU Wall

Chainlink Fence

Page 2: Various Sites Chilled Water Buffer Tank Installations at

BUILDING CODE

ROOM CODE DESCRIPTION

0030

A

LEGEND

KEY FOR BUILDING E

NORTH

ROOM IDENTIFICATION

A

E

0160

0170

0100

0110

0150

0060

0050

0220

0030

0040

0070

0080

0090

0020

0120

0130

0140 0180

0010

0190

0200

0210

AYER

ELEMENTARY SCHOOL

Leavenworth

4" pipe

Greenberg

4" pipe

Air Cooled

Chiller

Air Cooled

Chiller

Air Cooled

Chiller

Thomas

4" pipe

BT-1Air Cooled

Chiller

Cooper

4" pipe

Leavenworth, Greenberg,

Thomas, and Cooper

Schools

3/01/2021Scale

1/4" M-1

BT-1

BT-1

BT-1

Replace

(E) pump

Relocate

(E) valve

(E) housekeeping pad typ.

typ.AM6

P2

Mechanical

Room

Mechanical

Room

Page 3: Various Sites Chilled Water Buffer Tank Installations at

BUILDING CODE

ROOM CODE DESCRIPTION

0030

A

LEGEND

KEY FOR BUILDING E

NORTH

ROOM IDENTIFICATION

A

E

0160

0170

0100

0110

0150

0060

0050

0220

0030

0040

0070

0080

0090

0020

0120

0130

0140 0180

0010

0190

0200

0210

AYER

ELEMENTARY SCHOOL

Air Cooled

Chiller

Anthony

6" Pipe

Fort Miller

6" Pipe

Air Cooled

Chiller

Air Cooled

Chiller

Fremont

2" Copper Pipe

Air Cooled

Chiller

Storey

East Plant

6" Pipe

(N)Housekeeping pad

Mechanical room

Anthony, Fort Miller,

Storey, and Fremont

3/01/2021Scale

1/4" M-2

BT-2

BT-1

BT-2

BT-1

Page 4: Various Sites Chilled Water Buffer Tank Installations at

BUILDING CODE

ROOM CODE DESCRIPTION

0030

A

LEGEND

KEY FOR BUILDING E

NORTH

ROOM IDENTIFICATION

A

E

0160

0170

0100

0110

0150

0060

0050

0220

0030

0040

0070

0080

0090

0020

0120

0130

0140 0180

0010

0190

0200

0210

AYER

ELEMENTARY SCHOOL

Air Cooled

Chiller

Aynesworth

4" Pipe

Air Cooled

Chiller

Terronez

6" Pipe

Tees and

valve in riser

Mechanical

Room

Ayer

4" Pipe

Chiller yard

Air Cooled

Chiller

Balderas

6" Pipe

Aynesworth, Terronez, Ayer,

and Balderas

3/01/2021 M-3Scale

1/4"

BT-1

BT-1

BT-1

BT-1

Page 5: Various Sites Chilled Water Buffer Tank Installations at

BUILDING CODE

ROOM CODE DESCRIPTION

0030

A

LEGEND

KEY FOR BUILDING E

NORTH

ROOM IDENTIFICATION

A

E

0160

0170

0100

0110

0150

0060

0050

0220

0030

0040

0070

0080

0090

0020

0120

0130

0140 0180

0010

0190

0200

0210

AYER

ELEMENTARY SCHOOL

Air Cooled

Chiller

Easterby

4" Pipe

Air Cooled

Chiller

Yosemite

4" Pipe

Air Cooled

Chiller

Fresno High

6" Pipe

Easterby, Fresno High,

Yosemite, and Wawona

3/01/2021Scale

1/4" M-4

Air Cooled

Chiller

Wawona

4" Pipe

BT-1

BT-2

BT-2

BT-1

(N)Housekeeping pad

Mechanical

Room

Page 6: Various Sites Chilled Water Buffer Tank Installations at

BUILDING CODE

ROOM CODE DESCRIPTION

0030

A

LEGEND

KEY FOR BUILDING E

NORTH

ROOM IDENTIFICATION

A

E

0160

0170

0100

0110

0150

0060

0050

0220

0030

0040

0070

0080

0090

0020

0120

0130

0140 0180

0010

0190

0200

0210

AYER

ELEMENTARY SCHOOL

3/01/2021

Edison, and Addams

Scale

1/4" M-5

Water C

ooled

Chiller

Water C

ooled

Chiller

System Loop

Pumps

Chilled Water

Pumps

Edison

6" Pipe

Air Cooled

Chiller

(N)Valve in Riser

Addams

4" Pipe

BT-2

BT-1

Condenser

Condenser

Page 7: Various Sites Chilled Water Buffer Tank Installations at

BUILDING CODE

ROOM CODE DESCRIPTION

0030

A

LEGEND

KEY FOR BUILDING E

NORTH

ROOM IDENTIFICATION

A

E

0160

0170

0100

0110

0150

0060

0050

0220

0030

0040

0070

0080

0090

0020

0120

0130

0140 0180

0010

0190

0200

0210

AYER

ELEMENTARY SCHOOL

Details and Schedules

M-63/01/2021Scale

None

Secure Tank Baseplate w/Angle

Clips x4 to Concrete Slab

w/1/2" SS Hilti KBTZ

Ball Valve and

Auto Air Vent

1" Drain and Plug

Buffer Tank ScheduleDesignation BT-1 BT-2Tank Volume 250 gal. 500 gal.Inlet/Outlet 6" 6"Manufacturer Taco TacoModel BTL0250F06-125N BTL0500F06-125NOperating Wt. 2,792.5 lbs 5,325 lbs

Pump ScheduleDesignation P-2Horsepower 7.5Volts/Phase 460/3RPM 1760GPM/TDH 350/45 ftManufacturer TacoModel 3009DType InlineFrame TEFCNOTE: Upgrade (E) starter to accommodate new 7.5 hp motor overload requirements

Buffer Tank Installation A

M6

Insulate tank w/ 1-1/2"

fiberglass insulation

and aluminum jacketing

Housekeeping Pad @ Fremont & Wawona

(#4 rebar 12" o.c. each way, dowel vertical #4 into (E)

slab 24" max spacing and at least every corner)

min. 4" thickness