35
Validation | Slide 1 of 35 August 2006 Validation Supplementary Training Modules on Good Manufacturing Practice WHO Technical Report Series, No. 937, 2006. Annex 4.

Validation Part7

Embed Size (px)

DESCRIPTION

WHO: Supplementary Training Modules on Good Manufacturing Practice

Citation preview

Page 1: Validation Part7

Validation | Slide 1 of 35 August 2006

Validation

Supplementary Training Modules on Good Manufacturing Practice

WHO Technical Report Series, No. 937, 2006. Annex 4.

Page 2: Validation Part7

Validation | Slide 2 of 35 August 2006

ValidationValidation

Part 1. General overview on qualification and validation

Part 2. Qualification of HVAC and water systems

Part 3. Cleaning validation

Part 4. Analytical method validation

Part 5. Computerized system validation

Part 6. Qualification of systems and equipment

Part 7. Non sterile product process validation

Page 3: Validation Part7

Validation | Slide 3 of 35 August 2006

Non sterile product process validation

Part 7

Supplementary Training Modules on Good Manufacturing Practice

WHO Technical Report Series, No. 937, 2006. Annex 4. Appendix 7.

Page 4: Validation Part7

Validation | Slide 4 of 35 August 2006

ValidationValidation

Objectives

To discuss non-sterile process validation, focusing on:

General recommendations

Prospective validation

Concurrent validation

Retrospective validation

Revalidation

Change control

Page 5: Validation Part7

Validation | Slide 5 of 35 August 2006

ValidationValidation

Principle

Documented evidence: Process is capable of reliably and repeatedly rendering a product of the required quality

Planning, organizing and performing process validation

Process validation protocols

Data collected and reviewed against predetermined acceptance criteria – recorded in validation report

1.1 – 1.2

Page 6: Validation Part7

Validation | Slide 6 of 35 August 2006

ValidationValidation

Scope

General aspects of process validation for the manufacture of non-sterile finished products

Should cover at least the critical steps and parameters, i.e. those that may have an impact on the quality of the product

2.1 – 2.2

Page 7: Validation Part7

Validation | Slide 7 of 35 August 2006

ValidationValidation

General

Policy and approach to be documented– e.g. in a validation master plan – including critical process

steps and parameters

Process validation to start after qualification of support systems and equipment is completed

In some cases - concurrently with PQ– Normally completed prior to the manufacture of finished

product that is intended for sale (prospective validation)– During routine production (concurrent validation)

3.1 – 3.3

Page 8: Validation Part7

Validation | Slide 8 of 35 August 2006

ValidationValidation

Prospective validation

Critical factors or parameters possibly affecting finished product quality to be identified during product development

– Breakdown of production process into individual steps– Evaluate each step

Determine the criticality of these factors through a “worst-case” challenge where possible

4.1 – 4.2

Page 9: Validation Part7

Validation | Slide 9 of 35 August 2006

ValidationValidation

(continued) Prospective validation protocol should include:

– description of the process and of the experiment– equipment and/or facilities to be used including measuring

or recording equipment (and its calibration status)– variables to be monitored– details of the samples to be taken– product performance characteristics/attributes to be

monitored, together with the test methods– acceptable limits and time schedules– personnel responsibilities– details of methods for recording and evaluating results,

including statistical analysis 4.3

Page 10: Validation Part7

Validation | Slide 10 of 35 August 2006

ValidationValidation

Approach:

Equipment, production environment and analytical testing methods – already fully validated

– e.g. during installation qualification and operational qualification

Appropriately trained personnel and batch manufacturing documentation prepared after these critical parameters have been identified, and machine settings, component specifications and environmental conditions have been determined and specified

4.4 – 4.6

Page 11: Validation Part7

Validation | Slide 11 of 35 August 2006

ValidationValidation

Approach (2)

A number of batches of the final product should then be produced

What number of batches?– sufficient to allow the normal extent of variation and trends

to be established and– to provide sufficient data for evaluation

Data within the finally agreed parameters– from at least three consecutive batches, giving product of

the desired quality may be considered acceptable4.7 – 4.8

Page 12: Validation Part7

Validation | Slide 12 of 35 August 2006

ValidationValidation

Approach (3)

Same size batches

Full-scale production batch size– If not possible – reduced batch size considered– Validity of assumptions made should be demonstrated

when full-scale production starts

Extensive testing at various stages in the manufacturing process – including on the final product and its package

4.9 – 4.10

Page 13: Validation Part7

Validation | Slide 13 of 35 August 2006

ValidationValidation

Setting Limits: may include– Marketing authorization limits

stability specifications– Release specification– Validation limits

Batch release limits

Marketing authorization limitsbased on stability specifications

Validation limits

Page 14: Validation Part7

Validation | Slide 14 of 35 August 2006

Determining critical control point: example of a tablet granulation process

Particle size distribution of the active(s)

Blending time for the powder

Granulating time and speed; amount of granulating fluid and binder concentration

Drying time – final moisture content, granule particle size distribution

Granule active content and homogeneity, blending time of external phase

Validation

Page 15: Validation Part7

Validation | Slide 15 of 35 August 2006

Criticalcontrol

point

Decision as to whether tocompress or not based on

expected yield and actual yield

Process step Operation IQ/OQ/PQ requirements

Criticalcontrolpoint

Measure humidity withhumidity meterXIII

IQ/OQcalibration

Weigh granulate - balanceXIV IQ/OQcalibration

instrumentoperation,

cleaning, careand maintenance

Trainingrecords fortechnician

XV Sieve 3/5

sieve with sieve type 1

XVI Blend3/5

granulatemixer (speed 1, 1 minute)

XVI Blend 2with 3/5

granulate

mixer (speed 1, 30seconds)

IQ/OQ/PQCleaning

validationCleaning, and Blend

uniformity required to beestablished during validation

XVIII Weigh granulate

Validation

Determining critical control points

Page 16: Validation Part7

Validation | Slide 16 of 35 August 2006

Solid dose mixing (1)

Homogeneity in blending – the key to quality!

Sampling strategy

Sample site, label, container

Storage

Transport

Sample thief

Validation

Page 17: Validation Part7

Validation | Slide 17 of 35 August 2006

Solid dose mixing (2) In situ analysis

Methods of analysis

Statistical analysis – inter-batch

– intra-batch

– within-sample-site

Validation

Page 18: Validation Part7

Validation | Slide 18 of 35 August 2006

ValidationValidation

Tablet compression variables

Fill volume

Pre- and compression force

Turntable speed

Dwell time

Granule size and feed

Ejection force, lubrication

Page 19: Validation Part7

Validation | Slide 19 of 35 August 2006

ValidationValidation

Tablet compressionparameters

Mass

Hardness

Moisture

Friability

Disintegration

Dissolution Thickness

Page 20: Validation Part7

Validation | Slide 20 of 35 August 2006

ValidationValidation

Tablet coating variables Spray rate Inlet and outlet air temp Coating weight

Page 21: Validation Part7

Validation | Slide 21 of 35 August 2006

ValidationValidation

Results in the report that includes, e.g.– process description including details of critical steps– detailed summary of the results obtained from in-process

and final testing, including data from failed tests– raw data or reference to these– any work done in addition to that specified in the protocol– any deviations from the protocol with an explanation– a review and comparison of the results with those expected– formal acceptance or rejection of the work by the team or

persons designated as being responsible for the validation, after completion of any corrective action or repeated work

4.11

Page 22: Validation Part7

Validation | Slide 22 of 35 August 2006

ValidationValidation

Conclusion and recommendation:– Made on the basis of the results obtained– Incorporated into the batch manufacturing and batch

packaging documents and/or standard operating procedures (SOPs) for routine use

– Limits and frequencies of testing and monitoring should be specified. Actions in case of OOL

If validation batches are to be sold or supplied:– manufactured under GMP conditions– Compliance with the marketing authorization

4.12. – 4.14.

Page 23: Validation Part7

Validation | Slide 23 of 35 August 2006

ValidationValidation

Concurrent validation

May be appropriate to validate a process during routine production

– Can you give any examples?

Decision made by appropriately authorized personnel

Premises and equipment previously qualified

Done as per validation protocol; and results documented in the validation report

5.1 – 5.5

Page 24: Validation Part7

Validation | Slide 24 of 35 August 2006

ValidationValidation

Retrospective validation

Comprehensive review of historical data

Requires a protocol and a report with a conclusion and a recommendation

Not the preferred method of validation, and used in exceptional cases only:

– e.g. for well-established processes

Inappropriate in case of changes (e.g. equipment)

6.1 – 6.2

Page 25: Validation Part7

Validation | Slide 25 of 35 August 2006

ValidationValidation

Retrospective validation (2)

Sufficient data to be reviewed to provide a statistically significant conclusion

Satisfactory results of retrospective validation

only serve as an indication

that the process does not need

to be subjected to validation

in the immediate future6.3 – 6.4

Page 26: Validation Part7

Validation | Slide 26 of 35 August 2006

ValidationValidation

Revalidation

Standard processes (with conventional equipment)– data review similar to retrospective validation

Points to be considered:– the occurrence of any changes in the master formula,

methods, starting material manufacturer, equipment and/or instruments

– calibrations and preventive maintenance carried out– standard operating procedures (SOPs)– cleaning and hygiene programme

7.1

Page 27: Validation Part7

Validation | Slide 27 of 35 August 2006

ValidationValidation

Change control In case of changes, consider the change and its impact on the

process validation

Examples of changes (requiring revalidation):– manufacturing process (e.g. mixing times, drying

temperatures)– equipment (e.g. addition of automatic detection systems)– production area and support system changes– transfer of processes to another site– unexpected changes (e.g. those observed during self-

inspection or during routine analysis of process trend data)8.1 – 8.2

Page 28: Validation Part7

Validation | Slide 28 of 35 August 2006

Validation

Non sterile products

Tablets

Capsules Creams

Ointments

Suspensions Syrups

Page 29: Validation Part7

Validation | Slide 29 of 35 August 2006

ValidationValidation

Non sterile products

List some of the key parameters to be considered in the process validation of the dosage forms mentioned

2.4

Page 30: Validation Part7

Validation | Slide 30 of 35 August 2006

Validation

SUMMARYProspective validation

Page 31: Validation Part7

Validation | Slide 31 of 35 August 2006

Validation

SUMMARYProspective validation

Concurrent validation

Page 32: Validation Part7

Validation | Slide 32 of 35 August 2006

Validation

SUMMARYProspective validation

Concurrent validation

Retrospective validation

Page 33: Validation Part7

Validation | Slide 33 of 35 August 2006

Validation

SUMMARYProspective validation

Concurrent validation

Retrospective validation

Revalidation

Page 34: Validation Part7

Validation | Slide 34 of 35 August 2006

Validation

SUMMARYProspective validation

Concurrent validation

Retrospective validation

Change control

Revalidation

Page 35: Validation Part7

Validation | Slide 35 of 35 August 2006

Validation

Group Session

You are given a tablet manufacturing flow chart to study

List the critical steps that are required to be validated

List the critical equipment required to be qualified

Identify the variables and construct a table as directed