25
VA/DoD Collaboration The Way Of The Future

VA/DoD Collaboration The Way Of The Future

  • Upload
    dragon

  • View
    64

  • Download
    0

Embed Size (px)

DESCRIPTION

VA/DoD Collaboration The Way Of The Future. North Chicago VAMC. Established 1926 Current catchment area: 50,000 veterans 550+ inpatient beds Medical – 150 beds - ADC of 55 (FY05) Psychiatric – 25 beds - ADC of 16 (FY05) Long term care – 204 beds - ADC of 183 (FY05) - PowerPoint PPT Presentation

Citation preview

Page 1: VA/DoD Collaboration   The Way Of The Future

VA/DoD Collaboration The Way Of The Future

Page 2: VA/DoD Collaboration   The Way Of The Future

North Chicago VAMC• Established 1926• Current catchment area: 50,000 veterans

– 550+ inpatient beds• Medical – 150 beds - ADC of 55 (FY05)• Psychiatric – 25 beds - ADC of 16 (FY05)• Long term care – 204 beds - ADC of 183 (FY05)• Domiciliary – 186 beds - ADC of 141 (FY05)

– Outpatient visits: FY04=211,933, FY05=214,209 FY06=204,097• Veteran patients reside in northeastern, north central Illinois, and southeastern Wisconsin

– Gender : FY04 FY05 FY06 male veterans 96.6% 96.4% 96.7%female veterans 3.4% 3.6% 3.9%

FY04 FY05 FY06 Budget – $126,993,329 $140,168,561 $138,432,768.FTEE – 1,199.8 1,144.0 1,065.8

• Recent construction– 1.4M square feet distributed over 58 buildings– Building 133 - Constructed 1958 - Major renovation: 1996

Page 3: VA/DoD Collaboration   The Way Of The Future

Naval Health Clinic Great Lakes• Naval Hospital established 1911

– Support Navy Recruit Training• Current building dedicated December 1960

– Casualty receiving hospital for Marines and Sailors injured in Vietnam– 850 Inpatient beds/450,000 square feet

• Current catchment area: 67,000 beneficiaries.• Status prior to re-designation 1 June 06

– 22 Med/Surg/Peds inpatient beds– 7 Branch Health Clinics (medical & dental)– > 400,000 outpatient visits per year– 1,600 employees (active duty and civilian)– Annual Budget FY07 $105M (excludes military personnel expense)

• Redesignated Naval Health Clinic– 1 June 2006

Page 4: VA/DoD Collaboration   The Way Of The Future

Integrated Federal Health Care Facility

FY2007• Navy construction project begins• Construct parking structure• Renovate 45,000 square foot existing NCVAMC spaces

FY 2008• Construct 201,000 square foot ambulatory care center

FY 2010• Construction project completed• Functional integration of both healthcare organizations

Network Hospital Relationship

January 2005: • $13M NCVAMC Project• Constructed four new

Operating Rooms• Renovated four existing

Operating Rooms • Expanded existing

Emergency Department

June 2006• Transfer of inpatient

med/surg/pediatric wards• Transfer OR, ER, ICU care• Reimbursement via Tricare• Professional services

provided by Navy Physicians for Surgery and Pediatrics

Initial Collaboration

October 2003• Inpatient Mental Health transferred• TRICARE Network Provider Status

December 2004• DoD Blood Donor Processing Center transferred

Phase III

Phase I

Phase II

Page 5: VA/DoD Collaboration   The Way Of The Future

Demolition

Addition/ Alteration

Alteration

ParkingGarage

Demo

FY07 - $20M FY08 - $99M FY12 - $16M

Support Parking

35% Design

35% Design Final Design

Final RFP

DraftRFP

SEP 06

SEP07

APR 08

JUN2010

JAN-06 JAN-07 JAN-09 JAN-10FY06 FY07 FY09 FY10 FY11

o o o o ooUtilitiesRoad Improvements

9-15 Months >

Dec 2011

DEC 06

Draft RFP

JUL07

Final RFP

Final Design

A&A

FY08JAN-08

Construction

(Independent)

MAR 06

AUG06

MAY 07

Design/ConstA&A

$20M

SEP 10

Move In

DEC07

$7MConst

$92MA&A

FY12DEC2011

SBA Appeal caused delays

$16M

Acquisition Strategy & Funding Profile

Page 6: VA/DoD Collaboration   The Way Of The Future

Phase I• MH Inpatient -October 2003

Ward (131-4C) staff by VA personnel 1.5 FTEE Navy assigned to unit $1.5M annual savings – Navy Staff $500K annual savings to tax payers

DoD patients served Bed Days of CareFY 04 337 2372FY 05 466 2182FY 06 462 3251FY 07 1st QTR 138 1210

• Blood Processing Center December 2004 $3.2 million cost avoidance to renovate existing space at Navy $900,000 cost avoidance for not building in new FHCF

Page 7: VA/DoD Collaboration   The Way Of The Future

Phase II Workload

June 1 through Dec 31, 2006 • ER

– DoD = 8540 visits (40 per day) – VA = 4041 visits (20 per day)

(10,000th DoD visit on Feb 6, at 8pm 8yo girl)

• Surgical Suite Utilization (June 1- Dec 31)– DoD = 509 cases – VA = 576 cases

• Inpatient Admissions (June 1- Dec 31)Medicine CCU Surgery

– DoD 249 77 44 – VA 632 359 26

Page 8: VA/DoD Collaboration   The Way Of The Future

Phase II

• Patient satisfaction– NCVAMC ED time one hour less than national

average– 48-hour call back for all inpatients– ED patient call back– Decentralized patient advocates – all departments – NHCGL Patient Admin Dept liaisons 24x7

• Provides services such as follow-up appt for Active Duty

Page 9: VA/DoD Collaboration   The Way Of The Future

First Pediatric Patient

Page 10: VA/DoD Collaboration   The Way Of The Future

Devontay delivered September 13, 2006 at the North Chicago VAMC Emergency Department

Page 11: VA/DoD Collaboration   The Way Of The Future

State-of-the-Art OR Suite

Page 12: VA/DoD Collaboration   The Way Of The Future

State-of-the-Art OR Suite

Page 13: VA/DoD Collaboration   The Way Of The Future

Joint Incentive Fund Projects

• $9M in JIF projects• Women’s Health - $852K• Mammography - $470K • MRI - $3,426K• Oncology - $685K• Dedicated fiber optic connectivity - $248K• Hospitalist - $403K • Digital Radiography (PACS) – $638K• Project Management Support - $1,770K

Page 14: VA/DoD Collaboration   The Way Of The Future

JECHEC

VA SES DirectorNavy O6 Dep Director

Facility Support (Admin) Clinical CarePatient Services

Advisory Board of Directors

VHA

Stakeholders Advisory Council

Draft Integrated Governance Phase 3

BUMEDNMEVISN

AncillaryLTC/InpatientNursingPharmacyN & FSAudiology

Healthcare OperationsBusiness Office/FinanceIRMAcquisition/Procurement LogHuman Resource

MedicalSurgicalMental HealthNursing HomeVA & Navy Clinics

Page 15: VA/DoD Collaboration   The Way Of The Future

Proposed Advisory Board

MembershipNaval Service Training CommandVISN DirectorNavy Medicine East (NME) Veterans Health Affairs (VHA)Navy Bureau of Medicine & SurgeryFederal Medical Center Director – Ex Officio

Roles & ResponsibilitiesProvides input on Director & Deputy Director evaluationAdvises on Mission, Vision, & PolicyAdvises on Strategic DirectionAdvises on Adequate ResourcesMonitor Performance

Page 16: VA/DoD Collaboration   The Way Of The Future

Stakeholders Advisory Council

MembershipVeterans Service Organizations TRICARE Regional OfficeNavy Line RepresentationCommunity Representatives Rosalind Franklin University Medical SchoolOther VA/Federal System DirectorsManaged Care Support ContractorNetwork/VISN RepresentativesCongressional Liaison/Representative

Page 17: VA/DoD Collaboration   The Way Of The Future

National Task Groups

NATIONAL SENIOR-LEVEL STEERING GROUP

•Development•Education/

Training•Labor

Relations•Other

•Board•Reporting

Relationships•Perf. Measures

•Mission/Vision

•BusPlan•Staff/Org. Structure

•Budget•Financial

Management•Accounting•Productivity•Workload

•Other

•Single System•All Functions

•Medical Records•Other

•Medical StaffOrganization

•Credentialing•By-Laws•JCAHO•RM/QA

•Education/Research

•Pharmacy•Other

•Security•Force

Protection•Acquisition/Procurement/

Logistics•Eligibility/Benefits

•Facilities•Other

HR Leader-ship

Finance/Budget

IM/IT Clinical Admin

Legal and Congressional

Liaison

Page 18: VA/DoD Collaboration   The Way Of The Future

• Command and Control (Governance) Model– Executive Decision Memorandum (EDM)

• Facility designation (MTF, VA, network, combination?)– EDM

• Financial Model– Budgeting and reimbursement methodology– EDM

• Property ownership and investment fund– EDM

Federal Health Care Facility(Great Lakes Project)

“Big Rock” Issues

Page 19: VA/DoD Collaboration   The Way Of The Future

• Logistics Model– EDM

• Electronic Health Record Model– AHLTA vs. VISTA– EDM

• Personnel Management Model– Civilian Personnel

• Title 5 vs. Title 38• EDM

– Military personnel• Use of IDCs and HMs• Adverse events

Federal Health Care Facility(Great Lakes Project)

“Big Rock” Issues (cont.)

Page 20: VA/DoD Collaboration   The Way Of The Future

Process Flow

Master Sharing Agreement

Federal Health Care Facility 2010

5 TASK Groups

VACO/BUMED/OSD/OGC National Steering

Leadership Group

VACOBUMEDNMEVISN12OSD Regional GC -(Legal)

• CONOPS• Final EDMs• Timelines

• Draft EDMs• Timelines of Critical Elements• Showstoppers• Recommendations

Page 21: VA/DoD Collaboration   The Way Of The Future

• Commissioning June 2010• Projected catchment: 117,000 beneficiaries

– ~ 400 hospital beds (59 Acute Care)– More than 600,000 projected outpatients visits annually– ~2500 employees

• Staffing model under review • FTE savings will occur with integration

– Annual budget approximately $240 million

Federal Health Care Facility 2010

Page 22: VA/DoD Collaboration   The Way Of The Future

Rosalind Franklin University

Page 23: VA/DoD Collaboration   The Way Of The Future

MASSING STUDY FROM NORTH

Page 24: VA/DoD Collaboration   The Way Of The Future

Summary

• Vision: We will create a federal health care center of excellence through world-class patient care, customer service, education and research.

• Progress accomplished to date can be attributed to extensive cooperation at all levels between VA and DoD.

• Phased approach has allowed the adaptation of cultures which has contributed to our success.

• We have been given this opportunity to influence the future of federal health care.– The intent is to establish processes which can be exported.

Page 25: VA/DoD Collaboration   The Way Of The Future

Questions?