VISE PROJECT REPORT JULY 2 ND , 2009 David Irwin, Michael Zink, Prashant Shenoy, Navin Sharma, Deepak Ganesan, Jim Kurose

V I SE P ROJECT R EPORT J ULY 2 ND, 2009 David Irwin, Michael Zink, Prashant Shenoy, Navin Sharma, Deepak Ganesan, Jim Kurose

Embed Size (px)

Citation preview

Page 1: V I SE P ROJECT R EPORT J ULY 2 ND, 2009 David Irwin, Michael Zink, Prashant Shenoy, Navin Sharma, Deepak Ganesan, Jim Kurose

VISE PROJECT REPORTJULY 2ND, 2009David Irwin, Michael Zink, Prashant Shenoy, Navin Sharma, Deepak Ganesan, Jim Kurose

Page 2: V I SE P ROJECT R EPORT J ULY 2 ND, 2009 David Irwin, Michael Zink, Prashant Shenoy, Navin Sharma, Deepak Ganesan, Jim Kurose

PROGRESS: YEAR 1

Official Milestones Assembly of 3 sensor nodes (completed) Field deployment of 3 sensor nodes (completed) Initial ORCA integration (completed) GEC4 demo (completed) Outreach collaboration with UPRM (ongoing) Orca Clearinghouse integration (ongoing) Sensor virtualization; non-slivered control of data

(started) VLAN connection to the Internet2 (started) Actuator virtualization; single guest VM (started) Testbed available for use within cluster (started)

Page 3: V I SE P ROJECT R EPORT J ULY 2 ND, 2009 David Irwin, Michael Zink, Prashant Shenoy, Navin Sharma, Deepak Ganesan, Jim Kurose

CHALLENGES: YEAR 1 Getting up to speed on radar/sensor

interfaces Upgrading nodes to support multiple users BBN hired away our domain expert! Simplifying radar/sensor control code

Radar/sensor virtualization Problems controlling some devices in Xen and

other virtualized domains (e.g., VMware) Switching to VServers temporarily to continue

forward progress

Page 4: V I SE P ROJECT R EPORT J ULY 2 ND, 2009 David Irwin, Michael Zink, Prashant Shenoy, Navin Sharma, Deepak Ganesan, Jim Kurose

PROGRESS: ORCA INTEGRATION

Orca components developed Simple sensor resource handler Simple sensor slice controller Table-driven Clearinghouse allocation policy

(Re)developed a “queuing” policy

Setup geni.cs.umass.edu (with DOME) Will host both DOME and ViSE Orca actor servers Will transition from using a local Clearinghouse to the

one at RENCI when necessary

Page 5: V I SE P ROJECT R EPORT J ULY 2 ND, 2009 David Irwin, Michael Zink, Prashant Shenoy, Navin Sharma, Deepak Ganesan, Jim Kurose

PROGRESS: INTERNET2

Multiple meetings with UMass-Amherst OIT geni.cs.umass.edu should have VLAN connection

(over NEREN) to an Internet2 PoP in Boston (NOX) geni.cs will host both DOME and ViSE’s actor servers In the process of getting this done

What happens to our traffic at NOX? Ilia introduced us to John Volbrecht at Internet2

Knows about DCN We will coordinate with him once we have the

connection to the Internet2 PoP What is our end goal?

Page 6: V I SE P ROJECT R EPORT J ULY 2 ND, 2009 David Irwin, Michael Zink, Prashant Shenoy, Navin Sharma, Deepak Ganesan, Jim Kurose

PLANS: EXPERIMENT EXAMPLES

Sensor-centric experiments Comparing data fidelity from Furuno, Raymarine, MA1

Students in Puerto Rico looking at this Ground truth verification Long-term data collection: UMass Trace repository

Long-distance wireless experiments Experiments looking at long-distance wireless bandwidth One REU and one UMass undergrad looking at this now

Long-term vision Connect sensed data to cloud-based storage and processing Run complete experiments: sensing + storage +

processing

Page 7: V I SE P ROJECT R EPORT J ULY 2 ND, 2009 David Irwin, Michael Zink, Prashant Shenoy, Navin Sharma, Deepak Ganesan, Jim Kurose

PLANS: SPIRAL 2

Official Milestones December 1st, 2009

Sensor slivering (multiple VMs over time) Integration of ViSE with clearinghouse

January 1st, 2010 Installation of rapidly-deployed node Installation of camera devices 3-day class at the U. Puerto Rico on virtualization and GENI.

April 1st, 2010 Virtualization of camera devices Integration of slivering into testbed Testbed allocation policy for sensors Experiment control framework from updated reference software

October 1st, 2010 Demo testbed resources shared among multiple experiments Make federated testbed available to outside GENI users

Note: some Spiral 2 milestones accelerated to Spiral 1