STEAM TURBINE DATA SHEET
VP No. SEP-15-104-UU-P-50ABC-G-0006
Item No. UU-P-50A/B/C Page No. 1 OF 6 Rev. No. 3
Job No. 110670 Project Title Saudi Elastomers Project U&O, Carbon Black and MTBE Decomposition Unit Client Al-Jubail Petrochemical Company (KEMYA) Location Jubail Industrial City, KSA
No part of this document or the information it contains may be reproduced or transmitted in any form or by any means electronic or mechanical, including photocopying, recording, or by any information storage and retrieval system, without permission in writing from KEMYA or DAELIM
STEAM TURBINE DATA SHEET
Saudi Elastomers Project U&O, Carbon Black and MTBE Decomposition Unit
P.O. NO. 110670-15-104-002-A01 P.O. DESCRIPTION Centrifugal Pump (API 610, BB1) / 3 units
ITEM NO. UU-P-50A/B/C ITEM DESCRIPTION Cooling Water Pumps DOCUMENT NO SEP-15-104-UU-P-50ABC-G-0006 DOCUMENT TITLE. STEAM TURBINE DATA SHEET DAELIM INDUSTRIAL CO., LTD. SEOUL, KOREA Job. NO. 110670 A Approved without comments
AAN Approved As Noted RFC Returned for Correction
U&O CB MTBE SIGNED BY : DATE :
PURCHASER PERMISSION TO PROCEED OR REVIEW TAKEN ON VENDOR PRINTS SHALL NOT RELIEVE VENDOR FROM ITS RESPONSIBILITIES OR LIABILITIES UNDER THE PURCHASE ORDER.
FLOWSERVE
3 22-nov-2013 For Approval DRESSER-RAND E. LE MAREC E. CZARNYSZKA
2 16-sep-2013 For Approval DRESSER-RAND E. LE MAREC E. CZARNYSZKA
1 08-july-2013 For Approval DRESSER-RAND E. LE MAREC E. CZARNYSZKA
0 27-may-2013 For Approval P. ALBERDA E. LE MAREC E. CZARNYSZKA
REV DATE DESCRIPTION PREPARED BY CHECKED BY APPROVED BY
DOCUMENT NO.: U77-G-UPST50A-DS
FOR APPROVAL
DESCRIPTION
Apply Customer format and integrate comments from rev 00
FOR APPROVAL
APPR'DCHECKED
B.J.
BY
21-nov-13
B.J.
DATE
13-sept-13 B.J.
5-Jul-1301
02
REV
PROJECT NO.: 110670 (DR 128735)
Version 1, 03/23/09
128735_Data sheet rev03.XLS
STEAM TURBINE VENDOR DATA SHEETS
FOR
UU-PST-50A
AL-JUBAIL PETROCHEMICAL COMPANY (KEMYA)
03
SAUDI ELASTOMERS PROJECT
KEMYA RUBBER PLANT (KRP)
UTILITIES AND OFFSITES
Cooling Water Pump Steam Turbine
Date:
Area/Unit: of
REV
1 Case: Governing Case:
2 Supplier: Applicable To:
3 Mfr.: Ref. P&ID:
4 Model No.: Serial No.:
5
6 Note : INDICATES INFORMATION COMPLETED BY PURCHASER BY MANUFACTURER BY MFGR IF NOT BY PURCHASER7 OPERATING CONDITIONS PERFORMANCE
8 OPERATING POINT
9
10 NORMAL NORMAL/NORMAL
11 RATED (CERTIFIED ST RATE)
12 OTHER
13 DUTY, SITE AND UTILITY DATA
14 APPLICATION IS (SPARED, UNSPARED)15 WIDE SPEED RANGE RAPID START NOTE 2.4 RATED RATED NORMAL
16 SLOW ROLL REQUIRED HAND VALVES REQUIRED x317 DUTY CONTINUOUS STANDBY API-611
18 UNATTENDED AUTO START OTHER API-611 5th Ed., SES G06-S01 & G06-S01-AE
19 LOCATION INDOOR HEATED UNHEATED
20 OUTDOOR ROOF WITHOUT ROOF
21 AMBIENT TEMPERATURE MIN MAX TURBINE TYPE HORIZ VERTICAL
22 UNUSUAL CONDITIONS DUST SALT ATMOSPHERE NO STAGES SINGLE WHEEL DIAMETER
23 OTHER ROTOR: BUILT UP SOLID OVERHUNG
24 ELECTRICAL AREA CLASS GROUP DIV BETWEEN BEARINGS
25 NON HAZARDOUS BLADING 2 ROW 3 ROW RE-ENTRY
26 CONTROL POWER V 230 NOTE 2.5 CASING SPLIT AXIAL RADIAL
27 AUX MOTORS CASING SUPPORT CENTRELINE FOOT
28 COOLING WATER PRESSURE DF VERTICAL JACKSCREWS
29 FLOW DT VERTICAL TURBINE FLANGE
30 ALLOWABLE SOUND LEVEL @ NEMA 'P' BASE OTHER NOTE 2.3
31 STEAM CONDITIONS TRIP VALVE INTEGRAL SEPARATE BODY
32 INTERSTAGE SEALS LABYRINTH CARBON N/A
33 INLET PRESSURE
34 INLET TEMPERATURE END SEALS CARBON RING NO.PER BOX
35 EXHAUST PRESSURE LABYRINTH MATERIAL
36 STEAM CONTAMINANTS MECHANICAL MANUFR
37 TYPE RADIAL BEARINGS38 ALLOWABLE SPEEDS MAX MIN TYPE THRUST BEARING39 MAX CONT SPEED(3.1.10) CALCULATED THRUST LOAD40 TRIP SPEED BLADE TIP VELCY BEARING MFGR's ULTIMATE RATING41 FIRST CRITICAL SPEED THRUST COLLAR REPLACEABLE INTEGRAL NONE
42 EXHAUST TEMP NORMAL NOLOAD LUBE OIL VISCOSITY ISO GRADE43 POTENTIAL MAX POWER LUBRICATION RING OILED PRESSURE GREASE
44 MAX. NOZZLE STEAM FLOW OIL MIST45 ROTATION FACING GOVERNOR END PURGE OIL MIST PURE OIL MIST
46 DRIVEN EQUIPMENT THRUST BEARING HOUSING OILER TYPE
47 (VERTICAL TURBINE) (4.9.3)48 WATER PIPING FURN. BY MAX ALLOWABLE PRESSURE
49 OIL PIPING FURN. BY MAX ALLOWABLE TEMP.
50 REMARKS: HYDRO TEST PRESSURE
51
52
bar[g]
1.0
51 10
kgf
ISO VG 46
2.1: Area temperature class T32.2: Noise shall be limited to 85dBA at 1m 2.3: A Trip an throttle valve assembly is included in D-R scope of supply2.4: Refer to Quick start condition supplied with D-R offer2.5: Voltage transformer 230/110V supplied by Flowserve
m/h
kg/h 40819
331219
C 10
Flowserve
SAP No.:
425 412.8
1896
EXHAUST
NUMBER OF HAND
Chk'd: Appr'd:
2
128735
Page
Flowserve
kgf
CW
INLETCASING DESIGN
bar[g]
C
C
kW 2820
MINIMUM
TURBINE DATA
C
5.2
m/s
4998
rpm
db 85 m
MAXIMUM NORMAL
700
I 2
bar[g] 7
V 460 Phase Hz
Single Phase
Three Phase
Hz
bar 1
rpm
POWER SPEED OPERATING POINT/
Spared
4760
4760
2150
C 0.0 50.0
2
STEAM CONDITION VALVES OPEN
MINIMUM INLET AND
MAXIMUM EXHAUST110
Service: Cooling Water Pump Steam Turbine No. Req.:
RATED/NORMAL 2 14.5
STEAM RATE
kW
2365
4760
Saudi Elastomers Project - SEP UU2-K-2011A
kg/kWh
DATASHEETCooling Water Pump Steam Turbine
Al-Jubail, KSA
1
703 HEK 1000289064
Design
Al-Jubail Petrochemical Co. (Kemya)
110670 (DR:128735)
UU2
UU-PST-50A
GENERAL PURPOSE STEAM TURBINEB.J
4
192638 rev 02
Item No.:
Project No.: Revision: 21/11/201303
Date Version 1AZ General Purpose Steam Turbine.xls
Type:
Client:
Project:
Site:
365
bar[g] 45 43
By:
P.O. No.:
Inquiry No.:
DR Job
2365
FLOWSERVE
Design
DRESSER-RAND
14.9
APPLICABLE SPECIFICATION
%
CD
CONSTRUCTION
Phase
Sand
60
15.73
rpm 7580
rpm
bar[g] 6.0
5498
400 370
rpm 4998
3332
202
4.2
41
mm
Sleeve Bearing
Tilting Pad
kgf
60
T3
Date:
Area/Unit: of
REV
1
2 MATERIALS ACCESSORY EQUIPMENT BY VENDOR
3 HIGH PRESSURE CASING GRADE REMOTE TRIP SOLENOID
4 EXHAUST CASING GRADE VACUUM BREAKER
5 NOZZLES GRADE AUTOMATIC STEAM SEALING SYSTEM
6 BLADING GRADE GLAND VACUUM DEVICE WITH :
7 WHEELS GRADE WATER EDUCTOR STEAM EJECTOR
8 SHAFT GRADE SENTINEL WARNING VALVE
9 SHAFT COATING UNDER PACKING INSULATION TYPE
10 MATERIAL TACHOMETER TYPE
11 APPLICATION METHOD MFR MODEL
12 THICKNESS MOUNTED BY13 GOV. VALVE TRIM THERMAL RELIEF VALVES REQUIRED14 INLET STRAINER MESH SIZE SHUTOFF VALVES FOR SHUTDOWN SENSORS15 COUPLING SPACER/HUBS16 COUPLING DIAPHRAGMS (DISKS) THROTTLE STEAM FIRST STAGE
17 NOZZLE RING EXHAUST
18 SPEED CHANGER MANUAL PNEUM. ELECT (5.4.2.3) LIQUID FILLED GAUGES 19 MFR. MODEL INSTRUMENT PANEL 20 BASEMOUNT21 FREE STANDING22 TO TO EXTERNAL LUBE OIL SYSTEM BY FLOWSERVE23 TO TO CIRCULATING PRESSURE Supply by Flowserve
24 CONNECTIONS VENDOR FURNISH SYSTEM FOR: TURBINE
25 SIZE RAT'G FAC'G POS. MATING PARTS OTHER
26 FURNISHED OIL SYSTEM TO BE: CONSOLE TYPE
27 INLET MOUNTED ON BASEPLATE
28 EXHAUST OIL SYSTEM TO INCLUDE FOLLOWING EQUIPMENT: (4.10.5)(4.10.7)29 DRAINS STANDBY OIL PUMP: TYPE DRIVER30 LOW OIL PRESS ALARM TRANSMITTERS31 LOW OIL PRESS TRIP TRANSMITTERS (Qty. 3)32 COUPLINGS SEE SEPARATE DATA SHEET HEATER (4.10.8) ELECTRIC STEAM
33 LOCATION OIL DRAIN SIGHT FLOW INDICATORS34 MAKE Supplier by Pump Mfr HAND OPERATED STANDBY PUMP
35 MODEL Flexible
36 RATING 37 LUBRICATION38 LIMITED END FLOAT39 SPACER LENGTH FURNISH PROVISIONS FOR MOUNTING NON-CONTACTING40 SERVICE FACTOR 1.5 VIBRATION PROBES41 TURBINE VENDOR MOUNTS HALF COUPLING FURN. AXIAL POSITION PROBES NO. OF PROBES42 DYN. BALANCE MFR. MODEL
43 AGMA CLASS 8 OTHER FURN. RADIAL PROBES NO. OF PROBES44 TURBINE SHAFT TAPER STRAIGHT HYD FIT HUB MFR. MODEL
45 MOUNTING PLATES FURNISH BEARING METAL TEMP SENSORS FOR: See detail in PID
46 TYPE BASEPLATE SOLEPLATE RADIAL BEARINGS THRUST BEARINGS NOTE 3.3
47 FURNISHED BY TURBINE VENDOR TURBINE VENDOR SUPPLIES AND CALIBRATES MONITORS FOR: 48 DRIVEN EQUIPMENT VENDOR OTHER AXIAL AND RADIAL PROBES49 EQUIPMENT TO BE MOUNTED TURBINE GENERATOR BEARING TEMPERATURE SENSORS50 GEAR PUMP OTHER SEE SEPARATE DATA SHEETS FOR DETAILS51 UNGROUTED BASEPLATE SUITABLE FOR COLUMN MOUNTING
52 TURBINE VENDOR FURNISHES SUBPLATES
3.1 : Daelim will provide a strainer on steam inlet pipe with a mesh size of 200m3.2 : Overspeed test and auto start capability shall be provided from DCS through hardwired link to the governor controller3.3: Temperature transmiters provided by Flowserve
mm
mm
LOCAL GAUGE BOARD WITH FOLLOWING PRESS GAUGES:
TURBINE DRIVEN
kgf.m
VIBRATION AND POSITION DETECTORS
Bently Nevada 330101XL
2
Bently Nevada 330101XL
RH
RF
RF
Blanket Type
Electronic (Not in Dresser-Rand Scope)
Dynalco SPD 100 XA
Installed on Gauge board, connected by other
2
mm
OTHER 3/4" 150 RF
3/4" 600
12 150 RF
WOODWARD PEAK 150 see NOTE 3.2
3332
6 600
lbs
A
Not in D-R scope
Not in D-R scope
3.2YES see note 3.1
OPERATINGRANGE
CONTROLSIGNAL
Electrolytic chroming
mm
ASTM A471
ASTM A788
ASTM A473 Type 416
AISI 403SS
0.04 mm - 0.64 mm after finished grinding
110670 (DR:128735)UU-PST-50A
192638 rev 02
Page
P.O. No.:
21-nov-132
128735
Date
Case:
Version 1AZ General Purpose Steam Turbine.xls
STEAM CONTROL
CONTROLLED VARIABLE
ASTM A-216
ASTM A-216
3 4UU2
Item No.:
Project No.: Revision:
Inquiry No.:
Appr'd:
Design Design
B.J Chk'd:
Governing Case:
GENERAL PURPOSE STEAM TURBINEDR Job
SAP No.:
By:DATASHEETType: Cooling Water Pump Steam Turbine
WCB
SPEED rpm4998
4140
WCB
Chrome plating
Inch
Complete equipment train (See Note 5.10)
A
Date:
Area/Unit: of
REV
1
2 PREPARATION FOR SHIPMENT
3 SUPPLY ENGR. DATA FOR LATERAL/TORSIONAL ANALYSES TURBINE AUX. EQUIPMENT AND SPARE ROTOR PREPARED FOR :4
5 CALCS AND/OR DATA FOR SEPARATION MARGIN DOMESTIC SHIPMENT EXPORT SHIPMENT
6 TRAIN TORSIONAL VIBRATION ANALYSIS 7 WEIGHT OF HALF KEYS REMARKS
8 RESIDUAL UNBALANCE CHECK (4.8.4.3)9 PARTY HAVING UNIT RESPONSIBILITY DRIVEN EQUIPMENT VENDOR
10 REMARKS
11
12
13 TESTS
14 HYDROSTATIC 15 MECHANICAL RUN 16 4 hours
17 PERFORMANCE 18
19 100% ULTRASONIC INSPECTION AFTER ROUGH MACHINING NOTE 4.1 COMPLETE UNIT 20 GEAR 21 USE INSPECTOR'S CHECK LIST SOUND LEVEL22 CASTING SURFACE INSPECTION MSS SP-55 AUX. EQUIPMENT 23 OTHER
24 WELD INSPECTION
25 SPECIAL NDT INSPECTION REMARKS:
26
27 MAG. DYE ULTRA
28 COMPONENT PART PENE. SONIC
29 T&T VALVE
30 STM CHEST TURBINE
31 CASING ROTOR
32 PIPING TURBINE UPPER HALF CASING
33 SHAFT MAX.MAINTENANCE
34 MAX.MAINTENANCE DESCRIPTION
35 T & T VALVE
36 BASEPLATE
37 REMARKS: MISCELLANEOUS
38 TOTAL SHIPPING WEIGHT
39 REMARKS:
40
41
42
43
44
45
46
47
48
49
50
51
52
kg
kg
kg
4.2: T & T valve is one part with Turbine, so weight of T & T valve is included in Turbine Weight. Detail can be provided later
WHEEL
1833
175
159
175
RADIO-WITN'D
YES
Rotor
NOTE 4.2
4.1 : 100% Ultrasonic inspection of machined surfaces of T&T valve body, casings, shaft and wheel
kg
YES
YES
YES
YES
YES
N/A
YES
GENERAL PURPOSE STEAM TURBINEDR Job
SAP No.:
By:
N/A N/A N/A
GRAPHIC
Inquiry No.:
DATASHEET
OBSRVED
INSPECTION REQUIREMENTS
Governing Case:
Appr'd:
Design Design
Chk'd:B.J
21-nov-13
4
03
UU2
Item No.:
Project No.: Revision:
4
Date
Case:Type: Cooling Water Pump Steam Turbine
Version 1AZ General Purpose Steam Turbine.xls
ENGINEERING REQUIREMENTS
128735
110670 (DR:128735)UU-PST-50A
192638 rev 02
Page
P.O. No.:
REQD. WITN. OBSVD.
WEIGHTS
kg
kg
kg
kg
Date:
Area/Unit: of
REV
1 Case: Governing Case:
2 Supplier: Applicable To:
3 Mfr.: Ref. P&ID:
4 Model No.: Serial No.:
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
Item No.: UU-PST-50AProject No.: 110670 (DR:128735) Revision: 03 21-nov-13
UU2 Page 5 5
DR Job 128735 P.O. No.: 192638 rev 02
PROCESS SPECIFICATION SAP No.: Inquiry No.:DATASHEET By: B.J Chk'd:
UU2-K-2011A
Appr'd:
Type: Cooling Water Pump Steam Turbine Design Design
Cooling Water Pump Steam Turbine No. Req.: 1
Client: Al-Jubail Petrochemical Co. (Kemya) FLOWSERVE
Project: Saudi Elastomers Project - SEP DRESSER-RAND
5.1. Turbine Governors is WOODWARD Peak 150.5.2. Turbine shall be per Sabic Specification G06-S01 & G06-S01-AE and API 611, 5th Ed. as commented during BID phase. 5.3. Axially split casing shall be designed to permit inspection and replacement of the bearings and outer glands without the removal of upper half.5.4. Turbine shall be designed to cover the maximum BHP of entire Cooling Water Pump performance curve. Driven Equipment Vendor having unit responsability5.5. Bearing housing shall be provided with INPRO seal 5.6. Steam drains shall be provided with valves and terminated with flanged connection at the edge of the baseplate. 5.7. 2 Vibration probes and proximeter on sleeve bearings.5.8. 4 RTD's with transmitter on the thrust bearings. 1 RTD with transmitter on each sleeve bearing5.9. Turbine shall be equipped with hydraulic trip linkages and trip indicators.5.10. Pressure lube oil system for complete Cooling Water Pump and steam turbine train shall be provided by pump vendor. See pump data sheets UU-P-50A/B/C for details.5.11 Surface preparation and painting per Peinting Specification PS-128735.5.12 Turbine rotor to be equipped with keyphsasor and speed probe with readout in the DCS.5.13 Bearing housing to be equipped with INPRO seal to avoid condensate ingress into the oil system and provision for instrument air purge to be provided.5.14 TTV to be hydraulic type, fitted, with limit switches as described in PID 1000289390.5.15 Turbine to have capabilitly to overspeed test from CCR.5.16 Turbine efficiency is very important and will be used to determine selected bidder, based on energy consumption. Turbine efficiency at normal steam conditions shall be as a minimum 55% 5.17 Material certificates for carbon steel pressure containing parts, rotor, nozzle rings and blades shall be furnished.
Version 1 09/02/2004Notes Sheet
Site: Al-Jubail, KSA 703 HEK 1000289064
Service: