30
SAFER, SMARTER, GREENER DNV GL © 2017 1 August 2017 Data Center Utilities and data centers: a win-win for energy efficiency 1

Utilities and data centers: a win-win for energy efficiency

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

DNV GL © 2017 1 August 2017 SAFER, SMARTER, GREENERDNV GL © 2017

1 August 2017

Data Center

Utilities and data centers:a win-win for energy efficiency

1

DNV GL © 2017 1 August 2017

John Greco

▪ John is a D.O.E. Certified Data

Center Energy Practitioner,

Certified Energy Manager,

Certified Measurement and

Verification Professional,

Certified AEE Building

Sustainable Energy Technician

Trainer, and holds a Bachelor of

Science degree in Electrical

Engineering Technology from

the State College of New York

2

DNV GL © 2017 1 August 2017

DATA CENTERSData Centers

3

DNV GL © 2017 1 August 2017

Agenda

About Data Centers & Utility Opportunities

Market Trends

Key Concerns & Challenges

Data Center Efficiency Opportunities

Delivering a Utility Data Center Program

Q & A

4

DNV GL © 2017 1 August 2017

What is a Data Center?

5

Closet Utility Scale/Co-lo

DNV GL © 2017 1 August 2017

Why You Need a DC Program

Data Centers – Heavy Energy Users

Capitalize Large Energy Savings

Avoided Energy Costs with EE

Economic Development

6

DNV GL © 2017 1 August 2017

DC Operators – Why They Need This

Financial Incentives

Reliability

Best Practice

7

DNV GL © 2017 1 August 20178

Market Trends

DNV GL © 2017 1 August 2017

Data Center Growth Trends

9

DNV GL © 2017 1 August 2017

Key Concerns and Challenges

10

DNV GL © 2017 1 August 2017

Key Challenges

11

DNV GL © 2017 1 August 2017

Keeping Pace

12

Automation

Speed

Security

Spend

Agility

Flexibility

DNV GL © 2017 1 August 2017

New Investment Strategies

13

DNV GL © 2017 1 August 2017

Data Center Energy Use

14

Data Center

(IT Load)

53%

HVAC

Equipment

28%

UPS Losses

7%

Lighting

3%

Other

9%

Data Center (IT Load) HVAC Equipment UPS Losses Lighting Other

DNV GL © 2017 1 August 2017

Data Center Efficiency Opportunities

15

DNV GL © 2017 1 August 2017

Data Center Efficiency

16

DNV GL © 2017 1 August 2017

Data Center Efficiency Opportunities

17

Data Centers – Best Practices

DNV GL © 2017 1 August 2017

Data Center – A Common Design

18

DNV GL © 2017 1 August 2017

Improving Energy Efficiency

19

Data Center thermostat set point

DNV GL © 2017 1 August 2017

Improving Energy Efficiency

20

Optimize power distribution Airflow management

Virtualization Use free coolingPotential Efficiency Losses

DNV GL © 2017 1 August 2017

Measuring Data Center Performance

21

Power Usage Effectiveness

Total Facility Energy

IT Equipment Energy

DNV GL © 2017 1 August 2017

Delivering a Data Center Program

22

DNV GL © 2017 1 August 201723

Delivering a Data Center Program

Requirements to deliver a successful program

EngineeringExpertise

▪DOE-certified data center energy practitioner▪Engineering and analytics to identify savings▪Facility audits identifying EE opportunities, power chain reliability, and operational strategies▪ISO quality culture

CustomerFocus

▪Technical training offering▪Reliable energy savings estimates▪Customized EE program offerings for all types of data center operations▪Tailored to meet individual needs

IndustryKnowledge

▪Global data center experience▪Industry best practices approach▪Established relationships with industry-recognized vendors▪Knowledge of new data center energy codes

DNV GL © 2017 1 August 201724

Delivering a Data Center Program

Tactical Outreach - Market Actors

Highest Value High Value Moderate Value

DirectParticipants

•Co-Lo facilities•Enterprise facilities•National accounts

•Med-large individual-owned data center

•Server rooms•Server closets

Vendors &Contractors

•National vendors •Regional vendors•New construction

design firms

•Local vendors

MarketInfluencers

•Local data center associations

•Regional datacenter associations

•National data center associations

DNV GL © 2017 1 August 2017

Overall EE• Over 35 years’

Program Expertise

• Retrofit

• New Construction

• Specialty❖Data Center, Direct Install, Midstream, Agriculture

Experience• 50,000+ Projects

Processed Annually

• 150,000+ Million Paid Incentives Annually

• 133+ TWh Lifetime Savings

Data Center• Over 10 years

Energy Industry Projects

• 100 GWh 1st

year energy savings

• Hundreds of completed projects

25

Delivering a Data Center Program

DNV GL © 2017 1 August 2017

Delivering a Data Center Program

26

DNV GL Past Projects Breakdown

DNV GL national project data: 2009-2016

Cooling System Upgrade

51%

Lighting Upgrade

13%

Control System Upgrade

10%

Server Upgrade

9%

UPS Upgrade11%

New construction

6%

Cooling System Upgrade Lighting Upgrade Control System Upgrade

Server Upgrade UPS Upgrade New construction

DNV GL © 2017 1 August 2017

Delivering a Data Center Program

Develop Outreach

Plan

Conduct Assessments

Identify Potential

Analyze and Calculate Savings

Generate Plan

Identify Energy Savings

Opportunity

27

DNV GL © 2017 1 August 201728

Why DNV GL

▪What it means to partner

with DNV GL

✓Collaborative approach to

project design and

completion

✓Drive deeper savings

✓Ensure customer

satisfaction

✓Exceptional engineering

analysis

✓Post installation reviews

✓Realize your energy savings

DNV GL © 2017 1 August 2017 SAFER, SMARTER, GREENERDNV GL © 2017 1 August 2017

Questions and Answers

29

DNV GL © 2017 1 August 2017

SAFER, SMARTER, GREENER

www.dnvgl.com

Thank you for your participation!

30

John Greco

[email protected]

+1 702 277 5417