1
UT - WELD REPAIR STATISTICS (STRUCTURAL) PROJECT: GPC JU 125/300 SELF ELEVATING AND SELF PROPELELED JACK UP CRANE BARGE WITH ACCOMMODATION Job No: 3756 REPORT NO: 3756-UT-004 DATE: 04.10.2013 WORK SITES: ALL SITES DESCRIPTION WELD LENGTH TESTED (mm) WELD LENGTH ACCEPTED (mm) WELD LENGTH REJECTED (mm) WELD REJECTION RATE (%) TOTAL FOR THE WEEK – 40 93996 89031 4965 5.28% ACCUMULATIVE AS OF 04.10.13 6692137 6642121 50016 0.75% PREPARED BY: NAVISH M

UT-004 Repair Statistic

Embed Size (px)

DESCRIPTION

utyhjk

Citation preview

Page 1: UT-004 Repair Statistic

UT - WELD REPAIR STATISTICS (STRUCTURAL)

PROJECT: GPC JU 125/300 SELF ELEVATING AND SELF PROPELELED JACK UP CRANE BARGE WITH ACCOMMODATION Job No: 3756

REPORT NO: 3756-UT-004 DATE: 04.10.2013

WORK SITES: ALL SITES

DESCRIPTION WELD

LENGTH TESTED (mm)

WELD LENGTH

ACCEPTED (mm)

WELD LENGTH

REJECTED (mm)

WELD REJECTION RATE (%)

TOTAL FOR THE WEEK – 40 93996 89031 4965 5.28%

ACCUMULATIVE AS OF 04.10.13 6692137 6642121 50016 0.75%

PREPARED BY: NAVISH M