User Acceptance Test for LGN 2.0
Site ID_Site Name
2
1. Document Control 3
1.1 Document Information 3 1.2 Version policy 3 1.3 Revision History 3 1.4 Circulation 3
2. Installation Visit Details 4
3. Site Details 5
4. Coverage Area 6
5. Network Layout - Active 6
5.1. Diagram 7 5.2. IP Address Allocation 7
6. Network Layout Diagram - Passive 8
7. Verification against the Bill of Material 9
8. Wi-Fi Service Availability and Login Test 11
9. LGN WAN Link Test – SLT Link 13
10. Connectivity & Service Test – Government Employees 16
11. Connectivity & Service Test – Public Users 17
12. Device Configuration 18
13. Training & Document/Equipment handed over 20
14. Sign Off 21
Table of Contents
3
1. Document Control
1.1 Document Information
Author
Approved By
1.2 Version policy
Version number level Description First Level For any significant change in the process as decided by the author.. Example vX.1,
vY.4, vZ.7 Second Level Incremented for each formal release. Example v 1.x, 2.y
Third level Incremented for review comments received by client. Example r 0.1
1.3 Revision History
Date Version Author Section Description
1.4 Circulation
Client SLT/ICTA
Any Other
EZY Internal Only
4
2. Installation Visit Details
Site Site Name – Location
Date Commenced 1st April 2017
Date Completed 5th April2017
Participants EZY Names of the engineers
Participants ICTA / SLT ICTA/SLT (Name of the officers)
Participants from the Site (Name of the officer)
Purpose User Acceptance Test (UAT) - Deployment Wi‐Fi for “Site Name - Location” as per the design document.
5
3. Site Details
Site name Lanka Government Information
Infrastructure (LGII) Ltd. - LGN – NOC
796
Contact details (Name & Contact Number)
Technical contact (Name & Contact Number)
Site address
Site longitude/latitude 6.851005,79.865394
6
4. Coverage Area
5. Network Layout - Active
7
5.1. Diagram
5.2. IP Address Allocation
Network Name IP Subnet
LGN 2 Wi-Fi users ___.___.___.___/24
Infra Network (Management) ___.___.___.___/2_
WAN (SLT Link) ___.___.___.___/30
LGN 1 Network ___.___.___.___/24
Public Wi-FI users 10.208.0.0 - 10.223.0.0
8
6. Network Layout Diagram - Passive
9
UAT Summery/ Test cases/ Activities
Verification against the Bill of Material
Wi-Fi Service Availability & Login Test
LGN WAN Link Test – SLT Link
Connectivity & Service Test – GOSL Employee
Connectivity & Service Test – Public Users
Device Configuration
Onsite IT Admin Training
Training Document / User Guide
User Manual – Employee Wi-Fi
Repairing building/ materials damage/ patchwork during the implementation
Delivering Wi-Fi Network Adapters
Equipment Hand Over
Rack keys Hand over
7. Verification against the Bill of Material
ITEM Description Actual Quantity
Rack (12U) – active equipment 1
Rack (10U) – fiber termination
Access Points 1
POE Switch 1
Fiber termination Switch 1
Firewall 1
Patch Panels – UTP 1
Data Cables – UTP (Boxes/Meters)
Patch Codes - UTP (Rack-end)
10
UPS (1.5 kVA)
No of Wifi Adapters handed over 10
Data Cable to connect LGN1 & LGN 2 Rack
Firewall License activation Refer following image for
licensing details
Signature (EZY)
Signature (SLT)
ICTA Nominee
11
8. Wi-Fi Service Availability and Login Test
Test Case No 001
Test Name Wi-Fi Service Availability and Login Test
Pre-Requisite
Preconfigured user accounts for LGN Wi-Fi.
Preconfigured user accounts for Public Wi-Fi (Preferred)
Procedure
Visibility of broadcast SSIDs
o LGN_Wi-Fi
o Public_Wi-Fi
Check login onto Employee SSID
o Connecting to SSID
o Portal Redirection
o Authentication Successful
o Verify IP (allocated subnet)
Check login onto Public SSID
o Connecting to SSID
o Portal Redirection
o Authentication Successful
o Verify IP (allocated subnet)
Expected Results
Successful visibility and association to the Public and Employee
SSIDs and successful authentication and establishment of
connectivity.
Status (Pass/Fail) Pass Fail
12
Comments
Signature (EZY)
Signature (SLT)
ICTA Nominee
13
9. LGN WAN Link Test – SLT Link
Test Case No 002
Test Name Latency and bandwidth test for WAN link
Pre-Requisite Established connectivity to LGN Wi-Fi
Procedure
Circuit Test SLT
1. Ping Test:
This will be done by pinging the Policy Enforcer (172.28.28.110)
Latency RTT value of the ping should be less than 40 ms
Bandwidth test
Use iPerf with following command from the branch service switch (lap
top will be connected to check this)
#iperf3.exe -c 10.200.0.23 -d
Bandwidth
Mbps
90% - 100% of the required bandwidth is available at the site
14
Expected
Results Expected WAN link performance should be available for the site.
Status
(Pass/Fail) Pass Fail
Comments
Signatures (EZY)
15
Signature (SLT)
ICTA Nominee
16
10. Connectivity & Service Test – Government Employees
Test Case No 003
Test Name Connectivity and bandwidth test for government employees
Pre-Requisite Association to the Employee SSID (LGN_Wi-Fi) and authentication should
be successful
Procedure
Network reachability test for employees
LGN 2.0 to Internet www.google.com
LGN 2.0 to LGC - Public Tracert www.results.exams.gov.lk (43.224.126.5)
LGN 2.0 to LGC - Private https://wp.erl.gov.lk (172.18.100.49)
LGN 2.0 to LGN Service lgn.gov.lk (172.22.12.100) LGN 2.0 to LGN 1 Site Ping 10.42.104.1
Expected Results Internet and government services should be accessible through LGN 2.0
Wi-Fi network for government employees.
Status
(Pass/Fail) Pass Fail
Comments
Signatures (EZY)
Signature (SLT)
ICTA Nominee
17
11. Connectivity & Service Test – Public Users
Test Case No 004
Test Name Connectivity and bandwidth test for public users
Pre-Requisite
Association to the public SSID (Public_Wi-Fi) and authentication should be
successful
Procedure
Network reachability test for employees
LGN 2.0 to Internet www.google.com
LGN 2.0 to LGC - Public www.results.exams.gov.lk (43.224.126.5)
Expected Results Internet and government services should be accessible for public users
through the public portal
Status
(Pass/Fail) Pass Fail
Comments
Signatures (EZY)
Signature (SLT)
ICTA Nominee
18
12. Device Configuration
This is for information purposes only. There are no tests to be performed under this section.
Pre-Requisite All devices are installed and powered up
Refer the following configurations for devices
Access Point
Model Item Name Host Name IP Address Location
1832 Access Point 1 LGN20_Min_Indus_AP_01
1832 Access Point 2 LGN20_Min_Indus_AP_02
1832 Access Point 3 LGN20_Min_Indus_AP_03
1832 Access Point 4 LGN20_Min_Indus_AP_04
1832 Access Point 5 LGN20_Min_Indus_AP_05
N/A Access Point 6 N/A N/A
N/A Access Point 7 N/A N/A
N/A Access Point 8 N/A N/A
N/A Access Point 9 N/A N/A
N/A Access Point 10 N/A N/A
N/A Access Point 11 N/A N/A
N/A Access Point 12 N/A N/A
Switch – Cisco SG300
vlan 20,1111 hostname LGN20-Dpt-Post-SW-01 ! interface vlan 20 ip address 10.100.33.130 255.255.255.224 no ip address dhcp ! interface gigabitethernet1 - XX (no of access points) switchport trunk allowed vlan add 1111 switchport trunk native vlan 20 ! interface gigabitethernet24 (Uplink port to Firewall) switchport trunk allowed vlan add 20,1111 ip default-gateway 10.100.33.129
19
Firewall
Interface Configuration
Rule Base
20
13. Completion of patchwork / damages
Completion of patchwork / damages
Authorizing Person (SLT)
Authorizing Person (Distribution Pvt LTD)
ICTA Nominee
14. User Accounts/ Training & Document/Equipment handed
over
Check list
Training Document / User Guide
ICTA Leaflet – Project Overview
Rack keys
User Manual – Employee Wi-Fi
Site admin training : Admin Names
No of Wi-Fi network adapters handed over
Signature (GOSL Site Representative)
Rack keys are handed over Yes No
Signature (GOSL Site Representative)
21
15. Sign Off
Authorizing Person’s Name (GOSL) Authorizing Person’s Name
GOSL Organization (Name of the Organization)
ICTA Nominee
Designation
Designation
Signature Signature
Date
Date
Comments
Authorizing Person’s Name
Authorizing Person’s Name
SLT (Sri Lanka Telecom)
EZY Distribution Pvt LTD
Designation Designation
Signature
Signature
Date Date
22
Final Approval - ICTA
Authorizing Person’s Name
Designation
Signature
Date
Comments