USAID LESTARI SECOND ANNUAL WORK PLAN October 1, 2016 to September 30, 2017
This publication was produced for review by the United States Agency for International Development. It was prepared by Tetra Tech ARD.
This publication was prepared for review by the United States Agency for International Development under Contract # AID-497-TO-15-00005. The period of this contract is from July 2015 to July 2020. Implemented by:
Tetra Tech P.O. Box 1397 Burlington, VT 05402
Tetra Tech Contacts:
Reed Merrill, Chief of Party [email protected] Matthew Edwardsen, Project Manager [email protected]
Cover Photograph: Clockwise from left: Pak Hamdani, nutmeg farmer in Aceh; Mama Belinda, Mangrove Tea producer from Mimika; Boats at Danau Begantung, Pulang Pisau, Central Kalimantan; SMART Patrol at Cyclops Nature Reserve.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 3
USAID LESTARI
SECOND ANNUAL WORK PLAN
October 1, 2016 to September 30, 2017 DISCLAIMER
This document is made possible by the support of the American People through the United States Agency for International Development (USAID). The contents of this document are the sole responsibility of Tetra Tech ARD and do not necessarily reflect the views of USAID or the United States Government.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 4
TABLE OF CONTENTS
Tables and Figures ............................................................................................................. 6
Acronyms and Abbreviations ............................................................................................ 7
LESTARI Background ......................................................................................................... 9
Executive Summary ............................................................................................................ 9
Ringkasan Eksekutif ......................................................................................................... 15
Introduction ....................................................................................................................... 22
Theory of Change ................................................................................................................................ 22
LESTARI Team .................................................................................................................................... 22
Building From IFACS .......................................................................................................................... 24
LESTARI Technical Themes ............................................................................................. 26
Technical Theme 1: Forest & Land Use Governance & Advocacy ................................................ 26 Introduction........................................................................................................................................ 26 LESTARI 1 – Awareness and Advocacy ........................................................................................... 27 LESTARI 2 – Operationalize SEAs/LCPs to Improve Land Use Governance .................................. 31 LESTARI 3 – Sustainable Landscape Governance .......................................................................... 35
Technical Theme 2: Conservation Co-Management ....................................................................... 41 Introduction........................................................................................................................................ 41 LESTARI 4 – Co-Management ......................................................................................................... 42 LESTARI 5 – Protected Area Management ...................................................................................... 48
Technical Theme 3: Private Sector Engagement ............................................................................. 53 Introduction........................................................................................................................................ 53 LESTARI 6 – Green Enterprises ....................................................................................................... 54 LESTARI 7 – Private Sector Best Management Practices (BMPs) .................................................. 59 LESTARI 8 – Innovative Financing for Sustainable Land and Forest Management ........................ 62
Project Managment, Coordination, and Communications ............................................. 66
Project Management ........................................................................................................................... 66
Project Coordination ........................................................................................................................... 68
Project Communications .................................................................................................................... 70
Gender integration ............................................................................................................ 75
Grants Fund ...................................................................................................................... 77
National Initiatives ............................................................................................................ 79
Landscape Initiatives ........................................................................................................ 84
Introduction ......................................................................................................................................... 84
Leuser Landscape ............................................................................................................................... 84 Landscape Profile ............................................................................................................................. 84 Leuser Landscape Initiatives ............................................................................................................ 84
Katingan-Kahayan Landscape ......................................................................................................... 104 Landscape Profile ........................................................................................................................... 104
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 5
Landscape Initiatives ....................................................................................................................... 104
Papua Landscapes ............................................................................................................................ 128 Papua Provincial Initiatives ............................................................................................................. 128 Lorentz Lowlands Landscape ......................................................................................................... 128 Mappi-Bouven Digoel Landscape ................................................................................................... 132 Sarmi Landscape ............................................................................................................................ 135 Cyclops Landscape ......................................................................................................................... 137
Appendix 1: Performance Indicators ............................................................................. 163
Appendix 2: Results Framework .................................................................................... 171
Appendix 3: Map of Technical Components and Tasks to Strategic Approaches ..... 172
Appendix 4: Staffing Plan ............................................................................................... 175
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 6
TABLES AND FIGURES Table 1. LESTARI Implementation Partners’ progress and Year 2 focus............................. 23 Table 2. Key LESTARI Tools .............................................................................................. 24 Table 3. LESTARI Strategic Approach 1, Year 2 ................................................................. 29 Table 4. Strategic Approach 2 geographic focus, Year 2 ..................................................... 31 Table 5. LESTARI Strategic Approach 2, Year 2 ................................................................. 33 Table 6. Strategic Approach 3 geographic focus, Year 2 ..................................................... 35 Table 7. LESTARI Strategic Approach 3, Year 2 ................................................................. 39 Table 8. Alignment between MoEF Priorities 2015-2019 and LESTARI Technical Theme 2 41 Table 9. Types of Co-Management in Each Landscape and Estimated Ha ......................... 43 Table 10. LESTARI Year 2 FMU Capacity Building Activities .............................................. 45 Table 11. LESTARI Strategic Approach 4, Year 2 ............................................................... 46 Table 12. LESTARI Year 2 METT-related Priorities ............................................................ 49 Table 13. LESTARI Strategic Approach 5, Year 2 ............................................................... 51 Table 14. TT3 Alignment with MoEF Priorities 2015-2019 ................................................... 53 Table 15. Local commodities targeted for green enterprise development, Year 2 ............... 54 Table 16. Sustainable livelihoods support and targets, Year 2 ............................................ 56 Table 17. LESTARI Strategic Approach 6, Year 2 ............................................................... 57 Table 18. LESTARI Year 2 Technical Assistance for BMP collaboration ............................. 59 Table 19. LESTARI Strategic Approach 7, Year 2 ............................................................... 60 Table 20. Ecotourism Potential Sites Identified in Year 1 .................................................... 63 Table 21. LESTARI Strategic Approach 8, Year 2 ............................................................... 64 Table 22. LESTARI Year 2 Communications Summary ...................................................... 72 Table 23. LESTARI Grants 001-005 Update ....................................................................... 77 Table 24. LESTARI National Initiatives ............................................................................... 80 Figure 1. LESTARI Landscapes Map .................................................................................. 14 Figure 2. LESTARI 1 Theory of Change .............................................................................. 30 Figure 3. LESTARI 2 Theory of Change .............................................................................. 34 Figure 4. LESTARI 3 Theory of Change .............................................................................. 40 Figure 5. LESTARI 4 Theory of Change .............................................................................. 47 Figure 6. LESTARI 5 Theory of Change .............................................................................. 52 Figure 7. LESTARI 6 Theory of Change .............................................................................. 58 Figure 8. LESTARI 7 Theory of Change .............................................................................. 61 Figure 9. LESTARI 8 Theory of Change .............................................................................. 65 Figure 10. LESTARI Offices...................................................................................................66 Figure 11. Leuser Operational Landscape .......................................................................... 87 Figure 12. Katingan-Kahayan Operational Landscape ...................................................... 108 Figure 13. Lorentz Lowlands Operational Landscape........................................................ 131 Figure 14. Mappi-Bouven Digoel Operational Landscape ................................................. 134 Figure 15. Sarmi Operational Landscape .......................................................................... 136 Figure 16. Cyclops Operational Landscape ....................................................................... 139
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 7
ACRONYMS AND ABBREVIATIONS AMEP Activity Monitoring and Evaluation Plan ASEAN Association of Southeast Asian Nations ATR Ministry of Agrarian Affairs and Spatial Planning BAPPENAS Ministry of National Development Planning BIG Geospatial Information Agency BCC Behavior Change Communication BKSDA Nature Conservation Agency BMP Best Management Practice BRG National Peatland Restoration Agency CBO Community Based Organization CBS Constituency Building Strategy CCA / KKM Community Conservation Agreements / Kesepakatan Konservasi Masyarakat CCLA Community Conservation and Livelihood Agreement CLA Collaborating, Learning, and Adapting CMMP Conservation Management and Monitoring Plan COP Chief of Party CSO Civil Society Organization DAK Special Budget Allocation Fund DAU Regular Budget Allocation Fund DCOP Deputy Chief of Party DSC Destination Stewardship Council EU European Union FIP Forest Investment Program FMU Forest Management Unit (or KPH) FSC Forest Service Council GFW Global Forest Watch GHG Greenhouse Gas GOI Government of Indonesia HCS High Carbon Stock HCV High Conservation Value ICCTF Indonesia Climate Change Trust Fund ICT Information and Communication Technologies IDIQ Indefinite Delivery, Indefinite Quantity contracting mechanism IDS Spatial Data Infrastructure (Infrastruktur Data Spasial) IFACS Indonesia Forestry and Climate Support Project IPCC Intergovernmental Panel on Climate Change ISCC International Sustainability and Carbon Certification ISPO Indonesian Sustainable Palm Oil Foundation KADIN Indonesian Chamber of Commerce KfW German Development Bank KLHK Ministry of Environment and Forestry KM Knowledge Management LCP Landscape Conservation Plan LEDS Low Emission Development Strategy LOP Life of Project LTTA Long-Term Technical Assistance LULUCF Land Use, Land Use Change and Forestry M&E Monitoring and Evaluation METT Management Effectiveness Tracking Tool MIS Management Information System MOU Memorandum of Understanding
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 8
MRV Monitoring, Reporting, and Verification MSF Multi-Stakeholder Forum MSU Michigan State University MTD Monthly Thematic Discussion NGO Nongovernmental Organization NP National Park NRM Natural Resource Management NTFP Non-Timber Forest Product PA Protected Area PCN Project Concept Note PDD Project Design Document PES Payment for Environmental Services PHKA Directorate General of Forest and Nature PPP Public-Private Partnership BPPTSP One-Stop-Shop (Badan Pelayanan Perizinan Terpadu Satu Pintu) RDMA Regional Development Mission for Asia RDTR Detailed Spatial Plan / Rencana Detail Tata Ruang REC Review and Evaluation Committee REDD+ Reducing Emissions from Deforestation and Forest Degradation,
including conservation, sustainable management of forests, and enhancement of forest carbon stocks
REL Reference Emission Level REPLACE Restoring the Environment through Prosperity, Livelihoods and
Conserving Ecosystems RFTOP Request for Task Order Proposal RKT Provincial Development Plan RPJM District Development Plan RPJMD Regional Development Plan RPJMDes Village-level Development Plan RSPO Roundtable on Sustainable Palm Oil RTRWK District Spatial Plan RTRWP Provincial Spatial Plan SDI Spatial Data Infrastructure SEA / KLHS Strategic Environmental Assessment SMART Spatial Monitoring and Reporting Tool SP Spatial Planners SRAP REDD+ Agency’s Strategic Action Plan for REDD+ STI Sustainable Travel International STTA Short-Term Technical Assistance TBI The Borneo Initiative TFA Tropical Forest Alliance UKCCU UK Climate Change Unit UNPAR University of Palangkaraya USAID United States Agency for International Development USDA United States Department of Agriculture USDOI United States Department of the Interior USFS United States Forest Service USG United States Government WCS Wildlife Conservation Society WDC Washington, DC WWF World Wildlife Fund
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 9
LESTARI BACKGROUND USAID LESTARI supports the Government of Indonesia (GOI) to reduce greenhouse gas (GHG) emissions and conserve biodiversity in carbon rich and biologically significant forest and mangrove ecosystems. Built on the strong foundation of USAID’s IFACS project, LESTARI applies a landscape approach to reduce GHG emissions, integrating forest and peatland conservation with low emissions development (LEDS) on other, already degraded land. This is achieved through improved land use governance, enhanced protected areas management and protection of key species, sustainable private sector and industry practices, and expanded constituencies for conservation among various stakeholders. LESTARI is implemented under the leadership of Tetra Tech and a consortium of partners including WWF-Indonesia, Winrock International, Wildlife Conservation Society (WCS), Blue Forests, Yayasan Sahabat Cipta, PT Hydro South Pole Carbon, Sustainable Travel International (STI), Michigan State University, and the FIELD Foundation. LESTARI runs from August 2015 through July 2020. LESTARI activities are targeted in six strategic landscapes on three of Indonesia’s largest islands, where primary forest cover remains most intact and carbon stocks are greatest. In northern Sumatra, the Leuser Landscape comprises significant portions of Aceh Selatan, Gayo Lues, Aceh Tenggara, and Aceh Barat Daya districts, and includes the Aceh portion of Leuser National Park and Singkil Wildlife Sanctuary. In Central Kalimantan, LESTARI works in the Katingan-Kahayan Landscape, comprising Pulang Pisau, Katingan, and Gunung Mas districts; Palangkaraya municipality; and Sebangau and Bukit Baka Bukit Raya National Parks. LESTARI also works in four landscapes in Papua. Sarmi and Cyclops Landscapes are located along the northern coast and comprise Sarmi district as well as Jayapura district and municipality. The Lorentz Lowlands Landscape, comprising Mimika and Asmat districts plus a large portion of Lorentz National Park, and the Mappi-Bouven Digoel Landscape are located along Papua’s southern coast. LESTARI is managed from its headquarters in Jakarta, with offices in each landscape as well as the provincial capitals of Aceh, Central Kalimantan, and Papua.
EXECUTIVE SUMMARY Summary of Year 2 Strategy In Year 1 of LESTARI, the core of the strategy was to lay a foundation for sustainable impact by operationalizing various tools and approaches in landscape initiatives while developing a single stakeholder vision for the project. In Year 2, LESTARI will sharpen its initiatives to become more technically-driven and results-focused, building upon the various assessments, experiences, and lessons learned from Year 1.
LESTARI applies the Theory of Change (ToC) for each of the 8 Strategic Approaches in order to guide activity design and implementation, produce intermediate results, and eventually lead to a reduction on the threats and drivers impacting the focal interests – forests and biodiversity. For Year 2, the ToC for each Strategic Approach was revised together with partners in the landscapes. This primarily consisted of adding new activities (yellow boxes), creating more explicit linkages to other strategic approaches for greater synergy, and minor changes to naming and wording for better clarity. The higher level outcomes and results remain unchanged compared to Year 1.
Hence in Year 2, LESTARI will exert a greater overall emphasis on the landscape approach by identifying and scaling up areas of program synergy between all three technical themes: (1) Land Use Governance, (2) Conservation Co-Management, and (3) Private Sector Engagement.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 10
Technical Theme 1 will continue operationalizing Strategic Environmental Assessments (SEAs) and Landscape Conservation Plans (LCPs); build out a Sustainability Screening Tool for improved licensing and permitting with stakeholder engagement; focus Multi-Stakeholder Forum (MSF) discussions on technical issues related to landscape sustainability; support synchronized landscape zonation in Conservation Areas (CAs), Forest Management Units (FMUs), areas designated for other land use, and private sector concessions; and support spatial planning in Papua through SIMTARU, including expanding its reach to the Provincial One-Stop-Shop for natural resource licensing.
Given administrative realities, improved land use governance of selected landscapes must intersect seamlessly with improved district-level land use management decision-making. This is achieved primarily through ensuring higher quality and integrated spatial and development planning. Hence LESTARI interventions will continue to support the operationalization in regional planning and policymaking through the operationalization of SEAs/LCPs. Moreover, to obtain crucial public support for improved landscape governance, MSFs will continue to be supported as effective broad-based, citizen-based institutions for bringing about more responsible and better coordinated behavior among government agencies, the private sector, and local communities. Technical Theme 2 will develop and implement co-management agreements at community, FMU, and CA levels; and continue to mainstream the application of Management Effectiveness Tracking Tool (METT) for improved CA management capacity. Technical Theme 3 will implement current and new public-private partnerships in support for Green Enterprises that reduce pressures on forests; support Best Management Practices involving Reduced Impact Logging that Reduce Carbon Emissions (RIL-C) with timber companies in Central Kalimantan and Papua; possibly explore new opportunities with mining and palm oil companies for promoting more sustainable practices; and prepare for piloting innovative financing initiatives involving PES and ecotourism. Advocacy and awareness activities will utilize a range of innovative, impactful, and landscape-specific communication channels to build awareness, identify champions, and foster strong and enduring constituencies for conservation. LESTARI will continue to deepen media advocacy work with Mongabay in Central Kalimantan, while adapting this model to support advocacy efforts in Aceh and Papua landscapes. Grants under Contract will focus on rolling out grants from RFA-004 that supports projects focusing on co-management and sustainable land use practices, combined with sustainable livelihoods development, with a strong gender integration aspect. Project management will continue to promote team synergy and efficiency in program implementation, while focusing on ensuring that all landscape staff and partners understand LESTARI’s implementation of the landscape approach. Project communication will continue to focus on sharing LESTARI’s progress, challenges, and opportunities to a wide audience at both the national and landscape levels. Project coordination activities will involve collaboration with fellow USAID, USG, and other donor-funded initiatives (particularly BIJAK, MAJU, DOI, and USFS) to promote synergy and impact. Finally, LESTARI will focus on more routine and regular engagement activities with USAID, GOI, and other government partners at the landscape, provincial, and national levels. Keys to all LESTARI activities this year and going forward are building and maintaining strong GOI relationships at all levels – national, district, and national – aligning LESTARI activities and results to GOI development plans and strategic plans so that LESTARI is wholly owned and valued by our GOI partners. This will enable the project to meet and sustain its ambitious goals.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 11
Key Results for Year 1 Within Year 1, LESTARI achieved a range of key results in line with the ToC and aimed at improving both land use governance and forest management over time. Key results, per AMEP indicator, are highlighted below. A more thorough discussion is available in the LESTARI Year 1 Annual Report.
2 public policies introduced addressing climate change and/or biodiversity conservation (indicator #4)
1 high quality KLHS developed for Central Kalimantan Province and 1 updated for Mimika District and actively being used to revise RTRW Mimika (indicator #6)
6 MSFs have Bupati Decree for MSF institutionalization (indicator #7)
25 community champions engaged (indicator #8)
6,556 people reached to improve awareness of LEDS (indicator #9)
971 people received training in natural resource management (indicator #12)
3,401,167 USD in investment mobilized for climate change (indicator #13)
The first milestone for private sector firms’ improved management practices achieved through signing of 11 MoUs between LESTARI and concessionaries (indicator #15)
3 new PPPs formed in support for LEDS (indicator #16)
Key Results for Year 2
In Year 2, LESTARI will continue to build upon this foundational work, scaling up impact and producing measurable results, including in indicators not assessed within the first year (indicator #2 - hectares and under improved management and indicator #3 percentage reduction in poaching). Hence in Year 2, LESTARI’s key target is to improve the management of 1.7 million hectares of biological significance and/or natural resources, aggregated across its landscapes. The breakdown of this target per landscape is shown in the table below and further detailed in Appendix 1. This outcome in improving forest and land management will directly contribute to LESTARI’s overarching goal of reduced GHG emissions, which will be measured in Year 3 and beyond.
AREAS UNDER IMPROVED MANAGEMENT (HA) – YEAR 2
Leuser Leuser NP – 627,000 (Indicator #10) Co-management agreements – 38,064 (Indicator #11)
Katingan-Kahayan Sebangau NP – 596,000 (Indicator #10) Co-management Agreements – 43,714 (Indicator #11) Timber Concessions – 223,370 (Indicator #15)
Lorentz Lowlands Co-management Agreements – 8,282 (Indicator #11)
Sarmi Timber Concessions – 130,755 (Indicator #15)
Cyclops Cyclops – 31,480 (Indicator #10) Co-management Agreements – 1,200 (Indicator #11)
TOTAL ~1,700,000
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 12
The improved management key result will be supported by various lower level Year 2
targets, including:
Indicator #3: 10% reduction in poaching in focus areas (Leuser, Lorentz, Cyclops, Singkil, Sebangau developing baseline in Year 2)
Indicator #4: 9 sub-national public policies on climate change and/or biodiversity conservation introduced for discussion (including environmental management and Village Fund distribution, spatial plan, and development plan regulations)
Indicator #5: 2 provincial/district governments with improved licensing and permitting mechanisms (Sustainability Screening Tool – Pulang Pisau and Papua Province)
Indicator #6: 6 districts/provinces assisted to incorporate SEA-LEDS plans into the spatial or development plans (Mimika, Pulang Pisau, Central Kalimantan Province, Aceh Tenggara and Aceh Selatan, Aceh Province)
Indicator #7: 7 Multi-Stakeholder Forums operationalized (priority MSF: Pulang Pisau, Palangkaraya, Mimika, Bouven-Digoel, Mappi, Aceh Selatan, and Aceh Tenggara)
Indicator #8: 175 community champions engaged (community development facilitators, journalists, adat leaders, fire and dam champions, private sector managers)
Indicator #9: More than 3000 people reached by LESTARI communications programs
Indicator #11: 10 co-management agreements signed (focusing on Leuser and Katingan-Kahayan in areas outside PAs, and Cyclops Nature Reserve)
Indicator #12: More than 4000 people trained in natural resources management and/or biodiversity conservation (all landscapes)
Indicator #13: 4.75 million USD in investment mobilized for forest and biodiversity conservation and climate change (largely through the allocation of village funds and canal blocking funds from public and private sources)
Indicator #14: 7500 people receive livelihood co-benefits (livelihoods and co-management grants, direct implementation for sustainable livelihoods and PPPs)
Indicator #15: 2 private sector firms that have improved management practices (RIL and CMMP implementation in Katingan-Kahayan and Sarmi Landscapes)
Indicator #16: 6 new PPPs formed in support for LEDS (Leuser, Katingan-Kahayan, and Lorentz Lowlands Landscapes)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 13
LESTARI-GOI Priority Alignment LESTARI targets a 41% reduction in GHG emissions in its landscapes by 2020. This is in alignment with GOI ‘s climate change commitments to reduce GHG emissions, by 26% unilaterally or 41% with bilateral or multilateral support, by the year 2020. Indonesia is also a Party to the Convention on Biological Diversity and has set specific targets for protection of key endangered species such as orangutan, tigers, and rhinos. This clear alignment in goals and interests gives LESTARI strong buy-in and support from all stakeholders and contributes to the project’s successes in protecting Indonesia’s forest and biodiversity resources. In addition, LESTARI’s objectives in Year 2 and beyond align closely with specific KLHK priorities regarding METT score improvement in PAs, improved conservation area zonation, KPH capacity building, village co-management in CA buffer zone areas, and PPP development. Peatland restoration efforts in Central Kalimantan are in clear alignment with the National Peatland Agency’s (BRG) priorities, while LESTARI’s support for spatial data infrastructure (SDI) units and One Map supports Badan Informasi Geospasial (BIG). At the local level, LESTARI engagement involves close alignment and coordination with provincial and district governments. This is particularly relevant for operationalizing SEAs/LCPs to improve land use governance. LESTARI will assist local governments and the MSF to develop, revise and/or update IFACS-supported SEAs and LCPs (or produce new assessments and plans where needed), and incorporate recommendations into spatial and development plans (RPJMD, RTRW, Renstra) and new local regulations (PERDA, PerGub, PerBup, Qanun). Further details of the overlap between GOI and LESTARI priorities and targets can be found in the technical themes section of this Year 2 Work Plan. Description of this Document The purpose of the second annual work plan is for USAID and LESTARI to clearly program activities for the upcoming year (October 2016 – September 2017) and monitor their implementation. The timing, sequencing, and resource allocation for activities will be regularly monitored through the LESTARI Activity Monitoring and Evaluation Plan, and updated as needed through the quarterly reports to USAID. This work plan was developed by the LESTARI Team and partners through a series of meetings and workshops in Jakarta, Central Kalimantan, Aceh, and Papua. Throughout August 2016, workshops were held in Palangkaraya for the Katingan-Kahayan Landscape, Banda Aceh for the Leuser Landscape, and Jayapura for Papua Landscapes. Each workshop involved intensive discussion and refinement of the Theory of Change as well as the building out of detailed landscape activities and sub-activities to support each ToC. A small technical team finalized the work plan in September 2016. The LESTARI team intends to conduct a broad partners consultation of the work plan in the landscapes once it has been approved by USAID. This document is organized by technical themes, strategic approaches, and landscape work plans for LESTARI Year 2. Within each technical theme, various strategic approaches explain the strategies and tools the project applies to its activities, each supported by a ToC. This is followed by sections on project management, communications, and coordination; gender integration; grants; and national level initiatives. The landscape work plans detail the interventions, responsibilities, resource allocation, and sequencing in the project landscapes themselves. Separate sections are presented for Aceh, Central Kalimantan, and Papua Landscapes along with detailed activity matrices. Performance Indicators, Results Framework, and the project staffing plan can be found in the appendices.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 14
Figure 2. LESTARI Landscapes Map
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 15
LATAR BELAKANG LESTARI Proyek USAID LESTARI mendukung upaya pemerintah Indonesia untuk menurunkan emisi gas rumah kaca (GRK) dan melestarikan keragaman hayati yang berada di hutan yang kaya karbon dan bermakna secara biologis termasuk ekosistem hutan bakau. Proyek USAID LESTARI, yang dibangun di atas landasan yang sudah dirintis oleh proyek USAID IFACS, berusaha menerapkan pendekatan lansekap untuk mengurangi emisi GRK dan memadukan kegiatan konservasi hutan dan konservasi lahan gambut dengan pembangunan beremisi rendah (LEDS) pada lahan-lahan rusak. Hal tersebut dilakukan dengan memperbaiki tata kelola pemanfaatan lahan dan pengelolaan wilayah hutan lindung, melindungi satwa/flora spesies penting, memastikan keberlanjutan praktik - praktik industri dan sektor swasta, dan memperoleh dukungan dan partisipasi dari masyarakat luas dan seluruh pemangku kepentingan yang terlibat dalam kegiatan konservasi. LESTARI beroperasi di bawah pimpinan Tetra Tech dan kerjasama suatu konsorsium kemitraan termasuk WWF-Indonesia, Winrock International, Wildlife Conservation Society (WCS), Blue Forests, Yayasan Sahabat Cipta, PT Hydro South Pole Carbon, Sustainable Travel International (STI), Michigan State University dan FIELD Foundation. Proyek LESTARI dilaksanakan mulai Agustus 2015 hingga Juli 2020. Kegiatan LESTARI dipusatkan pada enam lansekap strategis yang terletak di tiga pulau terbesar Indonesia di mana terdapat hutan primer yang sebagian besar masih terjaga dan merupakan penyimpan karbon terbesar. Di Sumatra Utara, lansekap Leuser terdiri dari bagian wilayah yang termasuk Kabupaten Aceh Selatan, Gayo Lues, Aceh Tenggara, dan Aceh Barat Daya yang mencakup Taman Nasional Gunung Leuser yang dan Taman Suaka Margsatwa Singkil. Di Kalimantan Tengah, LESTARI bekerja di daerah Lansekap Katingan-Kahayan, yang terdiri dari Kabupaten Pulang Pisau, Katingan, dan Gunung Mas; Kotamadya Palangkaraya; Taman Nasional Sebangau dan Bukit Baka Bukit Raya. LESTARI juga beroperasi di empat lansekap berbeda di Papua. Lansekap Sarmi dan Cyclops terletak di pesisir utara dan terdiri dari Kabupaten Sarmi serta Kabupaten dan Kotamadya Jayapura. Lansekep Dataran Rendah Lorentz, terdiri dari Kabupaten Mimika dan Asmat ditambah sebagian besar Taman Nasional Lorentz. Sedangkan Lansekap Mappi-Bouven Digoel terletak di pesisir selatan Papua. Kantor pusat LESTARI berada di Jakarta, dengan kantor-kantor operasional di setiap lansekap dan di Ibukota Provinsi Aceh, Kalimantan Tengah dan Papua.
RINGKASAN EKSEKUTIF Ringkasan Strategi Tahun Kedua Pada tahun pertama, Program LESTARI membangun landasan untuk menciptakan dampak yang berkelanjutan dengan mengoperasikan berbagai perangkat dan pedekatan melalui program-program yang dilaksankan di tingkat lansekap. Selain itu, proyek ini juga berupaya untuk menyamakan visi antara para pemangku kepentingan yang terlibat dalam proyek ini. Pada tahun ke dua, LESTARI akan mempertajam inisiatif program agar dapat lebih didorong secara teknis dan berorientasi pada hasil, serta mengembangkan hasil dari berbagai kajian dan dari pengalaman serta dari pembelajaran Tahun 1. Berdasarkan Teori Perubahan yang dimutakhirkan dan disempurnakan, intervensi LESTARI akan menggunakan pola hubungan (yakni pola hubungan antara mata pencaharian dan konservasi hutan) dan menjadikannya sebagai target yang pada akhirnya akan memberi kontribusi pada hasil proyek untuk mengurangi kerusakan hutan dan memperbaiki konservasi keragaman hayati. LESTARI akan menekankan sebagian pendekatan lansekap dengan mengidentifikasi dan memperluas wilayah sinergi antara tiga tema teknis: (1) Tata
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 16
Kelola Pemanfaatan Lahan, (2) Pengelolaan Bersama Konservasi, dan (3) Keterlibatan Sektor Swasta. Tema Teknis 1 akan dilanjutkan dengan menerapkan Kajian Lingkungan Hidup Strategis (KLHS) dan Rencana Konservasi Lansekap (RKL); mengembangkan Perangkat Uji Keberlanjutan untuk memperbaiki pengurusan izin dengan melibatkan para pemambgku kepentingan; fokus pada pembahasan dalam Forum Multi-Pemangku kepentingan mengenai masalah teknis terkait keberlanjutan lansekap; mendukung sinkronisasi zonasi lansekap Kawasan Konservasi (CAs), Unit Pengelolaan Hutan (FMUs), kawasan untuk pemanfaatan lahan lain , dan konsesi sector swasta; dan mendukung perencanaan tata ruang di Papua melalui SIMTARU, termasuk memperluas jangkauannya untuk mencakup One-Stop-Shop tingkat provinsi untuk perizinan pegelolaan sumber daya alam. Dengan mempertimbangkan kondisi birokrasi saat ini, maka diperlukan perbaikan tata kelola pemanfaatan lahan dari beberapa lansekap yang terpilih yang harus diselaraskan dengan perbaikan pengambilan keputusan mengenai pemanfaatan lahan di tingkat kabupaten. Hal ini bisa dicapai terutama dengan memastikan perencanaan tata ruang dan pembangunan yang lebih berkualitas dan secara terpadu. Dengan demikian intervensi LESTARI dapat terus mendukung proses perencanaan daerah dan penyusunan kebijakan melalui Kajian Lingkungan Hidup Strategis /Rencana Konservasi Lansekap. Selanjutnya, untuk menggalang dukungan masyarakat yang penting bagi tata kelola lansekap, maka Forum Multi Pemangku Kepentingan akan terus diperkuat sebagai lembaga berbasis masyarakat yang efektif untuk mempengaruhi lembaga pemerintah, pihak swasta dan masyarkat setempat agar bisa bersama-sama lebih bertanggung jawab dan menain koordinasi yang lebih baik. Tema teknis 2 akan menyusun dan melaksanakan Perjanjian Pengelolaan Bersama di tingkat masyarakat, Forum Multi Pemangku-Kepentingan, dan di tingkat Kawasan Konservasi; dan kemudian selanjutanya mengarusutamakan Perangkat Management Effectiveness Tracking Tool (METT) yang digunakan untuk memperbaiki kapasitas pengelolaan Kawasan Konservasi. Tema Teknis 3 akan melaksanakan program kemitraan antara pihak pemerintah dan swasta yang sudah berjalan maupun yang baru untuk mendukung perusahaan yang ramah lingkungan (Green Enterprises) yang mengurangi tekanan pada hutan; mendukung Praktik Pengelolaan Terbaik yang melibatkan perusahaan kayu di Kalimantan Tengah dan Papua yang mengurangi Penebangan Kayu yang berdampak pada penurunan Emisi Karbon atau Reduced Impact Logging that Reduce Carbon Emissions (RIL-C); menjajaki kemungkinan peluang baru dengan pihak perusahaan tambang dan perusahaan kelapa sawit guna meningkatkan praktik berkelanjutan; dan mempersiapkan program pembiayaan yang inovatif yang melibatkan PES dan ekowisata. Kegiatan advokasi dan peningkatan kesadaran akan memanfaatkan saluran komuniksai yang inovatif dan berdampak pada lansekap terkait untuk membangun kesadaran, mengidentifikasi para kader unggul (champion), dan membina konstituen yang kuat dan loyal bagi usaha konservasi. LESTARI akan terus memperdalam pembinaan media di Mongabay di Kalimantan Tengah, sementara juga mengadaptasi model ini untuk mendukung upaya pembinaan di lansekap Aceh dan Papua. Hibah Berdasarkan Kontrak akan difokuskan pada pemberian hibah dari RFA-004 yang mendukung proyek untuk praktik pengelolaan lahan secara bersama dan berkelanjutan, yang digabung dengan pengembangan mata pencaharian yang juga berkelanjutan, dengan aspek integrasi gender yang kuat.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 17
Pada akhirnya, kegiatan komunikasi dan koordinasi proyek akan terus berlanjut dengan berfokus pada berbagi pengalaman mengenai kemajuan, tantangan dan peluang LESTARI secara eksternal dengan para pemangku kepentingan. Sementara secara internal LESTARI akan meningkatkan sinergi, efisiensi dan dampak - dampaknya. LESTARI juga akan lebih fokus pada kegiatan rutin dan kegiatan berkala yang melibatkan USAID, Pemerintah RI, dan mitra pemerintah lainnya pada tingkat lanskep, provinsi, dan tingkat nasional. Kunci dari semua kegiatan LESTARI tahun ini dan tahun-tahun berikutnya adalah membangun dan memelihara hubungan yang kuat dengan pemerintah Indonesia di semua jenjang–baik di tingkat nasional mapun di tingkat kabupaten–dan menyelaraskan kegiatan LESTARI dengan kegiatan tingkat nasional serta dipadukan dengan hasil-hasil dari rencana pembangunan RI sehingga LESTARI dikawal dan dihargai oleh mitra Pemerintah RI. Dengan demikian proyek akan dapat mencapai target dan menjaga sasarannya yang memang cukup ambisius. Hasil Utama pada Tahun Pertama Pada tahun pertama, LESTARI berhasil mencapai hal-hal besar yang sesuai dengan Teori Perubahan dalam meningkatkan tata kelola pemanfaatan lahan dan pengelolaan hutan. Hasil-hasil utama tersebut dirinci berdasarkan indikator AMEP dan tertulis di bawah. Dikusi yang lebih komprehensif tersedia di Laporan Tahun 1 LESTARI.
Dua kebijakan publik yang berhubungan dengan perubahan iklim dan/atau keanekaragaman hayati dibuat (indikator #4)
Satu KLHS yang berkualitas telah dikembangkan bagi Provinsi Kalimantan Tengah dan satu lainnya di Mimika telah dimutakhirkan dan digunakan secara aktif untuk merevisi RTRW Mimika (indikator #6)
Enam MSF telah mendapatkan kebijakan bupati setempat mengenai institusionalisasinya. (indikator #7)
25 komunitas kader unggul telah terlibat (indikator #8)
6.556 orang telah tercapai untuk meningkatkan kesadarannya mengenai LEDS (indikator #9)
971 orang telah menerima pelatihan mengenai pengelolaan SDA (indikator #12)
3,401,167 USD in dikucurkan sebagai investasi bagi isu perubahan iklim (indikator #13)
Sebelas MoU ditandatangani oleh LESTARI dan berbagai pemegang konsensinya yang menandai batu loncatan pertama dalam hal peningkatan praktik manajemen pihak swasta
Hasil Utama pada Tahun Kedua Pada tahun kedua, LESTARI akan terus bekerja berdasarkan pondasi utamanya, memperluas dampak dan mencetak keluaran-keluaran yang dapat diukur, termasuk indikator-indikator yang sebelumnya belum diukur pada tahun pertama (indikator #2 yaitu luas lahan yang pengelolannya sedang diperbaiki dan indikator #3 yaitu persentase berkurangnya perburuan satwa liar illegal. Mempertimbangkan hal tersebut, target utama LESTARI pada tahun kedua adalah untuk meningkatkan pengelolaan 1,7 juta hektar total luas lansekap-lansekpap LESTARI yang memiliki nilai biologis tinggi dan kaya akan
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 18
SDA. Rincian target dari tiap lansekap dapat dilihat di tabel berikut ini dan lebih detilnya dapat dilihat di Appendix 1. Perbaikan pengelolaan hutan dan lahan pada akhirnya akan memenuhi tujuan utama LESTARI yaitu mengurangi emisi gas rumah kaca yang akan diukur di tahun ketiga dan selanjutnya.
DAERAH DENGAN PERBAIKAN PENGELOLAAN (HA) – TAHUN KEDUA
Leuser TN Leuser– 627.000 (Indikator #10) Perjanjian Pengelolaan Bersama– 38,064 (Indikator #11)
Katingan-Kahayan TN Sebangau– 596.000 (Indikator #10) Perjanjian Pengelolaan Bersama – 43.714 (Indikator #11) Konsesi Kayu – 223.370 (Indikator #15)
Lorentz Lowlands Perjanjian Pengelolaan Bersama – 8,282 (Indikator #11)
Sarmi Konsesi Kayu – 130,755 (Indikator #15)
Cyclops Cyclops – 31.480 (Indikator #10) Perjanjian Pengelolaan Bersama – 1.200 (Indikator #11)
TOTAL ~1.700.000
Hasil utama dari perbaikan pengelolaan akan diperkuat oleh berbagai target pendukung di level bawahnya dalam tahun kedua termasuk:
Indikator #3: 10% penurunan perburuan liar di daerah fokus (Leuser, Lorentz, Cyclops, Singkil, Sebangau menetapkan patokan dasar pada tahun kedua)
Indikator #4: Diterbitkan 9 kebijakan pemerintah daerah mengenai perubahan iklim dan/atau memperkenalkan konservasi keragaman hayati sebagai bahan pembahasan (termasuk pengelolaan lingkungan dan distribusi dana desa, rencana tata ruang dan peraturan rencana pembangunan)
Indikator #5: 2 pemerintah provinsi/kabupaten memperbaiki proses perizinan (Perangkat Uji Keberlanjutan (screening) – Pulang Pisau dan Provinsi Papua)
Indikator #6: Terdapat 6 kabupaten/provinsi yang dibantu untuk menerapkan rencana KLHS-rencana strategis Pembangunan Rendah Emisi di dalam rencana tata ruang atau rencana pembangunan (Mimika, Pulang Pisang, Provinsi Kalimantan Tengah, Aceh Tenggara and Aceh Selatan, Provinsi Aceh)
Indikator #7: 7 Forum Multi-Pemangku Kepentingan dioperasikan (prioritas MSF: Pulang Pisau, Palangkaraya, Mimika, Bouven-Digoel, Mappi, Aceh Selatan, dan Aceh Tenggara)
Indikator #8: Terdapat 175 tokoh berpengaruh dari masyarakat dilibatkan (para fasilitator pembangunan daerah,wartawan, pemimpin adat, kader pemadam kebakaran dan bendungan, manajer sektor swasta)
Indikator #9: lebih dari 3000 orang dijangkau oleh program komunikasi LESTARI
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 19
Indikator #11: 10 Perjanjian Pengelolaan Bersama ditandatangani (terfokus pada daerah Leuser dan Katingan-Kahayan di wilayah luar PA, dan Taman Suaka Alam Cyclops)
Indikator #12: Lebih dari 4000 orang mengikuti pelatihan dalam mengelola sumber daya alam dan/atau konservasi keragaman hayati (di semua lansekap)
Indikator # 13: Investasi senilai 4,75 juta USD dikerahkan untuk konservasi hutan dan keragaman hayati dan perubahan iklim (terutama melalui alokasi dana desa dan dana blok untuk pengelolaan kanal dari sumber dana pemerintah maupun dari swasta)
Indikator #14: Terdapat 7500 orang yang menerima bantuan untuk meningkatkan hasiil dari mata pencaharian (hibah untuk mata pencaharian dan pengelolaan bersama, pelaksanaan langsung untuk mata pencaharian yang berkelanjutan dan KPS/PPP)
Indikator #15: Dua (2) perusahaan swasta telah memperbaiki praktik pengelolaan sumber daya nya (implementasi RIL dan CMMP di Lansekap Katingan-Kahayan dan Sarmi)
Indikator #16: Enam KPS baru dibentuk guna mendukung Strategi Pembangunan Rendah Emisi (LEDS) (di Lansekap Leuser, Katingan-Kahayan, dan Dataran Rendah Lorentz)
Kesesuaian Prioritas LESTARI dengan Pemerintah RI LESTARI menargetkan 40% pengurangan emisi pada tahun 2020. Hal tersebut sesuai dengan komitmen Pemerintah RI pada pengurangan emisi sebesar 26% secara unilateral atau 41% dengan bantuan bilateral atau multilateral pada tahun yang sama. Indonesia juga menandatangani Konvensi Keberagaman Biologis and telah menetapkan berbagai spesies langka dan terancam punah sebagai target-target spesifik untuk perlindungan. Spesies yang dimaksud termasuk orangutan, harimau dan badak. Kesesuaian kepentingan Pemerintah Indonesia dengan LESTARI tersebut memberikan persetujuan dan dukungan bagi proyek ini dari semua pemangku kepentingan sehingga berkontribusi terhadap kesuksesan proyek ini dalam menjaga sumber daya hutan dan keanekaragaman hayati Indonesia. Lebih dari pada itu, sasaran-sasaran LESTARI pada tahun kedua juga sangat sesuai dengan prioritas-prioritas KLHK mengenai peningkatan skor METT dalam PA, peningkatan zonasi pada area konservasi, peningkatan kapasitas, pengelolaan bersama tingkat desa di area-area penyangga (buffer zones) dan pembangunan PPP. Usaha restorasi lahan gambut di Kalimantan Tengah sangat sesuai dengan prioritas Badan Restorasi Gambut. Sedangkan dukungan LESTARI bagi unit-unit data spasial infrastruktur dan program Satu Peta membantu Badan Informasi Geospasial (BIG). Pada tingkat daerah, LESTARI bekerja sama dengan pemerintah provinsi dan kabupaten. Hal tersebut sangat relevan terutama dalam operasionalisasi SEA/LCP untuk meningkatkan tata kelola lahan. LESTARI akan membantu pemerintah daerah dan MSF setempat dalam mengembangkan, merevisi atau memutakhirkan SEA atau LCP yang didukung oleh IFACS (atau membuat asesmen-asesmen dan rencana-rencana baru jika dibutuhkan) dan menggabungkan rekomendasi-rekomendasi ke dalam rencana-rencana pembangunan dan spasial (RPJMD, RTRW, RENSTRA) dan peraturan lokal baru (PERDA, PerGub, PerBup, Qanun).
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 20
Uraian mengenai Dokumen ini Tujuan dari rencana kerja tahunan ke dua ini adalah agar USAID dan LESTARI menyusun kegiatan program secara jelas untuk tahun berikutnya (October 2016 – September 2017) dan memantau pelaksanaannnya. LESTARI secara rutin akan memantau jadwal waktu, urutan dan alokasi sumber daya yang ditetapkan dengan menggunakan Rencana Monitoring dan Evaluasi LESTARI, dan memutakhirkannya bila perlu, melalui laporan triwulan kepada USAID. Rencana kerja ini disusun oleh Tim LESTARI dengan para mitra kerja melalui serangkaian pertemuan dan lokakarya di Jakarta, Kalimantan Tengah, Aceh, dan Papua. Selama bulan Agustus 2016, lokakaryanya diadakan di Palangkaraya untuk lansekap Katingan-Kahayan, di Banda Aceh untuk lansekap Leuser, dan di Jayapura untuk lansekap Papua. Setiap lokakarya terdapat pembahasan intensif untuk penyempurnaan Teori Perubahan (ToC) pada setiap Pendekatan Strategis LESTARI. Diagram pada ToC yang sudah dimutakhirkan menunjukkan adanya sinergi yang lebih besar antara Pendekatan-pendekatan Strategis dan kegiatan tambahan yang mendukung hasil jangka menengah, serta memuat sedikit klarifikasi penggunaan istilah di dalam diagram yang disusun. Outcomes dan hasil pada level yang lebih tinggi tidak berubah dibandingkan Tahun 1. Kegiatan Lokarkarya juga melibatkan pengembangnan kegiatan lansekap yang rinci guna mendukung setiap ToC. Suatu Tim Teknis kecil menyelesaikan rencana kerja tersebit pada bulan September 2016. Tim LESTARI akan melakukan konsultasi dengan banyak pihak mitra mengenai rencana kerja lansekap yang sudah disetujui oleh USAID. Dokumen ini merangkai tema teknis, pendekatan strategis, dan rencana kerja lansekap yang digunakan untuk program LESTARI tahun 2. Pendekatan teknis memerinci pendekatan yang digunakan untuk mencapai target Tahun kedua, yang disusun berdasarkan tema teknis. Di dalam setiap tema, terdapat berbagai pendekatan strategis dan perangkat yang digunakan yang dijelaskan untuk setiap kegiatan, dengan didukung diagram ToC. Terakhir, rencana kerja lansekap memuat secara rinci intervensi, tanggung jawab, dan urutan kerja dari masing-masing lansekap. Secara terpisah dibuat matriks untuk masing-masing lansekap Aceh, Kalimantan Tengah, dan lansekap-lansekap Papua. Indikator Kinerja, Kerangka Hasil, dan rencana rekrut pegawai dirinci pada lampiran.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 21
Figure 1. LESTARI Landscapes Map
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 22
INTRODUCTION This introductory chapter of the Year 2 Work Plan is organized into three key sub-sections: Theory of Change, LESTARI Team, and Building from IFACS. Details of how the various tools and approaches are embedded into Year 2 activities can be found in both the Technical Themes and Landscape sections of this document.
THEORY OF CHANGE All LESTARI activities are built upon a comprehensive Theory of Change for each of the 8 strategic approaches implemented. The ToC illustrates the connections between LESTARI activities and intermediate results, based on causal linkages and assumptions, and eventually leading to a reduction on the threats and drivers impacting the focal interests – biodiversity and forest resources. Blue boxes indicate intermediate results that are brought about through the LESTARI interventions indicated by the yellow boxes. Arrows connect one intermediate result to another while also demonstrating linkages and synergies with other strategic approaches. Assumptions, relevant indicators, and outcomes are detailed in the Activity Monitoring and Evaluation Plan (AMEP). The LESTARI ToC was originally developed through close coordination with USAID during a ToC Workshop prior to the Year 1 launching of LESTARI. They required revision based on Year 1 lessons learned and input from landscape staff and lead Jakarta-based technical staff, many of whom were not yet mobilized when the ToC was first developed. Therefore, revisions to the ToC diagrams were made during Year 2 Work Planning sessions through close collaboration and input from the landscape teams. Sessions were held in August 2016 in Palangkaraya for the Katingan-Kahayan Landscape, Banda Aceh for the Leuser Landscape, and Jayapura for Papua Landscapes. Day 1 activities entailed breakout sessions per technical theme to discuss and update the ToC diagrams for each strategic approach. Day 2 activities involved building out the detailed activities and sub-activity tables per strategic approach and in line with the ToC. The revised ToC diagrams will serve as the blueprint for LESTARI in Year 2 and beyond. All LESTARI activities outlined within this Year 2 Work Plan align with the relevant ToC diagrams’ results (blue boxes) and contributing activities (yellow boxes). They are presented in the Technical Themes section for each of the 8 Strategic Approaches. Progress towards each ToC stream will be reported on in Annual Reports and Quarterly Progress Reports. Notably, the ToC diagrams apply for the life of the project. Progress will not likely be achieved at a linear rate, as foundational interventions in the early years will lead to more substantial progress, particularly for the GHG emissions reduction target, in the later years.
LESTARI TEAM LESTARI is implemented by Tetra Tech in conjunction with a consortium of international and Indonesian organizations with proven management experience with prior USAID projects, technical capacity in climate change and conservation, and trusted and established relationships and networks. A summary table of implementation partners, including Year 1 progress and Year 2 focus, is shown below.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 23
Table 1. LESTARI Implementation Partners’ progress and Year 2 focus
Partner Role
Tetra Tech
Overall technical and administrative project management
Lead donor and government coordination, communication, and local capacity development activities
Monitoring, evaluation, and learning
Winrock International
Year 1: Gathered data, engaged stakeholders, and built prototype version of Sustainability Screening Tool for improved provincial and district-level natural resource licensing and permitting
Year 2: Continue building stakeholder buy-in and develop the actual tool with requested functionalities
Michigan State University
Year 1: Met with stakeholders and explored opportunities for partnership with various Indonesian universities. Focused on educational capacity building in support for community mapping, forest management, and LEDS-based curricula.
Year 2: Work with UNPAR, MU, and IPB to build capacity, develop curricula, create distance-learning toolkits, and implement a university-based service learning program
Sustainable Travel International
Year 1: Exploration, data gathering, and initial discussions in Leuser and Katingan-Kahayan Landscapes for potential ecotourism opportunities and partnerships
Year 2: Develop a shortlist for ecotourism opportunities, including a business model and implementation plan for an ecotourism pilot project
WWF-Indonesia
Year 1: Improved management effectiveness of Bukit Baka Bukit Raya, Sebangau, and Cyclops; supported multi-stakeholder engagement in human-wildlife conflict mitigation
Year 2: Improve management effectiveness of Lorentz, Bukit Baka Bukit Raya, Sebangau, and Cyclops; improve biodiversity conservation through SMART patrols; innovative financing for conservation
Wildlife Conservation Society
Year 1: Improve management effectiveness of Leuser National Park and Singkil Wildlife Reserve; improve biodiversity conservation through SMART patrols, Wildlife Response Unit, and Wildlife Crime Unit
Year 2: Provide capacity building and support for SMART patrols, anti-poaching and combating wildlife trafficking, and human-wildlife conflict mitigation efforts
FIELD
Year 1: Conducted livelihood assessments in Aceh and Central Kalimantan
Year 2: Facilitate communities in developing and implementing co-management agreements in Aceh and Central Kalimantan
Yayasan Sahabat Cipta (Swiss Contact-Indonesia)
Year 1: Conducted market access and value chain assessment for sustainable livelihood development in Aceh
Year 2: Continue implementing PPP for cacao and explore new PPP opportunities involving nutmeg and patchouli in Aceh
PT Hydro Indonesia (South Pole Carbon Asset Management, Ltd)
Year 1: Produced PES/REDD+ Finance Assessment and built draft PES Toolkit
Year 2: Finalize PES Toolkit, produce rapid feasibility assessment of PES potential in the landscapes, and secure funding for PCNs
Blue Forests
Year 1: Produced social, economic, and ecological resiliency assessment and action plan for Mimika and Asmat
Year 2: Support the development of local commodities in Papua with a focus on co-management and market access
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 24
BUILDING FROM IFACS LESTARI builds on and operationalizes many of the foundational tools developed under IFACS. These include: the Multi-stakeholder Forum (MSF), Strategic Environmental Assessment and Low Emissions Development Strategies (SEA – LEDS), Landscape Conservation Plan (LCP), and Conservation Management and Monitoring Plan (CMMP). While they represent important achievements of IFACS, their findings and recommendations need to be followed up under LESTARI and integrated into government and private sector policies and programs to bring about meaningful, sustainable change to forest and land use. MSFs in particular are of foundational importance to LESTARI’s objectives of enhancing citizen-based mechanisms for public input on land use and building constituencies for conservation. LESTARI builds upon the MSFs developed under IFACS while considering the key recommendations from IFACS Lessons Learned Technical Briefing for MSFs. This assessment found four key challenges to MSFs developed under IFACS:
Ensure stakeholders work towards a shared vision and purpose
Ensure the sustainability of MSFs beyond the life of the project
Include the “right” mix of stakeholders that can work across government, civil society, and the private sector
Consider future resourcing needs and maintain relationship with local government Hence LESTARI works to revitalize MSFs as an established institution with government recognition and truly broad-based and balanced membership (across government, civil society, and private sector, with greater involvement of women). LESTARI MSFs are to be managed by a secretariat and with local government budgetary support. Further details of LESTARI’s MSF approach, including Year 2 focus, can be found in the sub-section on Strategic Approach 3: Sustainable Landscape Governance. LESTARI also implements various new and innovative tools to address the complex challenges facing its landscapes, including: Integrated Fire Management (IFM) and Peatland Restoration, Management Effectiveness Tracking Tool (METT), and Sustainability Screening Tool (SST). Together, these tools provide a broad range of options that cut across all three technical themes and allow the LESTARI team to implement strategies and achieve results in a targeted manner.
Table 2. Key LESTARI Tools
TOOL YEAR 2 FOCUS
Operationalizing from IFACS
Multi-Stakeholder Forum (MSF)
Continue building upon IFACS-supported MSFs by providing platform for inclusive dialogue while shifting discussion to relevant technical areas to garner support for LESTARI’s landscape goals (e.g., dam construction and canal blocking in Pulang Pisau)
Strategic Environmental Assessments (SEAs) and Landscape Conservation Plans (LCPs)
Assist local governments and MSF to revise and update existant IFACS-supported SEAs and LCPs (or produce new assessments and plans where needed) and incorporate recommendations into spatial and development plans (RPJMD, RTRW, Renstra), and new local regulations (PERDA, PerGub, PerBup).
Conservation Management and Monitoring Plan (CMMP)
Implementation of HCV monitoring for former IFACS partners that received support for CMMP development and update CMMP through adaptive management.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 25
New LESTARI Tools
Integrated Fire Management (IFM) and Peatland Restoration
Support canal blocking efforts to restore >30,000 hectares of degraded peatlands in Block C / KHG14, Central Kalimantan in an effort to mitigate fire and flood risks
Management Effectiveness Tracking Tool (METT)
For each PA in LESTARI’s landscapes, implement capacity building activities and other priority activities based on its action plan to improve the METT score
Sustainability Screening Tool (SST)
Conduct stakeholder engagement and bring tool from prototype to product, building in the requested functionalities (i.e., licensing and permitting, participatory mapping, land suitability, fire frequency mapping, and HCV/HCS tool)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 26
LESTARI TECHNICAL THEMES LESTARI is implemented through three integrated, synergistic technical themes: Forest and Land Use Governance and Advocacy, Conservation Co-Management, and Private Sector Coordination. In areas within the LESTARI landscapes where all three technical themes intersect, there are powerful synergies through increased likelihood of sustainability, logistical efficiency of intervention, and effectiveness (mutually-reinforcing activities) that make transformative changes more likely and therefore more able to persist beyond the lifetime of the project. Each technical theme consists of various core strategic approaches used to operationalize it. Each strategic approach is built upon a fully developed Theory of Change diagram, which illustrates the approach for the life of the project and also demonstrates linkages to other strategic approaches. The activity tables presented in this section capture the results and activities from each strategic approach’s ToC that will be implemented in Year 2. The detailed sub-activities, including when and how they are implemented in each landscape, can be found in the matrices in the Landscapes section. Each theme is managed by a Jakarta-based technical theme leader who is responsible for management and technical oversight while identifying and scaling up integration with other technical themes. Through consistent travel and engagement with all landscapes, they also play an important mentoring and capacity building role for staff and partners at the landscape level.
TECHNICAL THEME 1: FOREST & LAND USE GOVERNANCE & ADVOCACY
Introduction Achieving Transformative Landscape Governance. Technical Theme 1 is an integrated approach that focuses on supporting effective forest and land use governance practices while building strong constituencies that can advocate for their communities’ rights and interests. It recognizes that (1) improved land use governance (SA 2 & 3), while focused on forest Value Landscapes, must address the sources of threats and draw on opportunities from within the surrounding wider Operational Landscape as articulated in the Landscape Baseline Analysis. Improved landscape governance enables action on the ground that is driven by (2) collaborative conservation management (SA 3 & 4) and (3) improved private sector and industry practices (SA 5, 6, 7, & 8) but that none of these will succeed without (4) improving constituencies for conservation (SA1 & 3). (1) and (4), through more effective advocacy and communication, enable the drivers (2) and (3). Where all four intersect in identified sub-landscapes, there are powerful synergies through increased likelihood of sustainability, logistical efficiency of intervention, and effectiveness (mutually-reinforcing activities) that make transformative changes more likely and therefore more able to persist beyond the lifetime of the project. Furthermore, sub-landscape development provides opportunities for replication across the entire landscape as well as M&E counterfactual comparisons with similar areas biophysically and socially not yet reached by the project. In Year 2, a representative typology of sub-landscape governance will be identified, mobilized and consolidated in readiness for roll-out and scaling up in Year 3 across entire landscapes. In parallel with the sub-landscape approach, landscape-wide approaches to landscape governance will continue in Year 2, notably operationalization of SEA/LCP, IDS, SST, MSF, as well as advocacy and communications.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 27
The Theory of Change for this technical theme is that through strengthened governance and advocacy (including inclusive and transparent planning, budgeting and increased funding, natural resource licensing, and monitoring and enforcement), biodiversity will be conserved and emissions ultimately reduced in LESTARI landscapes.
LESTARI 1 – Awareness and Advocacy Advocacy is essential to the success of the overall project. It builds on awareness developed through IFACS and integrates activities to ensure all local stakeholders, especially underrepresented and marginalized groups, are equipped to contribute to sustainable land use decisions and policy through informed action. In its first year of implementation, LESTARI did not have a comprehensive awareness and advocacy strategy. Instead, individual communication and public outreach activities for each strategic approach were implemented based on immediate needs in each landscapes. However, LESTARI has been working to improve its engagement with multi-stakeholders including the media in all landscapes. In Central Kalimantan, LESTARI worked with Mongabay, a local organization, to advocate for environment issues in media, sharpen LESTARI’s advocacy messages, and identify target audiences. In Papua, LESTARI has been working closely with media through a number of activities, including media visits. One of the key results of the activities is the media exposé of LESTARI’s work on mangrove ecosystem sustainability in TEMPO English Weekly Magazine, a highly reputable media outlet in Indonesia. In Aceh, LESTARI started to improve engagement with local journalists by forming the Concerned Environmental Journalist Network. Based on lessons learned in the first year of implementation, LESTARI believes a comprehensive communication and outreach strategy for the project will help achieve more clarity, consistency, and overall higher quality in project communications. In the Year 2, LESTARI will be more focused towards result-oriented activities that are responsive to the newly updated Theory of Change. To streamline and better manage LESTARI awareness and advocacy activities and expected results as outlined in the contract and AMEP indicators, LESTARI has consolidated activities so that they are mainly aimed to map the key audience, deliver effective messaging, and media channeling. Alongside efforts to address accountability issues on forest management, land use governance, spatial planning, and other conservation-related policies (rules and procedures) that traditionally have focused on improving the “supply side”, LESTARI is also cognizant of the need to increase “demand side” efforts through an emphasis on “social accountability” – a complementary approach to “supply sides” measures. Using this approach, LESTARI will work to broaden its outreach to a variety of activities such as social media campaigns, story pitching, interactive dialogues, off air events. Strategic Approach 1, in many instances, is expected to build constituencies for conservation including with academia, media and journalists. Therefore, in Year 2 LESTARI plans to continue increasing journalists’ knowledge and capacity through activities such as training and journalist fellowships, while strengthening university partnerships to support LEDS-based curricula. LESTARI also aims to improve public information access on forest management. In Central Kalimantan, for instance, LESTARI will be working with local government institutions to implement public information access training. The training will be mainly based on the Indonesia Freedom of Information Act (Undang-undang Keterbukaan Informasi Publik) No.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 28
14/2008. In Aceh and Papua, a series of discussions on the most pressing issues will be held to create more pressure on policymakers. LESTARI will also support outreach to a younger audience by working with bloggers, social media activists, and artists through a popular culture approach while continuing to work with a specific task force in the MSF to disseminate and distribute relevant information to increase public awareness on issues relevant to LESTARI. To build stronger commitment among communities, LESTARI is cognizant of the pivotal role of women regarding forest resource utilization and biodiversity conservation. Thus, LESTARI will ensure that communication activities are addressing gender issues. In Aceh, LESTARI plans to work with women’s organizations to advocate for women’s and environmental issues in the media (e.g., role of women in social forestry initiatives). LESTARI will also continue to work with MSFs, including promoting its achievements, best practices, lessons learned, and help to advocate for the most pressing issues through any available communication channel. Through the continuing Knowledge Management process, LESTARI will identify and collaborate with the champions in each landscape. The champions are the people whose leadership drives the community to more sustainable development practices, commit to change through lengthy processes, and promote the benefits of what he/she is doing to the broader community. In general, the advocacy material will be quite similar across all landscapes and will be adapted to cover a range of relevant issues. In Leuser Landscape, overall advocacy efforts will promote improving forest management through village planning development and co-management with forest authorities. Some of the advocacy materials that will be used include: 1) 3D visualization of forest management vision during the process of village planning development as well as during the process of KPH/National Park planning development; 2) publication of articles in the media local and national to promote issues concerning collaborative forest management; 3) LESTARI Briefs on specific issues to be used in series of discussions/workshops at the district and provincial level to ensure stakeholder’s coordination; 4) production of videos that showcase best practices in implementing collaborative forest management and shared in strategic events from community level up to district/provincial level; and 5) post articles, infographics, and technical references in our website and social media (per landscape fanpage) on issues relevant to those being advocated for. For Katingan-Kahayan, similar advocacy materials will be adapted to support the integrated fire management and peatland restoration landscape vision. For Papua, main advocacy themes will include co-management around CAs (Cyclops and Lorentz Lowlands) and conservation of HCV and HCS forest (Mappi Bouven Digoel). As a cross-cutting approach, LESTARI advocacy efforts will work alongside and in support of other technical themes and approaches. The advocacy team will take the messages from the technical themes, identify whom the target audiences are, and produce and disseminate materials through strategic channels. The advocacy team will also provide direct support for activities as appropriate. If the need of target audiences is skills for advocacy, then SA 1 will conduct activities such as public speaking training, legal drafting training, and policy analysis training. If, however, the need of target audiences is GIS training, then this will be delivered under that relevant technical theme. SA 1 will also facilitate a series of discussions in all landscapes to discuss themes that are contained in our regular Journal. In addition, working with our MSF coordinator, SA 1 will involve and encourage regular MSF thematic meetings to equip MSF folks with technical knowledge. The matrix below identifies the key results and activities from the SA 1 ToC that will be implemented within Year 2. Detailed, landscape-specific sub-activities for each of the listed activities can be found in the landscape matrices of this Year 2 Work Plan Document.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 29
Table 3. LESTARI Strategic Approach 1, Year 2
LESTARI 1 – AWARENESS AND ADVOCACY
Result (blue box in ToC) Activities (yellow Box in ToC)
Target audience, desired behavior, appropriate media identified
1.1 Condition Analysis
In Katingan-Kahayan, continue to work with Mongabay to sharpen and strengthen the communication strategy, improve messages, and broaden campaign through diverse channels. In Leuser, hire a social media specialist to expose VL. In Lorentz Lowlands and Cyclops, engage with media and institutionalize regular meeting.
Target audience receive message
1.2 Communication Outreach
Implement variety of communication outreach including: social media campaign, story pitching, videos, contest, interactive dialogues in broadcast media, off-air events that will involve larger audience including youth and women. In Aceh, support Gayo Lues government to promote Rafting Championship and Saman Dance event and use it as entry point to leverage LESTARI key issues.
1.3 Journalist capacity building
Build capacity through trainings and fellowships, encouraging journalists to produce in-depth written pieces afterwards.
1.4 Series of public discussions on most pressing issues
Work with MSF to conduct regular discussions on issues such as: fire management, forest management, wild-life trafficking, illegal logging/poaching; and landscapes values.
Target audience has and retains desired knowledge. Target audience attitudes & values consistent with desired behavior Target audience adopts, implements, or continues desired behavior
1.5 Ongoing campaign based on KM, lesson learned, and best practices to create demand for public information access
Produce project communication products (factsheet, story from the field, success stories, and papers). In Katingan-Kahayan, assist policy makers with pocket guides on issues. In Leuser, work with parliament member/caucus to improve policies on biodiversity, forests, and climate change. Hold MSF summits as a fora for knowledge exchange and sharing.
1.6 Community based media engagement and development
In Katingan-Kahayan, work with local organizations/individuals to strengthen community-based media including citizen journalism. In Leuser, initiate new approach by advocating women-biodiversity issues through media. In Lorentz Lowlands, work with local NGOs and help improve communication and advocacy strategy.
Constituent (including academics) for conservation formed
1.7 Advocacy capacity building
In Leuser, work with Aceh Climate Change Initiative (ACCI) and Sustainable Development Caucus of Aceh and use this channel for improved policies.
In Katingan-Kahayan, initiate a training of public information access based on the Law No. 14/2008; launch educational partnership initiatives with MSU for improved low carbon forest management and LEDS-based curricula.
In Lorentz Lowlands, use the result of village mapping to MSF that includes visualization of village maps, village map competition, and vilage’s business plan competition.
1.8 Identify and collaborate with community champions
Work closely with MSF to institutionalize the organization and building their capacity in policy making including technical communication skills and legal drafting.
Improve public policies addressing climate change and/or biodiversity through inclusive processes
1.9 Advocacy and lobbying
Work closely with sub-national policy makers (governments and parliament) through serial discussion and visualize proposed changes.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 30
Figure 3. LESTARI 1 Theory of Change
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 31
LESTARI 2 – Operationalize SEAs/LCPs to Improve Land Use Governance Table 4. Strategic Approach 2 geographic focus, Year 2
LESTARI 2 – Year 2 Priorities
Activity Landscape Province / District Policy Outputs
Informing rationalized landscape zonation
Leuser Aceh Barat Daya Peraturan zonasi in kawasan strategis, zonation/blocking in FMU VI, revised TNGL zonation
Katingan-Kahayan Pulang Pisau Palangka Raya
KHG-14 zonation, pola ruang for RTRWK
Lorentz Lowlands Mimika Zonation/blocking in FMU VI
Informing KPH zonation
Leuser All LESTARI Districts Zonation/blocking in RJP KPH
Lorentz Lowlands Mimika Zonation/blocking in FMU VI
SEA/LCP Operationalization
Leuser
Gayo Lues Aceh Tenggara Aceh Selatan Aceh Barat Daya Aceh Province
SK Bupati, Qanun, New SEA, zonation (as above)
Katingan-Kahayan Province Pulang Pisau
SK Bupati
Lorentz Lowlands Mimika Asmat
Revised RTRWK
Mappi-Bouven Digoel
Mappi SK Bupati
Strategic Approach (SA) 2 – Operationalize SEAs/LCPs to Improve Land Use Governance – improved and rationalized spatial planning of land use functions that are aligned with sustainable development goals from the village to the district level in LESTARI landscapes provide greater spatial certainty and natural resource values for all stakeholders committed to low emission development, be they in the state or private sector. To achieve sustainable land use governance in practice requires that improved land use and related zonation be informed by multi-stakeholder ownership as well as supported by transparent geospatial information systems, the subject of Strategic Approach 3 – Sustainable Landscape Governance. SA 2 further informs advocacy and communications, is informed by activities under conservation co-management (SA 4 & SA 5, especially by conservation area zonation) and private sector engagement (SA 6, 7, & 8) about spatial dimensions relevant to their immediate goals. LESTARI aims to operationalize existing or updated Strategic Environmental Assessments (SEAs) and Landscape Conservation Plans (LCPs) drafted under IFACS to inform spatial and development plan rationalization that will ultimately reduce large scale pressures, such as oil palm, mining, and infrastructure, on forests in order reduce GHG emissions from the landscape. High quality SEAs will need to be developed in LESTARI districts that were not covered under IFACS, and existing SEAs updated and reviewed through a multi-stakeholder process. LESTARI will continue to assist local governments to produce publically-available assessments to inform new or revised spatial and development plans as well as new local regulations of landscape importance (PERDA, PerGub, PerBup). For example, while the original SEA for Pulang Pisau recognized the importance of effective fire responses, there was scant mention of fire prevention through canal blocking to improve peatland hydrology. Year 1’s rapid hydrological and social-economic surveys will be utilized to fill that gap in the SEA recommendations. New SEA drafting will be supported in Aceh for the new Governor’s
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 32
RPJMD after the 2017 election, and where there was not an IFACS-supported SEA such as in Aceh Barat Daya District (Abdya) to complement and run in parallel with zonation initiatives. LCPs produced by IFACS have had minimal utility, but the concept of promoting a development and spatial vision through the LCP remains important and can strengthen the MSF at the district level to advocate for landscape sustainability. LCPs will be drafted in new LESTARI districts, and where developed under IFACS, revised with improved MSF to help bring about their sustainable landscape vision. Specific SEA and LCP utility is focused on spatial scenarios of land use functional zones and management that is needed to support sustainable outcomes – what land use is desirable where, and who is institutionally responsible for management and enforcement. Therefore, working closely with BAPPEDA and/or BPLHD, SEA/LCPs will be systematically reviewed by LESTARI to determine whether they need updating to achieve high quality or formal recognition of supplementing, e.g., in the case of Block C / KHG14, with the results of hydrological assessments from Year 1, and Mimika for revision of the RTRW. Recommendations from these two important documents will be used to guide spatial planning zonation and development plan revisions, and also be used as a basis to inform sectoral service agency (SKPD) strategic plans Renstra and budgets as well as to serve as reference for evaluation of the actual impact of such regional government planning on the landscape. These core activities capitalize on the advantages presented in different districts and will include spatial plan revision (such as has begun in Year 1 in Mimika and will occur in Asmat during Year 2), development plan revision (planned from Aceh province such as that which has been completed in Kalteng), detailed spatial planning (RDTR) in urban and strategic areas that impact LESTARI landscapes with special emphasis on forest boundary villages within the sub-landscape of Abdya. Visioning and visualization exercises with the MSF to promote their sustainable development plans will encourage incorporation of MSF recommendations into the spatial planning zonation, development plans, Rentsra, and budget. Where necessary, LESTARI will encourage spatial and development plans that follow the SEA/LCP and MSF sustainable landscape vision recommendations and promote sufficient funding for their implementation through the development of district regulations. This will be focused on finalizing and developing the Village Fund regulation on environmental spending in Aceh Tenggara as well as the new regulation (Qanun) on environmental management in Aceh Selatan. All spatial planning rationalization support will take into account the One Map aim of synchronization among land use functions and management. LESTARI will support national and government institutions to improve and rationalize zonation at multiple levels in the state forests, private land (APL), and private sector concessions. In Year 2, spatial rationalization will focus first on manageable signature sub-landscapes based upon socially and biophysically-unifying criteria such as watersheds (daerah aliran sungai) and peatland hydrological units (kawasan hidrologis gambut, KHG). Important two-way linkages between SA 2 and other LESTARI activities include:
1. SA 5’s Conservation Zonation, where inputs will be provided for selected areas of national park zonation reviews (Leuser National Park), wildlife sanctuaries (Singkil) and nature reserves (e.g., Cyclops)
2. SA4’s Forest Management Unit zonation in Aceh where assistance will be provided to improving the spatial management plan in KPH 5 and 6 linked to their long-term development plans
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 33
3. District strategic areas / kawasan strategis and urban areas with significant rural land inside LESTARI landscapes, notably, Block-C Ex-Mega Rice Project (Palangka Raya) and SA5’s Cyclops (Jayapura & Sentani)
4. SA 4’s Village areas mapping (kawasan perdesaan) with input from RPJMDes; 5. SA 3’s Private sector licenses in Papua and Kalimantan Tengah (with input from
the Sustainability Screening Tool) Focus on better land use in such sub-landscapes encourages synergy with other LESTARI activities within the same areas, thereby increasing the likelihood of sustainable impacts and as spatial management units that can be replicated across the wider landscape in subsequent years. The value of improved and rationalized zonation at the above levels will be demonstrated to decision-makers through an evaluation of critical areas retained under forest and well-managed peatland. While the emphasis will be on regional planning and policy outputs, there will be continued appropriate engagement with national decision-making agencies, primarily KLHK, Baplan, DG PHPL, and Dir PIKA, as well as ATR and BRG to support their development of zonation standards. The matrix below identifies the key results and activities from SA 2 ToC that will be implemented within Year 2 Table 5. LESTARI Strategic Approach 2, Year 2
LESTARI 2 – OPERATIONALIZE SEAS/LCPS TO IMPROVE LAND USE GOVERNANCE
Result (blue box in ToC) Activities (yellow box in ToC)
High Quality SEAs developed or updated for all districts
2.1 SEA development, revising, or updating with supplementary assessment (Aceh Barat Daya – Abdya, Aceh Province, Central Kalimantan Province, Mimika, Mappi Bouven Digoel ,and Asmat)
SEAs/LCP recommendations included in district/provincial governments spatial plan zonation
2.2 LCP development or revision (Mappi-Bouven Digoel, Gayo Lues)
SEAs/LCP recommendations included in district/provincial governments spatial plan zonation District/provincial governments include high quality SEAs/LCP recommendations in development plans and sectoral budgets
2.3 Informing development plans to be spatially-based (Gayo Lues) 2.4 Informing spatial plans revision/review (Mimika, Mappi-Bouven Digoel, Asmat) 2.5 Informing spatial rationalization of FMU, conservation area and private sector license zonation (Abdya district, 5 villages in Pulang Pisau district, KPH V and VI Aceh, TNGL, KPH XXXI Central Kalimantan) 2.6 MSF used for public consultation to improve spatial and development planning (Abdya)
Regional and village government allocate budget for implement SEA/LCP recommendations
2.7 Budget analysis capacity-building for district government (Aceh Selatan, Gayo Lues, Pulang Pisau, and Mimika)
Assurance spatial and development plans follow SEAs/LCP recommendation
2.8 Draft specific spatial and development plan regulations based on SEA and/or LCP recommendations (Gayo Lues, Central Kalimantan Province, Pulang Pisau District, Mimika)
Major reduction of critical areas not converted to APL land by MOEF (KEQ)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 34
Figure 4. LESTARI 2 Theory of Change
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 35
LESTARI 3 – Sustainable Landscape Governance Table 6. Strategic Approach 3 geographic focus, Year 2
LESTARI 3 – Year 2 Priorities
Activity Landscape District(s) Policy Outputs
Multi-stakeholder Forum (MSF)
Katingan-Kahayan
Pulang Pisau, Palangkaraya Gunung Mas Katingan
SK Bupati
Leuser
Aceh Tenggara Aceh Selatan Gayo Lues Aceh Barat Daya
PerBup, Qanun
Cyclops (Sahabat Cyclops Forum)
Jayapura District & Municipality
SK Bupati
Lorentz Lowlands Mimika and Asmat Revised RTRWK
Mappi-Bouven Digoel Mappi, Bouven Digoel SK Bupati
Information System for Spatial Planning (SIMTARU)
Lorentz Lowlands Sarmi
Mimika Sarmi Papua Province
SK Governor
Sustainability Screening Tool for Natural Resource Licensing (SST)
Katingan-Kahayan Pulang Pisau / Central Kalimantan Papua Province
SK Governor SK Bupati
Sustainable land use governance in practice requires that rationalized and interconnected spatial and development planning is guided by up-to-date SEAs and LCPs informed by transparent and publicly-accessible geospatial information systems owned by a broad base of stakeholders in the LESTARI landscapes. This strategic approach works in parallel with SA 2, SA 4, and SA 5, developing geospatial information systems and strengthening stakeholder ownership and capacity through multi-stakeholder forums (MSFs). Geospatial tools of spatial data infrastructure units, some developed under IFACS, will be orientated to specific and explicit landscape challenges so that they will have utility and therefore not fall into disuse. Informed social legitimacy provides support for implementation of plans and enforcement of land use functions. In the past de facto land use has played little regard to formal land use functions which has also suffered from boundary inaccuracies that improved and rationalized spatial and development planning will inform. To conform to land use zonation functions, natural resource licensing processes will be screened for sustainability through the development with stakeholders of a Sustainability Screening Tool (SST) with public oversight of both permitting and monitoring of actual land use. While systems for geospatial transparency and management systems such as spatial data infrastructure and SST, and the functional land use zonation designations on which they are based are foundational, they cannot alone lead to transformative change towards actual land use sustainability until citizen-based mechanisms for public input on land use are strengthened. MSFs represent a neutral venue for discourse amongst otherwise competing agencies for land use decision-making that represents a major obstacle to achieving sustainable landscape governance which is needed to halt and reverse biodiversity degradation driven by individual sectoral agencies. MSFs will continue to identify and tackle strategic technical issues that threaten landscape sustainability, e.g., drainage and use of
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 36
fire in peatlands, illegal logging and agricultural encroachment in natural forest areas, and wildlife trafficking as well as human-wildlife conflict. LESTARI-supported MSFs will continue to build mutual understanding, respect, and trust among stakeholders including the establishment of working groups to pursue substantive technical challenges reporting back to the MSF, thereby increasing community stakeholder participation and sense of ownership in forest governance, providing key stakeholders with a platform to participate more fully in district, Conservation Area, and other land use decision-making. MSFs while not decision-making bodies in competition with the government executive and legislature will continue to provide reassuring and independent space valued by citizens of diverse backgrounds to discuss together challenging and contentious technical themes of relevance to the sustainability of LESTARI landscapes. Strengthen Citizen-based Multi-stakeholder Fora for Public Input on Land Use Decision-Making. LESTARI has revived MSFs initiated under IFACS that were facing challenges due to internal inconsistencies, e.g., overly-narrow set of members (mostly civil servant and selected NGO members) and operational structures representing project implementation units. In Year 2, LESTARI will continue to ensure broader-based MSF membership, especially from the private sector, and nurture mutual understanding, respect and trust among stakeholders in the LESTARI landscapes so that they willingly collaborate and reduce sectoral isolation. Consensus about the role of the MSF will be developed and institutionalized in line with MSF guidelines produced in Year 1 for implementation including reporting, further strengthened through formal recognition (formalized) from local government for all MSF in LESTARI landscapes. The guidelines (background paper) from Year 1 will be used to formulate SOP to better structure and schedule MSF meetings and their reporting managed by a Secretariat, identify core principles (e.g., gender integration and dispute resolution), support Pokja activities to inform the MSF, and achieve sustainable financing by building on Annual Work Plan arrangements with LESTARI that explicitly phase out LESTARI support, providing capacity building as needed. Emphasis will continue to be placed on the MSF as a forum, not a project implementation body, encouraging relevant collaboration between private sector, local community, and local government through their respective roles (e.g., reducing ego-wilayah and ego-sektoralisme in landscapes where inter-sectoral actions are crucial such as in peatlands and critical watersheds that share common water resource interests). Landscape envisioning and visualization will be especially important to enhance MSF members’ understanding of the need to coordinate and collaborate, especially in specific sub-landscapes. The example of the MSF in Pulang Pisau and support for canal blocking of peatlands across the KHG14 sub-landscape is based on a strong sustainable vision for the landscape in the future. During Year 2, this envisioning and visualization will be developed with application to all MSF based upon input from SEAs and revised or newly developed LCPs (SA 2). Training and capacity building (through involvement in all aspects of LESTARI activities and initiatives), MSF meeting facilitation and dispute resolution, and a stronger role for women will result in MSFs capacity to bridge collaboration gaps between stakeholders. Technical themed discussions at the district level and the formation of ad hoc “technical teams” from within the MSF membership will continue to be developed to implement specific actions at the ground level, such as regulation development (e.g., in process, Bupati decree on Village fund use in Aceh Tenggara), investigation of critical issues (e.g., in process, blocking of major canals and the use of fire in Pulang Pisau), and dispute resolution (e.g., overlapping community and plantation land). MSF results from these actions (recommendations,
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 37
agreements, and action plans) will then be channeled through appropriate communications and advocacy to effectively encourage better decision and policy making based on multi-stakeholder support for improved forest and peat land management, conservation, and sustainable development for communities. MSF have been shown to influence decision-makers not only through their constituent government members, but also through news media reports of their recommendations, e.g., news media article on the consensus of the third MSF of Pulang Pisau District to block all major canals in Block C / KHG14. Continued capacity will be provided for MSF members to channel citizen voices to decision makers more effectively. The MSF approach will also be used whenever public consultation for LESTARI initiatives is required (e.g., multi-stakeholder dialogue for Sahabat Cyclops; Mimika and Asmat SEA for RTRW revisions; land rationalization and sustainable investment for local commodities in Mappi-Bouven Digoel; PES, sustainable livelihood,co-management, PerBup Dana Desa, and Qanun Lingkungan Hidup in the Leuser Landscape; and canal blocking and fire-free land clearing in the Katingan-Kahayan Landscape). Increased citizen-based influence on national policy-making. Now that USAID BIJAK is operational, MSF “voice and choice” as well as LESTARI studies will be channeled to BIJAK to influence national level policy-makers to bring about reform that (1) increases spatial certainty aligned with sustainability goals (e.g., rationalized land use zonation in and between adjacent forest areas and private land), (2) strengthens KPH FMU institutions to be both responsible and sufficiently autonomous especially with respect to the management of forest use licenses, (3) raises forestry resource values currently undervalued by structural constraints such as onerous export bans (e.g., rattan and timber) and domestic trade restrictions, (4) internalizes negative externalities (e.g., socially-irresponsible water use in peatlands) and (5) nurtures positive externalities (e.g., PES such as water service incentives for upstream communities). Sustainability Screening Tool for Improving Licensing Processes. LESTARI will support better-informed and more sustainable natural resource licensing processes at the district and provincial level that ensures more equitable and sustainable economic development through participative design and roll out of a Sustainability Screening Tool (SST) with public oversight of both permitting and monitoring of actual land use. After exploratory work in Year 1, the SST under development by Winrock International is now focused on the Katingan-Kahayan Landscape where more carbon emissions occurred in 2015 than in all other LESTARI landscapes combined, and to further focus on Pulang Pisau District where 27% of all GHG emissions occurred. While natural resource license / permitting authority was recentralized to the province in accordance with Law 23 of 2014, district inputs to the process will be required. Therefore, SST design and development as well as rollout will continue to engage at both levels. The SST will continue to develop as a web-based tool aligned with the intent of BIG to achieve Indonesia’s One Map policy. This consists of geospatial data compilation (collation of land and forestry thematic maps) – integration (superimposition of thematic maps) – synchronization (resolution of overlapping thematic and licensed areas) as promoted by BIG in line with Presidential Decree 9 of 2016 as well as the Cabinet Meeting of 7 April 2016 and inter-ministerial meeting of 10 June 2016. Tool development will involve multi-stakeholder feedback through FGD’s and eventual thematic discussion at the MSF. The SST will transform its compilation of licenses overlaid on thematic and formal land use zonation by request to a dynamic automatically-updated system and proceed to an integration phase that informs licensing processes (with special emphasis on consistency with integrated fire prevention and response in peatlands in Pulang Pisau). SST will be incorporated formally into the one-stop-shops for licensing at the Provincial level and their
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 38
relationship to the RTRWP/K. For example, in Central Kalimantan, the SST will be incorporated into the Provincial Information System for Monitoring Revenue and Control of Regional Development (SIMP3D) Subsequent to the compilation and integration phases of SST, more sophisticated synchronization (sensu BIG) of geospatial information for licensing will involve estimation of cumulative effects and improper boundaries of licenses as well as their internal zonation to correspond with functional land use and riparian areas. Stakeholder participation with government sectoral agencies, especially those involved in licensing processes as well as affected village communities, will be emphasized. This will include technical land use dispute resolution protocols to address conflicts between proposed and actual licenses. A web-based tool will be developed for the entire Katingan-Kahayan Landscape and rolled out to other landscapes in Year 3. Systematic and Transparent Monitoring of Land Use in Line with Spatial Plans. More scientific and participatory monitoring at the landscape level depends upon basic and publicly-accessible spatial data infrastructure (SDI). Year 2 will continue to build on IFACS work to develop this capacity by linking it with the SST. In Papua, LESTARI will continue to support the Provincial Sistem Informasi Tata Ruang (SIMTARU), expanding its reach systematically and dynamically to the Provincial One-Stop-Shop for nature resource licensing. Information linkages with Sarmi and Mimika Districts, including the uploading of a decade of community mapping results into the system, will be enabled as required under the One Map policy following the principles of geospatial data compilation, integration, and synchronization. By the end of Year 2, SIMTARU and SST will be ready for integration in Year 3. The matrix below identifies the key results and activities from the SA 3 ToC that will be implemented within Year 2
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 39
Table 7. LESTARI Strategic Approach 3, Year 2
LESTARI 3 – SUSTAINABLE LANDSCAPE GOVERNANCE
Result (blue box in ToC) Activities (yellow box in ToC)
SDI formalized
3.1 Build monitoring capacity of SDI
3.2 Geospatial information linkages (inter-services agency) and (vertically between National and Village)
3.3 Initiate required and selected regulation for formalized SDI
SIMTARU operationalized for planning, implementation, monitoring and reporting
3.4 Improve SIMTARU utility and functionality in Papua Province with linkages to Sarmi and Mimika Districts
Sustainability Screening Tool (SST) developed as web-based tool for dynamic data compilation and integration in Central Kalimantan (Pulang Pisau District focus)
3.5 Establishing SST infrastructure, completing GIS and data server installation and web-hosting
3.6 Focus group discussions with related SKPD for SST module development
3.7 Assisting BAPPEDA for SST implementation
SST operationalized for systematic data compilation, integration, and synchronization in Central Kalimantan (Pulang Pisau District focus).
3.8 Strengthen BAPPEDA function as data coordinator
3.9 Build agreement across all SKPD (including SDI) for spatial data compilation and integration (SOP/Guidelines)
3.10 Collaborate with MSF for developing land-use dispute resolution protocols using SST (SOP/Guidelines)
Multi-stakeholder vision and mission (new or revised) agreed
3.11 Build consensus among MSF members about vision and mission (SOP/Guidelines)
The issuance of government decree/policy to formalize/institutionalize MSFs
3.12 Propose local government to formalize MSFs in a way that ensures its effectiveness and independence
MSF capacity to bridge gap in mutual understanding, respect and trust between stakeholders increased
3.13 Equip MSF with needed skills toward establishing lasting network for change: MSF facilitation, dispute adjudication resolution, etc
3.14 Strengthening the role of women
MSFs effectively encourage better decision making and policy making among citizen, local government and private sectors
3.15 Technical theme discussions and related working groups formed on demand for landscape and sub-landscape management as well as dispute resolution informed by adequate visualization of landscape goals
3.16 Channel MSF results to advocacy and communication strategy (SA 1) on most pressing issues, especially MSF recommendations, agreements and action plans
Citizens able to effectively advocate for their rights (if identified by MSF members as strategic, to be pursued through collaboration with MAJU)
3.17 Capacity building for MSF members on channeling other citizen voices to decision makers, e.g. from RPJMDes, communities excluded from conservation areas, communities losing land to corporate concessions (direct support from MAJU)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 40
Figure 5. LESTARI 3 Theory of Change
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 41
TECHNICAL THEME 2: CONSERVATION CO-MANAGEMENT
Introduction LESTARI’s success at the landscape level is dependent on effective management of conservation areas and other critical areas. This requires implementing an integrated approach. For co-management and zonation, this approach is closely aligned with strategic approach 2 for spatial planning and strategic approach 6 for Green Enterprise development and the connection between livelihoods and successful co-management. Our Theory of Change for this technical theme is that through improved governance, protection and management, innovative finance, expanded and empowered constituencies for conservation, and co-management of adjacent and critical areas, PA management will be improved, emissions reduced, and biodiversity conserved. The Year 2 target for area under improved management for Conservation Co-Management covers 1,343,480 hectares that is located in the conservation area, and forests around villages around critical areas. To achieve this target with broadscale support and buy-in, LESTARI strives to ensure closer alignment with MoEF Priorities of 2015-2019, shown in the table below. Table 8. Alignment between MoEF Priorities 2015-2019 and LESTARI Technical Theme 2
Strategic Plan of DG Natural Resources and Ecosystem Conservation
LESTARI Support
METT score improved by minimum 70% in priority conservation areas
Facilitate participatory METT score evaluation in 6 conservation areas in LESTARI Landscapes and support the implementation of strategies to improve METT score in those areas
Number of conservation forest management (KPHK) – non national park – established and operationalized
Support the development and operationalization of 2 units of KPHK (Rawa Singkil and Cyclops-Yuteva)
Number of domestic and foreign tourist visitors to conservation areas increased
Support ecotourism in TNGL, Sebangau National Park, Bukit Baka Bukit Raya, and potentially Cyclops and Lorentz National Park
Number of partnership in conservation established (ecotourism, ecosystem services)
Support the development of partnership between conservation area managers with communities and private sectors
Percentage of species population increased for 25 endangered species
Improve management effectiveness of the overall habitat of endangered species, particularly in 6 conservation areas under LESTARI Landscapes Grants to support Orangutan species in Leuser and Katingan-Kahayan Landscapes
Ecosystem restoration in number of degraded conservation areas
Implement pilots for community-based ecosystem restoration
Number of villages in bufferzone received technical assistance
Implement pilots for communities’ facilitation in bufferzone area and
Number of traditional zone managed through partnership agreement with communities
Implement pilots for community based traditional zone management
Strategic Plan of DG Social Forestry and Environmental Services
LESTARI Support
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 42
Improved number of forest area managed by communities through HKM, HTR, HD, and Hutan Adat
Provide capacity building and technical support for communities to obtain secure access to forest through social forestry scheme and partnership agreements
Strategic Plan of DG WSM and Protected Forest
LESTARI Support
Number of KPHL operationalized up to 2019 Provide capacity building and technical supports for selected KPHL in Aceh and Papua for completing forest long term management
LESTARI 4 – Improved Forest Management Through Co-Management Key to project success is building capacity and commitment for co-management among relevant actors in areas adjacent to PAs and critical areas. This is essential for pressure reduction on the conservation areas or critical areas through more transparent, negotiated roles and responsibilities. LESTARI works to improve the management of critical areas and areas around CAs1 through improving participation of communities living in and around critical areas in forest management and conservation and ensure their secured access to forests by developing co-management agreements. The co-management agreements could be in forms of social forestry initiatives (Hutan Kemasyarakatan (HKm), Hutan Desa, Hutan Adat, and Hutan Tanaman Rakyat) and partnership agreements between communities and managers of conservation, FMUs, private sectors, and other relevant entities. In the first year, LESTARI identified priority villages, key stakeholders for co-management, and types of co-management to be implemented; and facilitated dialogue between communities and relevant stakeholders for discussing co-management. Some pilot projects have been initiated in several villages in Leuser, Katingan-Kahayan, Cyclops, and Lorentz Lowlands Landscape. LESTARI worked to deepen community engagements in forest management engaging communities and leaders that represent both men and women and other disadvantaged groups to ensure differing gender considerations and viewpoints were addressed through a co-management approach. In the second year, LESTARI will scale up the initiative by focusing the work to develop and implement co-management agreements. It will be done in two different levels: First, in the community level, the following approaches have been implemented in several villages in all landscapes and will be scaled up in priority villages in Leuser and Katingan-Kahayan Landscapes:
1. Facilitate communities to build their capacity in integrating sustainable forest management and sustainable livelihoods in RPJMDes and village zonation (zonasi perdesaan). The inclusion of co-management and village zonation vision in RPJMDes is essential to ensure sustainable financing for sustainable livelihoods and forest management/conservation at the village level. Currently, the Indonesian government allocates approximately 1-2 billion IDR per year in each village for village development.
2. Carry out participatory mapping and planning for forest management in the area to be proposed for co-management.
3. Identify types of co-management to be pursued.
11 In several conservation areas such as Lorentz and Bukit Baka Bukit Raya National Parks, some communities are residing
inside the Park. LESTARI will pilot traditional zone utilization and partnership between communities and the government.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 43
4. Facilitate the communities to develop co-management agreements. This will include agreeing on a common vision to be achieved for the area to be managed, defining roles and responsibilities of each, and ensuring equitable benefits.
5. Carry out institutional and capacity building activities by engaging communities to develop forest management plans to be integrated and agreed upon in the co-management agreements.
6. Implement co-management agreements and key aspects of forest management 7. Ensure communities get benefits from forests through facilitating green enterprises,
sustainable livelihood activities (closely connected to SA 6), and ecotourism (connected to SA 8).
In Cyclops and Lorentz Lowlands Landscapes, the LESTARI team utilizes a slightly different approach considering the importance of strengthening adat communities and institutions in Papua Province. In the areas where Community Conservation and Livelihood Agreements (CCLAs) has been developed by the IFACS project, LESTARI will use this as a foundation to leverage community commitment for forest management and ensure secured access to forest resources. In addition, LESTARI will take more proactive measures for gender integration in this initiative by promoting and ensuring women’s access to decision making processes and benefits from forests and livelihoods. Detailed information is described in the Gender section. Table 9. Types of Co-Management in Each Landscape and Estimated Ha
Landscape Forest
Classification Types of Co-Management
to be Developed No. Villages
Targeted for Year 2
Estimated Area
Managed Through
Co-Management (ha)
Leuser
Conservation Areas
Partnership with Gunung Leuser National Park (eg. Community based ecosystem restoration)
1 village 500
Bufferzone (mostly production, APL and protected forest/hutan lindung)
Partnership with TNGL
Partnership with FMU in bufferzone area
Direct implementation: 10 villages Grant: 5 villages
6,638 2,185
Production Forest, Protected Forest (Hutan Lindung), and other forest types
Social Forestry Initiative (Hutan Desa/ Hutan Kemasyarakatan)
Partnership with managers of FMU III, V and VI
Direct implementation: 17 villages Grant: 10 Villages
14,347 14,894
Katingan – Kahayan
Conservation Areas
Partnership with national park managers to support communities’ engagement in utilizing traditional zone and/or MDK in the area around the park
Direct implementation: 4 villages
3,313
Bufferzone (production, APL, protected forest)
Social forestry in the bufferzone
Grant: 6 Villages 9,438
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 44
Production Forest, Protected Forest (Hutan Lindung), and other forest types
Social Forestry Initiative (Hutan Desa/ Hutan Kemasyarakatan/ HTR)
Partnership between communities and private sectors
Community Plantation Forest
Direct implementations: 13 villages Grant : 8 Villages 7 villages
24,403 5,269 4,604
Cyclops
Conservation area
Partnership with the manager of Cyclops Nature Reserve (eg. community-based restoration
3 villages 398
Bufferzone area
Partnership with the manager of Cyclops Nature Reserve/
Provincial Forest Agency
Direct implementation: 4 villages Grant : 3 Villages
803 398
Lorentz Lowlands
Conservation Area
Partnership with national park managers to support communities’ engagement in utilizing traditional zone/ utilization zone inside the national park area
Direct implementation: 3 villages inside the park
596
Bufferzone (mostly protected forests)
Partnership with the national park
Direct implementation: 1 village in buffer zone
2,231
Production Forest Areas/ Adat forest and other types of forests
Co-management among different adat communities
Partnership with KPHL
Direct implementation: 4 villages Grant : 4 Villages
1,209 4,246
ESTIMATED TOTAL AREA 95,472
Second, at the FMU and CA levels, LESTARI will continue to promote a more inclusive approach to protected area management and critical areas through carrying out capacity building for forest management units (FMUs) and PA managers and developing and implementing partnership agreements between communities and protected area/FMU managers. LESTARI acknowledges that supporting FMU operationalization becomes increasingly essential since the management of forest located outside the conservation area will be managed by FMUs. Despite regulatory and institutional barriers at the national and local levels, FMUs have been established throughout Indonesia. Yet, many steps need to be taken to enable FMUs to manage forests sustainably. Many FMUs, including those in LESTARI landscapes, suffer from not only insufficient staffing and budgeting but also limited capacity in forest management. LESTARI will continue support for FMUs’ capacity and institutional building by providing technical assistance for the completion of the long-term forest management plan and zonation system (interlinked with LESTARI Strategic Approach 2). An important element of our support for FMUs is ensuring the adoption of the co-management approach in FMU
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 45
forest management that needs to be reflected in their long-term management plan and zonation system. Some co-management initiatives described in Table 9 will require developing partnerships between communities and FMU managers. In addition, LESTARI will carry out capacity building activities, particularly on sustainable forest management, in several priority KPHs described in Table 10. In the Katingan-Kahayan Landscape, the second year priority will be an initial assessment on KPH development and identification of potential entry points for LESTARI to support the initiative. In addition, LESTARI has closely coordinated with USFS to create more synergy on the ground. In the second year, LESTARI will explore opportunities to align our work on FMUs, particularly in the Leuser Landscape, with USFS’ initiative. Table 10. LESTARI Year 2 FMU Capacity Building Activities
Landscape FMU Estimated ha
Impacted Priority Year 2 Activities
Leuser
Identify entry points for supporting FMU development in the provincial level Close coordination with other donors and partners to support FMU development in Aceh
Province
FMU III 112,000 Capacity building activities on sustainable
forest management and inclusive approach to forest management
FMU V 214,000
Capacity building activities on sustainable forest management and inclusive approach to forest management
Completion of Management and Zonation Plan
FMU VI 274,000
Capacity building activities on sustainable forest management and inclusive approach to forest management
Completion of Management and Zonation Plan
Katingan-Kahayan
FMU XXXI/KHG XIV
368,000 Identify entry points for supporting FMU XXXI
Lorentz Lowlands
FMU VI 194,000 Forest management and inclusive approach to
forest management
Completion of Management and Zonation Plan
TOTAL AREA 1,162,000 (to be reported in Year 3)
The matrix below identifies the key results and activities from the SA 4 ToC that will be implemented within Year 2. Co-management activities will be carried out in all landscapes with the exceptions of Mappi-Bouven Digoel and Sarmi. Detailed sub-activities are described in the landscape initiatives section.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 46
Table 11. LESTARI Strategic Approach 4, Year 2
LESTARI 4 – IMPROVED FOREST MANAGEMENT THROUGH CO-MANAGEMENT
Result (blue box in ToC) Activities (yellow box in ToC)
Dialogue between key stakeholders and communities
4.1 Facilitate dialogue between key stakeholders and communities
Co-management vision included in FMU management plan and zonation
4.2 Technical assistance to complete Forest Management/Zonation plan of FMU
4.3 Capacity and institutional building for FMUs on forest management
Key stakeholders understand the benefit of co-management and commit to collaboratively manage forest
4.4 Capacity building for FMUs and PAs for inclusive approach for forest management and conservation
4.5 Build capacity of communities to negotiate with government and companies
Co-management agreement formalized Community entitlement and responsibilities for management are secure
4.6 Advocacy and support policy coordination between government in provincial and national level for enabling policies to support co-management
4.7 Facilitate dialogues with stakeholders to reach co-management agreements
4.8 Help communities to develop forest management plan and co-management agreement
4.9 Implement co-management agreement and forest management plan
4.10 Develop RPJMDes/Regulation that incorporates environmental and sustainable forest management vision
Communities have capacities to sustainably management natural resources
4.11 Capacity building for communities for forest management and sustainable livelihood
Communities get values from forest Communities get long term benefit from forest and are motivated to conserve
4.12 Build capacity of communities to adopt sustainable livelihood practices
4.13 Identification and implementation for sustainable financing for co-management
4.14 Innovative financing plan development and implementation
Increase conservation stewardship (communities participate in forest protection
4.15 Scale-up best practices in facilitating RPJMDes that include co-management and zonation vision
4.16 Facilitate MSF for monitoring the agreements
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 47
Figure 6. LESTARI 4 Theory of Change
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 48
LESTARI 5 – Protected Area Management LESTARI works to support the management effectiveness of protected areas by using the baseline METT score to prioritize LESTARI’s support for protected area management improvement. In the first year, LESTARI supported CA managers in all conservation areas in LESTARI landscapes to establish the METT baseline and develop action plans to improve the METT score. Some key activities to improve the METT score were implemented, including patrols to improve conservation enforcement and trainings and capacity building for CA managers. Public consultations have also been held to obtain public inputs for key CA documents. In the second year, LESTARI will continue to mainstream the application of the METT2 tool to assess management effectiveness in protected areas embedded in its landscapes by engaging multi stakeholders in the landscapes. LESTARI strives to ensure broader public participation in the process of METT evaluation and enable public access to the result of the evaluation (see Figure 7 ToC). LESTARI will also provide more programmatic support for CAs in implementing key aspects of PA management plans and establishing effective partnerships with communities, NGOs, and other relevant stakeholders. Some key activities will include:
1. Training and roll out smart patrol. In the first year, LESTARI has implemented SMART patrols in Leuser National Park, Rawa Singkil Wildlife Reserve, and Cyclops Nature Reserve to improve the effectiveness of habitat protection and monitoring to enable the PA managers to be more adaptive and timely in their responses. In the second year, LESTARI will scale up the adoption of SMART Patrol in 4 other conservation areas in LESTARI Landscapes, which includes Bukit Baka Bukit Raya, Sebangau, and Lorentz National Parks and FMU 6 located adjacent to Rawa Singkil Wildlife Reserve. This will include activities for SMART Patrol training and roll out as well as facilitate the adoption of applied technology for SMART. By the end of the second year, LESTARI will promote nation-wide adoption of SMART by organizing a national workshop in Jakarta with relevant government institutions to disseminate the lessons learned from SMART Patrol adoption in all CAs under LESTARI.
2. Improve species conservation though carrying out surveys to provide evidence-based species conservation recommendations and assist CAs to develop species-based conservation strategies, and operationalize wildlife response units to mitigate human-wildlife conflicts.
3. Reduce wildlife trafficking through operationalizing wildlife crime units and joint patrols with relevant stakeholders.
4. Improve CA zonation by reviewing zonation plans (when applicable) and integrating into One Map Policy .
5. Facilitate communities’ other stakeholders to engage in CA protection and management. This will be implemented through utilization of traditional zones within Pas (most notably in Papua) and engagement of Masyarakat Mitra Polhut (MMP) in SMART patrols.
6. Pilot innovative conservation financing (see the description below).
In addition, LESTARI has closely coordinated with DOI to create more synergy on the ground. In the second year, LESTARI will support Sebangau National Park to develop Hydrology Data Management to follow up hydrology training that has been implemented by
2 METT is the Management Effectiveness Tracking Tool developed by WWF and the World Bank and used by the Indonesian
Parks Service to measure improved capacity within their protected areas.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 49
DOI. A similar approach can potentially be implemented for Cyclops Nature Reserve and Rawa Singkil Wildlife Reserve as DOI plans to widen its support in both CAs. In each PA, LESTARI will also implement capacity building activities and other priority activities based on their action plan to improve the METT score. Detailed sub-activities are described in the landscape initiatives section. Table 12. LESTARI Year 2 METT-related Priorities
Conservation Area
METT Baseline
Main Activities for Year 2 Estimated
ha Impacted
Gunung Leuser National Park
67%
Carry out participatory METT assessment
Roll out SMART Patrol (4 teams)
Operationalize Wildlife Crime Unit (WCU) (1 team)
Operationalize Wildlife Response Unit (WRU) (1 team, 2 model villages) to mitigate human-wildlife conflicts
Improve Orangutan conservation through grant
Pilot innovative conservation financing through ecotourism
Implement community-based ecosystem restoration
627,000
Rawa Singkil Wildlife Reserve
55%
Carry out participatory METT assessment
Roll out SMART Patrol (3 teams, additional 2 teams to patrol in neighboring KPH VI)
Operationalize WRU (1 unit)
Operationalize WCU (1 unit)
Support the completion of management plan/ blocking
82,000 (reported in year 3)
Sebangau National Park
62%
Carry out participatory METT assessment
Roll out SMART Patrol METT (2 teams)
Support the development of hydrology data management
Develop sustainable financing for conservation
Pilot innovative conservation financing through ecotourism business plan and Sebangau REDD+ project (connected to SA 8)
Facilitate community engagement in traditional zone
Pilot community based ecotourism
596,000
Bukit Baka Bukit Raya National Park
64%
Carry out participatory METT assessment
Roll out SMART Patrol (2 teams)
Pilot innovative conservation financing through ecotourism (connected to SA 8)
Facilitate community engagement in traditional zone (connected to SA 4)
125,000 (reported in year 3)
TWA Tangkiling 51% Carry out participatory METT assessment
Support the development of Medium Management Plan/Blocking system
533 (reported in year 3)
Cyclops Nature Reserve
43%
Carry out participatory METT assessment
Roll out SMART patrol (5 teams)
Support the completion of management plan and blocking
Community based ecosystem restoration
Carry out survey for key species and develop conservation strategy for the species
31,480
Lorentz National Park
43%
Carry out participatory METT assessment
Roll out SMART patrol (4 teams)
Review for zonation system
Carry out survey for key species and develop conservation strategy for the species
Facilitate community engagement in traditional zone (connected to SA 4)
Pilot ecotourism initiative (connected to SA 8)
1,017,000 (reported in year 3)
TOTAL AREA 2,479,013
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 50
Pilot innovative financing in Conservation. There are no silver bullets to long-term financing of PAs across the LESTARI landscapes. Each CA provides unique opportunities and challenges for leveraging conservation finance, while requiring different levels of funding to mitigate threats. In the second year, LESTARI will initiate the implementation of sustainable financing in several conservation areas. In Sebangau National Park, for instance, the LESTARI team will carry out a cost-benefit analysis and develop and operationalize a grand strategy for innovative financing for conservation. In Lorentz National Park, LESTARI will support the establishment of the Friends of Lorentz Foundation as an institution to support sustainable financing for conservation. The institution will serve as a multi stakeholder institution to mobilize broader financial and programmatic support to improve PA management. In order to support sustainable financing for conservation in Cyclops, LESTARI will initiate an assessment for ecotourism in this area and establish Friends of Cyclops (Sahabat Cyclops) to improve coordination among different institutions and actors to support Cyclops management and garner financial support to ensure sustainable financing for the nature reserve and its buffer zone. Ecotourism initiatives and REDD+ in conservation areas is described in Strategic Approach 8. In alignment with this plan, LESTARI will facilitate a learning visit that takes all protected area managers in LESTARI landscapes to a national park in Asia or beyond (TBD) to allow them to learn directly from conservation area managers who have successfully implemented ecotourism as an avenue for sustainable conservation financing. Enhance National Level Policy Coordination. The success of LESTARI in implementing a landscape approach requires effective policy engagement at multiple levels across multiple stakeholders. This is especially true for improving conservation area management, in which the authority for management is still held by the central government institutions. LESTARI will continue the first year work on policy coordination to ensure vertical linkages to the national level and inform policy issues based on our field activities and models. This will involve relevant line ministries work in roundtable discussions, policy feasibility and impact analyses, and facilitating advocacy based upon compelling findings from the LESTARI landscapes. LESTARI will provide support for policy coordination to several priority policy areas that includes:
Nationwide adoption for METT and SMART
Policies related to co-management such as social forestry
Operationalization of forest management units by taking lessons learned from the landscape level to provide inputs to policy and institutional arrangement at the national level
Integration of PA zonation into one map policy
Testing out the implementation of community engagement in managing and utilizing traditional zone
The matrix below identifies the key results and activities from the SA 5 ToC that will be implemented within Year 2. Activities will be conducted for all Protected Areas within LESTARI landscapes.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 51
Table 13. LESTARI Strategic Approach 5, Year 2
LESTARI 5 – PROTECTED AREA MANAGEMENT
Result (blue box in ToC) Activities (yellow box in ToC)
CA managers see the need for help for co-management CA Managers takes ownership of METT score
5.1 Facilitate METT workshop to establish METT baseline
Public pressures to CA authority to effectively manage CA
5.2 Organize activities/ events to raising public awareness and advocacy on biodiversity conservation issues
CA managers commit to improve their management weakness
5.3 Facilitate CAs to develop an action plan to improve their management weakness
GOI holds accountable to effective CA management
5.4 Organize public consultation of key PA documents and provide technical support for the documents completion
Effective partnership established with NGOs, Public, etc
5.5 Facilitate communities and other stakeholders’ involvement in PA protection and management
CA managers have capacities to better manage their CAs
5.6 Capacity building/technical assistance to improve CA management based on METT Evaluation
CA capacity improves and implement key aspects of management plan
5.6 Capacity building to improve conservation areas management based on METT evaluation
5.7 Improve PA’s habitat and species protection through adoption and roll out of SMART Patrol
5.8 Improve priority species conservation strategies
5.9 Reduce wildlife trafficking
5.10 Improve PA Zonation Plan
5.11 Participatory METT Assessment (Mid-term Review)
5.13 Develop and implement Innovative Financing for Conservation (Sebangau, Leuser, Lorentz NPs)
CA management is more effective
5.12 Advocacy for adoption of participatory METT, SMART, and other initiatives in the national level
5.14 METT final evaluation
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 52
Figure 7. LESTARI 5 Theory of Change
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 53
TECHNICAL THEME 3: PRIVATE SECTOR ENGAGEMENT
Introduction As with all other Technical Themes, Private Sector Engagement takes an integrated approach to the development of livelihoods, responsibilities of environmental governance, and shared roles in co-management of natural resources. This theme is focused on the development of Green Enterprises, BMP adoption, and innovative financing. In Year 1, several initial assessments were conducted to provide solid, evidence-based starting points in developing activities under Technical Theme 3. Follow-up activities included establishing public-private partnerships for Green Enterprises through which LESTARI supports alternative livelihoods while reducing pressures on forests. LESTARI has also been engaging private sectors within the landscapes (timber concessions, palm oil plantations, and mining companies) to apply BMPs focused on improving efficiency and sustainable land management (through implementing RIL and operationalize CMMPs). Furthermore, LESTARI has been working on developing innovative financing schemes and sources with a focus on ecotourism and Payment for Environmental Services (PES) sectors. Building from Year 1, the overall focus for Year 2 will be on developing, strengthening, and synergizing the implementation of the current and new PPPs, implementation of the BMP collaboration with private sector partners, and further on-the-ground activities to prepare for piloting of innovative financing initiatives. These steps are clearly reflected in the respective ToC diagrams for Strategic Approaches 6, 7, and 8. The following table demonstrates alignment between LESTARI Technical Theme 3 and GOI priorities of RENSTRA. Table 14. TT3 Alignment with MoEF Priorities 2015-2019
Strategic Plan of DG Natural Resources and Ecosystem
Conservation LESTARI Support
Improved capacity of local community for environmental issue
Technical assistance to the community through livelihood and co-management initiatives
Reducing number of hotspot & hectare of non-conservation area & land
Integrated fire management capacity building in Pulang Pisau, Central Kalimantan
Increase in NTFP production and PES investment
Providing support in sustainable NTFP production to the community and exploring the pilot potential for PES model
Number of villages in bufferzone receive technical assistance
Implement pilots for communities’ facilitation in bufferzone area through livelihood projects
Our Theory of Change for Technical Theme 3 is that if partnership with private sector entities are developed for green enterprises, private sectors adopt best management practices for sustainability, and community-based sustainable financing schemes are implemented, then emissions will be reduced and biodiversity conservation will be improved.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 54
LESTARI 6 – Green Enterprises Initiatives under SA 6 Green Enterprises are divided into two main initiatives – Public-Private Partnership (PPP) for Green Enterprises and Sustainable Livelihood development. Detailed information on each of the main Year 2 activities is provided below.
Public-Private Partnerships for Green Enterprises
LESTARI worked directly with businesses and business associations during Year 1 to foster their support and to broaden impact to increase economic benefits while reducing deforestation pressures and related GHG emissions. Several potential local commodities have been identified to be developed under PPP schemes. This was identified after a thorough screening/assessment process of all potential partners as well as potential local commodities or services. At result, PPPs were established and have started to be implemented in Leuser (for organic cacao) and Katingan-Kahayan (for community rubber). These PPPs support community-scale businesses critical to local livelihoods, including those of both men and women, by providing linkages to finance, markets, and technologies. LESTARI will continue the implementation of the current PPPs in the landscape (within Leuser and Katingan-Kahayan) as well as strengthen the sub-landscape approach to create significant impact in support for conservation/reducing deforestation in the region. Activities will be a follow up from the first year and will focus on providing specific technical assistance to the local smallholder business and facilitation of joint monitoring of the PPP among LESTARI, private partners, and the farmers. We will also develop stronger synergy with the livelihood/village intervention and co-management (SA 4) activities to achieve the Year 2 hectares under improved management target. Furthermore, to expand investment outreach and marketing for scaling up PPPs for Green Enterprises, LESTARI will organize a national investment gathering event in Year 2 with the main objective to outreach PPP facility under LESTARI and communicate opportunities for green investment in the landscapes. This will be held in coordination with a relevant national institution. Table 15. Local commodities targeted for green enterprise development, Year 2
No
Potential
Local
Commodities
Potential Partner
Estimated number of
people receiving USG
supported training in
natural resources
management
Landscape
1 Nutmeg (Pala) PT. Givaudan
Pt Supra Supa Niaga Approx 500-1000 Leuser
2 Nilam PT. Givaudan See no.1 above Leuser
3 Getah Pinus PT. Kencana Approx 300-500 Leuser
4 Rubber Crumb rubber factories Approx 200-500 Katingan-Kahayan
5 Sago TBD TBD (depending on the
assessment result) Lorentz Lowlands
6 Crab TBD TBD (depending on the
assessment result) Lorentz Lowlands
Focus on new PPP establishment will be on local commodities such as nutmeg, pine resin (getah pinus), and nilam within the Leuser landscape. In the Katingan-Kahayan Landscape, LESTARI will scale up implementation of the new PPP for community-level rubber while exploring new related PPPs in support for integrated fire and land management. The LESTARI PPP model will also be disseminated to Papua landscapes, especially within Lorentz Lowlands, where potential commodities such as sago and crab are potential targets
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 55
for PPP development. These new PPPs aim to improve the sustainable production of the local commodities, enhance access to markets, and complement and strengthen the sub-landscape approach to reducing deforestation pressures and supporting conservation. The LESTARI team will engage private sectors that support conservation initiatives by providing premium price and special treatment to the farmers in exchange of good agricultural practices on their land. The farmers also have to agree to practice zero deforestation-based activities, especially for farmers that live adjacent to the forest area. In Leuser landscape, the LESTARI team has also been establishing ICS (Internal Control System) in each district that manages activities of all farmer groups for all commodities under LESTARI including activities that contribute to conservation. By end of Year 2, LESTARI targets the establishment of at least six PPPs that contribute to the target of at least 7,500 individuals receiving benefits from sustainable livelihoods and provide capacity building for at least 4,000 individuals in natural resources management and/or biodiversity conservation.
Improved Sustainable Livelihoods and Alternative Livelihoods for Communities Adjacent to Critical Areas
LESTARI has identified locations and livelihood potential through a commodity analysis in Aceh and from previous work under IFACS in other landscapes. IFACS initiated sustainable livelihoods in villages where communities committed to conserve their forests and biodiversity, primarily through subcontracts and grants, and established 233 CCLAs in target villages. These villages are the starting point for improved livelihood interventions under LESTARI and will be expanded to clusters of villages around these priority nodes. This strategic approach synergizes with the co-management in critical areas (SA 4) since it is tied to conservation commitments and environmental safeguard development to reduce deforestation and degradation, and biodiversity conservation identified through the RPJMDes and zonation process (in Katingan-Kahayan and Leuser) or mapping of important places (in Papua landscapes). In Year 2, LESTARI will aim to move forward with engaging key stakeholders, especially the private sectors through a series of business to business meetings to attract and scale up green investment for (alternative) livelihood initiatives and also introduce business models through the MSF to secure buy-in from the local communities. LESTARI will facilitate the integration of livelihood development into the village development plans (RPJMDes) for continued and sustainable finance assistance from the village fund. Potential livelihood sources to be developed during Year 2 in the Leuser landscape include fresh water fisheries for watershed conservation and sustainable wild honey for NTFP production. In the Katingan-Kahayan Landscape, the focus will be on the development of community-based rattan, rubber, and integrated fire and land management. In Cyclops, focus will be on vanilla and orchids; in the Lorentz Lowlands, on sago, crab, mangrove tea, and cultural art. Sustainable livelihoods is not a primary focus for Mappi-Bouven Digoel in Year 2. Overall, this work aims to provide significant contribution to the LESTARI target of achieving 7,500 livelihood beneficiaries as well as at least 4,000 individuals trained in natural resource management and/or biodiversity conservation.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 56
Table 16. Sustainable livelihoods support and targets, Year 2
No Potential Livelihood
Estimated number of people
receiving USG supported
training in natural resources
management
Landscape
1 Freshwater fisheries for watershed
conservation Approx 500-1000 Leuser
2 Sustainable wild honey production
for NTFP development Approx 500-1000 Leuser
3
Freshwater fisheries for integrated
fire management / rubber / rattan /
IFM
Approx 500-1000 Katingan-Kahayan
4 Vanilla/orchid industry development Approx 200-500 Cyclops
5 Asmat art village TBD (depending on the assessment
result) Lorentz Lowlands
6 Mangrove commodities Approx 250-500 Lorentz Lowlands
During this second year, LESTARI will provide grants to local NGOs and businesses. As described in the Grants section, grantees will implement livelihoods programs that are discretely connected to conservation commitments in Leuser, Katingan-Kahayan, Cyclops, and Lorentz Lowlands Landscapes. An estimated 14 to 15 grants will be awarded on co-management and support for livelihood projects for local communities. The matrix below identifies the key results and activities from the SA 6 ToC that will be implemented within Year 2. Activities under this ToC are closely synergized and collaborated with SA 4 (Co-Management), especially activities related to improvement of community livelihoods. This is to ensure that the activities directly support the conservation and reducing deforestation objectives of LESTARI.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 57
Table 17. LESTARI Strategic Approach 6, Year 2
LESTARI 6 – GREEN ENTERPRISES
Result (blue box in ToC) Activities (yellow box in ToC)
Result of initial assessment of PPP potential
6.1 Market Assessment / Value Chain analysis for potential commodities
6.2 Identification of potential private sectors partners for PPP development
Public & Private sector demand for investment opportunities increased
6.3 Investment outreach, and marketing for potential green enterprise PPPs
6.4 Enabling business environment
PPP is formed, business is realized & join monitoring mechanism in place
6.5 Facilitate formalization of PPP agreement that integrates LESTARI mission and vision
6.6 Facilitate procedure monitoring PPP
6.7 Implementation of PPP program
Economic benefits realized
Job based on sustainable NRM increased
6.8 Technical assessment & support where appropriate
6.9 Disseminate model to other PPP
(Critical) area & key stakeholder identified
6.12 Identification of (critical) area & threats & relevant stakeholders
6.13 Identification of relevant potential livelihood
More appropriate & sustainable economic activities identified
6.14 Market & finance analysis
6.15 Develop livelihood models
Key stakeholders agree to engage in program
6.16 Outreach to communities
6.17 Facilitate and provide input for RPJMD that integrates with LESTARI’s goals
All stakeholders try new techniques
6.18 Targeted technical assistance
6.19 Development of joint monitoring mechanism
Below is the ToC for SA 6, which illustrates the interconnection between results and activities shown in Table 17. Our theory of change for Green Enterprises is that if companies and smallholders enter into PPPs for green enterprises or improving sustainable / alternative livelihoods, the improved economic benefit and value of managed resources will reduce pressure on forests.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 58
Figure 8. LESTARI 6 Theory of Change
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 59
LESTARI 7 – Private Sector Best Management Practices (BMPs) The focus of Strategic Approach 7 – Private Sector Best Management Practices in Year 1 involved the identification of suitable private sector companies within LESTARI landscapes. The private sector can be categorized into three types: timber companies (IUPHHK concessions / HPH), mining companies, and oil palm companies. Based on this assessment, landscapes such as Katingan-Kahayan, Sarmi, and Lorentz Lowlands exhibit higher numbers of large private sector companies compared to other landscapes. They drive local economies but also, to a large extent, create degradation and deforestation driving increases in GHG emissions. The LESTARI team has communicated extensively with a number of potential private sector companies during Year 1 to initiate and explore opportunities for potential BMP collaboration. Initial focus has been given to timber companies, several of which had partnership agreements with IFACS in the Katingan-Kahayan and Sarmi Landscapes. 11 companies have signed MOUs with LESTARI to collaborate on BMPs. Table 18. LESTARI Year 2 Technical Assistance for BMP collaboration
No Private Sectors
Area (ha)
BMP Collaboration Status Landscape
1 PT. Dwima Jaya Utama
127,300
RIL-C technical assistance; CMMP operationalization/HCV monitoring
IFACS and LESTARI partners
Katingan-Kahayan
2 PT. Carus Indonesia
72,110 RIL-C technical assistance
LESTARI partners Katingan-Kahayan
3 PT. Hutan Mulia
51,100
RIL-C technical assistance; CMMP operationalization/HCV monitoring
IFACS and LESTARI partners
Katingan-Kahayan
4 PT. Hutan Domas Raya
99,870 RIL-C technical assistance
LESTARI partners Katingan-Kahayan
5 PT. Graha Sentosa Permai
44,970
RIL-C technical assistance; CMMP operationalization/HCV monitoring
IFACS and LESTARI partners
Katingan-Kahayan
6 PT Sarana Piranti Utama
49,400 RIL-C technical assistance
LESTARI partners Katingan-Kahayan
7 PT Fitamaya Asmapara
43,880 RIL-C technical assistance
LESTARI partners Katingan-Kahayan
8 PT Sikatan Wana Raya
49,400 RIL-C technical assistance
LESTARI partners Katingan-Kahayan
9 PT Kayu Waja
38,450 RIL-C technical assistance
LESTARI partners Katingan-Kahayan
10 PT. Wapoga Mutiara Timber
130,755
RIL-C technical assistance; CMMP operationalization/HCV monitoring
IFACS and LESTARI partners
Sarmi
11 PT. Salaki Mandiri Sejahtera
79,130 RIL-C technical assistance
LESTARI partners Sarmi
TOTAL AREA 786,365
LESTARI will continue to move forward with the 11 private sector partners to implement the program during Year 2 starting with technical assistance for Reduced Impact Logging for Reduced Carbon Emissions (RIL-C). This RIL-C engagement will seek to improve company commitments for LEDS and biodiversity conservation. The RIL-C activities will be followed up with CMMP collaboration
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 60
with the 4 timber companies that were IFACS partners (Table 18), as an initiative to improve HCV forest management within their concessions and establish LEDS-based community partnerships (i.e., co-management agreements) with villages adjacent to their concessions (SA 4 – Co-management). The total combined area for Year 2 BMP activities is 354,125 ha, which is expected to significantly contribute to the key LESTARI Year 2 target of 1,700,000 ha improved hectares under management. LESTARI will also expand collaboration beyond these 11 timber companies to include oil palm and mining companies in Katingan-Kahayan, Lorentz Lowlands, and Mappi-Bouven Digoel Landscapes. Most of the oil palm and mining companies within LESTARI landscapes unfortunately exhibit some critical issues involving permits and licenses, land tenure, conflict with communities, and wild life conflict. LESTARI is proceeding cautiously in communicating with these companies. Land use rationalization utilizing the MSF platform to engage these companies in best management practices is being developed in Mappi-Bouven Digoel. Land use rationalization of undeveloped concessions will utilize spatial data on the distribution and abundance of high conservation values (biodiversity, ecosystem services, community needs and cultural significance) and land suitability to guide a multi-stakeholder vision for their landscape (linked to Strategic Approach 3). Our Theory of Change for SA 7 is that if companies apply BMPs, then emissions will be reduced and biodiversity conserved. The matrix below identifies the key results and activities from the SA 7 ToC that will be implemented within Year 2. Table 19. LESTARI Strategic Approach 7, Year 2
LESTARI 7 – PRIVATE SECTOR BMPs
Result (blue box in ToC) Activities (yellow box in ToC)
Key private sector partners assessed 7.1 Assessment for potential BMP collaboration 7.2 Potential private sector identification
Key private sector partners understanding BMPs & CMMPs
7.3 Identify the appropriate BMPs collaboration with the private sector partners 7.4 Develop plan with private sector partners to implement the monitoring/implementation of CMMPs/HCV-HCS
Appropriate BMPs put into MoU 7.5 Develop common interest to be included in the BMP MOU
Key private sector partners formally adopt BMPs
7.7 Provide technical assistance 7.8 Provide management advisory
Key private sectors employ BMPs 7.9 BMP Implementation
CMMP operationalization plan put into MoU
7.6 Develop CMMP operationalization plan into MOU
Key private sector partners formally adopt CMMPs operationalization plan
7.7 Provide technical assistance 7.8 Provide management advisory
Key private sector partners operationalize CMMPs
7.9 CMMP implementation
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 61
Figure 9. LESTARI 7 Theory of Change
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 62
LESTARI 8 – Innovative Financing for Sustainable Land and Forest Management Strategic Approach 8 focuses on leveraging innovative financing mechanisms in support for sustainable land and forest management within LESTARI landscapes. The approach is divided into two streams that involve identifying and scaling up Payment for Environmental Services (PES) and Ecotourism initiatives. Building from IFACS, Year 1 involved initial screening and identification of priority opportunities. This will be followed up in Year 2 by piloting a PES feasibility toolkit, securing donor funding for previously developed Project Concept Notes, and identifying pilot ecotourism sites in Aceh and Central Kalimantan.
Payment for Environmental Services
LESTARI has completed an assessment that outlined current financial architecture for PES/REDD+ and possible financing options from both domestic and international funding sources for sustainable rural landscapes in Indonesia. This report has been utilized to shape LESTARI activities in year 2. LESTARI has developed a draft toolkit for assessing PES feasibility that will be utilized by stakeholders to identify future PES/REDD+ activities in the landscapes, and explores possible PES options including carbon/forest, water, and biodiversity. Furthermore, LESTARI is committed to secure funding to finance the community-based forest conservation activities outlined in the Project Concept Notes (PCNs) that were originally developed under IFACS. In Year 1, LESTARI revised and updated the budgets and technical approaches and developed project information sheets for each of the four proposals. LESTARI will focus on developing an actionable funding plan for each of the PCNs early in Year 2. LESTARI will continue to focus on piloting the PES feasibility toolkit in the LESTARI landscapes to refine the toolkit and produce regional feasibility reports for Aceh, Central Kalimantan, and Papua landscapes. LESTARI will also synergize PES/REDD+ related programs with local government plans, (e.g., Renstra) as well as continue to work closely with other LESTARI initiatives from Technical Theme 2, especially related to innovative financing for PAs (Sebangau, Cyclops, and Lorentz). LESTARI aims to secure buy-in from stakeholders for the establishment of a PES scheme by introducing the results of the regional PES feasibility studies, followed by the establishment of project specific working groups to flesh out a PES design where it is feasible. Long-term financing mechanisms are required for peatland restoration in Sebangau National Park and forest conservation in Cyclops and Lorentz. LESTARI have started to engage with local actors to determine the requirements for such as system, including a benefit transfer mechanism for possible performance-based finance. The LESTARI team will also develop an initial analysis of the technical feasibility for carbon market opportunities both inside and outside the national park.
Ecotourism
During the first year the LESTARI team worked with the landscape teams in the Leuser and Katingan-Kahayan Landscapes to identify and short-list high potential opportunities for developing ecotourism as an innovative financing tool for conservation. From this foundation, the team conducted a comprehensive analysis of current and potential visitor flows within and to Central Kalimantan and Aceh, and their competing destinations, so that local, domestic, and international product positioning opportunities and challenges could be identified. The team also developed a Product Evaluation Tool (PET), which they used to 1) collect baseline visitation and economic impact data; 2) assess and rank the ecotourism potential of the prioritized opportunities; 3) screen the priority areas for conservation value, local, domestic and international market demand, socio-economic value, PPP prospects and
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 63
investment risks. The team also developed a draft ecotourism impact monitoring framework and visitor and resident survey to collect baseline data and inform progress on key results and ecotourism performance. Below are the identified locations for potential ecotourism initiatives that will be further assessed during Year 2. Table 20. Ecotourism Potential Sites Identified in Year 1
No Initial Ecotourism Potential Landscape
1 Agusen (Gayo Lues), Ketambe, Trumon Leuser
2 Sebangau National Park Katingan-Kahayan
3 HPH concessions in Central Kalimantan (Dwima group) Katingan-Kahayan
4 Cyclops Cyclops
5 Lorentz National Park Lorentz Lowlands
LESTARI will continue to focus on short-listing ecotourism opportunities and partnerships that will have the highest impact on leveraging a larger local economy and developing constituents for conservation. This will involve continued work with the local government as well as private sectors including National Park managers, HPH concessionaires, and other relevant stakeholders in developing the ecotourism initiative to ensure strong synergy in supporting landscape connectivity and a green economy. Furthermore, LESTARI will continue to coordinate the synergy of this ecotourism-related work with other linked LESTARI activities (PPPs, Alternative Livelihoods, SEAs and LCPs, MSFs, Co-Management, Awareness and Advocacy). Our Theory of Change for SA 8 is that mobilizing national and international climate change financing resources will develop capacities for sustainable land use and forest management, and ultimately conserve biodiversity and reduce GHG emissions. The matrix below identifies the key results and activities from the SA 8 ToC that will be implemented within Year 2.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 64
Table 21. LESTARI Strategic Approach 8, Year 2
LESTARI 8 – INNOVATIVE FINANCING FOR SUSTAINABLE LAND AND FOREST MANAGEMENT
Result (blue box in ToC) Activities (yellow box in ToC)
Innovative Financing for Sustainable Land and Forest Management (PES)
Potential payment for environmental services (PES) identified
8.6 Initial assessment (feasibility study) on PES
Stakeholders (including government) agree to engage in PES program Project working group established
8.7 Stakeholder engagement
PES PCNs and safeguards developed 8.8 Technical assistance to the working group
PES is synergized with Local Govt Plan (SEA, LCP, Renstra) Environmental services related regulations formulated or improved
8.9 Technical assistance and advocacy to government
Government budget for environmental services allocated
8.10 Advocacy and lobbying at the district level
Donors agree to fund project concept notes (PCNs) developed previously under IFACS
8.11 Outreach and marketing to funding sources
Innovative Financing for Sustainable Land and Forest Management (Ecotourism)
Ecotourism opportunities identified 8.1 Initial Ecotourism Assessment
Integrated business models for ecotourism developed
8.2 Develop integrated business models 8.3 Market linkage development
Growth of Ecotourism Increased government support for ecotourism
8.4 Capacity building and Training
Ecotourism incorporated in government budget, plan and policy (including RPJMDes and SEA)
8.5 Development of district ecotourism plan
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 65
Figure 10. LESTARI 8 Theory of Change
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 66
PROJECT MANAGMENT, COORDINATION, AND COMMUNICATIONS
PROJECT MANAGEMENT Success and sustainability of LESTARI hinges on effective horizontal and vertical coordination and communication both within and beyond the project. LESTARI uses a mixed-matrix management approach, as landscapes staff are supported technically by the Jakarta office but report to staff inside the landscape offices. Within the project, the COP facilitates integration and collaboration among staff and subcontractors to ensure synergy among technical themes, and work with partners to ensure landscape-level best practices and lessons learned inform provincial and national-level policy. Each technical theme is managed by a Jakarta-based technical lead who is responsible for management and technical oversight while identifying and scaling up integration with other technical themes. This is especially crucial in Year 2 as aggressive start-up in Year 1 has resulted in the emergence of technical silos. Year 2 management efforts will ensure that staff amplify the interconnection between activities to ensure coherent, synergized, and integrated programming. A focus will also be placed on ensuring that all landscape staff and partners understand LESTARI’s implementation of the landscape approach that optimizes development and conservation objectives. Senior technical staff are required to spend a minimum of two weeks per month working in the landscapes, thereby playing an important mentoring and capacity building role for landscape-level staff and partners. Notably, more clearly defined activities in this Year 2 Work Plan and beyond will reduce the reliance on project-based SOWs and will thus ensure more routine, technical content-driven work in line with the ToC. This year, LESTARI is also introducing an additional DCOP position in order to provide greater programmatic support at the landscape level and to alleviate any tendency for emergence of silos among technical themes. DCOPs report directly to the COP and, together, meet with the COP on a weekly basis to discuss routine programmatic and technical issues as well as on an ad hoc basis for addressing any emerging concerns or opportunities. Ms. Linda Ekaputri will join Neville Kemp as a LESTARI DCOP. Ms. Ekaputri will oversee LESTARI’s Aceh and Central Kalimantan landscapes as well as the Forest Governance and Advocacy technical theme and overall project monitoring and evaluation. Nev Kemp will be responsible for Papua’s 4 landscapes as well as the Conservation Co-Management and Private Sector Engagement technical themes. LESTARI is a technically complex and geographically disparate project that requires extensive, routine opportunities for coordination. Routine LESTARI meetings include:
COP-Home Office Support Team Weekly Skype – Weekly
COP-DCOP Programmatic and Technical Meeting – Weekly
Jakarta Senior Management Meeting – Weekly
Landscape-level Team Meetings – Biweekly
Landscape-Technical Senior Management Meetings – Quarterly
LESTARI landscape/province Work Plan Meetings – Annually Project Operations are managed from Jakarta, with major financial management, human resources management, administration, and procurement led in Jakarta through by the Operations Team. A number of administrative staff are stationed in field offices and support LESTARI’s robust field activities. A number of Finance staff – reporting directly to the Finance Officer – are based in the field and ensure compliance and cost-effectiveness of all
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 67
expenditures. The Operations Manager ensures that he and/or other members of the Operations Team visit field offices on at least a quarterly basis to provide required support, training, and oversight. Starting this year, LESTARI will also conduct and document periodic financial reviews as well as inventory assessments on at least an annual basis for each field/landscape office. Monitoring and Evaluation. LESTARI’s Monitoring, Evaluation, and Learning Coordinator works with USAID and partners to ensure timely quarterly and annual reporting of results. This Year 2 Work Plan is closely integrated with LESTARI’s Activity Monitoring and Evaluation Plan (AMEP), which is utilized to set work plan targets, and to monitor and evaluate LESTARI activities outlined in this and subsequent work plans. The AMEP is a living document that outlines Monitoring & Evaluation (M&E) systems, protocols, and data collection methodologies. This framework ensures continuous learning while improving coordination and collaboration to track, evaluate, and articulate results and impacts. Meanwhile, the fully operational MIS ensures efficient day-to-day monitoring and administration of landscape field activities. Early in Year 2, LESTARI will work with USAID to update and refine some minor aspects of the AMEP. This might include re-distributing targets at the landscape level as well as modifying milestones of specific indicators based on LESTARI’s experience gained implementing the project over the first year. Neither total targets nor indicator wording is expected to change, and thus it is unlikely that formal USAID approval will be required. Nevertheless, LESTARI will consult closely with our USAID COR prior to putting any changes into practice. Staffing. LESTARI ramped-up the majority of its anticipated staffing over Year 1. In reviewing LESTARI workloads and staff capacity during the recent Year 1 Annual Report & Year 2 Work Plan meetings, it was determined that additional staff are required to more professionally ensure successful achievement of LESTARI results and deliverables. For example, LESTARI will turn the current landscape based Communications and Advocacy Specialist position into two separate positions in order to make more progress specifically on LESTARI advocacy work. LESTARI is also working closely with WWF, especially in Papua, to mobilize more qualified staff for work in Mappi-Bouven Digoel as well as Cyclops. LESTARI is also working with WCS to expand the SOW of their subcontract to amplify work in Leuser National Park and then expand into Singkil Wildlife Reserve. As mentioned above, LESTARI is also establishing a second DCOP position to provide more strategic and systematic support to all landscapes and technical components in Year 2 and through the life of the project. The staffing tables for all landscapes (Jakarta, Aceh, Central Kalimantan, and Papua), including titles and positions of STTA and LTTA personnel, can be found in the appendix. The locations of all LESTARI offices are shown in the figure below.
Head Office Jakarta
Aceh Offices
Banda Aceh Tapaktuan Gayo Lues
Central Kalimantan Office
Palangkaraya
Papua Offices
Jayapura Timika Agats
Mappi-Bouven Digoel
Figure 11. LESTARI Offices
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 68
Subcontractor Management. LESTARI includes 9 institutional subcontractors built into the project budget as well as additional contractors – like Mongabay Indonesia – that provide support services for the project. In all instances, subcontractors are accepted as significant members of the LESTARI family and are expected to represent LESTARI accordingly. For the 9 institutional subcontractors, LESTARI has and will continue to provide regular operational and technical training and support to ensure their effective and efficient functioning. This includes operational and financial management training and support in Jakarta and the field. It also includes regular engagement in all LESTARI planning meetings in Jakarta and/or the field. In Year 2, LESTARI will provide continued support including additional financial management training. LESTARI will also conduct and document periodic technical and financial reviews on at least an annual basis, and remind subcontractors of required financial audits. Under the leadership of the COP, a DCOP or Technical Theme Leader will provide technical oversight of each subcontractor to ensure professional and high quality delivery of their work. EMMP. LESTARI activities will continue to operate in full compliance with USAID’s regulations and requirements regarding the environmental impact of project activities. An Environmental Mitigation and Monitoring Plan (EMMP) will be submitted separately from this Year 2 Work Plan. Reporting on the EMMP outcomes, including identified environmental impacts, mitigation measures, and monitoring indicators, will occur yearly in the Annual Report.
PROJECT COORDINATION GOI Coordination. LESTARI coordinates and works with GOI agencies at the national, provincial, and district levels. At the national level, LESTARI coordinates regularly with the Ministry of Environment and Forestry’s Director of Protected Areas as our official counterpart. This includes routine formal and informal coordination and communication. When requested by USAID, LESTARI also coordinates and provides reports to BAPPENAS as well as other Ministry of Environment and Forestry directorates. At the provincial level, formal partners are the provincial level Dinas Kehutanan. Besides regular coordination with and reporting to these agencies, LESTARI regularly coordinates and works with a wide range of GOI agencies at both the provincial and district levels. LESTARI has signed MOUs with the Governor of Papua and Aceh’s Dinas Kehutanan. LESTARI does not expect to enter into any additional MOUs, though may do so if requested by specific GOI agencies in order to ensure effective working relationships. In Year 2, LESTARI will institutionalize a minimum of quarterly meetings with key GOI counterparts in Jakarta and the field to ensure alignment of LESTARI activities with GOI priorities, ensure full transparency of LESTARI programming, and seek opportunities to amplify LESTARI best practices beyond our landscapes. LESTARI will also organize and facilitate quarterly Tim Teknis meetings with Ministry of Environment and Forestry, Bappenas, Ministry of Finance, and other GOI agencies to be determined by USAID. LESTARI project and technical documents and meeting agendas will be distributed and discussed with participants well ahead of all meetings. LESTARI will facilitate presentations from landscape partners to build awareness of field-level impact. With USAID, LESTARI will facilitate field trips for Tim Teknis members at least once each year. USAID & USG Coordination. In order to amplify the impact of USG – and especially USAID – investments for biodiversity conservation and sustainable landscapes in Indonesia, LESTARI strives to be an open and active partner. Regular coordination with USAID includes weekly meetings between the USAID COR and the COP. Frequently, these meetings also include other senior technical and operational staff, notably the DCOP, Operations Manager, and Technical Theme leaders. Further, LESTARI arranges and hosts
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 69
field visits for USAID so the COR and other USAID/US Embassy officials generate a better understanding of the project’s work at the landscape level. LESTARI also strives to build and implement effective coordination with other USAID projects and USG investments. Priorities for Year 2 include:
1. BIJAK. LESTARI will work with BIJAK to identify national-level policy opportunities and constraints that can enhance the effectiveness of LESTARI work at the landscape level, and then amplify positive impact at the national level. While discussions between BIJAK and LESTARI are still underway, notional opportunities include effective revision of UU/5 1990; and national policy support for effective implementation of Forest Management Units, Social Forestry, and One Map. LESTARI anticipates regular coordination meetings with BIJAK especially during work planning, as well as mutual participation on various working groups.
2. MAJU. LESTARI is coordinating with MAJU to integrate their interest in traditional land tenure in support of forest conservation in Papua. Initial coordination meetings have been held in Jakarta, and LESTARI looks forward to identifying 1-2 on-the-ground opportunities in Papua to collaborate. This might include incorporation of Adat groups in co-management of Cyclops Nature Reserve, Lorentz National Park, and possibly community-protected areas in Asmat.
3. Department of the Interior (DOI). LESTARI started collaborations with DOI specifically around their Sister Park work in Sebangau NP during Year 1. In Year 2, LESTARI seeks to work with DOI in Sebangau in support of ecotourism development, peatland hydrology, and national park management. LESTARI will also coordinate with DOI on their potentially expanded work with BKSDA Aceh and BKSDA Papua. In Aceh this might include ecotourism development in/around Singkil Wildlife Reserve or broader wildlife management. In Papua this might include co-management of Cyclops Nature Reserve or broader wildlife management at the provincial level. Details of this collaboration will be refined after submission of this Year 2 Work Plan.
4. USFS. LESTARI will continue to coordinate with USFS. This will include identifying and mobilizing participants for USFS training programs in Indonesia or the United States. It may also include further ecological and/or carbon analysis of southern Papua mangroves as well as technical support for Forest Management Unit training materials.
LESTARI also continues to regularly communicate with and seek opportunities for collaboration with GOLS, PPP-ASLI, GAMBUT and other USAID/Indonesia, USAID/RDMA and USAID/WDC initiatives. Donor Coordination. In coordination with our USAID COR, LESTARI maintains and will deepen coordination ongoing relationships with diplomatic and donor initiatives as well as their implementing partners. At the national level, this involves participating in – and often hosting Donor Working Groups on Climate Change, Aceh and Papua. It also includes regular coordination with UKCCU, Norway’s REDD+ Partnership Program, World Bank and ADB FIPs, EU and KfW. In Aceh, LESTARI coordinates closely with GIZ on various KfW initiatives, as well as EU implementing partners for their work.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 70
PROJECT COMMUNICATIONS Year 2 Communications Strategy. Under guidance and leadership of LESTARI’s Monitoring, Evaluation, and Learning Coordinator, LESTARI communications and knowledge management staff ensure regular, effective documentation of LESTARI project achievements, results, best practices, and lessons learned to a broad audience at the international, national, and local levels. The overall Communications Strategy in Year 1 was to build foundational support for LESTARI, communicating its various strategic approaches and landscape initiatives to local and national government, civil society, and private sector stakeholders both within and outside the landscape. Year 1 also involved designing and initiating a range of communications products and channels in order to build a presence and establish proper outreach mechanisms. The Year 2 Communications strategy is focused on deepening the foundational work of the previous year by continuing the routine production and dissemination of communications products through a range of innovative channels and aimed at both general and specifically targeted audiences. General audiences are aimed at when broadscale awareness raising and support is needed. This is relevant on topics such as the impacts of forest and land fires and the need for increased public pressure on policymakers to implement better policies. Targeted audiences include local government, MSF, local community leaders, and local NGOs/CSOs. They are aimed at in order to raise awareness and support for landscape-specific issues and interventions among local stakeholders (e.g., the need for canal blocking to mitigate fire and flood risk for local communities). As a cross-cutting component, Communications work in Year 2 will continue to rely on technical theme leaders, packaging and amplifying the messages of the Governance, Co-Management, and Private Sector Engagement teams both in Jakarta and the landscapes. The Communications team will, in particular, support the work of Strategic Approach 1: Awareness and Advocacy. In line with the ToC for SA1, Communications will support outreach, capacity building, and public discussions aimed at target audiences, eventually resulting in behavior change and the formation of constituencies for conservation. Content for Communications will span a wide range of topics including:
Socialization on the LESTARI project and its approach
Project progress/achievements/impacts
Findings from LESTARI technical assessments/studies
Visualizations of the Value Landscape and related challenges and outcomes
Links to wider news/studies/articles on relevant issues in Indonesia: deforestation, palm oil, forest and land fires, threats to key species, etc.
Capacity building materials
Outreach Mechanisms. LESTARI utilizes several innovative and broad-reaching products and channels to deliver its key messages. Products package content in a particular style and form. The major communications products are summarized below:
1. Factsheets, Posters, and Infographics are used to socialize a general audience on the LESTARI project and its approach, including important data/metrics.
2. Briefs present a case study on a technical issue, provide analysis, and issue a set of
recommendations consistent with LESTARI’s advocacy work. They are primarily
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 71
aimed at MSF and government decision makers, and also relevant NGOs/CSOs to equip them with knowledge to better advocate for sustainable land use.
3. Papers are written by LESTARI staff to provide further elaboration on a technical
approach or concept implemented by LESTARI. The target audience is similar to those of Briefs.
4. The LESTARI Journal is part of an engagement strategy that provides room for
external researchers to present their research results and thinking on issues determined by LESTARI. It is academic in style and targets a general audience.
5. Stories From the Field are human-interest stories produced from the landscapes
that showcase the challenges, opportunities, and positive impacts of LESTARI interventions on the lives of real people. They target a general audience.
6. Videos and Visualizations are multimedia products used as part of advocacy efforts
where providing messages visually is more effective than in written form. They are used to showcase the biodiversity and forest values of the landscape, depict threats, as well as illustrate how the landscape will be impacted by LESTARI interventions (e.g. through canal blocking). The purpose is primarily to inform and garner support from local communities and the MSF, and secondarily to raise awareness with a general audience.
Communications channels are the mediums through which products, as well as other key messages, are disseminated. Major communications channels are summarized below:
The LESTARI Website is used broadly to share all of the communications products listed above, in addition to project reports (quarterly, annual, and technical assessments). It targets a general audience and is available in both English and Bahasa Indonesia. It can be accessed at the following URL: http://www.lestari-indonesia.org/en/
The LESTARI YouTube channel is used share documentary-style video clips showcasing landscape values and threats. Links to this channel are shared via Facebook channels, Twitter, and Email Blast, as necessary.
6 Facebook pages exist for LESTARI: at the national level and for Katingan-Kahayan, Leuser, Lorentz Lowlands, Cyclops, and Mappi Bouven-Digoel Landscapes. They are utilized to showcase LESTARI landscape-level activities, share compelling visual imagery of the value landscape, and raise awareness through sharing links to news articles/multimedia/stories on wider issues. Landscape pages primarily target stakeholders within that landscape, while the national page targets a general audience.
Twitter and Instagram will be operationalized in Year 2 to raise awareness through sharing links to articles/multimedia/stories and visually reveal the value landscape, respectively. They will both target a general audience.
Email Blast is used to share LESTARI Briefs, Stories From the Field, technical assessments, and project reports with USAID, KLHK, BAPPENAS, local government, and subcontractor partners.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 72
Media Gathering / Journalist Visits are regularly conducted within all landscapes to build capacity of journalists to report on the landscape issues relevant to LESTARI (e.g. mangrove ecosystem sustainability in Papua), as well as encourage publicizing the challenges being addressed by LESTARI.
Offline Events – LESTARI will regularly support and actively participate in local, national, and international events on social forestry, biodiversity conservation, and other relevant issues organized by KLHK and other government partners. Relevant communications products (I.e. factsheets, posters, briefs) will be used to raise the profile of LESTARI and its initiatives. This channel also includes organizing competitions, contests, and exhibitions, particularly with youth groups.
Table 22. LESTARI Year 2 Communications Summary
LESTARI YEAR 2 COMMUNICATIONS ACTIVITIES
Outreach Mechanism Function Audience Production Schedule
Products
Factsheet Socialize LESTARI General Reviewed and updated yearly; additional as needed
Brief Present case study on technical issue and provide recommendations
Targeted Monthly
Paper Elaborate on technical approach or concept
Targeted As required by technical team
Journal
Academic-style publication including external researchers and thought leaders
General Semiannually
Videos Reveal VL and Challenges General As required by technical team
Stories From the Field
Share human-interest stories
General Weekly
Visualizations Illustrate landscape challenges and potential outcomes
Targeted As required by technical team
Poster Socialize LESTARI General Initially in Year 2 and updated as needed
Infographic Depict meaningful data/metrics
General As required by technical team
Channels
Website Broad sharing of LESTARI content and activities
General Biweekly Update
Facebook Share relevant news stories, issues, multimedia products, and landscape activities
General Weekly Update
YouTube Share video products General As videos are produced
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 73
LESTARI YEAR 2 COMMUNICATIONS ACTIVITIES
Outreach Mechanism Function Audience Production Schedule
Twitter Share relevant news stories, issues, multimedia products, and landscape activities
General Weekly Update
Instagram Reveal VL General Weekly Update
Email Blast Share Project Documents Targeted As Comms products are produced
Media Gathering / Journalist Visit
Capacity development Targeted Quarterly
Offline Events Support GOI partners; raise awareness of LESTARI
Targeted As required
Priority Themes. In order to deliver a more coherent and consistent message through the various communications channels, Year 2 communications activities will prioritize key themes (subject to change) per quarter:
Sustainable Landscapes
Improved Forest Management
Private Sector Role in Climate Change Mitigation
LEDS
Approximately 60% of communications products and channels will focus on these priority themes per quarter, while the remaining 40% will continue to involve other issues, findings, events, and activities. Moreover, LESTARI will utilize Earth Day (April 22), International Day of Forests (March 21), International Day for Biological Diversity (May 22), World Environment Day (June 5), Gerakan Satu Juta Pohon (January 10), Hari Air Sedunia (March 22), Hari Tani (September 24), Hari Hewan Sedunia (October 4), and Hari Menanam Pohon Indonesia (November 28) as opportunities for amplifying key messages to a broad audience via social media outlets. Knowledge Management. The Communications team will work in collaboration with the Monitoring and Evaluation (M&E) team to introduce a more systematic approach to results measurement and review for each communication initiative, knowledge sharing activities, and communication products. Monthly and quarterly review meetings and post-event meetings will be conducted as part of the efforts to feed into the annual project performance report.
LESTARI will institutionalize systematic project sharing and learning management with technical leaders and landscape coordinators in generating evidence-based knowledge. The evidence will be the basis for annual assessments that will provide lessons learned and best practices to feed back to annual work plans, with a view towards improving performance and influencing long-term development policy. Linkage between Individual Communication Activities with Broader Project Objectives. By implementing a landscape approach, LESTARI’s communication team understands that individual communication activities should achieve broader project goals. It is important to evaluate which activities worked well and which should be improved in future.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 74
The Communications team will work closely with technical leaders, M&E, and landscape coordinators to gain useful feedback. M&E tools include pre and post-test, observation, and interview with participants to measure the success of individual activities and broader project goals. Building Constituents and Advocacy. The Communications team will provide substantial direction and initiate activities relating to strengthening MSFs and engagement with external constituencies. In doing so, LESTARI’s stakeholders, partners, and champions will be supported and leveraged to influence policy change. LESTARI’s effort to build constituencies and advocacy will be indicated by the improvement of stakeholders’ (including public-private sectors, media, and community) level of support for conservation for each communication activity. More detailed awareness and advocacy activities can be found under Strategic Approach 1 as well as the landscape activity matrices in this Year 2 Work Plan. Resources and Reporting. LESTARI will also continue to leverage new opportunities as they arise to garner momentum for LESTARI campaigns. This may utilize STTAs, Service Agreements, Subcontractors, and direct implementation via Jakarta and landscape-based staff. Communications progress will be reported on in dedicated sub-sections within LESTARI Monthly, Quarterly, and Annual reports. All LESTARI communications activities will continue to operate in full compliance with USAID branding and marking requirements, as outlined in ADS 320.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 75
GENDER INTEGRATION The economic, political and cultural attributes associated with being a man or a woman in Indonesian society vary considerably throughout the country. These attributes can facilitate or hinder the ability of individuals, households, and communities to access and assert their rights to benefit from ecological services and natural resources. LESTARI’s approach to gender will ensure that all local stakeholders (men, women, girls, and boys) improve their understanding, awareness, and ability to act together to conserve biodiversity in the selected landscapes and reduce GHG emissions for the benefit of their communities. Increased devolution of land use planning and co-management in proposed LESTARI program areas ostensibly offers avenues for increased citizen participation and inclusion of marginalized groups such as women and indigenous people so that they can realize their rights. In practice, however, devolution of NRM tends to exacerbate existing power and gender hierarchies in the absence of proactive policies and interventions to safeguard the interests of disenfranchised groups. Indonesia has attempted to address these issues by mainstreaming gender into provincial development plans, and establishing provincial gender focal points and local gender mainstreaming working groups (Pokja PUG). However, World Bank and ADB report that discrimination against women and other disenfranchised groups persists. In this context, LESTARI has developed a deliberate approach to social inclusion informed by evidence-based research to achieve project outcomes that benefit all community members. In the first year, LESTARI completed a gender assessment in all landscapes and developed a LESTARI gender strategy to ensure gender mainstreaming in overall project activities. We have also carried out initial capacity building activities for staff and local partners in all landscapes on gender integrated planning. In the second year, LESTARI will hire a fulltime gender specialist to work under the guidance of biodiversity conservation advisor, Dr. Abidah Setyowati, to ensure implementation of LESTARI’s gender strategy. In addition, LESTARI has closely coordinated with BIJAK and MAJU projects and will potentially hold a joint national event together to promote gender integration in climate change and forest management. There are 5 main activities to be implemented in the second year:
Build capacity for project implement staff and partners. It will include training for LESTARI grantees (particularly RFA #004 co-management and livelihood) to integrate gender in overall project activities and enable them to monitor the progress of project achievements in terms of women empowerment.
Build capacity of women champions. It will include leadership training and
networking events for women champions in LESTARI landscapes and ensure women’s equal access to all technical capacity building activities organized by LESTARI.
Multi stakeholder engagement through MSFs. Increase public awareness on
gender issues in climate change and natural resources management by engaging MSFs to hold a thematic discussion on gender.
Campaign and awareness raising on gender issues by: 1) developing a guideline
on gender integrated planning; 2) developing policy papers to promote gender integration in biodiversity conservation, forest management and climate change
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 76
policy; 3) disseminating stories on women champions in LESTARI landscapes. In addition, a workshop at the national level, potentially co-organized with the BIJAK project, will be held towards the end of Year 2 to bring lessons learned from the LESTARI landscapes in order to advocate for gender integration in forestry and climate change policy.
Operationalize LESTARI Gender strategy. Key activities include developing gender
and social safeguards for LESTARI and developing indicators for monitoring and evaluation that integrate gender.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 77
GRANTS FUND LESTARI employs a Grants under Contract (GUC) program that supports project objectives, leverages funding from other non-USG resources, and builds the capacity of local partners. The grants program is used to achieve the overall results and targeted outcomes of the LESTARI project. Criteria for awards and grantees include those that:
Support a process of constructive engagement and planning between communities, NGOs, local government, the private sector, and other relevant institutions to work collaboratively towards sustainable landscapes management and effective biodiversity conservation
Pilot private sector engagement activities in support of the project’s objectives, including but not limited to innovative partnerships with landscape communities for Green Development initiatives, stimulating payment for environmental services opportunities, and catalyzing responsible tourism development
Support LEDS-based sustainable development initiatives to catalyze community support for conservation co-management in areas adjacent to protected areas in LESTARI landscapes
Support LESTARI’s goals through communications and advocacy campaigns led by NGOs, MSFs, civil society, or the private sector to build informed constituencies for conservation
Support via activities, equipment, materials to develop citizen-based district level mechanisms for monitoring compliance with existing land use regulations and planning processes, especially in carbon rich and biologically diverse forests in target landscapes
Provide innovative opportunities to support, engage and empower women to participate in and benefit from decisions related to their access to natural resources
Starting Year 2, the Grants Program has two grantees operating actively in Leuser and Katingan-Kahayan Landscapes. Table 23. LESTARI Grants 001-005 Update
Grant Grantee/Lead
Grantee Landscape Focus
LESTARI Commitment
Status
G-001 RFA-001
Save Our Borneo (SOB)
Kahayan-Katingan
Communications & advocacy
IDR 242,174,400 Completed
G-002 RFA-002
Yayasan Orangutan Sumatera Lestari-Orangutan Information Centre (YOSL-OIC)
Leuser Species conservation; co-management
IDR 1,999,750,950
Ongoing
G-003 RFA-003
Borneo Orangutan Survival Foundation (BOSF)
Kahayan-Katingan
Species conservation IDR 2,999,053,694
Ongoing
G-004 RFA-004
Forum Pala Aceh (Forpala)
Leuser Co-management; sustainable livelihoods
IDR 1,940,241,500
Under USAID review
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 78
G-005 RFA-005
INProSuLA Leuser Co-management; sustainable livelihoods
IDR 1,882,937,000
Under USAID review
The focus of Q1 in Year 2 is on rolling out grants from RFA-004. It is expected that 13 more grants will be rolled out as the pre-award process with potential grantees coming out of RFA-004 continuing throughout Q4 Year 1 and Q1 Year 2. RFA-004 was designed to generate grant projects that focus on co-management and sustainable land use practices, combined with sustainable livelihoods development, with a strong gender integration aspect. LESTARI understands that there is a varying degree of understanding and capacity between the selected grantees to perform a grant project with focus on co-management. In addition, the importance and mechanisms for gender integration as well as grant financial and administrative management also need to be instilled early in the project to increase the likelihood of success. In Q1, LESTARI plans to hold grantee workshops in Aceh and Central Kalimantan, as well as distribute a Grantee Handbook for their reference in managing the grants, with the main objective of strengthening the grantees’ work on collaborative management (including social forestry), gender integration, and overall capacity in managing the grant funds. In late Q2 through to Q4, it is expected that a few more RFAs will be developed, in line with LESTARI’s thematic approaches. A few identified focus areas that will be developed are:
Grants that develop and work with women’s groups
Grants that work with local organizations in Papua
Grants that support species conservation
Grants that develop sustainable livelihoods to support LESTARI’s specific landscape strategies and targets
Grants that support LESTARI’s strategy of land use rationalization in Mappi-Bouven Digoel Landscape or other PPP strategy
During the process of selecting applications for RFA-004, it became apparent that there is a need to provide capacity building for local organizations in Papua when releasing an RFA to improve proposal development as well as grant management. In Q4, when most of the signed grants are midway through the implementation phase, LESTARI plans to hold an internal midterm evaluation for some of the grant projects to garner lessons learned and improve on the way LESTARI manages its grant program. The full procedure for the selection of grantees is detailed in the Grants Management plan for LESTARI. The full criteria for selection of grantees will be detailed in the RFAs released biannually.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 79
NATIONAL INITIATIVES Adapting from lessons learned through IFACS project implementation, LESTARI places greater emphasis on building and nurturing national-level relationships in order to increase impact at the landscape level; amplify tools, approaches, models, and lessons learned from LESTARI landscapes to other critical areas; and ensure sustainability of LESTARI climate change mitigation and biodiversity conservation beyond the life of project through necessary policy reform and budget support. Building these bridges from the landscapes to the national level is especially important in national park management and other instances where the national government maintains significant authority through deconcentrated rather than decentralized institutional arrangements. Hence Year 2 national level priorities fall primarily under the Conservation Co-Management technical theme. LESTARI will work under continuous coordination with KSDAE and other relevant KLHK agencies to support the improvement of protected area management and multilevel policy coordination to foster co-management agreements and implementation. LESTARI will focus on promoting the scaling up of some initiatives at the national level such as:
1. For SMART Patrol – by focusing on bringing lessons learned from the landscape level to promote the nation-wide adoption of SMART Patrol and a reflection session for the second year to improve the SMART patrol roll out in the third year
2. For METT – by supporting the development and effective use of guidelines for participatory METT assessments
3. For RPJMDes that integrates environmental and sustainable forest management vision – to focus on scaling up at the district and other levels by developing and disseminating guidelines and sharing lessons learning through workshops
Cross learning from other successful initiatives will motivate local champions to adopt the approach in their landscapes. This will include study visits for sustainable conservation financing (e.g., ecotourism) involving CA managers and successful social forestry initiatives involving local champions. Land Use Governance work will also continue to engage at the national level with regards to informing spatial rationalization on zonation, One Map support with BIG, impacting spatial planning policy (along with BIJAK) with ATR/BPN and KLHK, supporting SDI Units and SIMTARU with BIG, and SST coordination with KLHK. Finally, LESTARI will provide regular support, coordination, and collaboration with the new national-level focused USAID BIJAK project in Year 2 and beyond. Given the significant thematic overlaps between LESTARI and BIJAK, supporting BIJAK at the national level will facilitate progress at the landscape level and amplify LESTARI’s overall impact.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 80
Table 24. LESTARI National Initiatives
NATIONAL LEVEL LESTARI INITIATIVES
Strategic Approach Activities Mechanism Q1 Q2 Q3 Q4 Comments
LESTARI 1
National-level awareness raising on key issues, including: Sustainable Landscapes, Social Forestry, Peatland Restoration, Private Sector Role in Climate Change Mitigation, LEDS, etc.
Social media; Offline events;
Workshops
LESTARI 2
Informing spatial rationalization on zonation coordinated with ATR/BPN, BIG, BRG, Kemendes, Kemendagri, KLHK
Field visit with designated agencies
National level meetings and necessary workshops
Influencing policy making for rationalization of spatial planning with ATR/BPN and KLHK (work with BIJAK)
Field visit and capacity building with designated agencies
National level meetings and necessary workshops
LESTARI 3
SDI/SIMTARU coordinated with ATR, BIG and LAPAN.
Field visit with designated agencies
National level meetings and necessary workshops
SST coordinated with KLHK, ESDM, BKPM
Field visit with designated agencies
National level meetings and necessary workshops
MSFs in collaboration with DKN, KLHK, Kemendagri to strengthen citizens’ voice to influence policy making (work with BIJAK)
Capacity building with designated agencies
National and local level meetings and necessary workshops
LESTARI 4
Coordination with Social Forestry DG to align GOI social forestry targets with LESTARI co-management conservation objectives and foster speed process for
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 81
NATIONAL LEVEL LESTARI INITIATIVES
Strategic Approach Activities Mechanism Q1 Q2 Q3 Q4 Comments
social forestry application from communities in LESTARI landscape
Coordination with relevant DG to support institutional and capacity building of FMU
Scale up RPJMDes that include co-management and environmental vision through organizing share-learning workshop and develop guideline for the RPJMDes development
Workshop; guidelines development
Cross-learning / study visit for community forestry for local champions in LESTARI landscape
Study visit
LESTARI 5
Regular coordination with KDSAE to ensure synergy and collaboration between LESTARI and KSDAE to establish working relationship at national and field (BTN/BKSDA) levels
Ensure effective working relationship; establish national model applied in LESTARI PAs
Support the development of guideline book to evaluate METT to be used by CAs in Indonesia
STTA; Workshop Ensure completion of the guideline and effective use of METT guideline in CAs
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 82
NATIONAL LEVEL LESTARI INITIATIVES
Strategic Approach Activities Mechanism Q1 Q2 Q3 Q4 Comments
Promote nationwide adoption of SMART patrol through organizing a national workshop for sharing lesson learns on SMART patrol from LESTARI Landscape
Workshop; LESTARI team
Training/study tour for CA managers on sustainable financing for conservation (e.g. Ecotourism)
Study tour; LESTARI team Connected to SA 8
LESTARI 6
Public consultation/national investment gathering with related stakeholders and investment outreach and marketing for scaling up green enterprise PPPs
Direct implementation, STTA, sub-contract through meetings/workshop
LESTARI 7
Coordination with KLHK, APHI, GAPKI, GAPKINDO, APHI on issue BMP practice, BMP regulation & policies
Coordinate & Explore FMU-Production PPP model to catalyze investment in these FMUs
Direct implementation/STTA through meetings, field trips, workshop, policy brief
Carry-on important work started under IFACS to clarify policy opportunities for HPHs to be more effective forest stewards; pre-condition for operationalization of CMMPs;
FMU-Production PPP model
LESTARI 8
Expert input on the ecotourism business model and master plan
STTA; sub-contact; meetings Pilot project for ecotourism
PES tool assessment and revision STTA (PT Hydro); meetings; proposal development
Provide longer-term framework for PES, climate change mitigation, and conservation financing
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 83
NATIONAL LEVEL LESTARI INITIATIVES
Strategic Approach Activities Mechanism Q1 Q2 Q3 Q4 Comments
Gender Integration
Trainings on gender integrated planning involving grantee of LESTARI in all landscape
STTA and LESTARI team
Thematic discussion in MSFs that include issues on gender and climate change and natural resources
STTA and LESTARI team e
Publish guideline/paper/briefs to promote gender integration in natural resources management and document stories on women champions
LESTARI team
Pilot women champions network in selected landscape in co-management and sustainable livelihoods
LESTARI team
Leadership training for women champions on co-management and sustainable livelihood
STTA and LESTARI team
Operationalize gender strategy for LESTARI
LESTARI team
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 84
LANDSCAPE INITIATIVES
INTRODUCTION This chapter includes the detailed Year 2 Work Plans for each LESTARI landscape. For each of the 6 landscapes, profile, initiatives, and landscape maps highlighting locations of activities are presented. The profile illustrates the unique socioeconomic and environmental features of the landscape and its constituent communities. It also briefly discusses land use transition projections and the GHG emissions profiles that were revealed by the Landscape Baseline Analysis (LBA). This information, in conjunction with close consultations with LESTARI team members in the field, was used to design the landscape initiatives. The initiatives section highlights the core approaches for each landscape, such as supporting co-management of a national park or green enterprise development. Each initiative is tackled through various inter-related strategic approaches and is designed to address the challenges underlying deforestation, degradation, and GHG emissions that are unique to each landscape. Each landscape section concludes with detailed summary tables of actionable activities and inputs per strategic approach. Items in italics indicate areas of synergy with other strategic approaches.
LEUSER LANDSCAPE
Landscape Profile According to the LBA, projected land transitions in the Leuser Landscape are dominated by primary and secondary dryland forest converted for agriculture, brush, agroforestry, mixed agriculture, and some transmigration projects. Such transitions are responsible for the vast majority of projected emissions. Moreover, the majority of these emissions are projected to occur within Leuser National Park and Singkil Wildlife Reserve and other use zones (APL). Nearly half of all land-based emissions in the Leuser Landscape occur on peatlands that are restricted to the areas along the coast.
Leuser Landscape Initiatives Principle interrelated initiatives that will relieve pressure on forest land resources and reduce GHG emissions are:
Improved governance to provide enabling conditions for conservation co-management and private smallholder farmers and community forests
Enhanced sense of ownership in maintaining forest values through the revitalization of MSF and establishment of technical working groups for the development of environmental regulations and advocacy
Integration of SEA and LCP recommendations for spatial plan zonation through RDTR in Aceh Barat Daya, “blocking” zonation in FMUs (V and VI), and the review of Leuser National Park Zonation
SEA-LEDS at the Provincial scale for anticipation of new Governor’s mid-term development plan (RPJMD), including incorporation into RENSTRA of the SKPDs, especially Provincial Dinas Kehutanan
Improved management of Gunung Leuser National Park and Singkil Wildlife Reserve primarily through SMART patrols, wildlife crime reduction, and human-wildlife conflict mitigation
Strategic partnership with Forum Konservasi Leuser for national park protection and restoration
FMU (KPH) management planning and capacity building
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 85
Co-management agreement development between the community and FMU protection forests
Green Enterprise Development (cacao, nutmeg, patchouli, freshwater fisheries, citronella and pine resin) in the 4 districts of the landscape through direct implementation and in conjunction with 6 grant awards to Indonesian NGO organizations
Ecotourism development in and around Leuser National Park
Payment for Environmental Services (water, carbon) development in Gayo Lues and Aceh Tenggara
Aggressive communications strategy advocating the conservation of forests and sustainable low-emission development capitalizing on prominent events in the Landscape emphasizing water resource services
Improving environmental governance in the Leuser landscape will be achieved through (1) increasing the extent to which recommendation from the SEA and LCP developed under IFACS are incorporated into policy, plans and regulations, and (2) increasing the effectiveness of MSF in the landscapes to improve the sense of ownership and stewardship of the Leuser ecosystem. SEAs and LCPs will be reviewed and updated where necessary and utilized for the zonation (or blocking) of FMUs and conservation areas (SM Singkil) that cover the majority of the forest estate outside of Leuser National Park. LESTARI will continue to focus on increasing strategic spatial awareness and related zonation by identifying critical zones for conservation, restoration, or sustainable utilization within the current spatial plan in Aceh Barat Daya and develop an SEA in parallel to guide this process. MSF revitalization in Aceh will incorporate a more diverse member-base and establish a neutral place for discussion among diverse stakeholders rather than an as a project operational unit as experienced at present. MSF, nonetheless, will initiate technical working groups consisting of MSF members that can be tasked with actions such as drafting regulations for improved environmental management or advocacy for funding support, and then reporting back to the MSF. Co-management of areas adjacent to these PAs to reduce agricultural expansion pressure on forests and biodiversity will use the village mid-term development approach (RPJMDes) in another 10 priority villages building off of community conservation agreements developed under IFACS and expanding into village in adjacent areas (village clusters). Co-management of these areas will be directed towards improving the welfare of local communities with shared responsibility for the protection of forests and key species such as the orangutan, for instance through the Menggamat Community Forestry scheme. LESTARI will continue to support orangutan conservation initiatives in the Kluet watershed through the Grants Fund. This year, LESTARI also plans to implement more programmatic support to improve the capacity of selected FMU staff/managers for sustainable forest management and support institutional building of the FMUs. Improved management of Gunung Leuser National Park and Singkil Wildlife Reserve will enhance the capacity of conservation management authorities to address threats to conservation. LESTARI will continue to support park management, ramping-up monitoring and preventing encroachment and wildlife poaching through SMART patrols. New opportunities to stop encroachment have emerged and a strategic partnership developed with Forum Konservasi Leuser who are spearheading this initiative. LESTARI will also support park management authorities to build better relations with districts and communities inside or adjacent to CAs to reduce the threat of encroachment primarily through messages for water and watershed conservation that depends upon intact forest ecosystems. Within the Leuser Landscape, Green Enterprise Development has started to develop opportunities for organic cacao (through a PPP) that benefit forest conservation and local
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 86
community welfare. Small environmentally sustainable growers will be supported for organic certification, where community responsibility to halt deforestation is a prerequisite. This will be scaled-up to 1,000 growers primarily at the forest margin. LESTARI will expand green enterprises to include commodities such as nutmeg, patchouli, citronella, freshwater fisheries, and pine resin to impact another 1,000 farmers in Year 2, either through developing PPPs, direct interventions and training, or through grants awarded to Indonesian NGOs. These green enterprises will support and be strengthened through interlinkages with the forest resource co-management, village development plans, and regulations. LESTARI will also design ecotourism opportunities (business model and implementation plan) that can generate revenue and support the sustainable financing of conservation areas through close coordination with the local government in developing the District Tourism Plan. This will be guided by the findings of two ecotourism feasibility reports produced under IFACS as well as Year 1 field surveys conducted by LESTARI. Under this technical theme, LESTARI also looks at the feasibility of developing Payment for Environmental Services (PES) schemes. PES will incentivize natural resource conservation by connecting beneficiaries and stewards of environmental services through formalized agreements. All of the above initiatives will be supported by increased awareness and advocacy campaigns that use social and formal media in support of forest and biodiversity conservation and low emissions development. In particular, LESTARI will expand its successful relationship with InFis in Central Kalimantan to include the Leuser Landscape.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 87
Figure 12. Leuser Operational Landscape
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 88
AWARENESS AND ADVOCACY
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Target audience, desired behavior, appropriate media identified
1.1 Condition Analysis
Issue mapping, stakeholder analysis, communication assessment, media mapping: i.e., identification of value landscape, forest management (KPH) positive coverage of landscape ecology and human
A brief of communication & advocacy strategy based on landscape values (mainstreaming gender)
How: Direct implementation & Subcontract (ACCI)
When: Q1
Target audience receive message
1.2 Communication Outreach
Visual campaign through video making, contests, public screening
Optimize local culture/wisdom (e.g., “budaya ngopi”, saman dance, faith based campaign etc) to disseminate messages
Story pitching in the form of article, infographics, advertorial to raise awareness
Social media campaign (e.g., facebook, twitter, instagram, etc)
Media monitoring and analysis
6 videos produced
18 video screenings, 30 preaching materials, with expected 5000
12 in-depth stories, 6 infographics, 5000 number of people reached
Expected total 300 posts, 1000 new fans
Quarterly report of media monitoring and analysis
How: Sub-contract, 1 STTA, 2 SA
When: Q1-Q4
1.3 Journalist capacity building
In-depth reporting training for most pressing issues
30 journalists trained; 12 in-depth articles published in prominent local media outlets
How: Sub-contract (ACCI)
When: Q2
1.4 Series of public discussions on most pressing issues
Series formal and informal discussions Notes, recommendations How: Sub-contract (ACCI)
When: Q1-Q4
Target audience has and retains desired knowledge
Target audience attitudes & values consistent with desired behavior
Target audience adopts, implements, or continues desired behavior
1.5 Ongoing campaign based on KM, lesson learned, and best practices
Producing and disseminating technical information (evidence and experience-based materials) for intended audience (e.g. decision makers, kaukus pembangunan berkelanjutan)
10 briefs (co-management, RPJMDes, Ecotourism, water protection, Qanun)
Number of 25 member of parliaments accessing tools and information
Notes, presentations, talking points, draft speech
How: Direct Implementation & Sub-contract (ACCI )
When: Q2-Q3
1.6 Community based media engagement and development
Citizen-journalism training (e.g., youth, village communities, teachers, etc)
Media advocacy for women
30 citizen journalists created, 1 news portal developed.
How: 1STTA
When: Q3
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 89
Constituent for conservation formed
1.7 Advocacy capacity building
Strengthen kaukus pembangunan berkelanjutan Aceh at the provincial level (using inputs from MSF at district level)
Community organizing training for champions
10 briefs accessed by caucus, 4 public discussion on most-pressing issues with member of caucus.
3 trainings conducted, 60 potential constituencies identified.
How: Direct implementation, Sub-contract (ACCI)
When: Q1-Q3
1.8 Identify and collaborate with community’s champions
Working with Aceh Climate Change Initiative (ACCI) to provide communication and advocacy training to Kaukus Pembangunan Berkelanjutan Aceh Parliament
Collaborate with ACCI to equip the caucus with new knowledge and skill on advocacy and legal drafting
Community organizing training for identified community’s champions
One communication and advocacy training, participated by 20 member of Aceh parliaments
One advocacy and legal drafting training, participated by 20 member of Aceh parliament
Implemented one community organizing training for 20 community organizers from sub-landscapes
How: Sub-contractor (ACCI) & 1 STTA (legal drafting trainer)
When: Q1-Q3
Improve public policies addressing climate change and/or biodiversity through inclusive processes
1.9 Advocacy and lobbying
Providing technical assistance for policy improvement for intended audience
2 policies improved (budgeting, Bupati’s decree/Qanun on Dana Desa and PPLH)
How: Direct Implementation
When: Q4
OPERATIONALIZE SEA/LCP TO IMPROVE LAND USE GOVERNANCE
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
High Quality SEAs / LCPs developed or updated for all districts
2.1 SEA development, revision or updating with supplementary assessments
Develop SEA document for Aceh Barat Daya RDTR
SEA Document of Abdya
How: Direct implementation with MSF and relevant SKPDs with SEA Expert support (1 STTA)
When: Q2-Q4
SEAs/LCP recommendations included in district/provincial governments spatial plan zonation #6 #12
District/provincial governments include high
2.2 LCP development or revision
Review of existing integration of SEA recommendation in spatial and development plan in Gayo Lues
Document–SEA review
How: Direct implementation, SEA expert support and development planning expert (1 STTA)
When: Q1-Q2
2.3 Informing development plans to be spatially-based
Review SEA in Gayo Lues planning Document report on SEA review
How: Direct implementation, SEA expert support (1 STTA)
When: Q2-Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 90
quality SEAs/LCP recommendations in development plans and sectoral budgets 2.5 Informing spatial
rationalization of FMU, conservation area and private sector license zonation
RDTR in sub DAS Susoh
KPH Blocking and conservation area zonation
Coordinating and harmonizing zonation between KPH, SM Rawa Singkil and TNGL
Zonation map in DAS susoh
Blocking map in KPH V and VI
Harmonized zonation between KPH, SM Rawa Singkil and TNGL
Draft Penetapan Kawasan Strategis
KPH Management Plan
RKTP/RKTK
Draft revision spatial plan
Draft zonation regulations
How: Direct implementation and Forestry Planner Expert for FMUs, SEA, Economic resource valuation, carbon emission, and development planning 7 STTAs
When: Q1-Q4
2.6 MSFs used for public consultation to improve spatial and development planning
MSF development in Aceh Barat Daya and thematic public consultation on specific issues (conservation area blocking, RDTR, FMU and village zonation)
MSF RDTR Abdya developed with SK Bupati issued
Public input for sustainable landscape through RDTR and zonation
Draft RENSTRA and RKPD
Draft revised spatial plan
Draft zonation regulations
How: Direct implementation
When: Q1-Q3
Regional and village government allocate budget for implement SEA/LCP recommendations
2.7 Budget analysis capacity-building for district government
Planning and budgeting analysis based on SEA Aceh Selatan
Program and activities recommendation for RKPD based on SEA Aceh Selatan
How: planning and budgeting analyst (STTA), SEA expert (STTA), data technical support (SA), direct implementation
When: Q1-Q4
Assurance that plans follow SEAs/LCP recommendation
2.8 Draft specific plan regulations based on SEA and/or LCP recommendations
Analyze and integrate RJPMD of Gayo Lues in line with SEA recommendations
Finalize Qanun on environmental management and protection in Aceh Selatan
Socialization of governor decree on village budget regulation for Aceh Tenggara
RPJMD in line with SEA
Qanun Aceh Selatan on environmental management and protection
Number of village leaders acknowledge the governor decree on village budget regulation
How: Direct implementation, planning and budgeting analyst (1 STTA), SEA expert (1 STTA)
When: Q3-Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 91
SUSTAINABLE LANDSCAPE GOVERNANCE
Result (blue box) Activities (yellow box) Sub-activities Output Delivery mechanism
Multi-stakeholder vision and mission (new or revised) agreed
3.11 Build consensus among MSF members about vision and mission (SOP/Guidelines)
MSF provincial level initiation meetings Multi-stakeholder pledge for MSF
Provincial initiation
How: Direct Implementation
When: Q1-Q4
The issuance of government decree/policy to formalize/institutionalize MSFs
3.12 Propose local government to formalize MSFs in a way that ensures its effectiveness and independence
Development MSF in Aceh Barat Daya SK Bupati How: Direct Implementation
When: Q2-Q4
MSF capacity to bridge gap in mutual understanding, respect and trust between stakeholders increased
3.13 Equip MSF with needed skills toward establishing lasting network for change: MSF facilitation, dispute adjudication, resolution, etc.
3.14 Strengthening the role of women
Forming Gender Working Group in MSF Aceh Selatan
Gender Working Group established
How: Direct implémentation
When: Q1-Q2
Training on Women Leadership and Climate Change
Number of women have improved their awareness and participation in climate change dialogues
How: Direct Implementation and Trainers
When: Q3-Q4
MSFs effectively encourage better decision making between among citizen, local government and private sectors
3.15 Technical theme discussions and related working groups formed on demand for landscape and sub-landscape management as well as dispute resolution informed by adequate visualization of landscape goals
Thematic Discussions Topics (e.g., Ecotourism, PES, Co-management, Sustainable livelihoods)
Gayo Lues: Review and integration of SEA
Aceh Selatan: Social Forestry
Aceh Tenggara: FMU and Village development plans and zonation
Aceh Barat Daya: RDTR
Public inputs for sustainable landscape through RDTR and zonation
Better multi-stakeholder understanding on issues and concepts, and their implications
Potentially new ad hoc working group
How: Direct Implementation
When: Q1-Q4
Development of Qanun environmental Draft Qanun How: Direct Implementation
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 92
3.16 Channel MSF results to advocacy and communication strategy on most pressing issues, especially MSF recommendations, agreements, and action plans
management (Aceh Selatan) When: Q1-Q2
Public consultations on Qanun Perlindungan dan Pengelolaan Lingkungan Hidup Kabupaten (Aceh Selatan)
Recommendation for draft Qanun Perlindungan dan Pengelolaan Lingkungan Hidup Kabupaten Aceh Selatan
How: Direct Implementation
When: Q1
Citizens able to effectively advocate for their rights
3.17 Capacity building for MSF members on channeling other citizen voices to decision makers
IMPROVED FOREST MANAGEMENT THROUGH CO-MANAGEMENT
Result (blue box) Activities (yellow box) Sub-activities Output Delivery
Co-Management agreement formalized (when applicable based on RPJMDes zonation)
4.10 Develop/Review Village planning document (RPJMDes/RKPDes) that incorporates co-management vision and zonation
RPJMDes/RKPDes:
1. Capacity building facilitators (TOT, module)
2. Socialization in villages
3. Review of RPJMDes/RKPDes (series of discussion, technical assistance,etc.) to incorporate forestry issues
4. Visualization of village planning
26 village plans (RPJMDes/RKPDes) which include activities focused on sustainable management of natural resources
Allocated budgets for implementation of village plans
How: Direct implementation with Village motivator support (SA) and RPJMDes Expert support (STTA)
When: Q1-Q2 (Aceh Selatan 7 villages), Q3--Q4 (Abdya 4 villages).
Q1-Q4 : Aceh Tenggara (9 villages) Gayo Lues (6 villages)
Activity / results informs SA 6:Green enterprises
Preparation of zoning map
1. Training for village zoning map preparation team including the use of zoning maps (where available – use CCLA participatory mapping result)
2. Mapping survey at village level
3. Completion of zoning map
26 village zoning maps based on village plans (RPJMDes)
How: Direct implementation with Village motivator support (SA)
When: Q1-Q2 (Aceh Selatan 7 villages), Q1-Q4 : Aceh Tenggara (9 villages) Gayo Lues (6 villages)
Q3-Q4 (Abdya 4 villages)
Activity informs SA 2:
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 93
4. Presentation of zoning map to village Operationalizing SEA-LCP
Co-Management agreement formalized (when applicable based on RPJMDes zonation)
4.8 Help communities to develop forest management plan and co-management agreement
1. Village-level coordination meeting to discuss steps of developing co-management agreements
2. Coordination meeting with stakeholders of the area
3. Facilitate dialogue between local people with the remaining stakeholders to develop co-management further
4. Survey the location and its potential
5. Draft the agreement
6. Draft the work plan
7. Discuss, finalize and sign the agreement
8. Forest stewardship training for the community in addition to only define rights and responsibilities in social forestry
3 co-management and monitoring plans with clear division of roles, responsibilities, and benefits for the parties, location of the co-management area and draft of cooperation work plan
How: Direct implementation with Village motivator support (SA)
When: Q1-Q2 (Aceh Selatan 7 villages), Q3-Q4 (Abdya 4 villages)
Q1-Q4 : Aceh Tenggara (9 villages) Gayo Lues (6 villages)
4.6. Facilitation and advocacy for enabling policy for co-management
Multi-party workshop promote and scale up RPJMDes and Co-management
Support for multi-village forum for strengthening co-management at the district level
How: Direct implementation with Village motivator support (SA)
When: Q4 onwards
Menggamat Case:
Analyze situation, condition and identify problems in Kemukiman and strengthen roles and functions of Kemukiman in managing
Situation analysis report qanun mukim perlindungan hutan, peta wilayah dan rencana perlindungan?
How: Sub-contract
When: Q1-Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 94
natural resources and supervising ecological functions
Producing short movies about RPJMDes— Co-management and Zoning
1 short but detailed movie about the Co-management approach based on RPJMDes and management zonation
How: Communications outreach sub-contract
When: Q4 onwards
Input for SA 1: Awareness & Advocacy
Co-management vision is included in FMU management plan and zonation
4.2 Technical assistance to complete Forest Management/Zonation plan of FMU
Needs assessment for KPH V and VI – analyze RPHJM and KPH forest governance
Collecting necessary data for RPHJP and forest governance book
Support the revision of RPHJP
Support the completion of RPHJP KPH V and VI and approval from the government
2 RPHJP finalized and submitted to MOEF
How: FMU/KPH Expert (STTA)
When: QI- Q4
4.3 Capacity and institutional building for FMU to improve forest management
Technical assistance to complete forest management/zonation plan of FMU
Basic forest management training (internal KPH V and VI)
Training to strengthen KPH institutionally
Develop forest management protocol in KPHL
Explore entry points and develop standard competency for FMU at provincial level
2 spatial forest management plan drafted
100 KPH staff trained
Sister FMU established
How: Collaboration with USFS
When: Q2-Q4
Is informed by SEA and LCP (SA 2)
Key stakeholders understand the benefit of co-management and commit to collaboratively manage forest
4.4 Build capacity for forest managers (FMU/CA) to adopt inclusive approach to forest management
Collaborative management training Additional 100 KPH field staff trained How: Collaboration with USFS
When: Q2-Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 95
PROTECTED AREA MANAGEMENT
Result (blue box) Activities (Yellow Box) Sub-activities Output Delivery Mechanism
CA capacity improves and implement key aspects of management plan
5.10 Improve PA Zonation Plan
Provide technical assistance to PA management to develop blocking (SM Singkil)
Provide technical assistance on the approval of blocking and management plan in the MoEF
Draft management plan of SM Rawa Singkil
Draft blocking document of SM Rawa Singkil
How: Direct implementation with support from CA Zonation Expert (4 STTA)
When: Q1-Q4
GOI holds CA accountable to effective management
5.4 Organize public consultation of key PA documents and provide technical support for the documents completion
Consultation and coordination to establish a working group for management plan document
Review document and management plan
Organize public consultations for blocking and management plan
Workshop to complete finalize the draft
Draft management plan and blocking document for SM Rawa Singkil
How: Direct implementation with support from CA management Expert (3 STTA)
When: Q1-Q4
CA improve and implement key aspects of management plan
CA improve and implement key aspects of
5.7 Adoption and roll out of SMART Patrol
Refreshment/Training for SMART patrol (operating SMART, photography, standardization of wildlife marks, etc) TNGL and Rawa Singkil
120 are trained from TNGL, Rawa Ringkil and KPH 5 and 6
SK for SMART patroli at Rawa Singkil and KPH 6
How: Direct implementation
When: Q1-Q2
Routine SMART patrol in TNGL, awa Singkil and KPH 6
4 teams in TNGL
3 teams in Rawa Ringkil
2 teams in KPH 6
How: Direct implementation
When: Q1-Q4
Monthly SMART evaluation and data management
TNGL, Rawa Singkil (and KPH 6) maintain the database
How: Direct implementation
When: Q1-Q4
Interlinkage with SA4: Co-management involving KPH
Refreshment/advance training for SMART Data operator
Increasing the capacity of 20 data operators
SK for data operator at TNG,, Rawa Singkil and KPH 5 and 6
How: Direct implementation
When: Q2
Interlinkage with SA4 (KPH)
Pilot applied forest monitoring technology in SMART patrol
Monitoring technology adopted in rolling out SMART patrol activities
How: Direct implementation
When: Q1-Q2
5.8 Improve priority WRU Aceh Tenggara carries out routine WRU team operational and carry out How: Direct implementation
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 96
management plan
CA improve and implement key aspects of management plan
species conservation strategies
activities for mitigating conflicts routine activites When: Q1-Q4
Wildlife response unit training in Aceh selatan and roll out routine activities for human-wildlife conflict mitigation
1 WRU in Aceh Selatan and 1 WRU in Aceh Singkil established
How: Direct implementation
When: Q1-Q4
Training for communities to independently mitigate conflicts (Lesten and Terlis Village)
2 Desa Mandiri established in WRU area in Aceh Tenggara
How: Direct implementation
When: Q1-Q4
Location : Desa Terlis and Lesten in Gayo Lues
Connection to SA 4 (RPJMDes)
Training for communities to independently mitigate conflics in 2 villages in Aceh Selatan
2 Desa Mandiri established in WRU area in Aceh Selatan
How: Direct implementation
When: Q1-Q4
Location : Desa Panton Luas and Alur Keujuren
Connection to SA 4 (RPJMDes work)
Training for communities to independently mitigate conflics in 2 villages in Subulussalam
2 Desa Mandiri established in WRU area in Aceh Singkil
How: Direct implementation
When: Q1-Q4
Connection to SA 4 (RPJMDes work)
Location : Batu Napal and Namo Buaya
Training for veterinarians in Leuser landscape
30 veterinarians trained to handle wildlife conflict victims
How: Direct implementation
When: Q1
Socialization of permenhut 48 on human-wildlife conflict mitigation to stakeholders in Leuser Landscape
Socialization report How: Direct implementation
When: Q1-Q4
Key species survey using camera traps
Detailed report of species distribution
Recommendations for management plan and zonation revision
Species conservation implementation plan
How: Direct implementation
When: Q1-Q4
Location : DAS (Cluster) Kluet, Sub-DAS Gulo.
Informs SA 2: (SEA and LCP revision)
Support the operationalization of CRU Trumon
CRU operation with sustainable management and funding mechanism
2 Desa Mandiri established in CRU
How: Subcontract to CRU
When: Q1-Q4
Location :Cluster Kluet (Lawe
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 97
Effective partnership established with NGOs, Public, etc
area in Aceh Selatan Cimanok), Kapa Sesak
5.9 Reduce wildlife trafficking (operationalization of WCU)
Support informant networks to gather information on illegal poaching and trading sites
Information on illegal poaching and trading sites
How: Direct implementation
When: Q1-Q4
Identify poachers, local dealers, intermediaries/middlemen, to understand the scale of their organized criminal groups that operate illegal wildlife trafficking
Perpetrators identified How: Direct implementation
When: Q1-Q4
Provide strong information and evidence gathered by informant network to law enforcement officers in targeted areas for operation to arrest the perpetrators
Information readily available How: Direct implementation
When: Q1-Q4
Assist TNGL and BKSDA Aceh, Aceh Provincial Police and Aceh District Police to arrest the poachers, dealers and middlemen
Number of arrest How: Direct implementation
When: Q1-Q4
Provide judicial process assistance to civil investigators (PPNS), police investigators, procecutors and judge to ensure that perpretators will be sentenced
Monitoring of the progress of cases How: Direct implementation
When: Q1-Q4
5.13 Develop and implement Innovative Financing for Conservation
Ecotourism development in Leuser Landscape
Trumon corridor
Ecotourism development plan to be incorporated further into district development plan
How: Sub-contractor
When: Q1-Q4
Location : Trumon Corridor
mplementation under SA 8: Innovative Financing
5.5 Facilitate communities and other stakeholders’ involvement in PA protection and management
Community based ecosystem restoration in Alur Baning Area in TNGL
1,000 hectares on national park land
How: LESTARI support from FKL (sub-contract); support through a local organization
When: Q1-Q4
Partner coordination meeting on SM Rawa Singkil
Identification of partner’s roles in supporting SM Rawa Singkil conservation
Collaborative action plan produced
How: Direct implementation
When: Q1, Q2,Q3, Q4
5.11 METT Participatory Assessment
ParticipatoryMETT in SM Rawa Singkil and TNGL
Improvement METT score for SM Rawa Singkil and TNGL in 2017
How: Direct implementation
When: Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 98
(mid-term review) documented
Routine coordination with CA managers
Routine coordination meeting for 4 months
Update activity
Successes of 2017 collaboration documented and reported to KSDAE, BAPPENAS
2018 collaboration between LESTARI and KSDAE agreed
How: Direct implementation
When: Q1, Q2, Q3,Q4
GREEN ENTERPRISES
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Public Private Partnerships for Green Enterprises
Result of initial assessment of PPP potential
6.2 Identification of potential private sectors partners for green enterprises
Develop common interest and conduct initial scoping with Givaudan and Supa Supra Niaga for Pala and Nilam and PT Kencana Hijau Bina Lestari for PPP development
Scoping report
How: Direct implementation & coordination with grantee (FORPALA) for nutmeg commodity
When: Q1
Public & Private sector demand for investment opportunities increased
6.3 Investment outreach, and marketing for potential green enterprise PPPs
Implement communication and advocacy for private sector and communities promoting potential PPP scheme
Compile feasibility data
3 Letter of Interest for collaboration with Givaudan (nutmeg and Patchouli essential oils), Supa Supra Niaga (spices), and PT Kencana (Pine Resin).
How: Direct implementation & coordination with grantee (FORPALA) for nutmeg commodity
When: Q1
6.4 Enabling business environment
Draft legal framework for PPP in Gayo Lues
Legal framework for PPP in Gayo Lues (Rancangan PerBup to support PPP scheme)
How: Direct implementation When: Q2-Q4
Legal framework and governance mechanism implemented under SA 3 through MSF working groups
PPP is formed, business is realized & join monitoring mechanism in place
6.5 Facilitate formalization of PPP agreement that integrates LESTARI mission and vision
Develop PPP scheme agreements including the implementation framework
Signing the MOU between PPP partners
3 PPP (MOU) document signed with Givaudan, Supa Supra and PT Kencana
How: Direct implementation with coordination with grantee (FORPALA) for nutmeg commodity
When: Q1-Q2
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 99
6.6 Facilitation on monitoring PPP procedure
Setting up monitoring system of PPP implementation involving relevant MSF members
Internal system for monitoring progress established for new PPs and Cacao PPP already signed
How: Direct implementation
When: Q3-Q4
6.7 Implementation of PPP program
Starting implementation of PPP for local commodities (patchouli, nutmeg, cacao)
Trainings for farmers How: Direct implementation
1 STTA (Patchouli)When: Q2-Q4
Economic benefits realized
6.8 Technical evaluation and additional support where appropriate (and based on monitoring results)
Follow up training with the farmer groups on ICS in all location for organic cacao PPP
7 modules training for farmer & group farmers
At least 1000 individual farmer trained
How: Direct implementation (& might need STTA on certification training) in Aceh Tenggara, Gayo Lues and Aceh Selatan
When: Q1-Q4
Facilitate pricing negotiation between farmer and buyers for cacao organic
Established agreement for pricing system & market scheme How: Direct implementation in
Aceh Tenggara, Gayo Lues and Aceh Selatan
When: Q2
Develop demo-plots for post harvest for cacao
Develop demo-plots for multi-crop system for cacao
Established 10 demo plots for post harvest in Aceh Tenggara, Gayo Lues and Aceh Selatan.
Facilitate the establishment of ICS and ICS member for nutmeg and patchouli
ICS system and member established (including SOP developed)
How: Direct implementation and ICS expert (STTA) with coordination with grantee (FORPALA) for nutmeg commodity
When: Q3
Provide training for improved post-harvest techniques for nutmeg and patchouli
Training for post harvest for each commodity at least 500 farmers
Facilitate pricing negotiation between farmer and buyers for nutmeg and patchouli
Established agreement for pricing system & market scheme
How: Direct implementation with coordination with grantee (FORPALA) for nutmeg commodity
When: Q3-Q4
6.9 Disseminate model to other potential PPPs
Identification of location (villages, in coordination with KPH and PT Kencana in Gayo Lues)
Location identified
Target: at least 500
How: Direct implementation and STTA
When: Q4
Activity integrates with SA 4: improving co-management with FMU
Training on GAP (good agriculture practices)
SOW Developed
Workshop on result of the training on district level
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 100
Improved Sustainable Livelihoods and Alternative Livelihoods for Communities Adjacent to Critical Areas
(Critical) area & key stakeholder identified
6.12 Identification of (critical) areas, threats & key stakeholders
Risk assessment to identify priority village for alternative and sustainable livelihood development
Priority villages identified in and adjacent to critical areas where alternative livelihoods is required to reduce deforestation
How: Direct implementation
When: Q1-Q2
Location: throughout Leuser Landscape in priority villages developing co-management and improved spatial zonation (SA 4 & 2)
6.13 Identification of potential livelihoods
Rapid assessment of potential alternative livelihoods in priority villages including wild honey, fisheries, citronella and, NTFP
Detailed production capacity and assessment
3 STTAs
When: Q1,Q2
Location: Cluster Kluet, Cluster Alas, Cluster Tripe Bate dan DAS Tamiang
More appropriate & sustainable economic activities identified
6.14 Market and Analysis Finance
Assess real market access & explore potential for additional PPP for identified commodities
Access to market developed (with additional potential PPP)
How: Direct implementation
When: Q3
6.15 Develop livelihood models
Identification of green technology for Citronella (sereh wangi) processing
Feasibility study on potential green technology
How: Direct Implementation with support from Appropriate Technology Expert (STTA) and
When: Q2
Develop business model integrated with co-management initiatives for identified and feasible livelihood interventions
Detail program (TOR) developed for fresh water fisheries, wild honey and citronella development.
How: Direct implementation
When: Q3
All stakeholders agree to engage program
6.16 Community outreach program
6.17 Village development planning (integrate LESTARI vision and mission with RPJMDes)
Provide planning assistance to LESTARI grantees
Regular progress report from each PIC of the grantees (INPROSULA, JAVLEC, AGC, YELPED, FORPALA, AID) demonstrating integrated grantee interventions with LESTARI direct implementation (e.g. PPPs)
How: Direct implementation integrated with awarded grants (estimated 6 grantees in Aceh)
When: Q1-Q4
Integrate the livelihood plan with the work under RPJMDes
Integrated RPJMDes (community agreement, potential for social forestry)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 101
All stakeholder try new techniques
6.18 Targeted technical assistance
Provide technical assistance to pilot programs identified in critical locations
20 village level integrated livelihoods schemes running with new techniques
How: Direct Implementation with support from Village motivators (SA) and Aquaculture Expert (STTA)
When: Q2-Q4
6.19 Development of joint monitoring mechanism
Setting internal monitoring system Monitoring system in place
Regular progress report
How: Direct implementation
When: Q4
6.22 Disseminate sustainable NRM model to other locations in landscape
Establish farmers forum peduli air at district level (coordinating with MSF & RPJMDes) for district wide capacity building for sustainable fresh water fisheries
Forum Peduli Air in 4 districts
10 potential champions each district
Kelompok Belajar / learning groups
How: Direct implementation with support from Aquaculture Expert (STTA)
When: Q4
Identify village level champions (coordinating with KPH & MSF) for each commodity and each district
Provide training for disseminating new techniques and conserving forest resource
10 potential champions identified in each district
Estimated total 10 days trainings for each sub-district
How: Direct implementation
When: Q3
INNOVATIVE FINANCING FOR SUSTAINABLE LAND USE AND FOREST MANAGEMENT
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Innovative Financing for Sustainable Land and Forest Management (PES)
Potential payment for environmental services (PES) identified
8.6 Initial assessment (feasibility study) on PES
Piloting the PES toolkit in 2 target areas (Gayo Lues, Southeast Aceh) in the landscape
Introduce the result of PES feasibility study to the stakeholders (including local government)
Develop necessary advocacy and awareness for PES implementation at the provincial level
PES feasibility assessment report for 2 areas in the landscapes completed Gayo Lues and Southeast Aceh with inputs from other strategic approaches
How: Direct implementation
When: Q1-2
Input from SA 6 & SA 4; Results feed into SA1: Awareness and Advocacy
Project working group established
8.7 Stakeholder engagement
Private sector engagement (local governments, private sector partners and other key stakeholders) workshops
Prepare engagement plan/scopes of work with the private sector
Letter of commitment by stakeholders on PES development and project working group agreed (1-2 depending on the result of PES feasibility study)
How: Direct implementation
When: Q3
Awareness raising and advocacy to government and other key
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 102
Design and setting up of the working groups
Stakeholders (including local government) endorse identified PES programs
stakeholders services provided under SA1: Awareness and Advocacy
PES PCNs and safeguards developed
8.8 Technical assistance to the working group
Capacity building (training and site visits / study tours) for PES development
Identification of project proponent
PES scheme development in targeted areas
Training reports
Project proponent identified
PES scheme design developed
How: Direct implementation
When: Q3-Q4
PES is synergized with Local Govt Plan (SEA, LCP, Renstra)
Environmental services related regulations formulated or improved
8.9 Technical assistance and advocacy to government
Review of SEA, LCP using PCN and PES feasibility study (supplementary study)
Coordination with Village Development Plans (RPJMDs)
Updated recommendations for LCPs and SEAs produced for Gayo Lues and Aceh Tenggara
How: Direct implementation
When: Q2-Q3
Regulatory requirements provided under SA 2 and 3
Government budget for environmental services allocated
8.10 Advocacy and lobbying at the district level
Advocacy and awareness linked to PES at provincial, district levels
Proportion (%) of village fund allocated for environmental sector
How: Direct implementation
When: Q4
Awareness raising and advocacy to government and other key stakeholders services provided under SA1: Awareness and Advocacy
Donors agree to fund project concept notes (PCNs) developed previously under IFACS
8.11 Outreach and marketing to funding sources
Outreach to donors that fund carbon and other performance-based PES projects
Rewriting the proposals in a new donor format for 2 PCN from IFACS (dependent on results of outreach)
Proposals in a new donor format completed (Gayo Lues, Trumon – Singkil Corridor)
How: Direct implementation
When: Q2-Q3
Crosscutting with SA 4 – C3.2 Pilot innovative financing for critical areas
Innovative Financing for Sustainable Land and Forest Management (Ecotourism)
Ecotourism opportunities identified
8.1 Initial Ecotourism Assessment
Shortlist of opportunities and clusters identifying key shortfalls, PPP opportunities, interventions required and investment risks
Map of existing and potential ecotourism product locations and tourism routes and project synergies
Review IFACS feasibility report on ecotourism potential
Plan for development of business model and implementation of activities based on shortlist of opportunities
How: Direct implementation When: Q1
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 103
Development of a draft monitoring framework
Draft monitoring framework How: Direct implementation When: Q1
Integrated business models for ecotourism developed Public-private sector partnerships identified
8.2 Development of business models
Conduct a viability, environmental and community impact/benefit assessment to select the most viable projects with the highest impact
Viability and impact assessments for shortlisted opportunities
How: Direct implementation and Ecotourism assistance support (STTA) When: Q1-Q2
Identification of required interventions to actualize ecotourism development (including PPPs, training, capacity building, MSF dialogues, attraction cluster, advocacy and awareness raising)
Outline of required interventions for each project
How: Direct implementation When: Q2 Awareness raising and advocacy to government and other key stakeholders services provided under SA1
Develop and coordinate ecotourism synergies e.g. PPPs (SA6); Livelihoods (SA6); SEAs and LCPs (SA2); Co-management target villages and Village Development Plans (SA4)
Coordination plan with Aceh landscape teams
How: Direct implementation When: Q2
Develop draft integrated business model for the highest impact project/s
2 draft integrated ecotourism business models for Leuser landscape (may be combined where appropriate with the development of PPPs)
How: Direct implementation When: Q3-Q4
8.3 Market linkage development
Private sector and tour operator outreach Database of potential project
partners
How: Direct implementation When: Q4 If PPPs are possible the development of PPP agreements will follow the approach taken by SA6: Green Enterprises
Identification of organizations to support/implement required interventions (e.g. training and capacity building)
List of preferred subcontractors
Growth of Ecotourism Increased government support for ecotourism
8.4 Capacity building and Training
Develop tailored training for capacity building for each of the ecotourism initiative
Trainings How: Direct implementation When: Q4
Advocacy & lobbying List of strategies
How: Direct implementation When: Q4 Linked to SA 1 Advocacy & Communication
Ecotourism incorporated in government budget, plan and policy (including RPJMD, RENSTRA, and RKPD)
8.5 Development of district ecotourism plan
Development detail plan for each identified district in Gayo Lues
Government initiates and supports the implementation plan on ecotourism
Policy issued on ecotourism
How: Direct implementation When: Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 104
KATINGAN-KAHAYAN LANDSCAPE
Landscape Profile The Katingan-Kahayan Landscape in Central Kalimantan covers more than 4 million hectares in Katingan, Pulang Pisau, Gunung Mas Districts; a small part of Kotawaringin Timur; and Palangkaraya municipality. It includes both deep peatland of the ex-mega rice project and Sebangau National Park as well as mineral soils including Bukit Baka Bukit Raya National Park. The region’s economy depends on forestry, agriculture, commodities, trade, services, and mining sectors. Much of the landscape is vulnerable to forest and peatland fires, illegal logging, forest degradation, and conversion for oil palm plantations. Such unsustainable land use management continues to release large emissions while also negatively impacting the health and livelihoods of local communities. Most significantly, land and forest fires in 2015, mostly in the peatlands, contributed to higher daily emissions than the whole of the European Union, resulted in IDR 221 trillion in damages, and sparked urgency at all levels of government to prevent this kind of disaster from happening again. Even without fire, the primary source of landscape GHG emissions are degraded peatlands, followed by the conversion of forest for agriculture. The primary interventions are therefore aimed at improved peatland management through various levels of intervention and regulatory reform to slow the rate of expansion of deforestation for plantations.
Landscape Initiatives Principle interrelated initiatives that will relieve pressure on forest resources and reduce GHG emissions in this landscape are:
Consolidation of the Provincial SEA for the mid-term development plan (RPJMD)
Updating of SEAs to incorporate improved peatland hydrological management to reduce the risk of fire
Promotion for the establishment of KPH XXX1 to manage peatlands in the peatland hydrological unit (KHG) 14 (Block C) and assessment of capacity needs
Establishment of a demonstration set of compacted peat dams across the Kahayan Hilir sub-landscape in KHG 14 through participatory construction and maintenance and with full free, prior, and informed (FPIC) consent from communities
Institutionalization of MSF in 2 districts (Pulang Pisau, Palangkaraya), establishment of new MSFs in Gunung Mas and Katingan Districts
Coordination of village, district, and provincial authorities action plans and budgets for integrated peatland fire management
Drafting regulations on village planning (RPJMDes) to support funding of low emission development (dana desa)
Development and roll-out of the Sustainability Screening Tool in Pulang Pisau integrated with province-level geospatial data management for natural resource licensing
Scaling up of village development plans and zonation to identify and develop co-management (social forestry) agreements as well as sustainable livelihoods including co-management with the 2 national parks in the landscape
Improving the management of Sebangau National Park and Bukit Baka Bukit Raya National Park to improve METT score through introduction of SMART patrols, orangutan conflict mitigation training, improved capacity for peat land / canal management, and field level plan (rencana tapak) in National Parks
Innovation financing for the long-term management of Sebangau National Park and development of a grand design for peat forest restoration
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 105
Continued development of community rubber work and expansion into additional potential local commodities through PPPs that are integrated into the village development plans
Development of alternative livelihoods through grants program (linking to co-management of forest resources) in the four districts that will be coordinated and synergized with village development plans
Introduction of Reduced Impact Logging (RIL-C) to the timber companies operating around Bukit Baka Bukit Raya National Park to reduce GHG emissions, and operationalize HCV monitoring/CMMPs produced under IFACS for 3 concessions in the landscape
Ecotourism development and identification of potential Payment for Environmental Services (PES) in the landscape
Roll out of collaboration between MSU and universities in Palangkaraya to introduce a certificate program on REDD; training of master trainers in carbon related disciplines; an overseas training program; and providing a sabbatical academic expert in Palangkaraya
Continued strong communications campaign of climate change and forest conservation through subcontractor Infis that supports all aspects of the landscape activities
Land use governance within the Katingan-Kahayan Landscape will build on the rapid hydrological survey and related assessments from Year 1 to indicate where peat canal dams should be constructed to raise water levels during the dry season while managing floodwaters during the wet season. LESTARI will support construction of a demonstration of compacted dams in the C2 sub-landscape in Kecamatan Kahayan Hilir in Year 2. This process will consist of a comprehensive action plan that draws on the SEA and LCP produced under IFACS and takes into account provincial and national plans for peatland restoration. The action plan will include free, prior, and informed consent (FPIC) at the village level together with participatory planning, construction, and maintenance to ensure sufficient sense of local ownership in canal blocking. It will delineate appropriate land use zonation derived from SEA/LCP, the 2008 Masterplan and government spatial planning instruments (notably Ministry of Environment and Forestry and BRG) as well as bottom-up perceptions of land use and zonation through LESTARI support for enhanced RPJMDes. FPIC safeguards will follow those of USAID and BRG. The actual construction, under the auspices of the District Government, is planned for the next dry season around June 2017. In parallel, LESTARI will support effective grassroots action to raise awareness and advocacy on integrated fire management at the community level by working with InFis and social media outlets as well as engaging with the MSF and other community-based organizations. Efforts are being made to coordinate these activities with the increasing number of other donors operating in the KHG14 landscape (see Introductory section on Landscape Approach). Co-management of areas inside and adjacent to PAs within the Katingan-Kahayan Landscape will be developed to reduce pressure of agricultural expansion to forests and on biodiversity resources as well as secure communities’ access to forest areas. To ensure sustainable impacts of this initiative, LESTARI will facilitate communities to include co-management visions in the RPJMDes in the villages described SA 4. LESTARI also works to foster partnerships and collaboration of CA managers with local partners, especially communities, through co-management agreements and community-based ecotourism. Moreover, several grants will be implemented to support social forestry initiatives in the landscape. An initial assessment will be carried out in FMUs XXXI and VI to identify strategic entry points for LESTARI to support FMUs’ capacity and institutional building.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 106
In support for protected area management improvement, LESTARI works closely with Bukit Baka Bukit Raya (TN BBBR) and Sebangau National Park (TNS) managers and BKSDA Central Kalimantan to build their capacity in CA management, reduce illegal wildlife trafficking and human-wildlife conflicts, and promote sustainable financing for conservation. In Year 2, LESTARI will start rolling out SMART patrols in TN BBBR and TNS to address threats to conservation. Following up capacity building activities carried out by US-DOI on hydrology, LESTARI will support TNS to develop data management practices to improve hydrology management in the national park. In addition, a crucial initiative this year involves designing and implementing sustainable conservation financing for Sebangau National Park. A Green Enterprise initiative has commenced through development of community rubber (through a PPP) that benefits local farmers in improving their agricultural practices as well as marketing process of the products. This PPP initiative also provides technical assistance in minimizing fire risk in rubber plantations and neighboring areas, as fires represent an annual major threat to local communities’ livelihoods and a massive source of GHG emissions. This will be scaled up to 1,000 rubber farmers within the Pulang Pisau District. During Year 2, LESTARI will also expand the rubber PPP by engaging more private sectors (crumb rubber factories) and other potential public institutions to get wider and more significant impact. Several grants in developing co-management and sustainable livelihoods that were awarded to local NGOs are in the pipeline. Implementation will be closely coordinated and strengthened with the village development plan activities and MSF plans. Another key initiative during Year 2 is the implementation of Reduced Impact Logging (RIL-C) training with six timber companies around Bukit Baka Bukit Raya National Park and operationalization of CMMP/HCV documents with three timber companies in the same area to improve the land use management within the concessions as well as the areas around them. Furthermore, LESTARI will continue to identify ecotourism opportunities that can generate revenue and support the sustainable financing of conservation areas and look at the feasibility of developing Payment for Environmental Services (PES). LESTARI team will provide continuous support for the innovative financing initiative for the Sebangau National Park restoration, led by WWF. This initiative seeks a long-term sustainable funding mechanism to support restoration work for Sebangau and its buffer zone.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 107
LESTARI – MSU Year 2 Work Plan The LESTARI-MSU team completed a July 2016 – September 2017 work plan for its educational capacity development work relevant to the Katingan-Kahayan Landscape. Year 2 initiatives will rely upon close collaboration with the University of Palangka Raya (UNPAR), Muhammadiyah University (MU), and Bogor Agricultural University (IPB). The 15-month work plan will focus on 5 key activities:
Activity 1: Institutional Linkages | Memorandum of Understanding (MOU) or General Agreement (GA) Formal Relationships. MSU will work with UNPAR, MU, IPB and the LESTARI team to formalize the academic relationships between MSU’s Department of Forestry and each of the three academic institutions. This will be accomplished through the institutional processes for developing and signing an MOU or GA between the agreeing institutions. These MOU/GA documents will specify key LESTARI focus areas of work and activities. Activity 2: Certificate Program. MSU will work with IPB and UNPAR to develop curricula material and a short-course or online program that would include a certificate of academic record for participation from IPB with MSU linkage. The curricula and program would be focused in the REDD+ Design Elements: National Forest Monitoring System (NFMS), Forest Reference Emission Levels (FREL/REL) and Safeguard Information Systems (SIS). The initial program would be implemented through UNPAR and if successful, this would serve as a model for other institutions across Indonesia and in particular those academic institutions in the LESTARI landscapes. Activity 3: Training of Master Trainers for Service Learning. MSU will work with the LESTARI Field Office in Palangkaraya, UNPAR and MU to develop and hold two or three short course programs for training master trainers in the following program topical areas: (1) Forest Carbon Accounting, (2) Spatial Analyses (Remote Sensing and GIS) for Mapping Forest Carbon, and (3) Participatory Community-Mapping and Measurement of Forest Carbon. These topic areas were identified in the May 24, 2016 Workshop with UNPAR, MU and the LESTARI Field Office. Training will include practicum in the LESTARI Katingan-Kahayan landscape in Central Kalimantan, and if possible specifically in Block C / KHG 14, Sebangau National Park, and/or Bukit Baka Bukit Raya National Park. Activity 4: MSU Academic Training Program for UNPAR and MU (Short Course). MSU will develop and implement a two-week training program for two to four academic faculty from UNPAR and MU. The training will take place at the GOES laboratory, Department of Forestry, Michigan State University in East Lansing, MI. The focus of the two week program will include (1) establishing Professor-to-Professor linkages to facilitate institutional strengthening and enhanced faculty skills and (2) training in spatial modeling/analysis and tools for computing emission factors and activity data. Activity 5: Sabbatical/US Academic Expert at UNPAR. An Academic expert from the US will be placed at UNPAR to work directly with UNPAR staff on institutional strengthening, educational training
and capacity-building along the core elements of the LESTARI project. The first year person will start in September or October 2016 and support the MSU-LESTARI-UNPAR logistics for all activities, especially in the development of the Certificate Program with IPB. A second year person will be identified to start in September 2017.
Activity Jul – Sep
2016 Oct – Dec
2016 Jan – Mar
2017 Apr – Jun
2017 Jul – Sept
2017
1. Institutional Linkages
2. Certificate Program
3. Training Master Trainers – Service Learning
4. Training and Institution Strengthening at MSU
Late March
Early
April
5. Academic Expert at UNPAR
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 108
Figure 13. Katingan-Kahayan Operational Landscape
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 109
AWARENESS AND ADVOCACY
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Target audience, desired behavior, appropriate media identified
1.1. Condition Analysis Issue mapping, stakeholder analysis,
communication assessment, media mapping
A brief of communication & advocacy strategy based on issue (mainstreaming gender)
How: Direct implementation with support from Subcontractor (Infis)
When: Q1
Target audience receive message
1.2 Communication Outreach
Story pitching in the form of article, advertorial, graphics to raise awareness (print media)
Interactive dialogue in local radio and TV stations (electronic media)
Off-air events for example: a) collaborate with youth and/or other communities to showcase film, photos; b) music campaign; c) thematic events (e.g., environmental day, Earth day) d) pop-culture events
Social media campaign (e.g., facebook, twitter, instagram)
Media monitoring and analysis
40 number of articles; 4 different messages of PSAs aired for 2000 times; 12 infographics
24 on-air/interactive dialogues; 15,000 listeners.
5000 number of people reached
600 fans for FB fanpage; 300 posts; average viewing 300 per post
Quarterly report of media monitoring and analysis
How: Direct implementation with support from Subcontractor (Infis) and Grants that utilize campaign approach
When: Q1-Q4
1.3 Journalist capacity building
Journalist fellowship program (i.e., collaborate with PWI, Komunitas Jurnalis Harian)
10 selected journalists as fellows; 30 in-depth articles published in prominent media outlets
How: Direct implementation
When: Q3-Q4
1.4 Series of public discussions on most pressing issues
Series of formal and informal discussions Reports and recommendations for
implementation
How: Direct implementation
When: Q1-Q4
Target audience has and retains desired knowledge
Target audience attitudes & values consistent with desired behavior
Target audience adopts, implements, or continues desired behavior
1.5 Ongoing campaign based on KM, lesson learned, and best practices to create demand for public information access
Producing and disseminating technical information (evidence and experience-based materials) for intended audience (e.g. decision makers)
Facilitating technical assistance for intended audience
Lobbying for tools and information utilization
10 Pocketguides (e.g., FDRS, SEA-LEDS, IFLM)
Number of individuals accessing tools and information
Notes, presentations, talking points, draft speech
How: Direct Implementation with support from subcontractor (InFis)
When: Q2
1.6 Community based media engagement and development
Citizen-journalism training (bloggers, social media, buzzer, youth groups, women organizations)
50 citizen journalists created How: Subcontractor (InFis)
When: Q2-Q3
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 110
Constituent for conservation formed
1.7 Advocacy capacity building
Award/promotion for champions (e.g., journalists, fire hero)
Series of advocacy training as needed to advocate specific issue (e.g., advocacy writing article training, legal drafting)
Public information access training for intended audience (e.g., government, community)
20 awards granted for champions
10 number of advocates created
60 number of people trained
How: Direct implementation
When: Q4
1.8 Identify and collaborate with community’s champions
Promoting MSF’s role in improved policy changes
Supporting MSF in building the action plan.
Equip MSF with new knowledge and skills to extent its role on policy changes.
Produced three videos that promote role and function of MSF in improved policy on specific issues.
Help produce one document of communication strategy to promote MSF.
Facilitated one advocacy and communication training for policy changing.
How: Direct implementation
When: Q3-Q4
Improve public policies addressing climate change and/or biodiversity through inclusive processes
1.9 Advocacy and lobbying
Providing technical assistance for policy improvement
FPIC at compacted peat dam pilot villages
2 policies improved (budgeting, Bupati’s decree on fire management)
How: Direct implementation
When: Q3
OPERATIONALIZE SEA/LCP TO IMPROVE LAND USE GOVERNANCE
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
High Quality SEAs / LCPs developed or updated for all districts
2.1 SEA development, revision or updating with supplementary assessments
Facilitate creation of SEA technical working group to produce technical report on SEA
Facilitated FPIC for compacted peat dam
Participatory planning, construction, and maintenance of demonstration set of appropriate compacted peat dams
Provincial report on SEA
Provincial SEA
RPJMD 2016-2021
Compacted peat dam
How: Direct implementation, SEA Expert, STTAs and SAs for compacted peat dam expert and compacted peat dam engineers
When: Q1
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 111
SEAs/LCP recommendations included in district/provincial governments spatial plan zonation #6 #12
District/provincial governments include high quality SEAs/LCP recommendations in development plans and sectoral budgets
2.5 Informing spatial rationalization of FMU, conservation area and private sector license zonation
Zonation on conservation area management by ground survey and visibilities study
Tenurial resolution (IP4T and Perhutanan Sosial)
Facilitate the establishment of KPH XXXI – KHG 14 through (FGD)
Zonation on village level (RPJMDES) including participatory mapping, Results used for zonation related to canal blocking by appropriate compacted peat dams in sub-block C2
Agreement on establishment of KPH XXXI-KHG 14
Draft land use zonation regulation for wilayah strategis in RTRWK
KPH XXXI established with governor decree
Detailed village spatial planning with land use zonation in sub-block C2, including appropriate visualization
How: Direct implementation and STTA (SEA expert, development planning expert, forestry management expert, with MSF support)
When: Q1-Q4
Regional and village government allocate budget for implement SEA/LCP recommendations
2.7 Budget analysis capacity-building for district government
Analysis on SEA based planning and budgeting at Pulang Pisau
Develop government regulation (perbup) on supporting village autonomy to implement low emission and sustainable village development
Recommendation for RKPD on program, activities, and budgeting based on SEA of Pulang Pisau
Perbup on village planning
Perbup on village budgeting APBDes including IFLM, Perhutanan Sosial and SEA recommendation
How: planning and budgeting analyst (STTA), SEA expert (STTA), data technical support (SA), direct implementation
When: Q1-Q3
Assurance that plans follow SEAs/LCP recommendation
2.8 Draft specific plan regulations based on SEA and/or LCP recommendations
Assist provincial government to implement SEA into development plan
Workshop for government to ensure recommendation and strategic issues in the SEA incorporated to RJPMD
Facilitate provincial government to adopt SEA
Workshop to Ensure SEA in provincial strategic plan (renstra and renja)
Assessment to Ensure SEA in provincial strategic plan (renstra and renja)
Facilitation on Renja SKPD Pulang Pisau
KRP RPJMD plan referring SEA (province)
Academic assessment for government regulation on fire
Recommendation for Renja 2018 to adopt SEA recommendation
Recommendation on program and activities for DPA 2017 based on SEA Pulang Pisau
How: Direct implementation, planning, and budgeting analyst (STTA), SEA expert (STTA)
When: Q1-Q2
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 112
SUSTAINABLE LANDSCAPE GOVERNANCE
Result (Blue box) Activities (Yellow box) Sub-activities Output Delivery mechanism
SDI formalized
3.1 Build monitoring capacity of SDI
Formalization of IDS Team Pulang Pisau
Develop decrees needed (Bupati Decree on IDS and IDS Forum (Structure and membership), Kepala Dinas Decree on IDS (penugasan)
Training and capacity development of IDS team
Peraturan Bupati, SK Bupati, PerKa Kepala Dinas/Badan
How: Direct implementation
When: Q2
3.2 Geospatial information linkages (inter-services agency) and (vertically between National and Village)
Complete data integration of village participatory mapping for spatial planning at district level
Finalize data land use and concession in district, provincial and national level (one map policy)
Linked thematic data (land cover, land governance, disaster etc) between village and national levels
How: Direct implementation, STTA
When: Q4
Sustainability Screening Tools (SST) developed as web-based tool for dynamic data compilation and integration in Central Kalimantan (Pulang Pisau District focus).
3.4 Establishing SST infrastructure, completing GIS and data server installation and
ESRI Online server installation and customization
ESRI Online server installed and running
How: Direct implementation When: Q1 - Q2
3.6 Focus group discussions with related SKPD for SST module development.
Series of FGDs for the development of Provincial/District’s Plantation Office and Agriculture Office modules
Two SST modules developed and being used
How: Direct implementation When: Q1 - Q2
3.7 Assisting BAPPEDA for SST implementation
Training on SST Usability and Data Management for BAPPEDA technical support unit.
Training report How: Direct implementation When: Q1 - Q2
SST operationalized for systematic data compilation, integration, and synchronization in Central Kalimantan (Pulang Pisau District focus).
3.8 Strengthen BAPPEDA function as data coordinator
Engage with key relevant person to attain SK Bupati for SST implementation coordinated by BAPPEDA
One SK for BAPPEDA on SST implementation is issued.
How: Direct implementation When: Q3
3.9 Build agreement across all SKPD (including SDI) for spatial data compilation and integration (SOP/Guidelines)
Facilitate SKPD for cross-topics information compilation and integration.
SOPs on data compilation and integration are issued
How: Direct implementation When: Q1 – Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 113
3.10 Collaborate with MSF for developing land-use dispute resolution protocols using SST (SOP/Guidelines)
Series of discussion with BAPPEDA and related SKPD for formulating permitting and licensing dispute resolution protocols.
SOP permitting and licensing related dispute resolution protocol
How: Direct implementation When: Q1 – Q4
Multi-stakeholder vision and mission (new or revised) agreed
3.11 Build consensus among MSF members about vision and mission (SOP/Guidelines)
Series of FGDs for MSFs’ development in Katingan, Gunung Mas and provincial level (4 GFDs maximum)
Multi-stakeholder charters developed for 2 MSF
How: Direct implementation, STTA
When: Q1-Q4
The issuance of government decree/policy to formalize / institutionalize MSFs
3.12 Propose local government to formalize MSFs in a way that ensures its effectiveness and independence
Engage with Bupati and key relevant persons to attain SK Bupatis for MSFs Palangkaraya and Pulang Pisau
2 SK Bupatis of MSF are issued How: Direct implementation
When: Q1-Q2
MSF capacity to bridge gap in mutual understanding, respect and trust between stakeholders increased
3.13 Equip MSF with needed skills toward establishing lasting network for change: MSF facilitation, dispute adjudication resolution, etc
Training on internal MSF dispute resolution
50 Number of people have conflict resolution and mediation skills
Better understanding and awareness raised in LESTARI’s thematic issues and stronger collaboration among stakeholders
How: Direct Implementation and Expert on internal MSF dispute resolution (STTA)
Selected champions participate in regional and National Forestry Congress VI
Improved champions understanding on technical issues and strengthened their networking at sub national and national level
How: Direct implementation
When: Q1-Q2
3.14 Strengthening the role of women
Forming Gender Working Group within MSFs in all landscapes
Gender Working Group established How: Direct implementation
When: Q1
Training on Women Leadership and Climate Change
Number of women have improved their awareness and participation in climate change dialogues
How: Direct implementation and trainers
When: Q3-Q4
MSFs effectively encourage better decision making between among citizen, local government and private sectors
3.15 Technical theme discussions and related working groups formed on demand for landscape and sub-landscape management as well as dispute
Monitoring of agreements from thematic 2-3. i.e., to facilitate the agent of Working Group Social Forestry
Public consultation conducted, awareness raised and consensus built
How: Direct implementation
When: Q2
MSF Dialogue series (crossed thematic issues). I.E Co-management in social forestry, private sector engagement in protection of Orang Utan, sustainable
Stakeholder understanding and awareness of LESTARI thematic issues improved
How: Direct implementation
When: Q1-Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 114
resolution informed by adequate visualization of landscape goals
livelihood for sustainable future, integrated fire and land management, eco-tourism development in Katingan
(Note: Any other pressing issues that required multi-stakeholder dialogues
IMPROVED FOREST MANAGEMENT THROUGH CO-MANAGEMENT
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Co-management Agreement formalized (when applicable based on RPJMDes zonation)
4.8 Help communities to develop co-management plan and agreements
4.9 Implement co-management and forest management plan
Perhutanan Sosial (Kamipang) – 5 villages
Obtain recommendation from the district head
Recommendation from district head sent to PSKL
How: Direct implementation
When: Q1-Q4
Partnership between the National Park in Sebangau Kuala Sub-district (2 villages – Paduran Sebangau and Sebangau Mulia):
Facilitate dialogues between communities and BTNS
Co-management agreements are developed
Community based reforestation
Capacity building for implementation (TBD)
Draft co-management agreement
How: Direct implementation with support from co-management expert (STTA)
When: Q2-Q3
Connected to SA 5 (Activity 5.5)
Partnership agreement between Kereng Bangkirai with TNS through Model Desa Konservasi
1. Facilitate dialogues between communities and BTNS
2. Develop agreement on co-management
3. Pilot for sustainable livelihood
Partnership agreement signed
15 people are trained for sustainable livelihood
How: Direct implementation with support from co-management expert (STTA)
When: Q1-Q4
Connected to SA 5 (Activity 5.5)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 115
Communities based ecotourism (Karuing Village and BTNS)
1. Facilitate dialogues between communities and BTNS
2. Agreement signed
3. Agreement implemented: capacity building activities to develop ecotourism in Karuing
Co-management agreement signed
20 people are trained for ecotourism
Connected to STI initiative in TT 3
Connected to SA 5 (Activity 5.5)
Social forestry initiative in Banama Tingang Sub-district (6 villages), Pulang Pisau:
1. Facilitation process for obtaining PAK
2. Develop forest management plan
3. Facilitate process HPHD from the governor
4. Forest management plan implemented
Social Forestry for Village Forest covering 6 villages in Banama approved and under implementation
How: Direct implementation with support from social forestry expert (STTA) and collaborative support with PSKL, Provincial and District Forest Agency, PS working group
When: Q1-Q4
Operationalization of collaboration agreement between BTN BBBR and 4 villages:
1. Study on potential commodities and its carrying capacity
2. Development of detailed agreement on the utilization of selected commodities and its quota
3. Regular resource monitoring
4 villages in Bukit Baka Bukit Raya buffer zone have detailed collaboration agreement and monitoring plan
How: Direct implementation
When: Q1-Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 116
Co-management Agreement formalized (when applicable based on RPJMDes zonation)
4.10 Develop RPJMDes or village regulation that incorporates co-management vision and zonation
Training RPJMDes for 6 additional villages in RPJMDes (6 training packages for 10 people). The following steps are carried out in 11 desa
1. Socialize RPJMDes Development/Review and conduct dusun level assessment meetings (11 meeting packages)
2. Prepare draft document
3. Share draft with community (meeting package)
4. Edit document and finalize document
5. Present to village government council
6. Socialization in village and district level
7. Documents finalized
11 village plans (RPJMDes) which include activities focused on sustainable management of natural resources
Number of people trained in RPJMDes development
How: Direct implementation with support from village motivators (SA)
When: Q1-Q4
RPJMDes informs and Green Enterprises.
Preparation of zonation map
1. Training for zoning map preparation team including use of zoning maps
2. Mapping survey at village level
3. Completion of zoning map
4. Presentation of zoning map to village
11 village zoning maps based on village plans (RPJMDes)
How: Direct implementation with support from village motivators (SA)
When: Q1-Q4
Activity informs with Improved governance (zonation)
4.6 Advocacy and support policy coordination between government in provincial and national levels for enabling policies to support co-management
Coordination meeting between Forestry Agency, PSKL and Pokja PS to collaborate to foster social forestry achievement in Kalimantan Tengah
Formalize SK
Joint commitment to stimulate social forestry progress
How: Direct implementation
When: Q1
Support Social Forestry Working Group to verify PS applications in LESTARI Landscape
PS application is verified How: Direct implementation
When: Q1-Q4
Key stakeholders understand the benefit of co-management and commit to manage forest
4.5 Build capacity of communities to negotiate with government and companies
Facilitation of dialogue and commitments government / companies and community for sustainable access and management of forest resources
Documentation of commitment from 14 communities and authorities / companies supporting co-management
How: To be managed by Grants
When: Q1-Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 117
collaboratively 4.4 Build capacity for forest managers (FMU/CA) to adopt inclusive approach to forest management
Need assessment for KPH XXXI (Pulang Pisau) and KPH XVI (Gunung Mas)
Assessment report with recommendation for future co-management
How: Direct Implementation
When: Q2
Co-management vision included in FMU management plan and zonation
4.2 Technical assistance to complete forest management/ zonation plan of FMU
Support the formation of Tahura in Pulang Pisau District
Feasibility study for Tahura in the previously-decided location
Apply Tahura status to the governor
Assessment for Tahura establishment
How: Direct Implementation with support from Tahura management plan expert (STTA)
When: Q3-Q4
Where: Katingan-Kahayan Landscape
PROTECTED AREA MANAGEMENT
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
CA Managers to have better capacity to manage their areas
5.7 Improve PA’s habitat and species protection through adoption and roll out of SMART Patrol
SMART patrol Training in Palangkaraya (TNBBBR, Sebangau and BKSDA Kalteng).
54 people (Polhut and community) in BBBR, Sebangau, and BKSDA Kalteng are trained to implement SMART patrol & data management
How: Direct implementation
When: Q1
SMART Patrol roll outs in TNBBR dan TNS
2 Patrol team in TN Sebangau and 1 patrol team in TNBBBR operational
Database for poaching
How: Direct implementation
When: Q1-Q4
Monthly evaluation and data management coaching in Kalimantan
2 National Park (Sebangau and BBBR) maintain the database
How: Direct implementation
When: Q1-Q4
Refreshment/advance training for SMART Data operator (Sebangau, BBBR)
Increasing the capacity of 8 data operators from TNS and TN BBBR
How: Direct implementation
When: Q3
CA improve and implement key aspects of
5.8 Improve priority species conservation
Develop the orangutan conflict mitigation strategy in Kalimantan Tengah (BKSDA)
Human-Orangutan Conflict Mitigation Strategy Document
How: Direct implementation
When: Q1-Q3
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 118
management plan strategies
Capacity building for Orangutan conflict mitigation
Module for orangutan-conflict migitation
SOP draft
30 BKSDA, TNS, TN BBBR and Pusdiklat staffs are trained for conflict migitation
How: Direct implementation with support from Ornag utan mitigation experts (STTA and SA)
When: Q1
Operationalization of 1 conflict mitigation team (wildlife response unit) in BKSDA Kalimantan Tengah
Reduce the number of orangutan removal due to conflict
Final draft of SOP based on lessons learned
How: Direct implementation
When: Q2-Q4
Facilitating meetings with private companies to build commitment to support Orangutan conflict mitigation
Financial support generated for conflict mitigaiton
How: Direct implementation
When: Q2-Q3
Socialization for SOP human-orangutan conflict mitigation to communities in TNBBR
Increased capacity of 4 communities to deal with human/OU conflicts
How: Grant - BOSF
When: Q1-Q4
5.6 Capacity building to improve conservation area management based on METT evaluation
Pilot project for canal blocking SOP for canal blocking inside TNS How: Direct implementation
When: Q2-Q3
Improve hydrology data management center and ensure it is operational (following up DOI’s capacity building activities)
Server procurement and data utilized
2 persons assigned to manage hydrology
How: Direct implementation
When: Q3-Q4
To develop a strategy for fire management in TNS (to be integrated with IFML)
A strategy for fire management in TNS
How: Direct implementation with Integrated Fire Managemnt expert support (STTA)
When: Q2
Capacity building for MPAs for fire management in TNS
8 MPA groups (15 participants each) How: Direct implementation
When: Q3
Provide technical support for the completion of medium management plan
Draft management plan for TWA How: Direct implementation
When: Q2
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 119
for TWA Tangkiling Tangkiling
GoI hold CA accountable to effective management
5.10 Improve PA Zonation Plan
Provide technical support for zonation plan completion in TWA Tangkiling
Zonation plan TWA Tangkiling How: Direct implementation
When: Q3
Expert Review longterm management plan for TNS and TN BBBR
Recommendations for improved long-term management plan for TNS and TN BBBR
How: Direct implementation with CA management expert (STTA)
When: Q1-Q2
5.4 Organize public consultation of key PA documents and provide technical support for the documents’ completion
Public consultation for longterm management plan for TNS and TN BBBR
Stakeholder recommendations for improved long-term management plan for TNS and TN BBBR
How: Direct implementation
When: Q3
Finalization and approval by KSDAE Long term management for TNS and
TN BBBR approved
How: Direct implementation with CA management expert (STTA)
When: Q4
Effective Partnership Established with NGOs, public etc.
5.5 Facilitate communities and stakeholders’ involvement in CA protection and management
Dialogue between CA managers and communities on the usage of traditional zone in Sebangau National Park in 2 location (sebangau REDD+ and Sungai Bulan
Agreement between TNS and communities for traditional zone usage
How: Direct implementation
When: Q2
CAs improve and implement key management aspect
5.13 Develop and implement Innovative Financing for Conservation
Grand Design for Sustainable Financing of TN Sebangau
Cost-Benefit Analysis
Multistakeholder meeting to disseminate the result of cost-benefit analysis and gain public inputs
Design governance for sustainable financing for Taman Nasional Sebangau and finalization
Fund raising
Grand Design for Sustainable Financing of TN Sebangau
Fund mobilized
How: Direct implementation with a team of sustainable conservation financing experts (STTAs)
When: Q1-Q4
Grand design for ecotourism in TNS Grand design document Conducted under SA 8
Site plan (design tapak) for ecotourism in TN BBBR
Siteplan document Conducted under SA 8
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 120
GREEN ENTERPRISES
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Public Private Partnerships for Green Enterprises
Result of initial assessment of PPP potential
6.1 Market Assessment/Value Chain analysis for potential commodities
Identification of potential partners with common interest and local commodities/services for PPP green enterprises development in Katingan district.
List of potential partners & local commodities/services for PPP green enterprises in Katingan district (focusing on the area around HPH concessions, working area of the grantees & area with ecotourism potential)
How: Direct implementation private Sector Specialist (STTA)
When: Q2
Location: Katingan
6.2 Identification of potential private sectors partners
Update PPP potential based on the recent work/assessment related to peatland (hydrology assessment & socio-eco assessment) in Pulang Pisau district.
Scoping report with updated potential partners & local commodities/services for PPP development in Pulang Pisau to improve fire mitigation, reducing deforestation & land).
How: Direct implementation private Sector Specialist (STTA)
When: Q1
Location: Pulang Pisau
Public & Private sector demand for investment opportunities increased
6.3 Investment outreach, and marketing for potential green enterprise PPPs
Develop common interest and TOR/drafting agreement with the potential private partner
3 PPP letters of Interest for collaboration
How: Direct implementation private Sector Specialist (STTA)
When: Q1-Q2
Location: Pulang Pisau, Katingan
6.4 Enabling business environment
Key stakeholder engagement (awareness and advocacy) & coordination
Advocacy material and awareness campaign implemented
Implemented through SA1: Awareness and Advocacy
Marketing Sebangau potential REDD+ project (note to check – validation)
Buyer commitment secured Conducted under SA 8
5.11 Participatory METT assessment (Mid-term review)
Participatory assessment of METT of TN BBBR and TNS
METT asssesment How: Direct implementation
When: Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 121
PPP is formed, business is realized & joined monitoring mechanism in place
6.5 Facilitate formalization of PPP agreement that integrates LESTARI goals
Develop potential PPP schemes agreements and implementation frameworks in Pulang Pisau and Katingan
Signing the MOU between PPP partners
3 PPP (MOU) documents signed between LESTARI & PPP partners (2 in Pulang Pisau & 1 in Katingan district)
How: Direct implementation
When: Q1-Q2
6.6 Facilitate monitoring of PPP implementation progress
Setting up monitoring system of PPP implementation involving relevant MSF members
Internal system for monitoring progress established, in coordination between LESTARI and the private sector partners
How: Direct implementation
When: Q3
6.7 Implementation of PPP program
Provide specific technical assistance for each PPP initiative
Workshops, trainings, demplot development
How: Direct implementation
When: Q2-Q4
Economic benefits realized
6.8 Technical evaluation and additional support where appropriate
Roll out the PPP program in the field with regular evaluation to improve and refine the on-going implementation
Providing technical assistance to the beneficiaries from all PPP partners
1,500 beneficiaries received training and benefit
USD 200,000 investment leveraged from private and public sector
2,000 ha area with improved management
How: Direct implementation private Sector Specialist (STTA)
When: Q3-Q4
Continue providing technical assistance for the rubber farmers in Pulang Pisau
5 new KUBK established in Pulang Pisau
Training for strengthening KUBK and potentially supporting the establishment of BUMDes
How: Direct implementation private Sector Specialist (STTA)
When: Q1-Q4
Improved Sustainable Livelihoods and Alternative Livelihoods for Communities Adjacent to Critical Areas
Critical area & key stakeholder identified
6.12 Identification of critical area, threats & relevant stakeholders
Risk assessment to identify priority villages for alternative and sustainable livelihoods development in Katingan and Gunung Mas
Priority villages identified in and adjacent to critical areas where alternative livelihoods are required to reduce deforestation
How: Direct Implementation and grants (Pulang Pisau); Katingan and Gunung Mas through grants
When: Q2-Q4 6.13 Identification of relevant potential livelihood
Rapid assessment of potential livelihoods (from kajian desa report) including those with PPP and co-management potential in Katingan & Gunung Mas region
Commodity assessment report and potential PPP and co-management scheme identified in Katingan and Gunung Mas
More appropriate & sustainable economic activities identified
6.15 Develop intervention models
Designing model for each potential livelihood
Develop intervention with existing grants awarded where possible
Design model for each specific intervention for livelihood, integrated with co-management (including potential link to PPP in Katingan and Gunung Mas)
How: Direct implementation private Sector Specialist (STTA) and Grants
When: Q1-Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 122
All stakeholders agreed to engage program
6.16 Community outreach program
6.17 Village development planning (integrate LESTARI vision and mission with RPJMDes)
Engage key stakeholders on the program (socialization)
Integrate & synergize the livelihood intervention during Musrenbangdes / RPJMDes
Synergize the progress with grant mechanism
Progress report/monitoring report from grant implementation and additional intervention programs in Katingan & Gunung Mas
Integrated RPJMDes (RKPDes & APBDes) with community agreement on inputs from village funds livelihood development (inputs, role distribution etc.)
How: Direct implementation and Grants
When: Q1-Q4
All stakeholder try new techniques
6.18 Targeted technical assistance
Providing technical assistance (training, field school, etc.)
1,500 of farmers received training and benefits
USD 50,000 investment leveraged from the village funds for livelihoods development
500 ha area with improved management
How: Direct implementation and Grants with support from village motivators (SA)
When: Q2-Q4 6.19 Development of joint monitoring mechanism
Setting up the monitoring system
6.9 Disseminate model/concept to other potential locations
Internal evaluation for training, field schools and other relevant technical assistance under the livelihood program
Revised implementation plan for livelihood program
Revised implementation program by grantees based on the input from LESTARI team
How: Direct implementation When: Q2-Q4
Progress evaluation for grantees
PRIVATE SECTOR BMP
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Key Private Sector Partner assessed
7.1 Assessment for potential BMP &CMMP collaboration
7.2 Potential private sector partner identification
Explore previous work under IFACS (CMMP/HCV HCS) to be further developed or revised or operationalized.
Introduction of potential BMP options (e.g., RIL, HCV, FSC, HCS) and develop common interest for potential BMPs with new potential private sectors
List of potential program continuation under IFACS (CMMP/HCV HCS) with detailed agreement with engaged private sectors
List of new engaged private sector, potentially from oil palm sector or mining sector
How: Direct implementation
When: Q1
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 123
Key Private Sector Partners understanding of BMPs and CMMPs
7.3 Identify appropriate BMP collaboration with private sector partners
7.4 Develop the plan with private sector partners to implement the CMMP/HCV-HCS
Develop shortlist for new potential partner for different type of BMP collaboration
Develop intensive and extensive communication with the new potential private sector partners for BMPs collaboration
Conduct due diligence on the new potential private sector partners especially capacity to change practices
Follow up communication and coordination with engaged private sectors to start detailing the plan for CMMP/HCV-HCS collaboration
Advocacy efforts for scaling up BMPs through video campaigns, policy briefs, and socialization and dissemination of training results
Inputs on shortlisted partners from multi-stakeholder consultations (related ministries, associations, big buyers)
Results of field-check for shortlisted potential partners with suitable BMP collaboration for the new private sectors
Detailed agreement from engaged private sectors on the CMMP/HCV-HCS operationalization plan
Videos, policy briefs, and information on results from BMP training
How: Direct implementation
When: Q1-Q4
Social aspects of HCV will contribute and link to potential Co-management agreements (with communities in and around the concession)
Connected to SA 1: Awareness and Advocacy
Appropriate BMPs put into MoU
7.5 Develop common interest to be included in the BMP MOU
Signing MOU with the new committed private sectors
Information transparency in demonstrating BMP collaboration
Signed MOU documents
How: Direct implementation for agreements and through subcontract for delivery of required capacity such as RIL-C training
When: Q1-Q4
Key private sector partners formally adopt BMPs
7.7 Provide technical assistance
7.8 Provide management advisory
Develop baseline analysis for each of the new private partners on the readiness to receive and implement the BMP trainings
Information transparency in demonstrating BMP collaboration
Result on GAP-baseline analysis on the potential BMP collaboration
How: Direct implementation for agreements and through subcontract for delivery of required capacity such as RIL-C trainings
When: Q1-Q4
Key Private Sector Partners employ BMPs
7.7 BMPs implementation
Continued technical assistance and management advisory BMP especially for development and implementation of appropriate SOPs, budget and working plans
Coordinate regularly with the private sector partner and the sub-contract
SOP which adopt BMPs
Budget which adopted cost of new BMPs
Progress report that demonstrates ongoing implementation
How: Direct implementation When: Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 124
CMMP operationalization plan put into MoU
7.6 Develop CMMP operationalization plan into MOU
Signing MOU with the committed private sectors
Development of detail operationalization CMMP plan
Signed MOU documents
CMMP operationalization plan
How: Direct implementation for agreements and through subcontract for delivery of required capacity building/training
When: Q1-Q4
Key private sector partners formally adopt CMMPs operationalization plan
7.7 Provide technical assistance
7.8 Provide management advisory
Develop baseline analysis for the current situation on the CMMP and readiness level to operationalize for the engaged private sectors
Information transparency in demonstrating CMMP implementation
CMMP operationalization plan
How: Direct implementation for agreements and through subcontract for delivery of required capacity such as CMMP monitoring trainings
When: Q1-Q4
INNOVATIVE FINANCING FOR SUSTAINABLE LAND AND FOREST MANAGEMENT
Results (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Innovative Financing for Sustainable Land and Forest Management (PES)
Potential payment for environmental services (PES) identified
8.6 Initial assessment
(feasibility study) on PES
Piloting the PES toolkit in 2 target areas
(Sebangau National Park and/or BBBR
National Park)
Introduce the result of PES feasibility study
to the stakeholders (including local
government)
Develop necessary advocacy and
awareness for PES implementation at the
provincial level
Feasibility study for 2 areas in the
landscapes completed (Village
Forests around Sebangau National
Park and/or watershed protection in
and around BBBR National Park)
Findings of the three reports are
used as inputs for PES feasibility
assessment with inputs from other
strategic approaches
How: Direct implementation
When: Q1-2
Input from SA 6 & SA 4;
Results feed into SA1:
Awareness and Advocacy
Project working group established
8.7 Stakeholder
engagement
Private sector engagement (local
governments, private sector partners and
other key stakeholders) workshops
Prepare engagement plan/scopes of work
with the private sector
Design and setting up of the working
groups
Letter of commitment by
stakeholders on PES development
and project working group agreed (1-
2 depending on the result of PES
feasibility study)
Stakeholders (including local
government) endorse identified PES
programs
How: Direct implementation
When: Q3
Awareness raising and
advocacy to government and
other key stakeholders
services provided under SA1:
Awareness and Advocacy
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 125
PES PCNs and
safeguards developed
8.8 Technical assistance
to the working group
Capacity building (training and site visits /
study tours) for PES development
Identification of project proponent
PES scheme development in targeted
areas
Training reports
Project proponent identified
PES scheme design developed
How: Direct implementation
When: Q3-Q4
PES is synergized with Local Govt Plan (SEA, LCP, Renstra, RPJMD/RKPD)
Environmental services
related regulations
formulated or improved
8.9 Technical assistance
and advocacy to
government
Review of SEA, LCP using PCN and PES
feasibility study (supplementary study)
Coordination with Village Development
Plans (RPJMDs)
Updated recommendations for
Pulang Pisau and Katingan through
RPJMD or RKPD on PES initiative
PES integrated village plans
How: Direct implementation
When: Q2-Q3
Regulatory requirements
provided under SA 2 and 3
Government budget for environmental services allocated
8.10 Advocacy and
lobbying at the district
level
Advocacy and awareness linked to PES at
provincial, district levels
Proportion (%) of village fund
allocated for environmental sector
How: Direct implementation
When: Q4
Awareness raising and
advocacy to government and
other key stakeholders
services provided under SA1:
Awareness and Advocacy
Donors agree to fund
project concept notes
(PCNs) developed
previously under IFACS
8.11 Outreach and
marketing to funding
sources
Outreach to donors that fund carbon and other performance based PES projects
Rewriting the proposals in a new donor format for 1 PCN from IFACS (dependent on results of outreach)
Proposals in a new donor format
completed (Buntoi Village
Forest)
Implementation (funding
dependent)
How: Direct implementation
When: Q2-Q3
Crosscutting with SA 4 – C3.2
Pilot innovative financing for
critical areas
Innovative Financing for Sustainable Land and Forest Management (Ecotourism)
Ecotourism opportunities identified
8.1 Initial Ecotourism
Assessment
Shortlist of opportunities and clusters
identifying key shortfalls, PPP
opportunities, interventions required and
investment risks
Map of existing and potential
ecotourism product locations and
tourism routes and project synergies
Shortlist of opportunities
How: Direct implementation
When: Q1
Development of a draft monitoring framework
Draft monitoring framework How: Direct implementation
When: Q1
Integrated business models
for ecotourism developed 8.2 Develop integrated business models
Work closely with SA 5: Protected Area
Management, C2.2 Pilot Innovative
Ecotourism blueprint for Sebangau
National Park How: Direct implementation
and Ecotourism assistance
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 126
8.3 Market linkage development
Financing for Protected Areas to develop
an ecotourism blueprint for Sebangau
National Park, and an ecotourism master
plan for BBBR National Park
Ecotourism master plan for BBBR
National Park
support (STTA)
When: Q1-Q3
Identification of required interventions to
actualize ecotourism development
(including PPPs, training, capacity building,
MSF dialogues, attraction cluster,
advocacy and awareness raising)
Outline of required interventions for
each project
How: Direct implementation
and Ecotourism assistance
support (STTA),
When: Q3
Awareness raising and
advocacy to government and
other key stakeholders
services provided under SA1:
Awareness and Advocacy
Private sector and tour operator outreach
Database of potential project
partners
Scope of work for at least 1 project in
Central Kalimantan
How: Direct implementation
and Ecotourism assistance
support (STTA),
When: Q2-Q3
Identification of organizations to
support/implement required interventions
(e.g. training and capacity building)
List of preferred subcontractors
How: Direct implementation
and Ecotourism assistance
support (STTA),
When: Q3
Development of PPP TORs, MOUs PPP MOUs (including potential PPP
with Dwima Group on ecotourism
implementation)
Partnerships implemented to
incentive and fund conservation
If PPPs are possible the
development of PPP
agreements will follow the
approach taken by SA6: Green
Enterprises
Implement the identified PPP interventions
in collaboration with identified public-
private and nonprofit sector partners and
stakeholders
Growth of Ecotourism 8.4 Capacity building and Training
Develop tailored training for capacity building for each of the ecotourism initiative
Trainings How: Direct implementation
When: Q4
Increased government support for ecotourism
8.5 Development of district ecotourism plan
Advocacy & lobbying List of strategies
How: Direct implementation
When: Q4
Linked to SA 1 Advocacy &
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 127
Communication
Ecotourism incorporated in government budget, plan and policy (including RPJMDes and SEA)
Development detail plan for each identified district in Katingan-Kahayan (Dwima area or Sebangau NP or other identified location)
Developed actionable plan
How: Direct implementation
When: Q4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 128
PAPUA LANDSCAPES
Papua Provincial Initiatives LESTARI operates in 4 landscapes in Papua Province – Lorentz Lowlands, Mappi-Bouven Digoel, Sarmi, and Cyclops. While treated as discrete units for implementation during Year 1, approaches, activities, and results have been considered in aggregate for Year 2. Apart from improved brevity of the work plan, this activity aggregation across all four landscapes highlights the similarity of approach within a single province, providing for an improved focus on provincial coordination and intervention (especially for governance and protected area management) and effectiveness of implementation by the LESTARI team. Papua Provincial initiatives during Year 2 will focus on:
Continued development and strengthening of the Spatial Planning Data System (SIMTARU) through regulations and operational ratification
Extending the Sustainability Screening Tool to Papua for improved data analysis for government offices (most notably, the One-Stop-Shop for investment – BPTSP and BAPPEDA
Initiation of a Provincial MSF that crosses Landscapes / Districts to discuss climate change, forest conservation and biodiversity issues and targeted activities to improve Provincial MSF capacity
Lorentz Lowlands Landscape
Landscape Profile
The IFACS Asmat and Mimika landscapes have been combined into a single Lorentz Lowlands Landscape. These two districts and the landscape are characterized by a large area of the Lorentz National Park that defines the landscape name. The Lorentz Lowlands Landscape consists of largely intact upland (free draining, mineral soil) forests in the northern parts of the landscape, extensive lowland swamp forests, and the world’s most rich and intact mangrove ecosystems. These mangroves, that are the focus of much of the LESTARI activities in the landscape, stretch along 500 km of coastline and cover over 400,000 ha. The bordering freshwater swamp forest (approximately 1M ha) is important for maintaining the mangroves and together harbor some of the highest carbon stock and biodiversity per hectare of similar forests on the planet. These assets need to be managed sustainably to mitigate vast GHG emissions and conserve its important endemic biodiversity and environmental services that local communities enjoy.
Landscape Initiatives
Principle interrelated initiatives that will relieve pressure on forest resources and reduce GHG emissions in the Lorentz Lowlands Landscape are:
Scaling-up of awareness raising communications and campaigns with the subcontract support of InFis / Mongabay and journalist training to increase public exposure and understanding of climate change, forest conservation, and biodiversity issues
Reviewing and updating SEAs and LCPs produced under IFACS to inform spatial planning revisions
Strengthening the SDI developed under IFACS with improved data (land suitability and modeling of threats and impacts, HCVs and Sustainability Screening Tool development) and SOPs
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 129
Continuation of capacity building for the MSF through routine meetings and technical discussions about climate change, forest management, governance, and gender issues
Formalizing and implementing co-management agreements at the community level that are developed from participatory mapping of important places
Assisting the KPHL VI in Mimika to finalize its RPHJP and forest zonation plan and provide training
Promoting a Forest Park (Tahura) in the mangroves of Mimika through management plan development
Improving the management in Lorentz National Park through introducing SMART patrols, assessing illegal activities (logging and wildlife trade), implementing biodiversity surveys and developing conservation plans, and a review / revision of the zonation plan
Establishing an Adat Community Forum in Lorentz to improve communication, collaboration and management effectiveness
Implementing a value-chain and market assessment for crab and sago, and identify and develop a Private Public Partnership for a low emission / green enterprise that provides incentives to conserve forests
Designing field-schools for green livelihoods based on the resilience assessment and village typology approach and providing technical assistance
Integrate the livelihoods programs initiated with village funds and development plans
Explore private sector best management practices development with timber concessions (and potentially Oil Palm) in Mimika district.
LESTARI improved governance efforts in Year 1 focused on the revision of the spatial plan with the incorporation of SEA and LCP recommendations. This work will continue and expect to achieve more sustainable land use planning for the future. A key issue that is being tabled by the current Bupati is a large area of forest land (35,000 hectares) proposed for development as an industrial park, town expansion, and energy crops. The SEA and LCP will be updated and recommendations to mitigate impacts from proposed developments incorporated in the spatial plan. Strengthening of the Spatial Data Infrastructure developed under IFACS, with updated data from mapping and assessments, and Sustainability Screening Tool development used to improve the environmental sustainability of decisions being made in the landscape. Co-management agreements between communities and authorities in charge of forest management are an important aspect of improving the management of the value landscape. Participatory mapping will inform these agreements with formalization through social forestry (hutan desa / HKm) schemes or developing partnerships with CA manager/FMUs to improve access and sustainable use of forest resources. These co-management agreements will be piloted in areas where forest resources are relatively secure and under traditional management. Lorentz National Park has ineffective management to date and the introduction on community-based patrolling using the SMART approach to reduce illegal pressures on the accessible parts of the park, and species conservation plans supported through effective awareness building communications will be rolled-out. An important aspect of improving the management of the park is to improve communication and coordination with adat communities through the establishment of an adat community forum as a formal part of park management. An important part of the initiative in the Lorentz Lowlands will be to continue to explore small-scale extractive industries and support their adoption of more sustainable practices. Areas close to the economic centers of Timika and Agats are increasingly being exploited for timber and crabs for export. Potential private-public partnerships and local community-based
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 130
green enterprises will be developed to improve resource management and increase communities’ perception of forest and mangrove value while fulfilling the demands for development. Sustainability of these initiatives will be improved through integration with village development plans and budgeting through the village funds. Private sector engagement will fully scope out the potential for collaboration with timber and oil palm companies currently operating in the landscape, as well as with Freeport.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 131
Figure 14. Lorentz Lowlands Operational Landscape
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 132
Mappi-Bouven Digoel Landscape
Landscape Profile
The Mappi-Bouven Digoel Landscape is a new area for USAID projects. It covers a large undeveloped expanse of lowland forest on a lowland mineral terrace, and extensive peat lands, swamps and some mangrove in the lower reaches towards the coast. The landscape is characterized by Papua’s largest river, the Digul, which forms the eastern boundary of the landscape. Southeast Papua has long been the focus of large development plans for the expansion in agricultural and land-based energy estates. The MIFEE (Merauke Integrated Food and Energy Estate) project that was initiated under the SBY government has been revisited and supported by the Jokowi administration. The actual impact of MIFEE spreads beyond the Merauke district, as large parcels of land have long been designated for conversion to oil palm and pulp plantations in Bouven Digoel and Mappi districts. We propose an extension to the Lorentz value landscape to encapsulate the forested areas slated for conversion within the ‘location license’ of these oil palm and industrial timber plantation companies. Most of these companies are not yet operating in the landscape to date, and the LESTARI presents an opportunity to rationalize conversion and mitigate negative environmental and social impacts from plantations development.
Landscape Initiatives
Principle interrelated initiatives that will relieve pressure on forest resources and reduce GHG emissions in the Lorentz Lowlands Landscape include:
Continuing capacity building for the MSF through routine meetings and technical discussions about climate change, forest management, governance, and gender issues
Developing SEA for Bouven Digul district, and review and revise the SEA document in Mappi
Developing a landscape conservation plan in parallel to the SEA based on participative mapping and HCV assessment carried out in Year 1 and through WWF previous activities in the area
Initiating the spatial plan review process in Mappi and Bouven Digul districts
Building SDI capacity in Mappi and Bouven Digul districts with improved data (land suitability and modeling of threats and impacts, HCVs) and SOPs, to compliment the SEA and LCP development
Identifying and developing PPP models for green enterprises based on rubber and gaharu
Identifying potential private sector partners and securing their commitment for the implementation of BMP based on the rationalization of land
The core initiative in the Mappi-Bouven Digoel Landscape is to rationalize current and proposed plantations to ensure conservation of HCV and HCS forest. This will be advanced in Year 2 through developing the capacity of MSF and SDI to manage the data already collected in Year 1 and from WWF’s previous activities in the region, and incorporating these into SEAs and LCP documents. Recommendations from these documents will then be used in the LESTARI initiated spatial planning review process at the district level. Awareness raising and advocacy to build constituencies for conservation and a low emissions development approach are key activities that will be amplified in Year 2. The MSF members, including those from the private sector, will discuss and advocate for more sustainable
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 133
patterns of development in the districts and create the social pressures needed for locally operating companies to embrace BMPs. At the small-holder level, the LESTARI team has conducted assessments for local commodities that will be combined with a land suitability analysis. This will highlight the potential low emission development strategies (LEDS) to be scaled up.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 134
Figure 15. Mappi-Bouven Digoel Operational Landscape
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 135
Sarmi Landscape At present the political situation in Sarmi involving rival factions from within the government has negatively affected LESTARI governance initiatives and work with communities to safeguard forests. Governance initiatives implemented under IFACS and in the first part of Year 1 of LESTARI (such as strengthening the MSF) have had to be postponed.
Landscape Profile
The LESTARI Sarmi Landscape is ~97% covered by forests, with 74% of in a pristine state. The area is renowned for its high levels of endemic biodiversity. Historical deforestation and degradation rates are relatively low, and 70% of the landscape is currently within natural forest timber concessions.
Landscape Initiatives
Principle initiatives that will relieve pressure on forest resources and reduce GHG emissions in the Sarmi Landscape include:
Best management practices with timber companies (HPH) in conducting RIL-C practices
CMMP Operationalization based on the CMMP doc produced during IFACS
Development of PPP with the private sectors and communities to support the conservation activities.
The sole purpose of LESTARI in the Sarmi Landscape is to ensure high conservation value (HCV) and high carbon stock (HCS) conservation. As 70% of the landscape is under timber concessions, these companies are important managers of the northern Papua lowland forests where adoption of Best Management Practices (BMPs) can mitigate GHG emissions and forest loss, as well as safeguard biodiversity from illegal poaching and decline. LESTARI has signed MOU with two HPHs in Sarmi and will be implementing Reduced Impact Logging (RIL-C) technical assistance as well as supporting the operationalization of CMMP or HCV monitoring. This will involve implementation of RIL-C training orientated to reduce GHG emissions and providing management advice for BMPs, especially for development and implementation of appropriate SOPs, budgets, and working plans.
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 136
Figure 16. Sarmi Operational Landscape
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 137
Cyclops Landscape
Landscape Profile
According to the LBA, projected land transitions in the Cyclops Landscape are dominated by primary and secondary moist forest converted at the margin for agriculture. Such transitions, especially adjacent to the urban arc of Sentani through to Jayapura are responsible for the vast majority of projected emissions. Northern and remote coastal areas, however, tend to be less at risk. Moreover, the majority of these emissions are projected to occur within Cyclops Nature Reserve.
Cyclops Landscape Initiatives
Principle interrelated initiatives that will relieve pressure on forestry land resources and reduce GHG emissions are:
Improved governance to provide enabling conditions for conservation co-management and private smallholder farmers
Enhanced sense of ownership in maintaining forest values through the creation of a provincial MSF, Sahabat Cyclops, and establishment of technical working groups for the development of environmental regulations and advocacy
Updating of SEA to inform nature reserve zonation with economic resource valuation
Improved management of nature reserve through SMART patrols, wildlife crime reduction, and human-wildlife conflict mitigation
Co-management agreement development between the community and FMU protection forests (KPHK) operationalized
Green Enterprise Development (vanilla)
Ecotourism development in and around the nature reserve
Payment for Environmental Services (water, carbon)
Aggressive communications strategy advocating the conservation of forests and sustainable low-emission development capitalizing on prominent events in the Landscape emphasizing water resource services
Improving environmental governance in the Cyclops landscape will be achieved through (1) updating existing SEA with economic resource valuations focused on direct and indirect use values to inform nature reserve zonation, and (2) increasing the effectiveness of MSF through the Sahabat Cyclops initiative. LESTARI will continue to focus on increasing strategic spatial awareness and related zonation by identifying critical zones for conservation, restoration, or sustainable utilization within current spatial plans. MSF will initiate technical working groups consisting of MSF members that can be tasked with actions such as drafting regulations for improved environmental management or advocacy for funding support, and then reporting back to the MSF. Co-management in Cyclops Landscape will focus on facilitating communities to adopt sustainable livelihood practices and co-management plan in the bufferzone area of Cyclops Nature Reserve. This will include working with communities to develop vanilla as a green enterprise that relieves encroachment pressures on the nature reserve. In addition, communities will be facilitated to implement community- based ecosystem restoration in close engagement with CA managers. At the policy level, LESTARI will closely support the finalization of local regulation draft on buffer zone management. Improvement of protected area management in this landscape will be achieved through rolling out SMART patrol to reduce threats, improving species conservation strategies, and
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 138
implementing relevant capacity building activities for CA staff members/managers based on METT evaluation. LESTARI will continue work in identifying the PES potential within Cyclops, especially for water and carbon. Furthermore, potential for ecotourism in the area will be furthered assessed. These initiatives should generate revenue and support the sustainable financing of the conservation area. All of the above initiatives will be supported by increased awareness and advocacy campaigns that use social and formal media in support of forest and biodiversity conservation and low emissions development. .
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 139
Figure 17. Cyclops Operational Landscape
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 140
AWARENESS AND ADVOCACY (Lorentz Lowlands, Mappi-Bouven Digoel, Cyclops, and Sarmi Landscapes)
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Target audience, desired behavior, appropriate media identified
1.1 Condition Analysis Issue mapping, stakeholder analysis,
communication assessment, media mapping
A brief of communication & advocacy strategy based on issue (mainstreaming gender)
How: Direct implementation with support from Subcontractor (Infis)
When: Q1
Target audience receive message
1.2 Communication Outreach
Education campaign for protective species in collaboration with KSDA Timika, Enviro, and Freeport (involving youth)
Story pitching in the form of articles to raise awareness
PSA in electronic media
Dialogue interactive in electronic media
Off-air events for example: a) thematic events (e.g., environmental day, earth day, etc); b) pop-culture events (e.g., comedy/mob, film and photo showcase); c) video/photography/writing contests
Social media campaign (e.g., facebook/fanpage, twitter, instagram, blog etc.)
Visualization program for envisioning sustainable landscape
Media monitoring and analysis
1,000 number of people reached
4 issues published in mass media; 8 articles published in LESTARI platform
3 messages of PSAs aired for 5 times a day in local radio within 6 months
2 on-air/interactive dialogues
1000 number of people reached
400 fans for FB fanpage; 180 posts
6 visualization products for planning (e.g., 3D architectural design, infographic, video etc)
Quarterly report of media monitoring and analysis
How: Direct implementation with support from Subcontractor (Infis)
When: Q1-Q4
1.3 Journalist capacity building
Journalist training for biodiversity conservation issues for local media (through serie of informal discussions, sharing information)
Journalist fellowship program (i.e., collaborate with PWI, Komunitas Jurnalis Harian)
Editorial meeting
8 LLL based journalists and 10 journalists from Cyclops and 5 from Mappi-Bouven Digoel. Three journalist networks on biodiversity conservation created.
10 selected journalists as fellows; 30 in-depth articles published in prominent media outlets in Papua.
3 editorial discussion meetings in each landscapes
How: Direct implementation
When: Q2-Q3
1.4 Series of Series formal and informal discussions Three discussions conducted, How: Direct implementation
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 141
public/stakeholders discussions on most pressing issues
produce 3 notes/recommendations for policy makers
When: Q1-Q4
Target audience has and retains desired knowledge
Target audience attitudes & values consistent with desired behavior
Target audience adopts, implements, or continues desired behavior
1.5 Ongoing campaign based on KM, lesson learned, and best practices to create demand for public information access
Collaborate with specific task force in MSF to producing and disseminate technical information (evidence and experience-based materials) for intended audience (e.g. decision makers)
Facilitating technical assistance for intended audience
Lobbying for tools and information utilization
6 technical guides (e.g., SEA-LEDS, METTS, SMART Partrol, PPP, Co-management, ilegal poaching)
Number of individuals accessing tools and information
Notes, presentations, talking points, draft speech
How: Direct implementation adding advocacy function in Papua and empowering MSF members, with support from Subcontractor (Infis)
When: Q3
1.6 Community based media engagement and development
Citizen-journalism training (bloggers, social media, buzzer, youth groups, women organizations)
“Camera for people/ Photo-VoiceTM” program
50 citizen journalists created
How: Direct implementation with support from Subcontract
When: Q3-Q4
Constituent for conservation formed
1.7 Advocacy capacity building
Training for community organize.
Working with faith based organization (church)/religious and cultural leaders to build constituenc.
Supporting “Sahabat Cyclops” as conservation constituent for younger audience
30 potential champions from sub-landscapes are trained
10 thematics preaches (sermon sheets) will be conveyed to religious community and outreaches 1000 people
One annual event that promotes cyclops, two visits to cyclops to promote Cyclops as protected area. Quarterly discussion issues fased by Cyclops. The activities will target 500 people
How: Direct implementation
When: Q2-Q3
1.8 Identify and collaborate with community’s champions.
Community organizing training for Papua’s sub-landscapes community organizers
Communication and advocacy training for Papua based NGOs on biodiversity conservation
One training implemented, participated by 20 community organizers.
One training implemented, participated by 15 representatives from Papua-based NGOs on communication and advocacy
How: Direct implementation
When: Q3
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 142
Improve public policies addressing climate change and/or biodiversity through inclusive processes
1.9 Advocacy and lobbying
Providing technical assistance for policy improvement.
Integrating village mapping to MSF that includes visualization of village maps, village map visual competition, and vilage’s business plan competition.
2 policies improved (budgeting, Bupati’s decree on fire management)
5 best village maps are selected and awarded
How: Direct implementation
When: Q4
OPERATIONALIZE SEA/LCP TO IMPROVE LAND USE GOVERNANCE
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
High Quality SEAs / LCPs developed or updated for all districts
2.1 SEA development, revision or updating with supplementary assessments
Developing Bupati decree on working group for SEA revision in Asmat
Provide technical assistance and support to the SEA Working Group for the revision of SEA in Mimika and Asmat
Facilitate stakeholder consultations for the SEA revisions in Mimika
Preparing input for TN Lorentz Zonation based on districts in Mimika and Asmat
Bupati decree on SEA working group in Asmat (already secured in Mimika)
SEA updated in Mimika and Asmat for revision of RTRWK
Revised zonation for FMUs and conservation areas (Lorentz, Cyclops), and plantation licenses (Mappi-Bouven Digoel)
How: Direct implementation with SEA Expert support (STTA)
When: Q1-4
Where: Lorentz lowlands (Mimika and Asmat)
Input from MSF (SA3)
Establishing SEA working groups in Mappi and Bouven Digul
Provide technical assistance and support to the SEA Working Group for the review of SEA in Mappi and Bouven Digoel
Training in SEA scenario development for decision makers based upon economic resource valuation
Facilitate stakeholder consultations for the SEAs
Bupati decree on SEA working group Mappi and Bouven Digul
SEA updated in Bouven Digoel and Mappi
How: Direct implementation with SEA Expert support (STTA)
When: Q1-4
Where: Mappi-Bouven Digoel
Input from MSF (SA3)
2.2 LCP development or revision
Finalizing LCP development in Mappi and Bouven Digul
LCP adopted in draft revised zonation for RTRWK Mappi Bodi
How: Direct implementation involving MSF
When: Q3-Q4
Where: Mappi-Bouven Digoel
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 143
LCP Review in Mimika Updated LCP for Mimika
How: Direct implementation involving MSF
When: Q1-Q2
Where: Lorentz Lowlands (Mimika)
Input from SDI (SA3)
SEAs/LCP recommendations included in district/provincial governments spatial plan zonation
District/provincial governments include high quality SEAs/LCP recommendations in development plans and sectoral budgets
2.4 Informing spatial plans revision/review
Lobby for LESTARI team to be included in RTRWK evaluation working group in Mimika and Asmat
Provide technical inputs for revision of RTRWK based on the RTRWP and LCP and SEA recommendation in Mimika and Asmat
Bupati Decree on working groups to revise RTRWK in both Asmat and Mimika
Gap between RTRWK dengan RTRWP, LCP and SEA are identified in Mimika and Asmat
Technical input for RTRWK evaluation based on SEA in Mimika and Asmat
How: Direct implementation
When : Q1-Q4
Where: Lorentz lowlands (Mimika and Asmat)
Input from MSF (SA3)
Lobby for LESTARI team to be included in RTRWK review working group in Mappi and Bouven Digul
Developing technical input for RTRWK review based on SEA in Mappi and Bouven Digul
Bupati Decree on working groups to review RTRWK in both Mappi and Bouven Digul
Completed review RTRWK based on RTRWP, and incorporating LCP and SEA recommendations in both Mappi and Bouven Digul
How: Direct implementation
When : Q3-Q4
Where: Mappi-Bouven Digoel
Input from MSF (SA3)
Regional and village government allocate budget for implementing SEA/LCP recommendations
2.7 Budget analysis capacity-building for district government
FGD on synchronizing RPJMD programs with RTRWK (Mimika)
Development planning and budgeting analysis based on SEA/LCP (Mimika)
Input for RPJMD’s program and activities based on RTRWK (Mimika)
Input for Renstra SKPD program and activities based SEA/LCP (Mimika)
How: Direct implementation, When: Q1-Q4
Where: Lorentz Lowlands (Mimika)
Assurance that plans follow SEAs/LCP recommendations
2.8 Draft specific plan regulations based on SEA and or LCP recommendations
FGD on synchronizing district regulations on licensing
Finalizing SOP for BKPRD
Developing draft of Bupati Decree on BKPRD’s SOP
Developing draft of Governor Decree on BKPR Province’s SOP
Recommendation to integrate and synchronize regulations on licensing produced
BKPRD’s SOP and Bupati Decree on BKPRD’s SOP (District)
BKPR Papua Province SOP developed
How: Direct implementation, Spatial Planning and Resource Licensing Specialist (STTA)
When: Q1-Q4
Where: Province, Lorentz Lowlands (Mimika, Asmat, Mappi & Bouven Digoel)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 144
Facilitating BKPR Province to develop the SOP referring to BKPRN (National Spatial Planning Coordination Board) SOP
SUSTAINABLE LANDSCAPE GOVERNANCE (Lorentz Lowlands, Mappi-Bouven Digoel, Cyclops, and Sarmi Landscapes)
Result (Blue box) Activities (Yellow box) Sub-activities Output Delivery mechanism
SDI and SIMTARU
SDI formalized 3.1 Build monitoring capacity of SDI
HCV mapping (1-6) in Mappi, Bouven Digoel, Asmat and data verification
Updated data essential for sustainable development and conservation of significant and critical resources in the landscape available within the SDI.
20 people with improved data management skills
How: Direct implementation with support from Social / Anthropologist (STTA) and involving indicative District SDI (and MSF) members
When: Q1-Q2
Where: Lorentz Lowlands, Mappi-Bouven Digoel
Synchronized with SEA / LCP development and revision activities
Evaluation on land suitability and site selection in Mimika, Mappi, Bouven Digoel, Asmat
Model builder development, and sustainability screening tool for Papua Province
Deforestation and value degradation models developed and published for the landscapes
How: Direct implementation with support from Trainer (STTA) and involving indicative District SDI (and MSF) members
When: Q2
Where: Mimika, Asmat, Mappi and BoDi and Province
Synchronized with SEA / LCP development and revision activities
Data Management and verification on SIMTARU spatial data in Mappi, Bouven Digoel, Sarmi, Asmat, and Papua province
Updated data essential for sustainable development and conservation of significant and critical resources published at the provincial level.
How: Direct implementation with support from Spatial Planning and Resource Licensing Specialist (STTA)
When: Q1
Where: District SDI (Mimika, Asmat, Mappi and BoDi)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 145
3.2 Geospatial information linkages (inter-services agency) and (vertically between National and Village)
Develop SDI institutional structure and membership
Structure of SDI institution and membership defined
How: Direct implementation with support from Spatial Planning and Resource Licensing Specialist (STTA)
When: Q1
Where: District SDI (Mimika, Asmat, Mappi and BoDi)
Rationalization of SoP to integrate SDI at all levels
SOP documents ratified
How: Direct implementation with support from Spatial Planning and Resource Licensing Specialist (STTA)
When: Q1-Q4
Where: District SDI (Mimika, Asmat, Mappi and BoDi)
Equip SDI Infrastructure Hardware, software, internet access,
and facilities provided
How: Procurement through lobbying government and providing supplementary assistance where needed
When: Q2
Where: District SDI (Mimika, Asmat, Mappi and BoDi)
Integration of HCV data in SDI
Public consultation
HCV assessment data produced through regional efforts, NGO, private sector as well as landscape assessments (e.g. LCPs) publicly consulted and integrated into SIMTARU database
How: Direct implementation with support from Spatial Planning and Resource Licensing Specialist (STTA)
When: Q2
Where: Provincial
3.3 Initiate required and selected regulations for formalized SDI
Coordination and consultation on development of government decree and SoP to operationalize SDI team
Draft of government decree, SoP document
How: Direct implementation with support from Spatial Planning and Resource Licensing Specialist (STTA)
When: Q1
Where: District SDI (Mimika, Asmat, Mappi and BoDi)
Advocacy on government regulation to operationalized
Government decree and/or relevant regulation needed
How: Direct implementation with support from Spatial Planning and Resource Licensing Specialist
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 146
Legalization of SDI team Decree and/or relevant document (STTA)
When: Q1-Q4
Where: Province; Lorentz Lowlands (Mimika, Asmat), Mappi-Bouven Digoel / District SDI
Advocating endorsement of SIMTARU SoP
Governor decree on SIMTARU SOP
SIMTARU operationalized for planning, implementation, monitoring and reporting
3.4 Improve SIMTARU utility and functionality (including SST)
Assist SIMTARU data management and update at provincial level
Updated thematic data (land cover, investment, social forestry)
How: Direct implementation with support from Spatial Planning and Resource Licensing Specialist (STTA)
When: Q1-Q4
Where: Provincial level
Technical assistance to support SIMTARU – data upload and update (provincial level) including all data from district SDI
HCV assessment data and other data produced through regional efforts, NGO, private sector as well as landscape assessments (e.g. LCPs) that has been verified by SDI at the District uploaded to Provincial database
How: Direct implementation with support from Spatial Planning and Resource Licensing Specialist (STTA)
When: Q1-Q4
Where: Provincial level
Regulation on licensing (Pergub)
Regulation on SIMTARU
Governor’s Decree on Licensing
Governor’s Decree on SIMTARU
Facilitate One-Stop-Shop on Licensing (BPTSP utilize SIMTARU)
Special working group (with decree from head of agency) for SIMTARU developed at BPTSP
BPTSP utilize SIMTARU for licensing
Linking BIG and SIMTARU in one map policy
Integrated SIMTARU in one map policy BIG
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 147
Multi-Stakeholder Forum
Multi-stakeholder vision and mission (new or revised) agreed
3.11 Build consensus among MSF members about vision and mission (SOP/Guidelines)
Preparation and development of MSF “Sahabat Cyclops” 1. Series of FGDs with SKPD and
relevant institutions (BKSDA, community, private sector, TNI-POLRI
2. Temporary secretariat for Forum Sahabat Cyclops
3. Development of MSF Sahabat Cyclops (Identification of Strategic issues, MSF management-vision mission, structure, etc.)
MSF charter developed for Cyclops MSF
How: Direct implementation
When: Q1-Q2
Where: Cyclops
LCP (SEA)
Initiation of MSF Cross-District Landscapes (e.g., Mimika and Asmat in Lorentz Lowlands; Jayapura District and Kabupaten in Cyclops)
MSF charter as a foundation for MSF provincial development
How: Direct implementation
When: Q3-Q4
Where: Provincial Level
The issuance of government decree/policy to formalize/institutionalize MSFs
3.12 Propose local government to formalize MSFs in a way that ensures its effectiveness and independence
Outreach and advocacy activities to formalize MSF in Asmat, Cyclops, and provincial level
MSFs formalized
How: Direct implementation
When: Q1-Q2
Where: Asmat, Cyclops and Provincial
MSF capacity to bridge gap in mutual understanding, respect and trust between stakeholders increased
3.13 Equip MSF with needed skills toward establishing lasting network
Supporting MSF Regular Meetings on MSF development and strategic thematic issues in Mappi, Bouven Digoel, Asmat, Mimika and Cyclops
Trust built through joining efforts of multi-stakeholder approach in addressing specific issues in the sub-landscapes
How: Direct implementation,
When: Q1-Q4
Where: All landscapes
Training on Conflict Resolution and Mediation in Cyclops
Number of people have conflict resolution and mediation skills
How: Direct implementation, with support from conflict resolution expert (STTA)
When: Q3
Where: Cyclops
Joint effort with Dewan Kehutanan Nasional and other donors in supporting
National Forestry Congress VI in Papua region
Provided strategic inputs for National Forestry Congress VI in Jakarta ; Shared learning on technical issues on forestry;
Strengthened network
How: Direct implementation
When: Q1-2
Where: District / Provincial
Selected champions participate in regional and National Forestry Congress VI
Improved champions understanding on technical issues and strengthened their networking at sub national and national level
How: Direct implementation
When: Q1-Q2
Where: All landscapes MSF
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 148
3.14 Strengthening the role of women
Forming Gender Working Group within MSFs in all landscapes
Gender Working Group established
How: Direct implementation
When: Q1
Where: All landscapes
Training on Women Leadership and Climate Change
Number of women have improved their awareness and participation in climate change dialogues
How: Direct implementation and Gender leadership trainer (STTA)
When: Q3-Q4
Where: All landscapes
MSFs effectively encourage better decision making between among citizen, local government and private sectors
3.15 Technical theme discussions and related working groups formed on demand for landscape and sub-landscape management as well as dispute resolution informed by adequate visualization of landscape goals
Including:
Revision or update of RTRWK through updating SEA in Asmat
In Mappi and Bouven Digoel i) Identification of Importance Local Commodities, ii) developing a LCP based on HCV, threat modeling, land suitability, iii) new initiatives and innovative funding for PES/REDD schemes
Broader stakeholder participation in discussion themes and stakeholder understanding and awareness of LESTARI thematic issues improved
Recommendations from themes publish / presented to government
Visualization of the landscape
How: Direct implementation
When: Q2
Where: All landscapes
Links to SA 1 & 2: Awareness and Advocacy; Operationalizing SEA and LCP for improved environmental governance
IMPROVED FOREST MANAGEMENT THROUGH CO-MANAGEMENT (Lorentz Lowlands and Cyclops Landscapes)
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Co-management agreement formalized
4.8 Help communities to develop co-management plan and agreement
For 8 villages (Keakwa, Nayaro, Ohotya, Pece, Kanmapri, Ewer, Syuru, Yepem)
Provide assistance for collaborative management
Strengthen social institutions and tribunal laws to maintain and develop resilience in managing natural resources
Hold discussion(s) to develop work plan for forest and co-management
Stakeholder analysis
Location of the co–management defined and mapped
Draft co-management agreement (Village / sub-district)
Work plan for management of land and forest
How: Direct Implementation
When: Q1-Q4
Where: Lorentz Lowlands [Kekwa – social forestry (HKm or HD / forest village); Nayaro – MoU with Freeport; Ohotya, Pece & Kanmapri – MoU with TNL/ LEMASKO; Syuru, Yepem – MoU with DKP or Forestry Agency]
Co-management agreement formalized
4.10 Develop RPJMDes/Regulation that incorporates environmental and
Formulating regulation on natural resources management in indigenous Adat villages in Ormu/ Nechebe
2 Adat regulation on forest management developed
How: Direct Implementation
When: Q2-Q4
Where: Cyclops (Nechebe, Ormu Wari
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 149
sustainable forest management vision Formulating regulations on natural
resources management in grantee villages bordering the nature reserve
Co-management and livelihood
How: Grant (PUSDAEE)
When: Q2-Q4
Where: Angkasa, Gurabesi, Waena
Community-based ecosystem restoration
1. Ecosystem restoration assessment
2. Facilitate community groups’ training for the restoration
3. Implement the community-based restoration
Assist the development of co-management agreement between people and BKSDA Papua
Ecosystem restoration assessment
Agreement between communities and BKSDA Papua
100 ha in CA area and buffer-zone restored
How: Direct implementation
When:
Q1-Q4
Where: Sereh and Angkasa
4.11 Capacity building for communities for forest management and sustainable livelihood
Cyclops participatory mapping in 12 villages in DAS Moi, Sentani and Tepera with MLA
Forest stewardship training for community in addition to management action plan
Participatory mapping - input for baseline blocking CA Cyclops and Supporting Area
How: Direct Implementation with student support team / village motivators
When: Q1-Q2
Where: Cyclops
Community entitlements and responsibilities for management are secure
4.9 Implement co-management and forest management plan
Signing the co-management agreement
10 co-management agreements signed
Social Forestry (Village Forest / HKm and co-management agreements with national park or private sector) under improved management (work plan implementation) covering at least 1,599 ha
Video documenting the process of assisting the collaborative management
How: Direct Implementation
When: Q1-Q4
Where: Cyclops, Lorentz Lowlands
Communities have capacity to sustainably manage natural resources
4.11 Capacity building for communities on forest management and sustainable livelihood
Implement field school(s) management action plan for development existing and alternative livelihood
Field school developing livelihoods (see SA6: Green enterprises)
How: Direct Implementation
When: Q3-Q4
See SA6: Green Enterprises. The
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 150
activities will be held together with LEMASKO — also possibly shared funding.
Co-management vision included in FMU management plan and zonation
4.2 Technical assistance to complete forest management/ zonation plan of FMU
Assisting KPHL VI Mimika
Improving landscape data and geospatial information
GIS training to support KPH blocking
Assisting finalization and approval of RPHJP and forest zonation plan
Providing assistance for business plan
Finished and recognized RPHJP
Developed business plan
How: Direct Implementation with expert in KPH planning and blocking (STTA)
When: Q2-Q4
Where: Lorentz Lowlands (Mimika)
Support the formation of Tahura Mangrove in Timika Regency:
Feasibility study for Tahura in the previously-decided location
Applying Tahura status to the governor
Formulate Tahura management plant
Tahura management plan in Mimika reformatted from the existing integrated mangrove action plan developed under IFACS
How: Direct Implementation with support from Tahura management plan expert (STTA)
When: Q3-Q4
Where: Lorentz Lowlands (Mimika)
4.3 Capacity and institutional building for FMUs on forest management
Need assessment to strengthen KPH’s capacity
Training to strengthen institutionalization of KPHL
Regional and provincial Forestry Agency’s commitment to strengthen the institutionalization of KPH VI
How: Direct Implementation collaboration with USFS
When: Q3-Q4
Where: Lorentz Lowlands (Mimika)
Key Stakeholders understand the benefit of co-management and commit to collaboratively manage forest
4.4 Capacity building for FMUs and PAs for inclusive approach in forest management and conservation
Collaborative KPHL management training
Basic KPHL forest management training
Learning series between staff and KPH trainers with the people by using Rapid resilience assessment – for enrichment of information about KPHL
Monitoring mangrove by involving the community and disseminating the results to MSF
Develop strategy for long-term monitoring through co-management agreements
50 KPH staff trained in natural resource management
How: Direct Implementation collaboration with USFS / UNIPA, Uni. Ottow Geisler
When: Q3-Q4
Where: Lorentz Lowlands (Mimika, BKSDA)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 151
Communities get values from forest Communities get long term benefit from forest and are motivated to conserve
4.13 Pilot innovative financing for co-management of critical area
PES model development in Cyclops (Ormu and Nechebe) for Water regulation
(i) Hydrology assessment and water consumption pattern in all locations
(ii) Identify the potential of PES mechanism to be developed Providing assistance to develop PES model by involving PDAM and (possibly) BKSDA Papua
PES model developed How: Implementation under SA 8 Innovative financing
PROTECTED AREA MANAGEMENT (Lorentz National Park and Cyclops Nature Reserve)
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
CA Managers to have better capacity to manage their areas
(TN Lorentz)
5.7 Improve PA’s habitat and species protection through adoption and roll out of SMART patrol
Refreshment/Training for SMART patrol in TN Lorenz
Refreshment/advance training for SMART Data operator
25 receive trainings in TN Lorentz
Increasing the capacity of 5 data operators How: Direct implementation
When: Q2-Q4
Where: Lorentz Lowlands SMART Patrol implementation in TN
Lorentz 2 Patrol team operational in TN
Lorentz
Monthly evaluation and data management TN Lorentz maintain SMART
database
5.8 Improve priority species conservation strategies
Survey on habitat, population and threats of Carettochelys insculpta, parrot, and migrant birds (for monitoring site)
Disseminating survey results to develop a strategic plan for Carretochelys insculpta in Asmat-Mimika District
Develop a strategic plan draft for Carettochelys insculpta conservation
Data on population, distributon and habitat collected for the key species
A conservation strategy developed
Updated population and habitat monitoring plan for Carettochelys insculpta
How: Direct Implementation with support from PTFI, Forestry Agency, BKSDA, TNL
When: Q1
Where: Lorentz Lowlands
5.9 Reduce wildlife trafficking
Assessment on illegal logging route and legal loopholes of Carettochelys insculpta in Lorentz Lowlands
Recommendations for action plan to combat illegal wildlife trafficking
How: Direct Implementation
When: Q1,Q3
Where: Lorentz Lowlands
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 152
Awareness raising on combating illegal wildlife trafficking
Public campaign to halt illegal trade in wildlife
Implemented through SA1: Awareness and Advocacy
Where: Lorentz Lowlands
5.10 Improve PA Zonation Plan
Review zonation of TN Lorentz
Zonation plan document reviewed based on participatory mapping and other planning documents (SEA and LCP)
How: Direct Implementation
When: Q2-4
Where: Lorentz Lowlands
Linked to Operationalizing SEA / LCP (SA2)
CAs improve and implement key aspects of management plan
(TN Lorentz)
5.13 Develop and implement Innovative Financing for Conservation
Community based ecotourism grand design development
Direct implementation with financial support from local government institutions and national park. Implemented under the approach described in SA8: Innovative financing
When: Q2-Q4
Where: Ohotya, TN Lorentz, DKP
Established Friends of Lorentz Foundation including founding board members, structure and administration
Friends of Lorentz established (Badan Hukum)
Programme of action for conservation and sustainable livelihoods developed
USD 250,000 leveraged for activities in Lorentz that support program of action
How: Direct implementation
When: Q3-Q4
Where: Lorentz Lowlands
Develop an action plan to mobilize the funding
Funding sourcing to support action plan
5.11 METT Participatory Assessment
Participatory METT assessment (midterm for Lorentz)
METT score Lorentz NP
How: Direct implementation
When: Q4
Where: Lorentz Lowlands
Effective partnership established with NGOs, Public, etc
(CA Cyclops)
5.5 Facilitate communities and other stakeholders’ involvement in PA protection and management
Facilitate the establishment of community patrol in Ormu, Tepera and Tepera area (to be further trained in SMART patrol)
2 MMP established
How: Direct implementation with BKSDA
When: Q3
Where: Cyclops
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 153
CA Managers to have better capacity to manage their areas
(CA Cyclops)
5.7 Improve PA’s habitat and species protection through adoption and roll out of SMART Patrol
Refreshment/Training for SMART patrol Skill for field SMART techniques, in Cyclops
Refreshment/advance training for SMART Data operator
50 receive trainings in TN Cyclops
Increasing the capacity of 5 data operators
How: Direct implementation
When: Q1-Q4
Where: Cyclops
SMART Patrol roll outs in Cyclops 5 patrol teams operationalized
Monthly evaluation and data management CA Cyclops staff maintain the
database
Joint patrol with mutli-stakeholders to monitor bufferzone
Routine (monthly) joint patrol implemented
5.8 Improve priority species conservation strategies
Carry out population and distribution survey of key species (Echidna, Victoria crown pidgeon, bird of paradise, Dendrolagus inustus) using multiple methods including camera traps)
Disseminating survey result
Design a grand strategy for species conservation including future population and habitat monitoring
Data on population and distribution of key speces
Document for a grand strategy for species conservation
How: Direct implementation with support from BKSDA
When: Q3-Q4
Where: Cyclops
5.4 Organize public consultation of key PA documents and provide technical support for the documents completion
5.10 Improve PA Zonation Plan
Finalization of blocking document draft revision
Public consultation on CA blocking draft
Support finalization and approval of the management and blocking plan
CA blocking document adopting results of participatory mapping already finalized as of Nov 2016 in Cyclops and allow for co-management in deforested areas in the future
How: Direct Implementation
When: Q3-Q4
Where: Cyclops
Linked to Operationalizing and advocacy (SA4) SEA / LCP (SA2)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 154
5.13 Develop and implement Innovative Financing for Conservation
Community based ecotourism grand design development for Cyclops
Masterplan document for the ecotourism initiative
Direct implementation. The Implementation will follow the same approach described in SA 8: Innovative financing
When: Q2-Q4
Where: Cyclops – pilot in Taplasupa for bird watching
5.11 Participatory METT Assessment (Mid-term Review)
METT assessment in Cyclops Nature reserve
METT mid term score for Cyclops
How: Direct implementation with support from BKSDA
When: Q4
Where: Cyclops
Effective Partnership Established with NGOs, Universities, and communities
(TN Lorentz)
5.5 Facilitate communities involvement in PA protection and management
Establish Adat Communities Forum to represent adat communities in Lorentz NP
Adat communities representatives represented in National Park
How: Direct implementation with TN Lorentz
When: Q3
Where: Lorentz Lowlands
GREEN ENTERPRISES (Lorentz, Mappi-Bouven Digoel, and Cyclops)
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Develop Public Private Partnerships for Green Enterprises
Result of initial assessment of PPP potential
6.1 Market Assessment/Value Chain analysis for potential commodities
Identification for market access for potential local commodities (sago, mangrove tea, crab)
Report on identified market access & value chain, barrier to enter, how to access the market for identified local commodities .
How: Direct implementation with Papua Commodities Development expert (STTA)
When: Q1
Where: Lorentz lowlands and Cyclops
Includes Ecotourism under SA8
6.2 Identification of potential private sectors partners for green enterprises
Identify potential PPP that can be developed in Lorentz and Cyclops
Scoping report with updated potential partners linked to local commodities/services for PPP development in Lorentz and Cyclops
How: Direct implementation with Papua Commodities Development expert (STTA)
When: Q1
Where: Lorentz lowlands and Cyclops
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 155
Public & Private sector demand for investment opportunities increased
6.3 Investment outreach, and marketing for potential green enterprise PPPs
Develop common interest and TOR/drafting agreement with the potential private partner
2 PPP letters of Interest for collaboration
How: Direct implementation with Papua Commodities Development expert (STTA)
When: Q2
Where: Lorentz lowlands and/or Cyclops
6.4 Enabling business environment
Key stakeholder engagement (awareness and advocacy) & coordination
Advocacy material and awareness campaign implemented
Implemented through SA1:Awareness and Advocacy
PPP is formed, business is realized & join monitoring mechanism in place
6.5 Facilitate formalization of PPP agreement that integrates LESTARI mission and vision
Develop potential PPP schemes agreements and implementation frameworks
Signing the MOU between PPP partners
2 PPP (MOU) documents signed for commodities in Lorentz and/or Cyclops
How: Direct implementation
When: Q4
Where: Lorentz Lowlands and/or Cyclops
6.6 Facilitation on procedure for monitoring PPP implementation
Setting up monitoring system of PPP implementation involving relevant MSF members
Internal system for monitoring progress established, in coordination between LESTARI and the private sector partners
How: Direct implementation
When: Q4
Where: Lorentz Lowlands and/or Cyclops
Improved Sustainable Livelihoods and Alternative Livelihoods for Communities Adjacent to Critical Areas
Critical area & key stakeholder identified
6.12 Identification of critical areas, threats and key stakeholders
Total Economic Valuation (TEV) identification of local commodities, stakeholders, and access to market taking into account important areas, resilience assessments and SEA
List of local commodities, key stakeholders, opportunities, and market access.
Potential livelihoods identified that lie within ecological carrying capacities and environmental threshold
How: Direct implementation in coordination with Papua Commodities Development expert, Value Chain and Commodity Experts (STTA)
When: Q1
Where: Lorentz lowlands
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 156
6.13 Identification of potential livelihoods
Identification of baseline based on SDGs (Sustainable development goals) to 5 villages
Present and discuss the result of development of local commodities & investment in MSF in combination with the result of kajian kesesuaian lahan/land suitability in Bouven Digoel and Mappi
Development of business plan for potential local commodities (rubber in Mappi and rubber/gaharu in Bouven Digoel
Baseline information on environment, NRM, economy, social, key stakeholders, watershed area, investment on local village
Result of discussion and follow up planning with MSF in Bouven Digoel and Mappi
Recommendation for potential green enterprise development
How: Direct implementation
When: Q1-Q2
Where: Mappi-Bouven Digoel
Identification critical areas suitable for livelihoods with high market value in Cyclops
Identify villages suitable for the introduction of new alternative livelihoods
List of local commodities, key stakeholders, opportunities, and market access.
How: Direct implementation in coordination with PT. CBI
When: Q1
Where: Cyclops
This will potentially be implemented as a PPP
More appropriate & sustainable economic activities identified
6.14 Market & finance analysis 6.15 Develop intervention models
Design field school for development of local livelihoods using resilience assessment village typology approach (such as sustainable crab fisheries, development of Asmat arts)
10 village sustainable / alternative livelihoods models designed based on village typology
How: Direct implementation
When: Q2-4
Where: Lorentz Lowlands
Linked to, informed by and supporting co-management SA4
Develop market access & explore potential for vanilla project
Access to market developed and potential for PPP identified (if available)
How: Direct implementation in coordination with PT. CBI
When: Q2
Where: Cyclops
This will potentially be implemented as a PPP
Develop market access & explore potential for PPP, if applicable
Marketing strategy development on potential commodity
Access to market developed
Support from the government in supporting sustainable livelihoods in Mappi and Bouven Digoel
How: Direct implementation
When: Q3-4
Where: Mappi-Bouven Digoel
Linked to, informed by and supporting co-management SA4
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 157
Key stakeholders agree to engage program
6.16 Community outreach program
6.17 Village development planning (integrate LESTARI vision and mission with RPJMKam)
Engage key stakeholders on the program (socialization)
Integrate & synergize the livelihood intervention during Musrenbangdes / RPJMKam
Synergize the progress with grant mechanism (Cyclops and Lorentz)
Progress report/monitoring report from grant implementation and additional intervention programs
Integrated RKPDes & APBDes with community agreement and inputs for livelihood development
How: Direct implementation and Grants
When: Q2-Q4
Where: Lorentz Lowlands and Cyclops
Integrate the livelihood plan with the work under MSF
Engage MoU with government for implementation of integrated livelihood program
Integrate the livelihood program with rationalization plan (spatial planning activity-see below box)
Integrated livelihood program in Bouven Digoel and Mappi
MoU available
RPJMKam in priority villages in Bouven Digoel and Mappi
How: Direct implementation and Grants
When: Q2-Q4
Where: Mappi- Bouven Digul
Key stakeholder trial new techniques
6.18 Targeted technical Assistance
Providing technical assistance (training, field school, etc.) described in livelihoods design
500 local villagers with improved skills in Lorentz Lowlands
8 livelihoods groups established and strengthened with work plan
USD 25,000 investment leveraged from the village funds for livelihoods development
How: Direct implementation and Grants
When: Q2-Q4
Where: Lorentz Lowlands
Selection of rubber and gaharu groups Rubber farmer groups that receive
training/capacity building in Mappi How: Direct implementation and potential future grantee assistance
When: Q2-Q4
Where: Mappi- Bouven Digul
Develop BMP plan for rubber and gaharu BMP plan for rubber and gaharu
Capacity building for the rubber farmer group through demo-plots development demonstrating sustainable agriculture practice
Rubber farmer groups that receive training/capacity building in Bouven Digoel
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 158
Providing training for on and off farm (coordinating with MSF & RPJMDes) for capacity building for the farmers, possibility for institutional and management training as well
Identification of potential champion for the vanilla project
100 Farmers trained
10 Champions identified
How: Direct implementation and potential future grantee assistance
When: Q3-Q4
Where: Cyclops
6.19 Development of joint monitoring mechanism
Develop internal monitoring system
Monitoring mechanism developed to measure the impact of livelihoods on reduced deforestation and biodiversity conservation
25,000 ha area with improved management (TBD)
1,000 people benefiting from livelihoods
How: Direct implementation and Grants
When: Q2-Q4
Where: All impacted villages in Papua landscapes
PRIVATE SECTOR BMPs (Lorentz Lowlands, Mappi-Bouven Digoel, Sarmi)
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Key Private Sector Partner assessed
7.1 Assessment for potential BMP & CMMP collaboration
7.2 Potential private sector partner identification
Explore previous work under IFACs (CMMP/HCV HCS) to be further developed or revised or operationalized.
Introduction of potential BMP options, e.g., RIL, HCV, FSC, HCS and develop common interest for potential BMPs with new potential private sectors
List of potential program continuation under IFACS (CMMP/HCV-HCS) with detail agreement with engaged private sector (Freeport).
List of engaged private sector, potentially from oil palm sector or mining sector (including potentials PT PAL & Dyandiani Timber)
How: Direct implementation
When: Q1
Where: Lorentz, Sarmi
Key Private Sector Partners understanding of BMPs and CMMPs
7.2 Identification the appropriate BMPs collaboration with the private sector partners
Finalization of the assessment of land suitability and HCV by GIS team as basis for rationalization planning (linked to zonation under SA 2)
In coordination with MSF, present the results and discuss the possible follow up on the rationalization plan
Develop common interest with private sector for the rationalization plan
Result of discussion with MSF on the rationalization planning and the follow up activities
List of potential private sector that has common interest for rationalization planning
How: Direct implementation
When: Q1
Where: Mappi-Bouven Digul
Implemented under SA 2 & 3. Spatial and Development Planning Zonation
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 159
7.3 Private sector consultation & discussion on BMP and certification
Socialization on BMP practice & related policy on district/provincial or national level
Advocacy efforts for scaling up BMPs through video campaigns, policy briefs, and socialization and dissemination of training results
Understanding and commitment from private sector on BMP implementation (including certification)
Videos, policy briefs, and information on results from BMP training
How: Direct implementation
When: Q1
Where: Mappi-Bouven Digoel
Connected to SA 1: Awareness and Advocacy
7.4 Develop the plan with private sector partners to implement the CMMP/HCV-HCS
Follow up communication and coordination with engaged private sectors to start detailing the plan for CMMP/HCV-HCS collaboration
Draft agreements from engaged private sectors on the CMMP/HCV-HCS operationalization plan with 2 HPH concessions and potentially with 1 Oil Palm
How: Direct implementation
When: Q1 (and additional private sector in Q4)
Where: Sarmi, Mappi-Bouven Digoel
Appropriate BMPs put into Collaboration Contract / commitment
7.5 Develop common interest to be included in the BMP MOU
Develop baseline analysis for each of the new private partners on the readiness to receive and implement the BMP trainings
Signing MOU with the new committed private sectors
Information transparency in demonstrating BMP collaboration
Signed MOU documents
How: Direct implementation
When: Q1 (and additional private sector in Q4)
Where: Sarmi
Key private sector partners formally adopt BMPs
7.7 Provide technical assistance 7.8 Provide management advisory
Develop baseline analysis for each of the new private partners on the readiness to receive and implement the BMP trainings
Information transparency in demonstrating BMP collaboration
Result on GAP-baseline analysis on the potential BMP collaboration
How: Direct implementation
When: Q1-Q4
Where: Lorentz, Sarmi
Key Private Sector Partners employ BMPs
7.9 BMPs implementation
Providing technical assistance for training RIL-C for Wapoga and Salaki
Continued technical assistance and management advisory for BMP especially for development and implementation of appropriate SOPs, budget and working plans (for engaged private sector partners and new potential ones)
Coordinate regularly with the private sector partner and the sub-contract
50 people training in BMPs
BMPs implemented
SOP which adopt BMPs
Budget which adopted cost of new BMPs
Progress report that demonstrates ongoing implementation
How: Direct implementation for agreements and through subcontract for delivery of required capacity (RIL-C trainings)
When: Q1-Q4
Where: Sarmi, Lorentz
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 160
CMMP operationalization plan put into MoU
7.6 Develop CMMP operationalization plan into MOU
Signing MOU with the committed private sectors
Development of detail operationalization CMMP plan
Signed MOU documents
CMMP operationalization plan
How: Direct implementation for agreements and through subcontract for delivery of required capacity building/training
When: Q1-Q4
Where: Sarmi, Lorentz
Key private sector partners operationalize CMMPs
7.10 CMMPs implementation
Providing technical assistance for CMMP monitoring for Salaki
Coordinate regularly with the private sector partner and the sub-contract
CMMP operationalized
SOP which adopt CMMPs
Budget which adopted cost of new CMMPs
Progress report that demonstrates ongoing implementation
How: Direct implementation for agreements and through subcontract for delivery of required capacity (CMMP monitoring for PT Salaki)
When: Q1-Q4
Where: Sarmi, Lorentz
INNOVATIVE FINANCING FOR SUSTAINABLE LAND USE AND FOREST MANAGEMENT
Result (blue box) Activities (yellow box) Sub-activities Output Delivery Mechanism
Innovative Financing for Sustainable Land and Forest Management (PES)
Potential payment for environmental services (PES) identified (excluding ecotourism)
8.6 Initial assessment (feasibility study) on PES
Piloting the PES toolkit in 2 target areas (Cyclops Nature Reserve and bufferzone)
Develop necessary advocacy and awareness for PES implementation at the provincial level
Feasibility study for PES scheme in villages around Cyclops Nature reserve
How: Direct implementation
When: Q1
Where: Cyclops
Stakeholders (including local government) agrees to engage in PES programs
Awareness raising and advocacy (if positive potential for PES)
Introduce the result of PES feasibility study to the stakeholders (including local government)
Development of advocacy and awareness-linked to PES for provincial, district and local authorities
Endorsement of the proposed PES project from the local government
Agreement from stakeholders to move forward with the PES scheme
How: Direct implementation
When: Q2
Where: Cyclops
Implemented as a part of SA1: Awareness and Advocacy
Project working group established
8.7 Stakeholder engagement
Private sector (and local governments, private sector partners and other key stakeholders) engagement workshops
Prepare engagement plan/scopes of work with the private sector
Design and setting up of the working groups
Letter of commitment by stakeholders on PES development and project working group agreed
Stakeholders (including local government) endorse identified PES programs
How: Direct implementation
When: Q3
Where: Cyclops
Awareness raising and advocacy to government and
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 161
other key stakeholders services provided under SA1: Awareness and Advocacy
PES PCNs and safeguard developed
8.8 Technical assistance to the working group
Capacity building (training and site visits / study tours) for PES development
Identification of project proponent
PES scheme development in targeted areas
Training reports
Project proponent identified
PES scheme design developed
How: Direct implementation
When: Q3-Q4
Where: Cyclops
LESTARI program related to PES is synergized with Local Government Plan (SEA, LCP, Renstra)
Environmental services related regulations formulated or improved
8.9 Technical assistance and advocacy to government
Review of SEA, LCP using PCN and PES feasibility study (supplementary study)
Coordination with Village Development Plans (RPJMDs)
Updated recommendations through RPJMD related to PES initiative
PES integrated village plans
How: Direct implementation
When: Q2-Q3
Where: Cyclops
Regulatory requirements provided under SA 2 and 3
Government budget for environmental services allocated
8.10 Advocacy and lobbying at the district level
Advocacy and awareness linked to PES at provincial, district levels
Proportion (%) of village fund allocated for environmental sector
How: Direct implementation
When: Q4
Where: Cyclops
Awareness raising and advocacy to government and other key stakeholders services provided under SA1: Awareness and Advocacy
Innovative Financing for Sustainable Land and Forest Management (Ecotourism)
Ecotourism opportunities identified
8.1 Initial Ecotourism Assessment
Shortlist of opportunities and clusters identifying key shortfalls, PPP opportunities, interventions required and investment risks
Development of a draft ecotourism impact monitoring framework to inform progress on key results and ecotourism performance
Map of existing and potential ecotourism product locations and tourism routes and project synergies in Cyclops
Draft impact monitoring framework
How: Direct implementation
When: Q3-Q4
Where: Cyclops; Yapero (Ohotya)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 162
Integrated business models for ecotourism developed
8.2 Develop Integrated business model
8.3 Market Linkage development (if viable)
Conduct a viability, environmental, and community impact/benefit assessment
Identification of required interventions to actualize ecotourism development (including PPPs, training, capacity building, MSF dialogues, attraction cluster, advocacy and awareness raising)
Develop the draft integrated business model/ecotourism masterplan for the highest impact project/s in Cyclops
Viability and impact assessments for shortlisted opportunities
Outline of required interventions for the project
Coordination plan with landscape teams
Draft integrated ecotourism business model/ecotourism masterplans
How: Direct implementation
When: Q4
Where: Cyclops, Yapero (Ohotya)
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 163
APPENDIX 1: PERFORMANCE INDICATORS
INDICATOR
TARGET OVER THE
LIFE OF PROJECT
ACHIEVEMENT Y1
LANDSCAPE
ANNUAL TARGETS
B Y2 Y3 Y4 Y5 TOTAL
1. Percentage reduction in
GHG emissions as a result of
USG assistance measured
using actual emissions
compared to REL
(OUTCOME/IMPACT)
Note: for the purpose of
FACTS reporting, quantity of
GHG emissions will be
reported in metric tons of
CO2equivalent
41% reduction
Not measured
Leuser 0%
Not measured
30% 40% 41% 41%
Not measured
5,839,579 7,786,105 7,980,758 7,980,758 M tCO2-
eq
Katingan-Kahayan
0%
Not measured
30% 40% 41% 41%
Not measured
40,715,537 54,287,382 55,644,567 55,644,567 M
tCO2-eq
Lorentz Lowlands
0%
Not measured
30% 40% 41% 41%
Not measured
12,231,438 16,308,584 16,716,299 16,716,299M
tCO2-eq
Mappi-Bouven Digoel
0%
Not measured
30% 40% 41% 41%
Not measured
10,132,229 13,509,638 13,847,379 13,847,379 M
tCO2-eq
Sarmi 0%
Not measured
30% 40% 41% 41%
Not measured
1,001,325 1,335,100 1,368,478 1,368,478 M tCO2-
eq
Cyclops 0%
Not measured
30% 40% 41% 41%
Not measured
81,488 108,651 111,367 111,367 M tCO2-
eq
2. Number of hectares of
biological significance and/or
natural resources under
improved natural resource
management as a result of
USG assistance (FACTS
4.8.1-26)
(OUTCOME/IMPACT)
8.7 Million 0
Leuser 0 665,064 262,163 314,596 157,298 1,399,121
Katingan-Kahayan
0 863,084 612,604 735,125 367,563 2,578,376
Lorentz Lowlands 0 8,282 944,988 1,133,986 566,993 2,654,249
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 164
INDICATOR
TARGET OVER THE
LIFE OF PROJECT
ACHIEVEMENT Y1
LANDSCAPE
ANNUAL TARGETS
B Y2 Y3 Y4 Y5 TOTAL
Mappi-Bouven Digoel
0 0 467,123 560,547 280,274 1,307,944
Sarmi 0 130,755 205,605 246,726 123,363 706,449
Cyclops 0 32,680 7,517 9,020 4,509 53,726
3. Percentage reduction in
poaching in focus area
(OUTCOME)
40% reduction
0
Leuser TBD 10% 20% 30% 40% 40%
Katingan-Kahayan
TBD 10% 20% 30% 40% 40%
Lorentz Lowlands
TBD 10% 20% 30% 40% 40%
Mappi-Bouven Digoel
n/a n/a n/a n/a n/a n/a
Sarmi n/a n/a n/a n/a n/a n/a
Cyclops TBD 10% 20% 30% 40% 40%
4. Number of public policies
addressing climate change
and/or biodiversity
conservation introduced,
changed or adopted
consistent with citizen input
(OUTCOME)
28 policies 3 policies
Leuser 0 2 3 2 1 8
Katingan-Kahayan
0 2 2 1 1 6
Lorentz Lowlands 0 2 1 1 1 5
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 165
INDICATOR
TARGET OVER THE
LIFE OF PROJECT
ACHIEVEMENT Y1
LANDSCAPE
ANNUAL TARGETS
B Y2 Y3 Y4 Y5 TOTAL
Mappi-Bouven Digoel
0 1 1 1 1 4
Sarmi 0 0 0 0 0 0
Cyclops 0 2 0 0 0 2
5. Number of sub-national
government with improved
licensing and permitting
mechanism (OUTCOME)
14 sub-national
governments
0
Leuser 0 0 1 2 1 4
Katingan-Kahayan
0 1 1 1 1 4
Lorentz Lowlands
0 0 1 1 0 2
Mappi-Bouven Digoel
0 0 0 1 0 1
Sarmi 0 0 1 0 0 1
Cyclops 0 1 0 1 0 2
6. Number of sub-national
government incorporating high
quality SEA-LEDS & LCPs
into draft spatial plans,
zonation regulation or draft
mid-term development plan
(OUTCOME)
14 sub-national
governments
0
Leuser 0 3 1 0 0 4
Katingan-Kahayan
0 2 1 1 0 4
Lorentz Lowlands
0 1 1 0 0 2
Mappi-Bouven Digoel
0 0 1 0 1 2
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 166
INDICATOR
TARGET OVER THE
LIFE OF PROJECT
ACHIEVEMENT Y1
LANDSCAPE
ANNUAL TARGETS
B Y2 Y3 Y4 Y5 TOTAL
Sarmi 0 0 0 0 0 0
Cyclops 0 0 1 1 0 2
7. Number of Multi Stakeholder
Forum (MSF) operational as
citizen based mechanisms for
public input on land use
(OUTCOME)
14 MSFs 0
Leuser 0 2 1 1 0 4
Katingan-Kahayan
0 2 1 1 0 4
Lorentz Lowlands
0 1 1 0 0 2
Mappi-Bouven Digoel
0 2 0 0 0 2
Sarmi 0 0 0 0 0 0
Cyclops 0 0 1 1 0 2
8. Number of community
champions engaged in
advocacy interventions
(OUTPUT)
500 community champions
25 community champions
Leuser 0 50 50 50 0 150
Katingan-Kahayan
0 50 40 40 0 130
Lorentz Lowlands
0 25 20 20 0 65
Mappi-Bouven Digoel
0 25 20 20 0 65
Sarmi 0 0 0 0 0 0
Cyclops 0 25 20 20 0 65
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 167
INDICATOR
TARGET OVER THE
LIFE OF PROJECT
ACHIEVEMENT Y1
LANDSCAPE
ANNUAL TARGETS
B Y2 Y3 Y4 Y5 TOTAL
9. Number of people reached by
LESTARI communication
programs to improve
awareness and understanding
of LEDS and biodiversity
conservation (OUTPUT)
15,000 people
120,551
Leuser 0 1,200 1,000 500 250 2,950
Katingan-Kahayan
0 1,000 1,000 700 300 3,000
Lorentz Lowlands
0 550 200 100 100 950
Mappi-Bouven Digoel
0 400 300 150 100 950
Sarmi 0 0 0 0 0 0
Cyclops 0 400 150 50 50 650
10. Number of Conservation
Areas (CAs) with at least 70
point in METT scores across
LESTARI landscapes
(OUTCOME)
6 CAs 0
Leuser See
PIRS 0 0 1 1 2
Katingan-Kahayan
See PIRS
0 0 2 0 2
Lorentz Lowlands
See PIRS
0 0 1 0 1
Mappi-Bouven Digoel
n/a n/a n/a n/a n/a n/a
Sarmi n/a n/a n/a n/a n/a n/a
Cyclops See
PIRS 0 0 1 0 1
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 168
INDICATOR
TARGET OVER THE
LIFE OF PROJECT
ACHIEVEMENT Y1
LANDSCAPE
ANNUAL TARGETS
B Y2 Y3 Y4 Y5 TOTAL
11. Number of co-management
agreements signed that
secure community rights and
benefits (OUTPUT)
40 agreements
1 agreement
Leuser 0 4 6 4 2 16
Katingan-Kahayan
0 3 4 4 1 12
Lorentz Lowlands
0 2 2 2 1 7
Mappi-Bouven Digoel
0 0 0 0 0 0
Sarmi 0 0 0 0 0 0
Cyclops 0 1 1 1 1 4
12. Number of people receiving
USG supported training in
natural resources
management and/or
biodiversity conservation
(FACTS 4.8.1-27/OUTPUT)
10,000 people
971 people
Leuser 0 1500 1,100 600 250 3,450
Katingan-Kahayan
0 1500 1,000 700 200 3,400
Lorentz Lowlands 0 600 550 360 50 1,560
Mappi-Bouven Digoel
0 170 100 50 0 320
Sarmi 0 0 0 0 0 0
Cyclops 0 150 100 50 0 300
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 169
INDICATOR
TARGET OVER THE
LIFE OF PROJECT
ACHIEVEMENT Y1
LANDSCAPE
ANNUAL TARGETS
B Y2 Y3 Y4 Y5 TOTAL
13. Amount of investment
mobilized (in USD) for climate
change as supported by USG
assistance (FACTS 4.8.2-
10/OUTPUT)
USD 20 Million
USD 3.4 Million
Leuser 0 1,700,000 1,500,000 1,500,000 1,000,000 5,700,000
Katingan-Kahayan
0 1,300,000 1,100,000 1,000,000 1,000,000 4,400,000
Lorentz Lowlands
0 1,000,000 1,500,000 1,200,000 1,000,000 4,700,000
Mappi-Bouven Digoel
0 500,000 450,000 300,000 200,000 1,450,000
Sarmi 0 0 0 0 0 0
Cyclops 0 250,000 100,000 0 0 350,000
14. Number of people receiving
livelihood co-benefits
(monetary or non monetary)
(OUTCOME)
30,000 people
0
Leuser 0 2,800 2,650 3,000 3,000 11,450
Katingan-Kahayan
0 2,500 2,650 3,000 3,000 11,150
Lorentz Lowlands
0 1,000 1,000 700 700 3,400
Mappi-Bouven Digoel
0 200 200 300 300 1,000
Sarmi 0 0 0 0 0 0
Cyclops
0 1,000 1,000 500 500 3,000
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 170
INDICATOR
TARGET OVER THE
LIFE OF PROJECT
ACHIEVEMENT Y1
LANDSCAPE
ANNUAL TARGETS
B Y2 Y3 Y4 Y5 TOTAL
15. Number of private sector firms
that have improved
management practices as a
result of USG assistance
(FACTS 4.6.2-9/OUTCOME)
10 private sector firms
0
Leuser 0 0 0 0 0 0
Katingan-Kahayan
0 2 3 3 0 8
Lorentz Lowlands
0 0 0 1 0 1
Mappi-Bouven Digoel
0 0 0 0 0 0
Sarmi 0 0 1 0 0 1
Cyclops n/a n/a n/a n/a n/a n/a
16. Number of new USG-
supported public-private
partnerships (PPPs) formed
(FACTS PPP 5) (OUTPUT)
20 PPPs 3 PPPs
Leuser 0 3 3 2 1 9
Katingan-Kahayan
0 2 1 1 1 5
Lorentz Lowlands
0 1 1 1 0 3
Mappi-Bouven Digoel
0 0 0 1 0 1
Sarmi 0 0 0 0 0 0
Cyclops 0 0 0 0 0 0
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 171
APPENDIX 2: RESULTS FRAMEWORK
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 172
APPENDIX 3: MAP OF TECHNICAL COMPONENTS AND TASKS TO STRATEGIC APPROACHES
LESTARI Strategic Approaches
Tasks included in Strategic Approaches (RFP Technical Components: 1. Land Use Governance; 2. CAs & Species; 3.
Private Sector; 4. Constituencies) Technical Component
Awareness and Advocacy
C1.1. Increasing government level awareness, appreciation, and advocacy to ensure that government decision-makers embrace a conservation and sustainable use vision for land use planning
1, 4
C4.1. Improve local level awareness, appreciation, and advocacy. Improve key stakeholders’ awareness, appreciation and advocacy for healthy ecosystems, leveraging increased availability of mobile and internet based technology
C4.2. Empower media coverage of environmental issues. Strengthen the ability of media and citizen journalists to monitor, document, and publicize the positive and negative consequences of land use decisions, including those made by private sector actors in the landscapes
Operationalize SEAs/LCPs to Improve Land Use Governance
C1.2. Operationalizing Strategic Environmental Assessments (SEAs) and Landscape Conservation Plans (LCPs) developed by USAID IFACS within land use plans
1,4
Sustainable Landscape Governance
C1.3. Improving licensing and permitting processes so they are public and accessible, subject to public oversight, compliant with laws and regulations, and violations are enforced
1,4 C1.4. Monitoring and enforcing land use, including increasing district government prosecution and adjudication capacity, building on USAID C4J activities, and capacity to use remote sensing and other geospatial tools, building on the spatial data infrastructure units established previously by USAID IFACS
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 173
C4.3. Strengthen citizen based mechanisms for public input on land use. Building on the multi-stakeholder forums established under USAID IFACS, support citizen-based mechanisms for public input and monitoring of land use decisions by key groups, especially local communities, indigenous groups, and women. This task is closely aligned with the Component 1 task to encourage districts to solicit and adopt input from citizen based mechanisms
C1.6. Increasing district governments’ willingness to adopt input from citizen-based mechanisms. This is connected to the work with multi-stakeholder forums under Component 4.
Improved Forest Management Through Co-Management
C2.3 Improve co-management adjacent to Conservation Areas by building staff knowledge and implementation of improved collaborative management strategies with adjacent districts and local communities. This task is closely linked to Component 4’s collaborative management task.
2
C3.2. Pilot innovative financing for critical areas. Mobilize financing opportunities, including payments for ecosystem services, to incentivize sustainable enterprises that meet required criteria for environment and social soundness
C4.4. Improve co-management adjacent to critical areas. Provide technical assistance to establish co-management arrangements between communities living in and near critical areas and the appropriate government entities. Includes defining acquiring clear tenure. Closely linked to LESTARI 2. SEAS. See IUCN definition of "co-management".
Protected Area Management
C2.1. Improve Conservation Area management by determining priority needs and actions for addressing threats specific to each CAs and the species they harbor in consultation with key stakeholders. Once these have been identified, support the implementation of priority actions to address threats and strengthen the protection and/or management of CA and the species they harbor. These may include management planning; improving data, monitoring and information systems; increasing the use of technology to monitor and enforce wildlife encroachment and poaching; enhancing patrols; improving public relations with districts and communities inside or adjacent to CAs; and other capacity building
2
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 174
C2.2. Pilot innovative financing for Conservation Area by identifying and trailing CA sustainable financing and revenue-generating strategies
C1.7. Enhance national level policy coordination Component 2
Green Enterprises
C3.1. Develop public private partnerships for green enterprises. This includes reviewing existing or conducting new market and feasibility studies to explore the potential for ecotourism and other environment-friendly sustainable enterprises that will directly benefit conservation and local communities living within and adjacent to high conservation area forests. Equality important is cultivating relationships with key private sector actors in the project’s landscapes to identify sources of co-investment in the above conservation efforts. Finally, the Contractor should develop and pilot sustainable business models that can have broad impacts, including outside the specified landscapes, and disseminate the results of pilots
3
C4.5. Improved sustainable livelihoods and alternative livelihoods for communities adjacent to critical areas. Provide technical assistance to communities living in or near critical areas to improve sustainable natural resources management practices, including those that might lead to eventual third party certification, that enhance productivity and income or adopt locally appropriate alternative livelihoods or green enterprises in order to reduce encroachment. Communities receiving livelihood support must acknowledge and agree to reduce encroachment through formal agreements such as the Community Conservation and Livelihoods Agreements (CCLAs) developed under the USAID IFACS project
Private Sector BMP
C3.3. Industry certification, best management practices (BMPs) and Conservation Management and Mitigation Plans (CMMPs). Support private sector-led efforts to make explicit commitments towards zero deforestation and conservation of HCV and other critical areas including support for third party certification, implementation of BMPs and CMMPs
3
Innovative Financing for Sustainable Land and Forest
Management
C1.5.Enhance district readiness to access financing (DAK, REDD+, etc.) by building necessary capacity, supporting MRV systems, and informing policies, rules, and systems for the equitable distribution of funds generated from payments for carbon or other ecosystem services
3
USAID LESTARI Year 2 Annual Work Plan: October 2016 – September 2017 P a g e | 175
APPENDIX 4: STAFFING PLAN
LESTARI
Wisma GKBI, 12th Floor, #1210 Jl. Jend. Sudirman No. 28, Jakarta 10210, Indonesia.
Phone: +62-21 574 0565 Fax: +62-21 574 0566
Email: [email protected]