10
217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 237 237 237 80 119 27 252 174 .59 “The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.” 1 US ARMY CORPS OF ENGINEERS SACRAMENTO DISTRICT JULY 27, 2017 SOCIETY OF AMERICAN MILITARY ENGINEERS 2017 SUSTAINING MEMBERS FORUM LTC JOHN LORY, PMP DEPUTY DISTRICT COMMANDER FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGE

US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

217

217

217

200

200

200

255

255

255

0

0

0

163

163

163

131

132

122

239

65

53

110

135

120

112

92

56

62

102

130

102

56

48

130

120

111

237

237

237

80

119

27

252

174

.59

“The views, opinions and findings contained in this report are

those of the authors(s) and should not be construed as an

official Department of the Army position, policy or decision,

unless so designated by other official documentation.”

1

US ARMY CORPS OF ENGINEERSSACRAMENTO DISTRICTJULY 27, 2017

SOCIETY OF AMERICAN MILITARY ENGINEERS2017 SUSTAINING MEMBERS FORUM

LTC JOHN LORY, PMPDEPUTY DISTRICT COMMANDER

FOR INFORMATIONAL PURPOSES ONLY

ALL INFORMATION SUBJECT TO CHANGE

Page 2: US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES

2

FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov

QuarterAdvertise

Construction A-E Environmental

Unrestricted Small Bus TBD Unrestricted Small Bus Unrestricted Small Bus

4QFY17

~$12.67M

1QFY18

~$375M ~$45.5M ~$3M ~$9M ~$7.5M

2QFY18

~$237.5M ~$138M ~$105M ~$50M

3Q-4QFY18

~$215.5M ~$28M

TBD ~$125M ~$2.5M

Page 3: US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 4Q FY17

3

FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov

Construction – Small Business Design Build Remove/Replace Gate Houses

106DDJC Tracy Between $100K - $250K

Repair Floors at Warehouses 15, 17-22, and

28 DDJC Tracy Between $1M-$5M

Terminal 2 Bridge Repairs MOTCO Between $5M-$10M

Design Bid Build Renovate Cafeteria - Bldg 16 DDJC Tracy Between $1M-$5M

Page 4: US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 1Q FY18

4

FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov

Construction – UnrestrictedCalifornia Central Valley Levee Improvement

Construction MATOC BaseNatomas, CA Between $250M - $500M

Access Control Point (ACP) -1 MOTCO >$10M

ARCF Reach D Sacramento, CA Between $10M - $25M

FY19-23 Habitat Restoration /Biomonitoring

IDIQ Former Fort Ord Between $5M-$10M

Design Bid Build Access Control Point 5 MOTCO Between $5M-$10M

Design Bid Build Composite Aircraft Antenna

Calibration FacilityHill AFB Between $5M-$10M

Design Build Gas Line and Fuel Swap Tooele Army Depot Between $5M-$10M

East Gate Canopy and Inspection Facility Hill AFBBetween $1M-$5M

Construction – Small Business

Page 5: US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 1Q FY18

5

FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov

A-E – Small Business

Master Planning-GIS (Small Business) SPD - Division $9M capacity

FY19-23 Habitat Restoration /Biomonitoring

IDIQ Former Fort Ord Between $5M-$10M

Environmental – Small Business

Construction – TBD

Design Build Radiant Heating System

Replacement at Bldgs 102 and 103Fort Douglas Between $1M-$5M

Page 6: US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 2Q FY18

6

FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov

Construction – Unrestricted

VA Reno Main Bldgs Reno, NV Between $100M - $250M

VA Alameda Phase I Alameda CA Between $25M - $100M

MOTCO Paving & Utilities MATOC Base MOTCO Between $25M - $100M

Utah Design-Build MATOC Base Utah Between $25M - $100M

Recreation Maintenance MATOC Base Various Between $5M-$10M

Design Build Secondary Wastewater

Treatment Facility Fort Hunter Liggett Between $1M-$5M

Munitions/Admin Warehouse Beale AFB Between $1M-$5M

Construction – Small Business

Page 7: US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 2Q FY18

7

FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov

Construction – TBD

MATOC IDIQ Design Build Underground

Utilities SPD - Division Between $25M - $100M

Design Bid Build Marysville Ring Levee Phase

2A Civil Construction South Yuba County, CA Between $10M - $25M

Design Bid Build Replace POL Pump House Hill AFB Between $10M - $25M

MOTCO Bridge T-1/ -4/ -5/ -6/ -7/ -10

Renovation MOTCO Between $5M-$10M

A-E - Unrestricted

Master Planning-GIS (Unrestricted) SPD - Division $50M capacity

Page 8: US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES - 3Q-4Q FY18

8

FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov

Construction – Unrestricted

Consolidated Mission Control Center Hill AFB Between $25M - $100M

Solar Photovoltaic 2MW Dugway Proving Grounds Between $5M-$10M

Solar Photovoltaic 2MW Dugway Proving Grounds Between $1M-$5M

Energy Resilience Microgrid Hill AFB Between $5M-$10M

Repair Steam Condensate System B260/1590 Hill AFB Between $1M-$5M

Construction – Small Business

Page 9: US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES – FY18ADVERTISE DATE TBD

9

FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov

Construction – Unrestricted

American River Watershed Folsom Dam Raise Folsom, CA Between $25M - $100M

American River Watershed Natomas Basin Natomas, CA Between $25M - $100M

Install New PCC Apron Hill AFB Between $5M-$10M

Construction – Small Business

Page 10: US ARMY CORPS OF ENGINEERS SACRAMENTO ...samesacramento.org/calendar/2017smf/09-USACE-SPK-John...217 217 217 200 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135

217

217

217

200

200

200

255

255

255

0

0

0

163

163

163

131

132

122

239

65

53

110

135

120

112

92

56

62

102

130

102

56

48

130

120

111

237

237

237

80

119

27

252

174

.59

SACRAMENTO DISTRICT PROJECTED BUSINESS OPPORTUNITIES

10

FOR INFORMATIONAL PURPOSES ONLY ALL INFORMATION SUBJECT TO CHANGEACTUAL NOTICES AND SOLICITATIONS WILL BE POSTED TO FBO: www.fbo.gov

QUESTIONS?

http://www.spk.usace.army.mil/