15
QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 217 200 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62 102 130 102 56 48 130 120 111 237 237 119 27 174 .59 Prepared by Cheryl Webster For M2S2 Webinar 15 August 2018 “The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as an those of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

QUALITY ASSURANCE1

217217

200200

237237

80119

252174

SEEDING217217

200200

255255255

000

163163163

131132122

2396553

110135120

1129256

62102130

1025648

130120111

237237

11927

174.59

Prepared by Cheryl WebsterFor M2S2 Webinar15 August 2018

“The views, opinions and findings contained in this report are those of the authors(s) and should not be construed as anthose of the authors(s) and should not be construed as an official Department of the Army position, policy or decision, unless so designated by other official documentation.”

Page 2: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

QUALITY ASSURANCE SEEDING OVERVIEW2

• Quality Management –Quality Control (QC) vs. Quality Assurance (QA)Quality Control (QC) vs. Quality Assurance (QA)

• QA Seeding• QA Template• Multiple Award Task Order Contract (MATOC) – Third-

Party Seeding, Range Support Center

Page 3: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

QC and QA – Aspects of Quality Management 3

Quality Management System

• Conformance to requirements

• Goal – customer satisfaction QA

Quality Control (QC) –Focused on achieving

i t

QCQA

requirementsConduct inspections

Quality AssuranceQuality Assurance (QA) –

Focused on the processProvides confidence

Page 4: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

WHAT IS SEEDING? 4

Emplacement ofEmplacement of• Industry Standard

Objects (ISOs) • Inert MunitionsThroughout an area to be surveyed.

Applied to:Applied to:• Surface• Subsurface

Page 5: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

QC and QA SEEDING 5

QC Seeds –Placed by ContractorTests:Tests:• Instrument function• Limits of thresholds• Coverage

QA SeedsQA Seeds –Placed by Government or 3rd Party ContractorsTests:• Process

Page 6: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

QC vs QA SEEDS6

QC Seed –

• Blind to UXO teams data collectors• Blind to UXO teams, data collectors, and data processors

• Known to Contractor’s QC manager• Challenging locations

QA Seed –• Blind to UXO teams, data collectors,

data processors, and QC personneldata processors, and QC personnel• Known only by Government or 3rd party• Less challenging placement

Page 7: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

CONFORMANCE TO REQUIREMENTS 7

Munitions Response –Quality Assurance Project Plan (MR-QAPP))

• Data Quality Objectives (DQO)

• Measurement Quality Objectives (MQO)Objectives (MQO)

• Measurement Performance Criteria (MPC)

Page 8: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

QA SEEDING8

Type• Representative of targets on Site

Depth• Surface• Subsurface

Distribution• Throughout area of survey

Number• Analog sensoro 5-6 seeds/day/operator

• Digital Geophysical Mapping (DGM) or Advanced Geophysical Classification (AGC) sensoro 1-3 seeds/day/instrumento 1 3 seeds/day/instrument

Page 9: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

SEED PLACEMENT9

Page 10: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

QC SEED FAILURE10

NonconformanceNonconformance –Failure to meet conformance requirements

Triggers a Root Cause Analysis (RCA)

Corrective MeasuresCorrective Measures

Page 11: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

QA SEED FAILURE 11

Page 12: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

QA SEED TEMPLATE12

QA ToolQuality Assurance Surveillance Plan (QASP)

Lays out seed plan:• Types • Depth • Distribution • Number

Page 13: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

MATOC – THIRD PARTY VALIDATION SEEDING AND AGC DATA COLLECTION AND PROCESSING SUPPORT

13

DAGCAP Accredited Companies Qualified

– APTIMARCADIS

Typical Task Order Examples• Work Plan, UFP/MR-QAPP, and other Planning

Documents Development St d d E i t l d/ G h i l– ARCADIS

– BLACK TUSK – CH2M (Jacobs)– PARSONS

TETRA TECH

• Standard Environmental and/or Geophysical Reports

• Professional Surveying • Other standard Military Munitions Response

Program (MMRP) Document Preparation – TETRA TECH– WESTON– TPMC-WRT JV

og a ( ) ocu e t epa at o• Procurement of Industry Standard Objects (ISO)

Seeds • Geophysical and Geospatial Equipment Rental or

Supply UXO T h i i S t ( i il f l

Award March 2018

First Task Order: Camp Fannin

• UXO Technician Support (primarily for anomaly avoidance and escort roles and responsibilities)

• Geophysicist Support • Intrusive Investigations (primarily as part of QC/QA) • AGC Data Collection and ProcessingAGC Data Collection and Processing • DoD or Site-Specific Target or Interest (TOI) Library

Modifications • Establishment of an Instrument Verification Strip

(IVS)

Page 14: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

14

Page 15: QUALITY ASSURANCE SEEDING...QUALITY ASSURANCE 1 217 217 200 200 237 237 80 119 252 174 SEEDING 217 200 255 255 255 0 0 0 163 163 163 131 132 122 239 65 53 110 135 120 112 92 56 62

15

Cheryl Webster – USACE [email protected]

Photo Credits: C. Cox, M. Hernandez, C. Larson, M. Jones