Executive Summary US 51 Alternative Selection Report
January 2014
PROJECT OVERVIEW The US 51 Bridge Project proposes replacement or rehabilitation of the existing US 51 Bridge that connects Ballard County, Kentucky with Cairo, Illinois. The planning phase of this project was completed in 2014; this Executive Summary summarizes the findings of the planning phase. The US 51 Bridge carries US 51, US 60, and US 62 traffic across the Ohio River. It also provides a connection to the US 60/US 62 Mississippi River Bridge to Missouri, approximately ½ mile to the south. Maintaining the cross-river connectivity is important to the local communities, resident farms, and other businesses in the region. During the traffic counts completed in January 2013, over 150 large trucks (including farm, grain, and logging trucks) were observed using the US 51 bridge over an 8-hour period. If the US 51 Bridge were not available for local traffic, the detour trip between Wickliffe, KY and Cairo, IL increases from 7 miles to 80+ miles per direction. Adding approximately 70 miles per direction to trips between Illinois and Kentucky would be a hardship to area residents. This is especially true for the population of Cairo, IL which exhibits elevated concentrations of minority and low income populations, which rely on the US 51 Bridge to access jobs in Wickliffe, KY. On the Kentucky side of the river, the US 51 Bridge is essential to farmers. Agriculture is a major component of Ballard County’s economy and the bridge facilitates transport of crops and livestock from the county’s farms to the interstates and ports in Illinois.
Existing US 51 Bridge
PROJECT PURPOSE & NEED The primary purpose of the proposed project is to rehabilitate or replace the existing US 51 Ohio River Bridge in order to: improve or replace the functionally obsolete/structurally deficient bridge; maintain cross-river connectivity between Wickliffe, KY and Cairo, IL; and improve safety on the bridge and its approaches. CONDITION OF THE EXISTING BRIDGE The existing bridge was constructed between 1936 and 1938. The bridge is rated both Functionally Obsolete (because of its substandard geometric features) and Structurally Deficient (because the original design load for the bridge is less than today’s current design standards). This does not mean the existing bridge is unsafe. Following the 2012 inspection and 2013 load rating analysis, KYTC assigned the US 51 Bridge a sufficiency rating of 39.8 on a 100-point scale. Bridges considered structurally deficient or functionally obsolete with a sufficiency rating less than 50.0 are eligible for replacement with federal funds under the Federal-Aid Highway Bridge Replacement or Rehabilitation Program. The existing bridge was designed before seismic design was required. Applying today’s seismic design criteria, preliminary estimates indicate that severe damage or collapse is probable in the event of a major earthquake. The functional and geometric deficiencies affect the bridge’s ability to carry traffic over the river in an effective manner. Bridge Geometric Deficiencies:
Narrow 10-foot lanes Narrow 1’-3” shoulders No accommodations for pedestrians or
bicyclists One of the sag vertical curves in Span 2
does not meet current AASHTO design standards for headlight sight distance.
The horizontal curve on the Kentucky approach does not meet current AASHTO or state design standards.
US 51 OHIO RIVER BRIDGE PROJECT KYTC Item No. 1-100.00 & 1-1140.00
Wickliffe, KY to Cairo, IL
EXECUTIVE SUMMARY
Executive Summary US 51 Alternative Selection Report
January 2014
Currently the bridge is allowed to carry legal loads, but permit loads (i.e. oversize or overweight vehicles) are not allowed. Under the no-build scenario it is anticipated the bridge would be closed to truck traffic around 2025 and closed to all traffic around 2030.
TRAFFIC OPERATIONS The 2013 Average Annual Daily Traffic (AADT) volume on the US 51 Bridge is 5,400 vehicles per day (vpd). Approximately 35% of the bridge traffic is trucks. By 2040, the bridge AADT is anticipated to increase to 6,200 vpd, which translates to 370 vehicles per hour traveling in the peak direction during the 2040 design hour. Based on these volumes, a two lane facility provides adequate capacity for anticipated future traffic demands. CRASHES AND SAFETY During October 2008-September 2012, there were 18 vehicle crashes on the bridge between the 20 mph curve in Kentucky and the US 60/US 62/US 51 intersection in Illinois. Of these, there were no fatalities and one injury collision. Crashes were largely concentrated at either end of the bridge. The bridge approach in Kentucky has a critical rate factor (CRF) of 1.13 and the bridge approach in Illinois has a CRF of 1.52; both are considered high crash spots under KYTC analysis methodology. The primary crash types were sideswipes and single vehicle collisions. INPUT During coordination activities in April and May 2013, agencies, local officials, and members of the public were given opportunities to review and comment on the range of alternatives considered. Input indicated that the bridge is a vital link for farming operations; therefore, closures and lane restrictions should be minimized during any future construction efforts. Survey respondents indicated a strong preference for constructing a new river crossing at or near the existing location.
RECOMMENDATION Combined Alternate 2 shown in the attached map is recommended to advance for additional development. Combined Alternate 2 represents a range of potential crossing locations located upstream of the current US 51 Bridge structure - within 2,000 feet of its present location. In future project development phases, designers should look at alignment, cross-section, and bridge type options that best fit within this corridor. Cable stay, truss, and arch bridges are all considered suitable bridge types at this location. Combined Alternate 2 is approximately 1.8 miles in length and would require a horizontal clearance of 900 feet for the navigational channel based on correspondence provided by the US Coast Guard. A vertical clearance of at least 113 feet above the zero gage at Cairo is recommended for the mid 700-foot portion of the primary navigation channel. Final vertical clearance requirements will be determined in future phases of project development when more detailed information is available. Construction is estimated to cost $180-210 million¹ depending on the selected cross-section.
Combined Alternate 2 Planning Level Cost Estimate
(44 ft Clear Roadway Width on Bridge)
Phase Cost (millions)¹
Design $25.2
Right‐of‐Way $0.9
Utilities $0.1
Construction $210.0
Total $236.2
EVIRONMENTAL CONCERNS FOR RECOMMNED ALTERNATE A windshield survey was conducted in Fall 2013 to identify environmental concerns that should be addressed as part of any future project development activities. The survey found the following environmental considerations in the Combined Alternative 2 footprint that will require further analysis in future project phases:
Habitat for endangered species: Indiana bat, Gray bat, listed mussel species, pallid sturgeon
Potential bald eagle habitat, including a known nest site in the vicinity
Streams, Floodplains, & Wetlands Potential for economic effects associated with
barge moorings along shore
Narrow lanes and shoulders
¹ Cost Estimates in 2013 Dollars
Z
Zh
ê
Æe
"K
4
ÆJ
4
"K
"K
ÆJ
"K
ï
ï
!y
îî
î îî
î
î
î
îî
î
î
îî
î
î
î
î
î
î
î
î
î
î
î
î
î
î
îî
î
î
î
îîî
î
î
î
ï
ÆJ
ï
§¦57
£¤51
£¤60
£¤62
£¤51
£¤60
¹·286
¹·1105¹·37
1290
1368
Holloway Landing Rd
Cairo
Hollo
way R
d
Crews Rd
Gum Corner Rd
King Rd
212
V F W Rd
Redmond Rd
Bord
en R
d
Oldham Rd
Adkin
s Dixo
n Rd
Curtis Rd
Sallie
Cric
e Rd
28Th St
Monroe Dr
Levee Rd
Swan
Lake
Rd
Lap Rollings Rd
1St S
t
Commerce Ave
Prairie Lake Rd
205
301
34Th St
Sleepy Rd
Ohio St
Washington Ave
Fish Lake Rd
24Th St
Hancock Rd
23Rd St
33Rd St
J Joh
nson
Rd
6Th S
t
Jim Ireland Rd
Terrell Rd
204
Coun
ty Fa
rm R
d
Hugh
es R
d
Wall St
Park Ave
17Th S
t
Leasetown Rd
19Th S
t
30Th St
Stev
e Den
ton R
d
Lake Dr
Edwa
rds R
d
22Nd St
5Th S
t
18Th St
8Th St
Dynamite Rd
10Th S
t
Illinois
Bob L
n
Main St
Libert
y Rd
9Th St
14Th S
t
20Th St
Railroad St
27Th S
t
Sheppard Ln
16Th St
26Th St
21St S
t
7Th S
t
11Th St
Allen Ln
Beac
h Ridg
e Rd
12Th S
t
4Th St
Cedar St
Court St
Center
St
Flat L
ake L
n
Lisa D
r
Clay St
Hartm
an Ln
Farmers St
2Nd St
Fort Defience Rd
39Th St
Cemeta
ry Hill R
d
3Rd S
t
Crys
tal La
ke R
d
Armstrong Ln
Elm St
Taylo
r Dr
Cane
Cree
k Cuto
ff Rd
Turner Ln
Pine St
Short St
38Th St
Charles Ln
Circle DrKentu
cky S
t
Cairo Holloway Rd
Beach Ridge Rd
V F W Rd
Redmond Rd
Elm St
1St S
t
Terrell Rd
6Th St
Levee Rd
6Th S
t
7Th St
Fish Lake Rd
9Th S
t
205
£¤60
£¤51
£¤62
£¤62
¹·3
Cairo
Wickliffe
Barlow
MoundCity
Wyatt
Deep
Slou
gh
CaneCre ek
Shawnee Creek
B uzza rd C re e k
CacheR iver
H aze l C re ek
S odo m C re ek
L ittle Sha w nee C r e ek
M in o r S loug h
S a ndy S lo u gh
K in g C r e
ek
C ypr e
ssS l
oug h
S te venso n B ayo u
C o t ton w o o d S lo u g h
Ohio River
Mississippi River
KENTUCKY
MISSOURIILLINOIS
MISSOURI
KENT
UCKY
ILLIN
OIS
Mississippi River
Alex
ande
r Cou
nty
Alex
ande
r Cou
nty
Combin
edAlter
nate2
E x is t in g U S 5 1 B r id g e
R e c o m m e n d e dN e w B r id g e C o r r id o r
WickliffeWyatt
Balla
rd C
ounty
Alexander County
Miss
issipp
i Cou
nty
Pulaski County
Boatwright WMA
N
0 2,000 4,000Feet
US 51Ohio River Bridge
RecommendedAlternate
0 0.5 1Miles
InterstateUS HighwayState HighwayLocal RoadRailroadState BoundaryCounty BoundaryStudy AreaStreamsCombined Alternate 2
Community ResourcesÆe Airport!y Boat Rampï Cemetery"K Health FacilityÆJ Park4 School
Major Employersê Industrial Areah Marine Transportation