MOODY NOLAN | PERKINS+WILL
UPPER ARLINGTON SCHOOLSBUILDING TEAM MEETING #3
GREENSVIEW ELEMENTARY SCHOOLJANUARY 12, 2016
YOURVOICE MATTERS
MOODY NOLAN PERKINS+WILL HILLIARD JEANE KORDA EMH&T MKSK TURNER
Affirm
Guiding
Principles
Present
Facilities
Analysis
Findings
Evaluate
Master
Plan
Options
Evaluate
Revised
Master
Plan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review
Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 15-17
OUR PROGRESS
••
••
••
••
••
••
••••••••
•••••••••••
••••••••••••
••••••
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
•
215
758
418
598
508
407
CURRENT ENROLLMENT
BURBANK
BARRINGTON
GREENSVIEW
TREMONT
WICKLIFFE
WINDERMERE
1 Source: Upper Arlington Enrollment Projections-(November 2015)
CURRENTSF/STUDENT
177 SF
112 SF
115 SF
133 SF*
100 SF
135 SF
* With planned additions
10 YEARSF/STUDENT
N/A
96 SF
91 SF
106 SF
86 SF
111 SF
10 YEAR PROJECTION
N/A
887
526
749
589
494
1
SQUARE FEET PER STUDENT
701
705
1,816
SQUARE FEET PER STUDENT
HASTINGS
JONES
UAHS
1 Source: Upper Arlington Enrollment Projections-(November 2015)
717
806
1,947
191 SF
186 SF
162 SF
187 SF
162 SF
151 SF
CURRENT ENROLLMENT
CURRENTSF/STUDENT
10 YEARSF/STUDENT
10 YEAR PROJECTION
1
GREENSVIEW ELEMENTARY SCHOOLMAJOR CHALLENGES
BUILDING:
• LACK OF SECURE ENTRY VESTIBULE
• SIZE OF CLASSROOMS
• LIBRARY SIZE AND CONFIGURATION DOES NOT
SUPPORT COLLABORATION
• LACK OF COLLABORATIVE SPACE
• FOOD SERVICE CONFIGURATION INCREASES TIME TO
GET FOOD
• SOME DISJOINTED SUPPORT OFFICE LOCATIONS
• SP ED - MD ROOM IS NOT CENTRALLY LOCATED
• LIMITED ADJACENT STORAGE FOR MPR
• NOT ENOUGH STUDENT STORAGE, CONDITION OF
STUDENT STORAGE
• NO ROOM FOR SEATING IN THE GYM
SITE:
• LACK OF CLEAR MAIN ENTRY
• NO SECURE OUTDOOR LEARNING SPACE
CHRONOLOGY DIAGRAMGREENSVIEW ELEMENTARY SCHOOL
CIRCULATION ANALYSISGREENSVIEW ELEMENTARY SCHOOL
LENGTH FROM ONE END OF THE BUILDING TO THE OTHER: 640 LINEAR FEET
AVERAGE WIDTH OF CORRIDOR:8 FEET
CLASSROOM SIZE ANALYSISGREENSVIEW ELEMENTARY SCHOOL
SECURITY ANALYSISGREENSVIEW ELEMENTARY SCHOOL
Main Entry
REPAIR +
RENOVATE +
REBUILD
Infrastructure: Maintain/upgrade to working order # of Teaching Spaces: Added spaces right-sized to accommodate year 6 enrollment projection, assumes 25 students per classroom
Program: Limited or no change Core Spaces: (Cafeteria/MPR): Sized to year 10 enrollment projection w/minimum time for lunch (max: three lunches)
Physical Appearance: No significant change Kindergarten: Assumes full-day (20 students per classroom)
Infrastructure: Change uses of existing structure or expand to allow better use
# of Teaching Spaces: Right-sized spaces added to accommodate year 6 enrollment projection, assumes 25 students per classroom
Program: Some alteration possible Core Spaces: (Cafeteria/MPR): Sized to year 10 enrollment projection (two lunches), gym sized to elementary school standard (HS court size)
Physical Appearance: Change mostly limited to interiors and/or expansion
Kindergarten: Assumes full-day (20 students per classroom)
Infrastructure: New and optimized # of Teaching Spaces: Right-sized spaces included to accommodate year 6 enrollment projection, assumes 25 students per room
Program: Addresses deficiencies Core Spaces: (Cafeteria/MPR): Sized to year 10 enrollment projection (two lunches), gym sized to elementary school standard (HS court size)
Physical Appearance: Completely new Kindergarten: Assumes full-day (20 students per classroom)
NOTE: Two or more strategies can be combined
NORTH
REPAIR• REPAIRED CLASSROOMS• REPAIR EXISTING PER
PHYSICAL ASSESSMENT REPORT
RENOVATE• ADMIN AND SECURE
VESTIBULE AT ENTRY• MEDIA CENTER
REBUILD• SOME NEW, LARGER
CLASSROOMS
NOT MODIFIED:• EXISTING TO REMAIN• MOST CLASSROOM SIZES• MULTIPURPOSE ROOM
AND KITCHEN SIZES
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
REPAIR• REPAIRED CLASSROOMS• REPAIR EXISTING PER
PHYSICAL ASSESSMENT REPORT
RENOVATE• ADMIN AND SECURE
VESTIBULE AT ENTRY• MEDIA CENTER
REBUILD• SOME NEW, LARGER
CLASSROOMS
NOT MODIFIED:• EXISTING TO REMAIN• MOST CLASSROOM SIZES• MULTIPURPOSE ROOM AND
KITCHEN SIZES
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
RENOVATE• LARGER CLASSROOMS• LARGER MEDIA CENTER• LARGER ADMINISTRATION• LARGER MULTIPURPOSE
ROOM AND KITCHEN/ RECEIVING
• SECURE VESTIBULE AT ENTRY
• NEW COLLABORATION SPACE• NEW LOBBY SPACE
REBUILD• NEW, LARGER CLASSROOMS
AND COLLABORATION SPACE• NEW, LARGER GYMNASIUM
NOT MODIFIED:• EXISTING TO REMAIN
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
RENOVATE• LARGER CLASSROOMS• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SECURE VESTIBULE AT ENTRY
• NEW COLLABORATION SPACE
• NEW LOBBY SPACE
REBUILD• NEW, LARGER
CLASSROOMS • NEW, LARGER MULTI-
PURPOSE ROOM AND KITCHEN/ RECEIVING
• NEW GYMNASIUM
NOT MODIFIED:• EXISTING TO REMAIN
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD
RENOVATE• LARGER CLASSROOMS• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SECURE VESTIBULE AT ENTRY
• NEW COLLABORATION SPACE
• NEW LOBBY SPACE
REBUILD• NEW, LARGER
CLASSROOMS • NEW, LARGER MULTI-
PURPOSE ROOM AND KITCHEN/ RECEIVING
• NEW GYMNASIUM
NOT MODIFIED:• EXISTING TO REMAIN
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD
RENOVATE• LARGER CLASSROOMS• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SECURE VESTIBULE AT ENTRY
• NEW COLLABORATION SPACE
• NEW LOBBY SPACE
REBUILD• NEW, LARGER
CLASSROOMS • NEW, LARGER MULTI-
PURPOSE ROOM AND KITCHEN/ RECEIVING
• NEW GYMNASIUM
NOT MODIFIED:• EXISTING TO REMAIN
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD
RENOVATE• LARGER CLASSROOMS• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SECURE VESTIBULE AT ENTRY
• NEW COLLABORATION SPACE
• NEW LOBBY SPACE
REBUILD• NEW, LARGER
CLASSROOMS • NEW, LARGER MULTI-
PURPOSE ROOM AND KITCHEN/ RECEIVING
• NEW GYMNASIUM
NOT MODIFIED:• EXISTING TO REMAIN
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
65
NORTH
NEW BUILDING ZONE
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
65
RENOVATE• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SUITE
REBUILDNEW AND LARGER: • CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD
RENOVATE• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SUITE
REBUILDNEW AND LARGER: • CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
NEW BUILDING ZONE
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
REBUILDNEW AND LARGER:• CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
REBUILDNEW AND LARGER:• CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
NEW BUILDING ZONE
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
REBUILDNEW AND LARGER:• CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
REBUILDNEW AND LARGER:• CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016