UPDATED PROCUREMENT PLAN FOR WORKS
DATE SUBMITTED: 23 JAN 2015
COUNTRY: GHANA
COORDINATING AGENCY: MINISTRY OF ROADS AND HIGHWAYS
PROJECT NAME URBAN TRANSPORT PROJECT
CREDIT NO.: 4334-GH
PROJECT ID: P100619
IMPLEMENTING AGENCY: DEPARTMENT OF URBAN ROADS
Serial No. Component Description*
List of Contracts
3 3A
Route Improvement under UTP -Supply and
Install Traffic Signals
(LOT 3) -TYPE B
Norm Duration of Proc Steps
1 3A Route Improvement under UTP -Amasaman to
Kwame Nkrumah Circle plus Depots/Workshops
(LOT 1) -TYPE B
2 3A Route Improvement under UTP -Kwame
Nkrumah Circle to CMB
(LOT 2)- TYPE B
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Pub
lic D
iscl
osur
e A
utho
rized
Total Cost
Note Exchange Rate (Average Interbank) - 31/07/14
$1.00 = Ghs3.0337
Package
Number
Lot
Number
Lumpsum or Bill
of Quantities
Procurement
Method
DUR/IDA/UTP/NCB/W/Lot 1/2014 1 BOQ NCB
DUR/IDA/UTP/NCB/W/Lot 2/2014 2 BOQ NCB
DUR/IDA/UTP/NCB/W/Lot 3/2014 3 BOQ NCB
Basic Data
Estimated Amount in
US $
Pre-or Post
Qualification
Prior or Post
Review
Plan vs.
Actual
Invitation for Pre-
qualification of
contractors
If Prequalification Plan
add 7-13 wks Actual
4,000,000.00 Post Post Plan N/A
2,224,661.01 Actual
4,000,000.00 Post Post Plan N/A
2,517,599.83 Actual
6,000,000.00 Post Post Plan N/A
Actual
Basic Data Pre-qualification Process
14,000,000.00 Plan
4,742,260.84 Actual
Submission of Pre-
qualification evaluation
Report
No- Objection DatePrep & Submission
by Ex Agency
No-objection
Date
4 - 7 wks 1 - 1.5 wks
N/A N/A N/A N/A
N/A N/A
N/A N/A N/A N/A
N/A 11-Jun-14
N/A N/A 29-Jan-15 N/A
N/A
Draft Bid Documents, including specs and
quantities, draft SPNPre-qualification Process
If Post-Review, No-objection Dates are not needed
Spec Proc Notice
Advert
On-line UNDB
Gateway
Nat Press
Bid Invitation Date Bid Closing-OpeningPlan vs.
Actual
1.5 - 2 wks 1.5 - 2 wks 6 to Plan
Actual
18-Apr-14 18-Apr-14 20-May-14 Plan
18-Jun-14 18-Jun-14 17-Jul-14 Actual
18-Apr-14 18-Apr-14 20-May-14 Plan
18-Jun-14 18-Jun-14 17-Jul-14 Actual
5-Feb-15 5-Feb-15 5-Mar-15 Plan
Actual
Bidding Period
Plan
Actual
Submission
Bid Eval Rpt
No-objection
DateContract Amount in US$
12 wks 1.5 - 3 wks
N/A N/A
N/A N/A 2,224,661.01
N/A N/A
N/A N/A 2,517,599.83
12-Mar-15 N/A N/A
Bid Evaluation Contract Finalization
0.00
0.00
Date of
Contract
Award
Publication of Award
Date
Contract
Signature
Plan vs.
Actual
1 wk 1 -2 wks 1.5-3 wks Plan
Actual
4-Aug-14 11-Aug-14 18-Aug-14 Plan
18-Aug-14 29-Aug-14
4-Aug-14 11-Aug-14 18-Aug-14 Plan
18-Aug-14 29-Aug-14
16-Mar-15 30-Mar-15 23-Mar-15
Contract Finalization
Plan
Actual
Commencement Date
Mobilization
Advance
Payment
Substantial
Completion
Final
Acceptance
4 wks
1-Sep-14 15-Sep-14 20-Dec-14 20-Dec-14
8-Sep-14 5-Feb-15
1-Sep-14 15-Sep-14 20-Dec-14 20-Dec-14
8-Sep-14 5-Feb-15
30-Mar-15 20-Apr-15 8-Jun-15 5-Dec-15
Contract Implementation
Final
Cost in US$
(i) To improve mobility in the selected Metropolitan,
Municipal and District Assemblies through a
combination of traffic engineering measures,
management improvements, regulation of urban
passenger transport and implementation of a Bus
Rapid Transit (BRT) system; and (ii) To promote a
shift to a more environmentally sustainable
transport modes and lower transport-related GHG
emissions along the Pilot BRT corridor in Accra.
Contract Implementation
Results
0.00
0.00
UPDATED PROCUREMENT PLAN FOR GOODS
DATE SUBMITTED: 23 JAN 2015COUNTRY: GHANACOORDINATING AGENCY: MINISTRY OF ROADS AND HIGHWAYSPROJECT NAME URBAN TRANSPORT PROJECTCREDIT NO.: 4334-GHPROJECT ID: P100619IMPLEMENTING AGENCY: DEPARTMENT OF URBAN ROADS
S/No. Component Description*
List of Contracts
Supply of Office Equipment For:
1
2
3
4
1G
Norm Duration of Proc Steps
OFFICE EQUIPMENT
Photocopiers: Heavy Duty (6Nr.)
Photocopiers: Light Duty(10Nr.)
Shredder (8 No.)
Scanner (5 No.)
5
6
7
8
9
10
11
12
13
1G
Softwares (Design Application & Anti-Virus)
Laptop Computers(10Nr.)
Desktop Computers - 24"- and peripherals (5 No.)
Desktop Computers - 17"- and peripherals (10 No.)
A3/A4 Printers (4no Coloured )
Printers (10no Black and White)
Surveying equipment-Levelling Instrument(5 No.)
Precimeters (12 No.)
Furniture (Various)- 2No.
Supply of Stationery for
14
Total Cost
1G
Office Statinery (Various)
Furniture (Various)- 2No.
STATIONERY
Package
Number
Lot
NumberEstimated Amount in US $
23,733.39
19,777.83
1,318.52
2,966.67
BASIC DATA
DUR/IDA/UTP/NCB/G-1/OFF.EQP.
1
2
3
DUR/IDA/UTP/NCB/G-2/OFF.EQP.
1
13,185.22
4,120.38
7,251.87
7,911.13
4,944.46
3,420.00
4,120.38
3,955.57
8,306.69
7
DUR/IDA/UTP/NCB/G-4/OFF.EQP.
DUR/IDA/UTP/NCB/G-2/OFF.EQP.
2
3
4
DUR/IDA/UTP/NCB/G-3/OFF.EQP.
5
6
1
2
1
15,000.00
120,012.12
DUR/IDA/UTP/NCB/G-
5/STATiIONERY
DUR/IDA/UTP/NCB/G-4/OFF.EQP.1
1
Procurement Method Pre-or Post Qualification Prior or Post ReviewPlan vs.
Actual
If Prequalification Plan
add 7-13 wks Actual
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review Plan
Actual
BASIC DATA
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review Plan
Actual
Shopping Post Qualification Post Review Plan
Actual
Plan
Actual
Plan
Actual
If Post-Review, No-objection Dates are not needed
Spec Proc Notice
Advert
Prep & Submission
by Ex Agency
No-objection
Date
On-line UNDB
Gateway
Nat Press
Bid Invitation Date
4 - 7 wks 1 - 1.5 wks 1.5 - 2 wks 6 to
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
Draft Bid Documents, including specs and
quantities, draft SPN Bidding Period
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
10-Feb-2015 N/A N/A 17-Feb-2015
If Post-Review, No-objection Dates are not needed
Bid Closing-OpeningComplete
Bid Eval Rpt
No-objection
Date
Plan vs.
Actual
12 wks 2 - 4 wks 1 - 1.5 wks Plan
Actual
Plan
Actual
24-Feb-2015 3-Mar-2015 N/A Plan
Actual
24-Feb-2015 3-Mar-2015 N/A Plan
Actual
24-Feb-2015 3-Mar-2015 N/APlan
Actual
24-Feb-2015 3-Mar-2015 N/APlan
Actual
Bidding Period Bid Evaluation
24-Feb-2015 3-Mar-2015 N/A Plan
Actual
24-Feb-2015 3-Mar-2015 N/A Plan
Actual
24-Feb-2015 3-Mar-2015 N/A Plan
Actual
24-Feb-2015 3-Mar-2015 N/A Plan
Actual
24-Feb-2015 3-Mar-2015 N/APlan
Actual
24-Feb-2015 3-Mar-2015 N/A
24-Feb-2015 3-Mar-2015 N/APlan
Actual
24-Feb-2015 3-Mar-2015 N/APlan
Actual
24-Feb-2015 3-Mar-2015 N/APlan
Actual
24-Feb-2015 3-Mar-2015 N/A Plan
Actual
Plan
Actual
Plan
Actual
Contract Amount in
US$'000
Date
Contract
Award
Publication of Award
Date
Contract
Signature
1 wk 1.5-3 wks
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
Contract Finalization
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
17-Mar-2015 31-Mar-2015 31-Mar-2015
Opening
of
Let of Credit
Arrival
of
Goods
Inspection
Final
Acceptance
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
Contract Implementation
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
N/A 15-May-2015 29-May-2015
2-May-2015 16-Jun-2015 30-Jun-2015
Contract Start Date
15-Apr-2015
15-Apr-2015
15-Apr-2015
15-Apr-2015
Contract Implementation
15-Apr-2015
15-Apr-2015
15-Apr-2015
15-Apr-2015
15-Apr-2015
15-Apr-2015
15-Apr-2015
15-Apr-2015
15-Apr-2015
15-Apr-2015
DISBURSEMENT PLAN 2015
DATE SUBMITTED: 23 JAN 2015
COUNTRY: GHANA
COORDINATING AGENCY: MINISTRY OF ROADS AND HIGHWAYS
PROJECT NAME URBAN TRANSPORT PROJECT
CREDIT NO.: 4334-GH
PROJECT ID: P100619
IMPLEMENTING AGENCY: DEPARTMENT OF URBAN ROADS
Total contract
amount € Equivalent
Supply of Equipment, Goods and Services
Procurement of Office Equipment & Goods 120,000.00
BRT Studies, Training and Tours 100,000.00
Type B Bus Infrastructure
Route Improvement under UTP -Supply and Install Traffic Signals
(LOT 3) -TYPE B 6,000,000.00
3. Consultancy ServicesConstruction Supervision of Bus Priority Measures and Infrastructure for
Amasaman - CMB Corridor Ph I 415,791.38
Interbank Exc Rate 31-07-2014 Rate
Euro 1: 4.0583 GHC
USD 1:3.0337 GHC
Non
Total
Route Improvement under UTP -Amasaman to Kwame Nkrumah Circle plus
Depots/Workshops (LOT 1) 2,224,661.01
Route Improvement under UTP -Kwame Nkrumah Circle to CMB (LOT 2)
2,517,599.83
MINISTRY OF ROADS AND HIGHWAYS
URBAN TRANSPORT PROJECT
DEPARTMENT OF URBAN ROADS
Disbursements as of
31/12/2014 15-Jan 15-Feb 15-Mar 15-Apr 15-May
40,000.00 40,000.00 40,000.00
50,000.00 50,000.00
3,000,000.00 1,500,000.00 1,500,000.00
317,472.39 32,772.99 32,772.99 32,772.99
Goods - - 40,000.00 40,000.00 40,000.00
Works 1,053,487.88 1,053,487.88 4,053,487.88 1,500,000.00 1,500,000.00
Consultancy 32,772.99 32,772.99 32,772.99 - -
Non
Total 1,086,260.88 1,086,260.88 4,126,260.88 1,540,000.00 1,540,000.00
UTP DISBURSMENT PLAN - 2015
ANTICIPATED DISBURSEMENTS
405,223.26 606,479.25 606,479.25 606,479.25
1,176,573.94 447,008.63 447,008.63 447,008.63
15-Jun 15-Jul 15-Aug 15-Sep 15-Oct 15-Nov 15-Dec
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
UTP DISBURSMENT PLAN - 2015
ANTICIPATED DISBURSEMENTS
GHANA PROCUREMENT HUB
2014 CONTRACT DATA
# of
Contracts Value ($'000)
# of
Contracts
Value
($'000)
# of
Contracts
Value
($'000)
# of
Contracts Value ($'000)
# of
Contracts
Value
($'000)
Department
of Urban
Roads
None None 3 10,743 None None None None 3 10,743
Name of PIU
Works
ICB NCB Others Total Prior Review ContractsTotal Post Review
Contracts
GHANA PROCUREMENT HUB
2014 CONTRACT DATA
Department
of Urban
Roads
Name of PIU
# of
Contracts
Value
($'000)
# of
Contracts
Value
($'000)
# of
Contracts
Value
($'000)
# of
Contracts
Value
($'000)
# of
Contracts
Value
($'000)
None None None None 14 120 None None 14 120
NCB OthersTotal Prior Review
Contracts
Total Post Review
Contracts
Goods
ICB
GHANA PROCUREMENT HUB
2014 CONTRACT DATA
Department
of Urban
Roads
Name of PIU
# of
Contracts
Value
($'000)
# of
Contracts
Value
($'000)
1 416 None None
Consultancy
Total Prior Review
Contracts
Total Post Review
Contracts
Programme/Project : Urban Transport Project
Loan : IDA & AFD CO-FUNDING
Dec. 13 Jan. 14 Feb.14 Mar.14 Apr. 14 May.14 Jun. 14
1
2
3
4
5
6
7
8
9
10
11
14
NB Activities No.s 1 - 5 are funded from UTP component no.3 (Development of a BRT system)
Activities No.s 6- 12 are funded from UTP component No. 2 (Traffic engineering, management, and safety)
Route Improvement under UTP -Supply and
Install Traffic Signals
(LOT 3) -TYPE B
Construction of Traffic Management Works -
Batch 2
Construction of Phase 2 Works: Relocation of
Utilities Only
Procurement of Phase 2 Works (To be Funded by
AFD)Construction of Phase 2 Works (To Be Funded By
AFD) in 2015Procurement of Traffic Management Works
(Batch 1 Lot 1&3 and Batch 2)(To be Funded by
AFD)
Construction of Traffic Management Works -
Batch 1 Lot 1
Construction of Traffic Management Works -
Batch 1 Lot 3
Detail Design of Phase 2 Works: Bus Priority
Infrastructure, Aveno-Circle, Abeka (9th Street to
Abeka Jn) and Amasaman Depot and
Maintenance Facility
Country/Organisation : Ghana/ Department of Urban Roads
Work Plan for 2014 -15
Activity
Procurement of Consultant for Detail design and
supervision of Bus Priority Measures and
Infrastructure
Detail Design of Phase 1 Works: Bus Shelters and
lay-bys, Amasaman Terminal, Ofankor Terminal,
Achimota Terminal, Depot & Maintenance
Facilities and Bus Shelter, Contra Flow at Kwame
Nkrumah Avenue (South Liberia -Tudu Road) and
Tudu Terminal
Procurement of Phase 1 Works
Construction of Phase 1 Works
Jul. 14 Aug. 14 Sept. 14 Oct. 14 Nov.14 Dec.14 Jan. 15 Feb.15 Mar.15 Apr. 15
Activities No.s 6- 12 are funded from UTP component No. 2 (Traffic engineering, management, and safety)
Work Plan for 2014 -15
May.15 Jun. 15 Jul. 15 Aug. 15 Sept. 15 Oct. 15 Nov.15 Dec.15
Country/Organisation:Ghana / Department of Urban Roads
Project/Programme: Urban Transport Project
Credit #: IDA 433340
Procurement of Office Equipment and Goods 120,000.00
Subtotal 120,000.00
Route Improvement under UTP -Supply and
Install Traffic Signals
(LOT 3) -TYPE B
6,000,000.00
Subtotal 22,742,260.84
Construction of Traffic Management Works - Batch
1 Lot 1 6,758,711.78
Construction of Traffic Management Works - Batch
1 Lot 3 828,549.92
Construction of Traffic Management Works - Batch
2 2,392,170.50
BUDGET PLAN
1
Summary of Budget
No DescriptionTotal Budget Allocation
(A+B+C) (US$)Supply of Goods
Type B Route Infrastructure
2
Route Improvement under UTP -Amasaman to
Kwame Nkrumah Circle plus Depots/Workshops
(LOT 1) -TYPE B 2,224,661.01
Route Improvement under UTP -Kwame
Nkrumah Circle to CMB
(LOT 2)- TYPE B 2,517,599.83
Route Improvement under UTP -Relocation of
Utilities - Water (LOT 3)750,000.00
Route Improvement under UTP -Relocation of
Utilities - Telecom (LOT 5)500,000.00
Route Improvement under UTP -Relocation of
Utilities - Electricity (LOT 4)750,000.00
Route Improvement under UTP -Amasaman to
Kwame Nkrumah Circle plus Depots/Workshops 5,000,000.00
Traffic Engineering Management & Safety
3
Route Improvement under UTP -Kwame
Nkrumah Circle to CMB (PH II) 5,000,000.00
Subtotal 9,979,432.20
Construction Supervision of Bus Priority Measures
and Infrastructure for Amasaman - CMB Corridor Ph
I
415,791.38
Construction Supervision of Phase 2 Works: Bus
Priority Infrastructure, Aveno-Circle, Abeka (9th
Street to Abeka Jn) and Amasaman Depot and
Maintenance Facility
511,381.31
Supervision of Traffic Management Works (Batch 1
and Batch 2) 366,269.35
BRT Studies and Training Tours 100,000.00
Subtotal 1,393,442.03
5 GRAND TOTAL 34,235,135.07
Interbank Exc Rate 31-07-2014 Rate
Euro 1: 4.0583 GHC
USD 1:3.0337 GHC
3
Consultancy Services, Training and Workshops
4
IDA (A) AFD (B) GEF (D)
120,000.00 0
120,000.00 0
6,000,000.00 0
10,742,260.84 12,000,000.00 1,581,797.19
6,758,711.78 952,284.76
828,549.92 92,636.10
2,392,170.50 308,365.93
BUDGET PLAN
Budget Allocations (US$) Total Amount Disbursed at
Dec. 2014Supply of Goods
Type B Route Infrastructure
2,224,661.01 405,223.26
2,517,599.83 1,176,573.94
750,000.00 0
500,000.00 0
750,000.00 0
5,000,000.00 0
Traffic Engineering Management & Safety
5,000,000.00 0
9,979,432.20 1,353,286.79
415,791.38 317,472.39
511,381.31 -
366,269.35 -
100,000.00 -
515,791.38 877,650.65 317,472.39
11,378,052.22 22,857,082.86 3,252,556.38
Consultancy Services, Training and Workshops
120,000.00 120,000.00
120,000.00 120,000.00
6,000,000.00 6,000,000.00
21,160,463.65 21,160,463.65
5,806,427.02 5,806,427.02
735,913.82 735,913.82
2,083,804.57 2,083,804.57
BUDGET PLAN
Amount Available (US$) Budget for 2015 Deficit/Surplus
Supply of Goods
Type B Route Infrastructure
1,819,437.75 1,819,437.75
1,341,025.89 1,341,025.89
750,000.00 750,000.00
750,000.00 750,000.00
500,000.00 500,000.00
5,000,000.00 5,000,000.00
Traffic Engineering Management & Safety
5,000,000.00 5,000,000.00
8,626,145.41 8,626,145.41
98,318.98 98,318.98
511,381.31 511,381.31
366,269.35 366,269.35
100,000.00 100,000.00
1,075,969.64 1,075,969.64
30,982,578.70 30,982,578.70
Consultancy Services, Training and Workshops