KARGI KIZILIRMAK HYDROELECTRIC POWER PLANT Kargı hydroelectric power plant in northern Turkey is located on the river Kızılırmak, in the districts of Osmancık and Kargı. After four years of construction, Kargi went into commercial operation in May 2015. Kargı Kızılırmak Enerji A.Ş. is a wholly owned Statkraft company. Background In 2007 Statkraft was given the license to build and operate the Kargi power plant for 49 years by Turkey’s Energy Market Board Authority allowing for utilization of the energy potential of Kızılırmak river between the town of Osmancık and the reservoir of Boyabat Dam. The Project Kargı power plant is operated and maintained by Statkraft. In total the production of renewable energy will be 470 GWh per year, based on a total installed capacity of 102 MW. The construction of Kargi took place between February 2011 and May 2015 employing more than 400 people. Central to the project was the construction of a reservoir. The dam, constructed 15 km downstream of Osmancık town, allows water from the Kızılırmak river to be stored and used for power generation. The maximum water level of the reservoir is 405 m above sea level and it covers 3 km agricultural land and 1 km forest and public land. 2 3 2 2 www.statkraft.com Ownership: Statkraft Installed capacity: 102 MW Production: 470 GWh - equals approximately 1% of Turkey’s total current hydroelectric capacity Elevation difference: 75 m Maximum discharge: 167 m /s Dam height: 11 m Dam type: Zoned clay core Highest operating water level: 405 m above sea level Construction time: 4 years Reservoir area: 4 km No village in the valley is inundated. KEY FACTS

Updated January 2017 · Statkraft is a leading company in hydropower internationally and Europe’s largest generator of renewable energy. The Group produces hydropower, wind power,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Updated January 2017 · Statkraft is a leading company in hydropower internationally and Europe’s largest generator of renewable energy. The Group produces hydropower, wind power,

K A R G IK I Z I L I R M A K H Y D R O E L E C T R I C P O W E R P L A N T

Kargı hydroelectric power plant in northern Turkey is located on the river Kızılırmak, in the districts of Osmancık and Kargı. After four years of construction, Kargi went into commercial operation in May 2015. Kargı Kızılırmak Enerji A.Ş. is a wholly owned Statkraft company.

BackgroundIn 2007 Statkraft was given the license to build and operate the Kargi power plant for 49 years by Turkey’s Energy Market Board Authority allowing for utilization of the energy potential of Kızılırmak river between the town of Osmancık and the reservoir of Boyabat Dam.

The ProjectKargı power plant is operated and maintained by Statkraft. In total the production of renewable energy will be 470 GWh per year, based on a total installed capacity of 102 MW.

The construction of Kargi took place between February 2011 and May 2015 employing more than 400 people. Central to the project was the construction of a reservoir. The dam, constructed 15 km downstream of Osmancık town, allows water from the Kızılırmak river to be stored and used for power generation. The maximum water level of the reservoir is 405 m above sea level and it covers 3 km agricultural land and 1 km forest and public land.

2

3

2

2

www.statkraft.com

Ownership: Statkraft

Installed capacity: 102 MW

Production: 470 GWh - equals approximately 1% of Turkey’s total current hydroelectric capacity

Elevation difference: 75 m

Maximum discharge: 167 m /s

Dam height: 11 m

Dam type: Zoned clay core

Highest operating water level: 405 m above sea level

Construction time: 4 years

Reservoir area: 4 km

No village in the valley is inundated.

K E Y FAC T S

Page 2: Updated January 2017 · Statkraft is a leading company in hydropower internationally and Europe’s largest generator of renewable energy. The Group produces hydropower, wind power,

Power House Switchyard Surge Tank

www.statkraft.com

Environmental and Social ManagementThe main impact of Kargı on its surroundings is the flooding of agricultural lands in order to create a reservoir as well as altered water flows downstream. Statkraft works systematically to minimize the negative effects of its presence as far as possible and find ways of replacing the assets that are lost with something new that will create a good basis for biodiversity and livelihoods for the affected people. Statkraft works consistently to maintain this work during operations.

Kargı Kızılırmak HES

Maksutlu Köyü Mevki19900 Kargı-Çorum

Phone: +90 364 364 64 02E-mail: [email protected]

Statkraft Enerji A.Ş.

Büyükdere Cad. Bahar Sok. No:13River Plaza Kat:434394 Levent, Şişli-İstanbul

Phone: +90 212 340 1900E-mail: [email protected]

P R O J E C T L AYO U T

About StatkraftStatkraft is a leading company in hydropower internationally and Europe’s largest generator of renewable energy. The Group produces hydropower, wind power, gas-fired power and district heating and is a global player in energy market operations. Statkraft has 4200 employees in more than 20 countries.

Updated January 2

01

7