15
Update on ATM rulemaking ©EASA 2012

Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

Embed Size (px)

Citation preview

Page 1: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

Update onATM rulemaking

•©EASA 2012

Page 2: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

2

What is EASA?

High & uniform level of aviation safety to be ensured at all times –

EU/EASA aviation safety regulatory systemestablishing common safety rules

ensuring that products, services, persons and organisations comply with safety rules

establishing independent safety regulator: EASA

EASA system = shared roles between Member States, Commission, EASA & stakeholders

Aviation system behaves as a networkprogressive harmonisation of safety requirements

Safe: aircraft + operations+ air traffic + landing/take-off

Page 3: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

3

EASA tasks in ATM

RULEMAKING – IR & AMC/CS/GM:- ANS provision (OR + services)- ATCO licensing- ATM/ANS systems & constituents- requirements on airspace users- safety oversight (competent authority)

CERTIFICATION of:- pan-European service providers- non-EU ANSP’s- non-EU ATCO training org.+ oversight of network management

functions

SAFETY ANALYSIS:covering whole ATM/ANS

STANDARDISATION: inspections of national

competent authorities in ATM/ANS

‘SAFETY ADVISER’ inSES implementation

Page 4: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

ATM & ADR rulemaking

EASA RMP 2013-16 adopted

ATM (& ADR) Standardisation

visits

&

EASA oversight

feedback loops

European

Aviation

Safety

Programme

safety actions

AIBs

safety

recommendations

ATM Rulemaking approach –(more) risk-based approach

4

Page 5: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

ATM rulemaking - status

ATM/ANS

Rulemaking

ATM/ANS

Rulemaking

ACAS II on smaller a/c

ATCO CQB (Q/A data bank)

ACAS II on smaller a/c

ATCO CQB (Q/A data bank)

Implement BR

Implement SES

Rulemaking

Inventory

‘Fast-

track’

rules

‘Fast-

track’

rules

On-going

RM tasks ->

comply / BR

On-going

RM tasks ->

comply / BR

ATM Performance scheme

PBN implementation

HETA (Harm. Transition Alt.)

ATM Performance scheme

PBN implementation

HETA (Harm. Transition Alt.)

Feedback loops (AIB SRs,

occurrences, inspections, …)

rulemaking ‘driver’:

pre-RIA

amendments (poss.) to

existing rules (or AMC/GM)

amendments (poss.) to

existing rules (or AMC/GM)

Page 6: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

ATM/ANS rules (by EASA) in force

ATM/ANS

Providers1035/2011

ATM/ANS

Providers1035/2011

Competent

Authorities1034/2011

Competent

Authorities1034/2011

ATCO

Licensing805/2011

ATCO

Licensing805/2011

Airspace

Usage1332/2011

Airspace

Usage1332/2011

SystemsSystems SERASERA

Part ACASPart ACAS ADR

equipment

ADR

equipment

ATM

systems

ATM

systems

Parts

A – B - C

Parts

A – B - C

Part HETAPart HETA

Basic Regulation (amended by Reg 1108/2009)

Certification

Specifications -

ATM on-board

equipment

Certification

Specifications -

ATM on-board

equipment

ATM

performance

scheme

ATM

performance

scheme

and also …

Page 7: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

ATM Rulemaking programme;on-going tasks

NPA on ATCO licensing: Q3-2012

A-NPA on HETA (Harmonised European Transition Altitude): consultation closed

NPA on SERA - AMC/GM: Q3-2012

NPA on SERA - ICAO SL on Annex 2/RPAS: Q3-2012

NPA on SERA Part C: Q4-2012

NPA on Common requirements & ATM oversight: Q4-2012

Other on-going ATM tasks:

Requirements for Safety assessment of changes to ATM/ANS functional systems

Technical requirements and operational procedures for MET

ATM Performance scheme (SKPI) for RP2

Provision of requirements in support of European and global PBN operations –> several RM tasks (in different domains)

7

Page 8: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

ATM Rulemaking programme;future tasks

ATM rules (amending Common Requirements Reg) on services (not yet covered);

Transposition of ICAO SARPs (with proportionality/subsidiarity)

Aiming at high level of safety, level playing field and legal certainty

HETA (?)

ATM systems and ADR equipment;

Where common requirements necessary

To alleviate the ‘operator’ responsibilities

Reactions - AIB SRs, EASP, inspections feedback (etc.)

Airborne ATM equipment – EASA CS -> ‘remove overlaps in rulemaking and verification of compliance’

SESAR deployment;

Safety requirements where necessary for deployment

8

Page 9: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

9

ATCO licensing

NPA on ATCO licensing

WHEN Q3/Q4-2012

METHOD EASA NPA, rulemaking group (ToR; Sep 2009)

OBJECTIVES (main)

• EASA BR (Annex Vb) safety objectives• Promote mutual recognition & ATCO mobility• Provide necessary AMC & GM• Review training requirements (all phases)• Harmonisation of applicable requirements (e.g. assessment

of language proficiency)• Common criteria for instructors & assessors• Rating/endorsement system (developments/harmonisation)• Management system requirements (harmonise + ICAO

compliance, incl. SSP), incl. ATCO training organisations)• Use of synthetic training devices, etc.

Opinion

Q3/Q4-2013

Adoption

- 2014 -

(poss. transition)

entry into force

9

Page 10: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

10

Requirements on ANSP & services and on competent authorities

State of play

WHEN Q4-2012/ Q1 -2013

METHOD EASA NPA (combined), rulemaking groups (2 ToRs; Sep 2009)

OBJECTIVES (main)

• Implement EASA BR (Annex Vb) safety objectives, e.g. to cover the BR scope

• Align common requirements and their oversight• Develop (+ ICAO compliance) of management system

requirements and SSP � align with ICAO Annex 19 work

• Facilitate total system approach, align/link with aerodrome requirements (operators and safety oversight)

• Competence scheme for ATSEPs• Human factors safety objectives• Provide necessary AMC & GM

Opinion

Q4-2013

Adoption process TBD

Transition (poss.)

Entry into force TBD

10

Page 11: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

Standardisation – status of ATM visits

11

• ‘Transition period’ 2010-2011 (ESIMS results)

• EASA visits from 2012 onwards

• EU-ICAO MoC; avoiding duplication of effort

• ‘Transition period’ 2010-2011 (ESIMS results)

• EASA visits from 2012 onwards

• EU-ICAO MoC; avoiding duplication of effort

Background

• 27 EU Member states

• 4 ‘EASA States’ (Iceland, Norway, Liechtenstein, Switzerland)

• 7 ECAA States (Working Arrangements)

• 8 ECAC States (Working Arrangements)

• 27 EU Member states

• 4 ‘EASA States’ (Iceland, Norway, Liechtenstein, Switzerland)

• 7 ECAA States (Working Arrangements)

• 8 ECAC States (Working Arrangements)

Scope

• 13 ATM visits planned for 2012

• 5 already conducted

• Teams including observers and trainees (States, EUROCONTROL)

• Close link with rulemaking

• 13 ATM visits planned for 2012

• 5 already conducted

• Teams including observers and trainees (States, EUROCONTROL)

• Close link with rulemaking

Status

Page 12: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

Organisation approval/oversight - ATM

12

� Oversight of 3rd country training organisations is being

performed in accordance with Regulation 805/2011

� On-going oversight of the Network Manager on behalf of EC

� The French NSA is closely cooperating with EASA to ensure smooth takeover of EGNOS oversight (November 2012)

� EASA has received application(s) for pan-European service provider and relevant certification activity has been launched

Page 13: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

ATM regulatory roadmap – SES/EASA

ATM Regulatory Roadmap

Implement Art. 65a (? SES III)

in 2012 2013 … (?)

ATM Regulatory Roadmap:

� Managed by the Commission

� Includes EASA, SES & SESAR

� 4-year rolling plan, now for 2013 - 2017

� Sets regulatory priorities and timeframes

Page 14: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

ATM regulatory roadmap – objectives

� Solid basis for a single aviation regulatory framework;

� high and uniform level of safety

� global interoperability and

� defragmentation by common EU rules implementing ICAO SARPs

� Technological advancement (through SESAR)

� ANC 2012 outcome ���� to support global interoperability ���� swift implementation in EU (+ harmonisation/FAA)

� Implement a proactive risk-based rulemaking system enabling a swift mitigation for identified unacceptable safety risks

Page 15: Update on ATM rulemaking - Luftfartstilsynet 5...EASA tasks in ATM RULEMAKING – IR & AMC/CS/GM: ... Reactions -AIB SRs, EASP, ... • Management system requirements

Thank you for your

attention