Update November 27, 2009 Professional Municipal Administrators. Edward Evans Executive Director. Government of Newfoundland & Labrador Waste Management Strategy – May 2007. Divert 50% of materials going to disposal by 2015; Reduce number of waste disposal site by 80% by 2020; - PowerPoint PPT Presentation

Citation preview

Page 1: Update  November 27, 2009 Professional Municipal Administrators

Update November 27, 2009

Professional Municipal Administrators

Edward EvansExecutive Director

Page 2: Update  November 27, 2009 Professional Municipal Administrators

Government of Newfoundland & Labrador Waste Management Strategy – May 2007 Divert 50% of materials going to disposal by 2015;

Reduce number of waste disposal site by 80% by 2020;

Phase out use of unlined landfill site by 2020;

Full province wide modern waste management by 2020.

Central Newfoundland waste management system operational by 2011

Page 3: Update  November 27, 2009 Professional Municipal Administrators

Key Components of Waste ManagementSource separation

Collection

Local waste management facilities (LWMF)

Material Recovery Facility (MRF)

Compost facility

Construction & Demolition Debris facility

Household Hazardous Waste facility

Second generation Landfill (lined landfill)

Page 4: Update  November 27, 2009 Professional Municipal Administrators

Study Area Boundary

50 – Towns, 38 – LSD’s, 19 – Unincorporated Areas

Page 5: Update  November 27, 2009 Professional Municipal Administrators

Source Separation – Two Bag (wet/dry)Advantages

efficient single-pass collection (lower collection costs)

the production of compost;

the stabilization of Wet waste residue;

the inability to hide unacceptable wastes (e.g. HHW, yard waste) in transparent bags.

compost carts not required

less education of the public required (sorting is simpler)

control of recovery rates occurs at the facility instead of in the home or curb, providing the flexibility to respond to market demands

Page 6: Update  November 27, 2009 Professional Municipal Administrators

Wet Bag (green transparent)

Baby wipes, bandages, cotton swabs, diapersGrass clippings, leavesAll food scraps, meats, tea bagsPaper plates (dirty)Anything that could contaminate recycles in the Dry bag belongs in the Wet bag

Page 7: Update  November 27, 2009 Professional Municipal Administrators

Dry Bag (blue transparent)

Aluminum cans, juice cansAll types of cardboard and paper productsFabrics, clothesAll types of plastics

Page 8: Update  November 27, 2009 Professional Municipal Administrators

Transportation Analysis

Centroid

Page 9: Update  November 27, 2009 Professional Municipal Administrators

Regional Landfill Site Selection – Constraint Criteria

Land Slope - < 12% Public Roads – 300 m Water bodies & Stream – 150 m Residential Dwellings – 1.6 km Parks – 1 km Water Supplies & Water Shed Area – Avoidance Minimum Soil Cover of 2 m Airport – 2 km. Potable wells – 1 km. Electrical service - Opportunity

Page 10: Update  November 27, 2009 Professional Municipal Administrators

Preferred Regional Site

Page 11: Update  November 27, 2009 Professional Municipal Administrators

RWMF Concept Plan

Page 12: Update  November 27, 2009 Professional Municipal Administrators

Administration Building

Page 13: Update  November 27, 2009 Professional Municipal Administrators

Weight Scales

Page 14: Update  November 27, 2009 Professional Municipal Administrators

Public Drop Off

Page 15: Update  November 27, 2009 Professional Municipal Administrators

C&D Storage

Page 16: Update  November 27, 2009 Professional Municipal Administrators

Typical MRF

Page 17: Update  November 27, 2009 Professional Municipal Administrators

MRF Concept Plan

Page 18: Update  November 27, 2009 Professional Municipal Administrators

Semi-automatic MRF

Page 19: Update  November 27, 2009 Professional Municipal Administrators

MRF Products

Page 20: Update  November 27, 2009 Professional Municipal Administrators

Major Components of Compost Facility

Pre-processing

First stage composting

Second stage curing

post-processing

Page 21: Update  November 27, 2009 Professional Municipal Administrators

Compost Facility Concept Plan

Page 22: Update  November 27, 2009 Professional Municipal Administrators

First Stage Composting in-vessel

Page 23: Update  November 27, 2009 Professional Municipal Administrators

Second Stage Curing

Page 24: Update  November 27, 2009 Professional Municipal Administrators

Post Processing

Page 25: Update  November 27, 2009 Professional Municipal Administrators

Typical Compost Facility

Page 26: Update  November 27, 2009 Professional Municipal Administrators

Selected HHW System

One central HHW depot and a HHW depot at each LWMF

Page 27: Update  November 27, 2009 Professional Municipal Administrators

HHW Typical Facility

Page 28: Update  November 27, 2009 Professional Municipal Administrators

Update Regional SiteRS01 Clearing and Grubbing Tender: (Woodco) - Completed

RS02 Site Roads (Marine Contractors)- Final contract payment to be made

RS03 Well Drilling (Pius Sullivan & Sons Ltd.)- 4th borehole being drilled for administration building- Water wells to be drilled over the next two weeks

RS04 Landfill:- Landfill design on hold pending approvals from DOE- Alternate liner design submitted to Environment for approval July 31, 2009- Stream buffers from landfill sent to environment for approval July 13, 2009 

Page 29: Update  November 27, 2009 Professional Municipal Administrators

RS08 Power• Received preliminary contribution in aid (127,000) amount. NF Power continuing to get CIA

amount approved internally.• Poles installation completed on site• Wires stringing to start next week• Expecting power to be available before Christmas

RS09 Telephone & Data Communications• Expressions of interest to be called• Aliant working on advising what services are available

RS10 Site Buildings : (Bluebird Investments)• Administration Building

- Foundations complete - Erection of walls ongoing

• Scale House- Foundations complete- Erection of walls ongoing

• Maintenance Garage - Foundations poured

Page 30: Update  November 27, 2009 Professional Municipal Administrators

RS11 Leachate Treatment• Final Pre-design report on leachate treatment option issued and sent to Environment

for approval Sept 09, 2009

RS12 Compost:• Pre-design report completed and issued this week

RS14 Access Road and Site Work (Marine Contractors)• Rock on slopes.• Rock for sedimentation pond to be placed• Deficiencies remaining

Site Office• Site office set up on Maintenance Garage parking lot

Page 31: Update  November 27, 2009 Professional Municipal Administrators

Local Waste Management Facilities

Page 32: Update  November 27, 2009 Professional Municipal Administrators

LWMF Concept Plan

Page 33: Update  November 27, 2009 Professional Municipal Administrators

Typical LWMF

Page 34: Update  November 27, 2009 Professional Municipal Administrators

Typical LWMF

Page 35: Update  November 27, 2009 Professional Municipal Administrators

Local Waste Management Facilities

Clearing & Grubbing TS01: (Professional Grading Ltd)• Release of holdback to be made

Site Buildings TS02 (Bluebird Investments)• Fogo: concrete work 100% complete• Gander Bay: concrete work 100%• NWI: Starting concrete work this week

 

Civil Works TS05 (Cougar Engineering & Const)• Fogo: completed• Gander Bay: completed• NWI: completed• Indian Bay: 75% complete• Terra Nova: completed• Point Leamington: completed• Buchans Junction: May be started in two weeks

Page 36: Update  November 27, 2009 Professional Municipal Administrators

• Replace Septic tanks and disposal fields with Mini-bio STP. GSC has issued certificates of approval. Waiting on acceptance of draft agreement from STP contractor.

Draft Certificate of Approval• Comments of draft regulations submitted to DOE

Project Master Schedule• Land fill should be completed by fall of 2010.• Transfer Stations should be completed by end of 2010 

Page 37: Update  November 27, 2009 Professional Municipal Administrators

Staffing RequirementsRegional Waste Management Facility

Manager

Administration (2)

Equipment Forman

Scale House Operators (2)

Site Supervisors – Landfill (2)

Process Supervisor – Compost

Process Supervisor – Dry recyclables

Equipment Operators (4)

Laborers (30 full time, 20 part-time)

Security (2)

LWMF

One Part Time Employee at Each Facility

Page 38: Update  November 27, 2009 Professional Municipal Administrators

Tipping Fee

ITEM CAPITAL COST AMORTIZATION OPERATING ANNUAL COST COST PER TONNE

COSTS COSTS TO CNWMA

Local Waste Management Facilities $15 400 000 $0 $842 412 $842 412 $20.75Disposal Site ( landfill ) $10 300 000 $0 $1 854 800 $1 854 800 $45.69Materials Recovery Facility (MRF) $18 000 000 $0 $1 275 600 $1 275 600 $31.42Compost Facility $25 500 000 $0 $622 775 $622 775 $15.34Household Hazardous Wastes (Regional Site Only) $200 000 $0 $71 500 $71 500 $1.76Construction & Demolition Debris $300 000 $0 $48 850 $48 850 $1.20Public Drop-off $300 000 $0 $46 000 $46 000 $1.13Public Education $105 000 $105 000 $2.59Administration $251 000 $251 000 $6.18Capital For Equipment $9 100 000 $455 938 $455 938 $11.23Revenue From Recovered Materials -$824 264 -$824 264 -$20.30

TOTALS $79 100 000 $0 $4 749 611 $4 749 611 $117.00

Cost Per Person $39.83

Page 39: Update  November 27, 2009 Professional Municipal Administrators

Existing Disposal Sites Closeout Costs

42 Existing Sites

$215,000 Average Closeout Cost Per Site

Gander is Largest Site at a Cost of $1,990,000

$9,000,00 Total Closeout Costs

Page 40: Update  November 27, 2009 Professional Municipal Administrators

Governance ModelThe Central Newfoundland Waste Management Authority will finance with capital funding from government sources or through public/private partnerships, manage, and operate the waste management system for the Greater Central Newfoundland region which includes the area from Terra Nova National Park in the east, Buchans in the west, north to and including Fogo Island.The Board of Directors of the Authority will make decisions pertaining to:

- The construction and operation of regional solid waste disposal sites including a facility designated in the regulations as a regional facility; and,

- The charging of user fees on Municipal Authorities, areas under development control or unincorporated areas benefited by a regional facility.

Board members will operate in accordance with the expectations of the Regional Services Board Act.

Page 41: Update  November 27, 2009 Professional Municipal Administrators

The initial Board of Directors will have the added responsibility of guiding the construction of the waste management facilities, establishing costs for users, initiating stakeholder communication and involvement, developing the Board operating policies, approving the By-laws and essentially building the Authority.

It is expected that the nature of the Board will evolve as the waste management system becomes more firmly established. The Board at the outset will play a larger management role, but over the first term a shift towards a predominantly policy making Board of Directors should be anticipated. During the start-up period, the Authority Board will have engaged professional staff to manage and operate the facilities.

In order to most adequately represent all parties, and to maintain a manageable size board, the board would then be comprised of seventeen (17) directors, twelve (12) voting members, the Chairperson and four (4) non-voting members. Every town, community or local service district within the central region will have a representative on the Board of Directors, nominated directly or through a regional representation. The Minister of Municipal Affairs will appoint board members.

Page 42: Update  November 27, 2009 Professional Municipal Administrators

Voting Members – 13

One (1) member from each of the regional waste management zones 7

One (1) member from the large towns; Gander and Grand Falls-Windsor 2

One (1) member from town’s with no transfer stations 1

One (1) member from Norris Arm & Norris Arm North 1

One (1) member for the three (3) towns over 3000 population 1

The Lieutenant-Governor in Council shall appoint a chairperson. 1(Chairperson will only vote to break a tie)

Other officials such as Vice-Chair, Secretary, and Treasurer, will be appointed from the elected board but these officers will still represent their communities or regions.

- All voting Board members would be selected from elected municipal councilors or an appointed representative of the Local Service District

- Each transfer station region will have a committee made up of elected officials and the chair of that committee will serve on the Central Regional Service Board.

Page 43: Update  November 27, 2009 Professional Municipal Administrators

- Larger towns will appoint one from elected officials.- Three (3) towns over 3000 population will jointly appoint a board member but this member must alternate between the three towns.- Norris Arm and Norris Arm North will appoint one member which will alternate between the two communities. (For the Interim, one representative will sit with the board and the other with the Technical Committee. The person sitting with the board will carry the vote.)The Authority will recognize the Technical committee. The Chairperson of the Technical Committee will be asked to sit as a non-voting board member.

Terms of Members

With the exception of the chairperson, a member appointed to a board shall serve a term of 2 years with the right to be re-appointed for a further term of 2 years and shall be ineligible for a further re-appointment until at least 2 years after the expiration of his or her last term as a member of the board.

Page 44: Update  November 27, 2009 Professional Municipal Administrators

Central Newfoundland Waste Management AuthorityRepresentation by Directors

1 Director Gander1 Director Grand Falls - Windsor1 Director Bishop Falls - Botwood - Lewisporte1 Director Norris Arm - Norris Arm North

1 Director Appleton - Comfort Cove - Newstead – Peterview- (Centroid Zone) Badger - Embree - Porterville – Baytona – Glenwood - Sandy

Point - Benton - Laurenceton - Stanhope - Birchy Bay - Little Burnt Bay -Wooddale - Brown’s Arm - Loon Bay-Campbellton -Michael’s Harbour

1 Director Buchans - Buchans Junction - Millertown(Zone 1)

Page 45: Update  November 27, 2009 Professional Municipal Administrators

1 Director Cottrell’s Cove - Northern Arm - Fortune Harbour -Phillip’s

(Zone 2) Head -Glover’s Harbour – Pleasantview -Leading Tickles - Point Leamington Moore’s Cove - Point Of Bay

1 Director

(Zone 3) Boyd’s Cove - Horwood - Ragged Harbour – Bridgeport – Indian Cove - Salt Harbour – Chanceport - Kettle Cove - Shoal Harbour

Change Islands - Little Harbour – Stoneville - Cobb’s Arm - Merritt’s Harbour–Summerford - Cottlesville - Moreton’s Harbour -Sunnyside - Crow Head – Newville -Tizzard’s Harbour - Fairbanks-Hillgrade - Paradise - Too Good Arm - Green Cove - Pike’s Arm – Twillingate- Hatchett Harbour - Port Albert - Valley Pond - Herring Neck - Purcell’s Harbour - Virgin Arm-Carter’s Cove

1 Director

(Zone 4) Fogo -Fogo Island Region - Joe Batt’s Arm - Barr’d Islands - Shoal Bay - Seldom - Little Seldom - Stag Harbour – Tilting

Page 46: Update  November 27, 2009 Professional Municipal Administrators

1 Director(Zone 5) Aspen Cove - Gander Bay South - Carmanville - Musgrave

Harbour - Deadman’s Bay - Main Point – Davidsville – Frederickton – Ladle Cove - Gander Bay North - Noggin Cove

1 Director(Zone 6) Cape Freels North -Hare Bay - Centreville - Wareham -

Trinity - Indian Bay – Dover – Lumsden - Greenspond - New - Wes - Valley

1 Director(Zone 7) Burnside - St. Chad’s -Glovertown - St. Brendan’s - Cull’s

Harbour-Happy Adventure - Terra Nova – Charlottetown -Salvage – Traytown- Eastport - Sandy Cove – Gambo -Sandringham

Page 47: Update  November 27, 2009 Professional Municipal Administrators

Construction Schedule

• 2009

Road Networks

• 2010Administration BuildingScale Houses

Transfer StationsHousehold Hazard Waste FacilitiesC & D Site Landfill SiteLeachate Treatment AreaMaintenance Building

• 2011 Compost Facility

• 2012 Material Recovery Facility

• 2013 Full Operation

Construction Schedule

Page 48: Update  November 27, 2009 Professional Municipal Administrators

Contact Information

Edward Evans

Executive Director

Central Newfoundland Waste Management

126 Roe Avenue, PO Box 149

Gander, NL A1V 1W5

Ph: 256 – 2299 Fax: 256 - 4206

Email: [email protected]

Web Site: www.cnwmc.com

Page 49: Update  November 27, 2009 Professional Municipal Administrators

Central Newfoundland Solid Waste Management Study

BAE Newplan Group Ltd.Wayne Manuel P.Eng

Page 50: Update  November 27, 2009 Professional Municipal Administrators

Questions