    Draft U.P Rooftop Solar PV

    Power Plant Policy

  • 8/10/2019 UP Draft Rooftop SPP Policy

    3/24

    Objectives

    To contributeto solar capacity additionand energy security

    To optimally utilizethe available solar energy resourcein the State

    To encourage developmentand promotionof environment benign solar energy

    generation contributing to sustainable development

    To enable stakeholders in reducing greenhouse gas emissions

    To attract private sector participationin solar energy sector

    To build favorable environment for setting up grid connected rooftop solar

    photovoltaic power plants

    To contribute investmentsin manufacturing, research & development in solar energy

    sector

    To enhance skills and create employment opportunities

    To contribute to productive utilization of available sites To create public awarenessand environment consciousness amongst the citizens

  • 8/10/2019 UP Draft Rooftop SPP Policy

    4/24

    TargetsGrid Connected Rooftop Solar Segment(by FY 2016-17) 20 MW

    Public Institutions Private Institutions

    10 MW 10 MW

  • 8/10/2019 UP Draft Rooftop SPP Policy

    5/24

    Implementation Plan

    The State shall encourage implementation of the grid connectedrooftopsolar photovoltaic power plantsfor captiveor self-consumptionfollowingnet energy metering/billing mechanism.

    Rooftop Solar Photovoltaic Power Plants are proposed to be promoted underNet Energy Metering Mechanism up to 50 kW and Net Energy BillingMechanism above 50 kW.

    Government/Public Institutions Deployment of rooftop solar photovoltaic plants for captive/self-consumption

    on the offices of the government organisations, State government owned oraided institutions/organisations like training centres, hospitals , jails etc shallbe promoted by the State Government.

    All the aforementioned institutions shall implement grid connected rooftopsolar photovoltaic power plant and generate & consume some percentage oftheir annual electricity consumption from such plant.

    The rooftop solar photovoltaic power plant shall be implemented utilizing atleast 25% of the available plinth area.

  • 8/10/2019 UP Draft Rooftop SPP Policy

    6/24

    Implementation Plan

    Funds from the Government of Uttar Pradesh, may bemade available for implementation of Grid connectedRooftop Solar Photovoltaic Power Plant.

    Private Institutions

    All the Private Institutions shall be encouraged toimplement rooftop solar photovoltaic power plant, of

    suitable capacity, on the roof of their premises/area,

    generate & consume the electricity for their self-

    consumption

  • 8/10/2019 UP Draft Rooftop SPP Policy

    7/24

    Eligible Entities

    Any person, which shall include any company or bodycorporate or association or body of individuals, whetherincorporated or not, shall be eligible to set up rooftop solarphotovoltaic power plant and approach nodal agency for

    implementation of such power plants. Provided such plants are set up for the purpose of captive

    use/self-consumption of electricity and such plants complywith the technical standards and specifications, if any,

    specified by the Central/State Government. or through itsnominated nodal agency.

  • 8/10/2019 UP Draft Rooftop SPP Policy

    8/24

    Rationale for Net Energy Metering for Rooftop Solar

    Photovoltaic Projects

    Public/Private Institutions

  • 8/10/2019 UP Draft Rooftop SPP Policy

    9/24

    Movement of Energy Charges in the State

    for select Consumer

    Year FY09 FY10 FY11-FY13FY14

    EXISTING

    Reference

    PETITION NO. :624,625,626,627,628 OF

    200931 March 2010

    PETITION NO. :624,625,626,627,628 OF

    200931 March 2010

    PETITION NO.: 738/2011 &792/2012

    19 October 2012

    Case No. 02,03,04,05,06 of2013

    31 March 2013

    Domestic (Urban)

    0 - 200

    3.00/kWh

    3.45/kWh

    3.45/kWh

    4.00/kWh

    201 - 500

    3.30/kWh

    3.80/kWh

    3.80/kWh

    4.50/kWh

    >500

    3.30/kWh

    3.80/kWh

    3.80/kWh

    5.00/kWh

    Non-Domestic

    0 - 300

    4.30/kWh

    4.95/kWh

    5.75/kWh

    6.00/kWh

    >300

    4.30/kWh

    4.95/kWh

    6.00/kWh

    6.50/kWh

    Public InstitutionsAll Units

    4.00/kWh

    4.60/kWh

    6.20/kWh

    6.50/kWh

    Private Institutions

    All Units

    4.30/kWh

    4.95/kWh

    6.75/kWh

    6.75/kWh

    Energy Charges in the Consumer categories have increased by 2/kWh in last 6 years Final billing rate include, fixed charges, energy charge, regulatory surcharge, electricity duty

  • 8/10/2019 UP Draft Rooftop SPP Policy

    10/24

    Scenario Net Energy Metering Mechanism

    0.00

    1.00

    2.00

    3.00

    4.00

    5.00

    6.00

    7.00

    8.00

    9.00

    Domestic Non-Domestic Public Institution Private Institution

    /kWh

    Fixed Charge Energy Charge Regulatory Surcharge Electricity Duty

    Description DomesticNon-

    DomesticPublic

    InstitutionPrivate

    Institution

    Fixed Charge 0.75 1.00 1.11 1.11

    Energy Charge 4.30 6.35 6.50 6.75

    RegulatorySurcharge

    0.19 0.27 0.28 0.29

    Electricity Duty 0.05 0.08 0.08 0.08

    Effective BillingRate

    5.29 7.70 7.97 8.23

    Charges of consumer categories as per the Case No. 02,03,04,05,06 of 2013 of UPERCFor public and private institution billing rate computation is carried out for connected load of 20kW

    DescriptionWithoutSubsidy

    With 30%GOISubsidy

    Levellised Cost of Generation 9.13 6.65

  • 8/10/2019 UP Draft Rooftop SPP Policy

    11/24

    Subsidy

    State Nodal Agency shall facilitate in availingGovernment of India subsidy, if available forimplementation of such plants, to both Public and

    Private Institutions / organisations.

  • 8/10/2019 UP Draft Rooftop SPP Policy

    12/24

    Transaction Framework

    for Net Energy Metering

  • 8/10/2019 UP Draft Rooftop SPP Policy

    13/24

    Role of UP NEDA (To act as Nodal agency )

    Facilitation in availing subsidy/incentive identification of sites suitable for deployment of solar power capacities Empanel system integrator for implementation of power plants. Organise competitive bidding for allotment of capacities to system

    integrator Allotment of solar power capacities.

    Support in establising procedures/protocols for easy adoption of solarpower Recommend and specify fee and charges necessary to operationalise

    the framework Declaration of Government Orders from time to time Support in development of Regulatory Framework

    Approvals from Empowered Committee headed by Cheif Secretary.

  • 8/10/2019 UP Draft Rooftop SPP Policy

    14/24

    Provisions to be proposed to UPERC for

    developing Net energy Metering /

    Billing framework

  • 8/10/2019 UP Draft Rooftop SPP Policy

    15/24

    Eligible Consumer

    Net Metering

    IndividualCapacity

    Provisions proposedAll consumershaving contracted load of not less than

    1kW shall be eligible

    The power plant can be self-owned by the consumeror

    owned by any other personand install the Power Plantfollowing the provisions of the Electricity Act, 2003 andamendment thereof

    The eligibility of the consumer for availing net energymetering & billing arrangement shall cease to applyin case the eligible consumer defaults in settling theelectricity bills due for payment. The arrangementshall be restored after settlement of energy bills

    Grid

    Connectivity

    Energy

    Accounting

    Solar Purchase

    Obligation

    Metering

    Protocol

    Other Charges

    Eligible

    Consumer

  • 8/10/2019 UP Draft Rooftop SPP Policy

    16/24

    Individual Capacity

    Net Metering

    IndividualCapacity

    Provisions proposedThe eligible consumer shall be allowed to off-set its entireelectricity imports from the host distribution Licenseeduringthe year;

    The capacity of the solar photovoltaic power plant shall beequivalent to the contracted load of the consumer and theservice line for the consumer shall be utilized for grid

    connectivity for evacuation at 415 V or below voltage level;The consumer may implement solar photovoltaic power plant ofhigher capacity, in excess of its existing contracted/sanctioned load,only after equivalent enhancement of its contracted/sanctioned loadby the distribution Licensee;

    The consumer shall bear all expenses of laying new electricalline and related infrastructure, up to the network of distributionlicensee, for evacuation of generation due to implementation ofsolar photovoltaic power plant capacity in excess of contractedloadof the eligible consumer and/or export of generation above415 V voltage level,

    Maximum capacity should be 500 kWp shall be allowed forimplementation at single site, after taking consent from thedistribution licensee

    Grid

    Connectivity

    Energy

    Accounting

    Solar Purchase

    Obligation

    Metering

    Protocol

    Other Charges

    Eligible

    Consumer

  • 8/10/2019 UP Draft Rooftop SPP Policy

    17/24

    Grid Connectivity

    Net Metering

    IndividualCapacity

    Provision Proposed

    Capacity Target for Distribution Licensee Distribution Licensee shall submit procedure, and amended

    procedure, for implementing net energy metering mechanism forapproval of Uttar Pradesh Electricity Regulatory Commission

    Distribution Licensee shall provide net energy meteringarrangement to eligible consumers within the stipulated timeafter receiving the written applicationin a prescribed formatand complete in all respect;

    The cumulative capacity to be allowed at a particulardistribution transformer shall not exceed 15% of the peakcapacity of that distribution transformer, after that the

    distribution licensee shall upgrade the capacity of distributiontransformer;

    Grid Connectivity

    Interconnectivity shall be as per Regulations specified by CEA orElectricity Supply Code specified by UPERC

    GridConnectivity

    Energy

    Accounting

    Solar Purchase

    Obligation

    Metering

    Protocol

    Other Charges

    EligibleConsumer

  • 8/10/2019 UP Draft Rooftop SPP Policy

    18/24

    Energy Accounting

    Net Metering

    IndividualCapacity

    Provision Proposed Net Energy Metering Arrangement connectivity at 415 V

    and below

    Energy accounting shall be primarily on basis of netimport/export recorded in the bi-directional meter.

    The distribution Licensee shall pursue energy bill on thebasis of net energy metered in the bi-directional meter.

    Net Energy Metering Arrangement - connectivity at above415 V

    Energy accounting shall be primarily on basis of two

    separate meters for recording import from thedistribution Licensee and export of generation from solarphotovoltaic power plant, respectively.

    The distribution Licensee shall pursue net energy billafter taking into account the reading in both the meters

    GridConnectivity

    Energy

    Accounting

    Solar Purchase

    Obligation

    Metering

    Protocol

    Other Charges

    Eligible

    Consumer

  • 8/10/2019 UP Draft Rooftop SPP Policy

    19/24

    Solar Purchase Obligation

    Net Metering

    IndividualCapacity

    Provisions proposed

    The quantum of electricity consumed byeligible consumer, who is not defined asobligated entity, from the solar photovoltaicpower plant shall qualify as deemedRenewable Purchase Obligation (RPO) forthe distribution Licensee.

    GridConnectivity

    Energy

    Accounting

    Solar PurchaseObligation

    Metering

    Protocol

    Other Charges

    Eligible

    Consumer

  • 8/10/2019 UP Draft Rooftop SPP Policy

    20/24

    Metering Protocol

    Net Metering

    IndividualCapacity

    Provisions proposed The type, accuracy & class, location of meters and metering arrangement

    shall be governed by regulations notified by Central Electricity Authorityfrom time to time;

    seeking connectivity with the grid above 415 V voltage level,

    Central Electricity Authority (Installation and Operation of Meters)Regulations, 2006 and Central Electricity Authority (Installation

    and Operation of Meters) Amendment Regulations, 2010 and anyamendment thereof

    Power plant seeking connectivity with the grid at 415 V and belowvoltage levels,

    Central Electricity Authority is notifying separate regulations ongrid interactive renewable energy plants, the same shall apply;

    Procurement, testing, installation of new meter and replacement ofexisting meter with new and/or additional meter shall be undertakenby the host distribution Licenseeand shall recover the chargesfrom the eligible consumer as approved from the Commission

    Solar Check meters shall be mandatoryfor installations havingcapacity more than 10 kW. For installations size of less than and equal

    to 10 kW, the solar Check meters would be optional .

    GridConnectivity

    EnergyAccounting

    Solar PurchaseObligation

    MeteringProtocol

    Other Charges

    EligibleConsumer

  • 8/10/2019 UP Draft Rooftop SPP Policy

    21/24

    Other charges

    Net Metering

    IndividualCapacity

    Banking of power

    The eligible consumer shall be allowed to bank 100% of the

    electricitywith the Distribution Licensee,

    The withdrawal of banked energy shall be allowed during theperiod other than 17:00 Hrs. to 22:00 Hrs., specified as peak hours,

    The withdrawal of banked energy shall be allowed subject todeduction of 2%of the banked energy, in each month, as bankingchargespayable to the distribution Licensee in kind,

    The banking of energy shall be allowed during the year from the date ofbanking or from 1stApril and ends on 31stMarch of the year.

    The energy generated in a month shall be adjusted againstconsumption in that month and the balance if any shall be consideredas the banked energy for the month m. Similarly, the generation inconsecutive month, m+1, shall be first adjusted against the

    consumption in that month. In a situation that the consumptionexceeds the generation during the month m+1, the energy banked inthe previous month(s) mshall be drawn to the extent.

    The unutilized banked energyon the expiry of the year would betreated as free energy to the Distribution Licensee and nocommercial settlement shall be made

    GridConnectivity

    Energy

    Accounting

    Solar PurchaseObligation

    MeteringProtocol

    Other Charges

    Eligible

    Consumer

  • 8/10/2019 UP Draft Rooftop SPP Policy

    22/24

    Other charges

    Net Metering

    IndividualCapacity

    Wheeling of power In order to promote the rooftop solar photovoltaic projects, wheeling

    charges and losses shall be nil during the first control period or when thetotal capacity 20 MW for rooftop solar power plant is being installed,whichever is earlier.

    However, after such period the wheeling charges and losses for the use ofdistribution licensees network at respective voltage levels shall be as

    determined by the Commission by general or specific orderCross Subsidy Surcharge

    In case the solar photovoltaic power plant is owned by the eligibleconsumer, it shall not be liable to pay surcharge for consumption of thegenerated electricity for its own use. Provided it complies with therequirement of captive generating plant specified under Electricity Rules,

    2005 In order to promote the rooftop solar projects, cross subsidy surcharge in

    case the supply of power is made to the eligible consumer by any otherperson shall be nil during the first control period or when the totalcapacity 20 MW for rooftop solar power plant is being installed,whichever is earlier.

    After such period such consumer or person shall be liable to paysurcharge as determined the Commission, from time to time.

    GridConnectivity

    Energy

    Accounting

    Solar PurchaseObligation

    MeteringProtocol

    Other Charges

    Eligible

    Consumer

  • 8/10/2019 UP Draft Rooftop SPP Policy

    23/24

    Net Energy Meter ing Schematic Arrangement

    Proposed to be connected at 415 V and below Proposed to be connected at above 415 V