±25 mm
BITUMINOUS SURFACE COURSE 50mm thk. BITUMINOUS BINDER COURSE 50mm thk. VERTICAL TOLERANCE: +/- 6mm BASE COURSE 150mm thk VERTICAL TOLERANCE: +/- 12mm
SUB-BASE COURSE 175mm thk. VERTICAL TOLERANCE: +/- 20mm Capping Material 300mm thk. VERTICAL TOLERANCE: SUB-GRADE FORMATION
Figure 1 SECTION THROUGH PAVEMENT
STA: 0+80.00 STA: 0+90.00 STA: 0+100.00 STA: 0+125.00 STA: 0+160.62
- ----------------------------------------------------------------------------------------------------------------------
CENTER LINE OF ROAD WAY
STA: 0+80.00 STARTING POINT OF ROAD WORKS
LEVELS
MARKER
AUTO BUSINESS
NEW R.C. RETAINING WALL
STATION
START
STATION
END
LAYER OF
PAVEMENT
LENGTH
(M)
WIDTH
(M)
THICKNESS
(M)
AREA
(M2)
VOL.
(M3)
0+80.00 0+90.00 BASE 10 6 0.150 60 9
ASPHALTIC
CONCRETE
10 6 .05 60 (2) 3(2)
0+90.00 0+100.00 CAPPING 10 4.1 0.300 41 12.3
SUBBASE 10 3.5 0.175 35 6.125
BASE 10 6 0.150 60 9
ASPHALTIC
CONCRETE
10 6 0.05 60(2) 3(2)
0+100.00 0+125.00 CAPPING 25 7.1 0.300 177.5 53.25
SUBBASE 25 7.1 0.175 177.5 31.06
BASE 25 6 0.150 150 22.5
ASPHALTIC
CONCRETE
25 6 0.05 150(2) 7.5(2)
0+125.00 0+160.62 BASE 35.62 6 0.150 213.72 32.058
ASPHALITIC
CONCRETE
35.62 6 0.05 213.72 10.68(2)