PSZ 19:16 (Pind. 1/07)

UNIVERSITI TEKNOLOGI MALAYSIA

DECLARATION OF THESIS / UNDERGRADUATE PROJECT PAPER AND COPYRIGHT

Author’s full name : Date of birth : Title :

MOHD NAZER BIN APAU

THE ANALYSIS AND DEVELOPMENT OF SECURE

27th FEBRUARY 1976

SOFTWARE ASSESSMENT MODEL (SSAM)

CASE STUDY: ONE OF THE MAJOR FINANCIAL INSTITUTION

Academic Session : I declare that this thesis is classified as: I acknowledged that Universiti Teknologi Malaysia reserves the right as follows:

1. The thesis is the property of Universiti Teknologi Malaysia. 2. The Library of Universiti Teknologi Malaysia has the right to make copies for the purpose

of research only. 3. The Library has the right to make copies of the thesis for academic exchange.

Certified by:

SIGNATURE SIGNATURE OF SUPERVISOR (NEW IC NO. /PASSPORT NO.) NAME OF SUPERVISOR

Date : Date :

760227-04-5193

2007/2008

RABIAH AHMAD

OPEN ACCESS I agree that my thesis to be published as online open access (full text)

RESTRICTED (Contains restricted information as specified by the organization where research was done)*

CONFIDENTIAL (Contains confidential information under the Official Secret Act 1972)*

NOTES : * If the thesis is CONFIDENTAL or RESTRICTED, please attach with the letter from the organization with period and reasons for confidentiality or restriction.

Page 3: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

20 November 2007 Librarian Perpustakaan Sultanah Zanariah UTM, Skudai Johor. Sir,

CLASSIFICATION OF THESIS AS RESTRICTED - THE ANALYSIS AND

DEVELOPMENT OF SECURE SOFTWARE ASSESSMENT MODEL (SSAM)

CASE STUDY: ONE OF THE MAJOR FINANCIAL INSTITUTIONS BY MOHD

NAZER BIN APAU

Please be informed that the above mentioned thesis entitled “The Analysis and

Development of Secure Software Assessment Model (SSAM) Case Study: One of the

Major Financial Institutions” be classified as RESTRICTED for a period of three (3)

years from the date of this letter. The reasons for this classification are:-

(i) Thesis contains some confidential information regarding the case study

organization’s process flow and standard operating procedure, and

(ii) The contents display some information about the bank’s participated vendors

Thank you.

Sincerely yours,

……………………..

Dr. Rabiah Ahmad [email protected] J2803 – Fakulti Sains Komputer dan Sistem Maklumat (CASE) 03-26154756

Page 4: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

“I hereby declare that I have read this thesis and in my

opinion this thesis is sufficient in terms of scope and quality for the

award of the degree of Master of Information Security”

Signature : ..................................................

Name of Supervisor I : ..................................................

Date : ..................................................

Signature : ..................................................

Page 5: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

THE ANALYSIS AND DEVELOPMENT OF SECURE SOFTWARE

ASSESSMENT MODEL (SSAM)

CASE STUDY: ONE OF THE MAJOR FINANCIAL INSTITUTIONS

MOHD NAZER BIN APAU

A project report submitted in fulfillment of the requirements for the award of the degree

of Master of Computer Science (Information Security)

Faculty of Computer Science and Information Systems

University Teknologi Malaysia

NOVEMBER 2007

Page 6: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

ii

I declare that this thesis entitled “The Analysis and Development of Secure Software

Assessment Model (SSAM) Case Study: One of the Major Financial Institutions

(Malaysia)” is the result of my own research except as cited in the references. The thesis

has not been accepted for any degree and is not concurrently submitted in candidature of

any other degree.

Signature : ................................................................

Name : ................................................................ Mohd Nazer bin Apau

Date : ……………………………………........

Page 7: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

iii

To my wife Izam Zuliana Yahya, and

children Zarif Aiman , and Nur Zara Safiah

Also to my beloved mother and father for their patience, understanding, and dedication

Page 8: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

iv

ACKNOWLEDGEMENT

IN THE NAME OF ALLAH, MOST GRACIOUS, MOST COMPASSIONATE

Thank you to Allah for giving me the blessing for health, strength and earnestness to

accomplish and fulfill my final project report. I take this opportunity to convey my

utmost gratitude and appreciation to my supervisor, Dr. Rabiah Ahmad and Pn. Salmah

Awang who gives me the full support and all guidance, advice and commitment upon my

effort to complete this report.

This appreciation also goes to my beloved family, lecturers and friends who always

encourage and give me full support when needed. Indeed, the courage and support is

highly appreciated.

Page 9: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

v

ABSTRACT

Software evaluation can sometime become a problem in determining on how

extensive to which a software products satisfies a set of requirements. Decision in

choosing the right solution is a challenge to every organization. Conceptually, there is no

right or wrong procedure in dealing with software purchases; however a consistent and

transparent approach within the evaluation committee is important to ensure a high

quality gathered from the end product. As for a big organization, choosing the right

solution from the right vendors is crucial in order to ensure the business objective and

goals are not interrupted. The problem with the situation is always on resources in term of

people, process and skills with regards to the technology acquired. Insufficient number of

people may contribute to the lack of quality output in finding out the best solution. Lack

of skills in term of the requirement and technical “know-how” and “know-who” in

choosing the right vendors may as well contribute to non-conformance product. The

improper process of finding the solution is also can lead to the above problem. All

mentioned problems can be aggregate with more shortcomings i.e. to incur more effort

and cost to the organization in rectifying the problem. Introducing Secure Software

Assessment Model (SSAM) can assist the organization to have a proper evaluation

process with regards to security properties. Indirectly, implementing SSAM can also

create more awareness on security requirements among users and solution providers. It

would then reduce the problem facing by the organization in term of lacking compliances

to the IT Security Policy.

Page 10: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

vi

ABSTRAK

Menilai perisian komputer atau produk boleh menimbulkan masalah kepada

mana-mana organisasi dalam menentukan betapa spesifikasi produk terhadap keinginan

organisasi dapat dipatuhi. Membuat keputusan untuk mana-mana perisian yang sesuai

merupakan aspek yang mencabar bagi mana-mana organisasi. Secara mana sekali pun,

memang tidak ada jalan yang mudah mahupun jalan yang betul atau yang salah dalam

menentukan perisian yang sesuai di sesebuah organisasi. Tetapi kaedah yang teratur,

konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan apa yang

dipilih berkualiti tinggi. Bagi syarikat-syarikat besar, penilaian ini adalah penting untuk

memastikan tidak ada gangguan operasi kelak. Masalah-masalah ini timbul selalunya

berdasarkan manusia, proses dan kemahiran terhadap sesuatu teknologi. Kurangnya

tenaga kerja boleh mendatangkan kemudaratan terhadap kualiti pengeluaran. Kemahiran

yang kurang terhadap teknikal dalam memilih resolusi juga boleh menjejaskan hasil kerja

dan menyebabkan perisian yang diperolehi tidak mencapai tahap piawaian yang dingini.

Proses yang tidak tepat juga boleh menyebabkan apa yang dibincangkan tadi boleh

berlaku. Kesemua ini boleh berlaku dan menjejaskan apa yang ingin dicapai oleh

sesebual organisasi. Dengan memperkenalkan Penilaian Perisian Berdasarkan

Keselamatan Maklumat atau “Secure Software Assessment Model (SSAM)”, ia dapat

membantu organisasi dengan cara pengendalian penilaian yang betul mengenai

keselamatan maklumat perisian. Ini juga membantu organisasi dengan kesedaran yang

lebih mendalam kepada aspek keselamatan maklumat dikalangan pengguna dan

pembekal perisian. Masalah yang dihadapi oleh organisasi dalam kurangnya tahap

piawaian terhadap polisi keselamatan maklumat juga dapat dibendung.

Page 11: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

vii

TABLE OF CONTENTS

CHAPTER TITLE PAGE

DECLARATION ii

DEDICATION iii

ACKNOWLEDGEMENTS iv

ABSTRACT v

ABSTRAK vi

TABLE OF CONTENTS vii

LIST OF TABLES x

LIST OF FIGURES xi

LIST OF ABBREVIATIONS xii

LIST OF APPENDICES xiii

1 INTRODUCTION

1.1 Overview 1

1.2 Background of Selected Study Organization 1

1.3 The Background of Problem 4

1.3.1 Lack of Compliances to IS Security Policy 5

1.3.2 Staff Constraint 6

1.3.3 Cost 6

1.4 The Objective 7

1.5 Scope 8

1.6 Project Importance 10

1.7 Project Plan 11

1.8 Summary 12

Page 12: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

viii

2 LITERATURE REVIEW

2.1 Introduction 13

2.2 Techniques and Approach 14

2.3 Common Criteria 16

2.4 Architecture Trade-off Analysis Method 18

2.5 Qualitative Selection 20

2.6 SDLC Phase 0: Evaluation 26

2.6.1 Introduction 26

2.6.2 Initiations and Endorsement 27

2.6.3 Source for Solution 28

2.6.4 Assessment and Selection 29

2.6.4.1 Functional and Technical Review 29

2.6.4.2 Cost Implication Review 31

2.6.4.3 Overall Assessment 31

2.6.4.4 Recommendation 32

2.7 Commercial of the Shelf (COTS) Evaluation 3

2.7.1 Plan the evaluation 34

2.7.2 Design the evaluation instrument 34

2.7.3 Apply the evaluation instrument 34

2.8 Summary 35

3 PROJECT METHODOLOGY

3.1 Introduction 36

3.2 Operational Framework 36

3.2.1 Data Collection and Analysis 37

3.2.2 Pilot Study 38

3.2.3 Evaluate the Result 38

3.2.4 Develop Prototype 38

3.3 Summary 39

Page 13: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

ix

4 ANALYSIS AND DESIGN

4.1 Introduction 40

4.2 Secure Software Assessment 40

4.3 Mapping on Activity between

SDLC Phase 0 and COTS Model 43

4.4 Generic Secure Software Assessment model 45

4.5 IT Security Baseline Requirement 46

4.5.1 Physical Security 47

4.5.2 Network Security 47

4.5.3 Application Security 48

4.5.4 Database Security 48

4.5.5 System Security 49

4.5.6 ID Security 49

4.5.7 Operational Management 49

4.5.8 Logical Security 50

4.5.9 Policies 50

4.6 Summary 51

5 RESULT AND DISCUSSION

5.1 The Result of SSAM Implementation 52

5.2 The Result of Pilot Project Implementation 53

5.3 Summary 58

6 CONCLUSION

6.1 Conclusion 59

6.2 Summary of Contribution 61

REFERENCES 62

Page 14: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

x

LIST OF TABLES

TABLE NO TITLE PAGE

1.1 SDLC Phases 2

1.2 IS Security Policies 9

2.3 Scoring Table 21

2.4 Vendor Self-Evaluation scale 23

2.5 Risk Factor 24

2.6 Vendor Self-Evaluation Score scale 24

2.7 SDLC Phase 0: Fix Scoring for Functional and

Technical 29

4.8 COTS and SDLC Phase 0 42

4.9 IT Security Baseline Requirement

Section 44

5.10 Project 1 for Vendor A 52

5.11 Project 1 for Vendor B 53

5.12 Project 2 for Vendor A 54

5.13 Project 2 for Vendor B 54

5.14 Project 2 for Vendor C 55

Page 15: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

xi

LIST OF FIGURES

FIGURE NO TITLE PAGE

1.1 Project Life Cycle 3

1.2 Project Activities 11

2.3 Security Software Assessment

and SDLC Phase 0 26

3.4 Operational Framework 35

4.5 COTS and SDLC Phase 0 42

4.6 Secure Software Assessment Model 44

5.7 Vendor Compliances Chart 57

Page 16: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

xii

LIST OF ABBREVIATIONS

GITSC – Group IT Steering Committee

LTM – Logical Technology Model

ORM – Operational Risk Management

PTM – Physical Technology Model

RD – Requirement Definition

WO – Work Order

COTS – Commercial of the Shelf

RFI – Request for Information

RFP – Request for Proposal

Org. – Organization

R&R – Roles and responsibilities

ITSEC – IT Security

BAFO – Best and Final Offer

CMM – Capability Maturity Model

Page 17: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

xiii

LIST OF APPENDIXES

APPENDIXES TITLE PAGE

A IT Security Baseline Requirements 64

B IT Security Baseline Compliance Table 103

C IT Security Baseline Prototype Scoring

Calculation 105

Page 18: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

CHAPTER 1

INTRODUCTION

1.1 Overview

This chapter begins with the background of the selected case study organization.

In section 1.2 it briefly explains on the current process in dealing with a software

development and a project life cycle. One of the focus areas is software evaluation.

Section 1.3 highlights the difficulty face by the organization if the proposed Secure

Software Assessment Model (SSAM) is not in place. Chapter 1 emphasizes on the

objective of having SSAM with explaining on the scope and the importance of SSAM.

1.2 Background of the Selected Study Organization

The organization selected for the case study is well known as the largest banking

group in Malaysia. It has been the leading for the banking industry with over three and a

half decades. This organization has established around 500 branches nationwide and

available in most of the major cities globally. In order to better manage and concentrate

the core businesses, the organization has outsourced the IT infrastructure related matters

to the United States fortune 500 companies. Currently, the organization has about 500

staffs in IS Sector to support the organization in IT operation for growth and innovation.

Page 19: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

2

Within the outsource environment, the process of implementing IT project is very crucial.

It is a known fact that each IT project implementation involves a new software

deployment. Staff within the organization is expected to comply with the System

Development Life Cycle (SDLC) framework where it consists of Phase 0 until Phase 9 as

illustrated in Table 1.1 below. The organization’s Project Life Cycle (PLC) framework

has two main processes which are SDLC and Account Project Management Office

(APMO). SDLC is used to govern the software development life cycle while APMO is

governing the infrastructure related matters. This is consisting of network operation

setup, server preparation, server hardening and the port scanning activities. Figure 1.1

representing the organization high level process of SDLC and APMO.

System Development Life Cycle (SDLC) – Phase 0 to 9

Phase 0 Evaluation – software initiation or product evaluation

Phase 1 System Analysis and Design – product initiation

Phase 2 Functional Specification – documenting functional requirements

Phase 3 Technical Specification – documenting technical requirements

Phase 4 Installation – product or software installation for development and

testing

Phase 5 Programming – product development

Phase 6 Testing – verification on technical and functional requirements

Phase 7 Documentation – compiling all project evidence

Phase 8 Implementation - product or system cut over / live

Phase 9 Post Implementation Review (PIR) – review product / lesson learnt

Table 1.1: SDLC Phases

Page 20: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

3

Figure 1.1: Project Life Cycle

The selected case study organization has made the outsource party to be

responsible for the infrastructure setup. The APMO process starts from a user to raise

their requirements through a formal service request. Then, the representative from the

organization, which is the Project Manager will discuss with the representative from the

outsource partner company in coming up with the Requirement Definition (RD) or Draft

Requirement. Once the RD is confirmed and agreed upon both parties, the Work Order

(WO) will be produced. WO is a documented requirement with a stated cost to develop or

materialize the request. In this organization, a software assessment and vendor selection

will take place during the SDLC phase 0. The activity during this phase is very crucial in

order to ensure potential software that was installed during the project implementation is

the ideal solution and able to support the business innovation and goals. These processes

are important to relate to software evaluation processes because the effort and the cost

should be estimated up front or at the beginning of evaluation exercise.

Page 21: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

4

1.3 The Background of the Problem

Annually, the Information System (IS) sector is mandated with at least 400

projects for implementation. These projects are required to support and align the business

objective. The directive is critical due to aggressive competition among the Financial

Institution (FI) Sector. Each FI desire to come up with own product within the reasonable

time frame. Lapse in ‘time to market’ of the product will dampen the business objective

and possibly losing opportunity to the other FI. Even though, the volume of a project is

filtered every year whereby only a high Return on Investment (ROI) project is

implemented, yet the volume is still far ahead with a comparison to the available

manpower. In this case, we are specifically referring to the staff responsible in

guaranteeing that the IS Security Policy is followed and being addressed accordingly.

The potential software for implementation in the organization is evaluated

through a standard process flow where all participated vendors are having equal chances

in providing their solution capabilities. Vendors will need to submit proposal as per

requirement and later short listed to present their solution to the organization. IS Security

personnel is expected to participate in all evaluation projects and must ensure that the

projects implemented are complying with IS Security Policy. Unfortunately, in a big

organization with an average of 400 projects per year, it is daunting tasks to ensure

software implemented is fully complying with the available policy. The current

predicaments that the organization is facing would be:-

Page 22: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

5

1.3.1 Lack of Compliances to IS Security Policy

Occasionally, the projects implemented and systems installed are not able

to fully comply with the IS Security Policy and Requirements. Prior to project

implementation, evaluation committee was formed in order to evaluate the

suitable solution. The solution selected must be able to fulfill the business

requirements. Even though the selection of vendors is going trough a very detail

and structured process, there are still possibilities that the system is not able to

fully comply with the IS Security Policy once the software is installed. This is due

to the fact that the committee members is not normally put a priority to other

requirement such as security requirement as compared to their business or

functional requirement. During the evaluation process, verification is done

through a paper based. This is where the proposal submitted is reviewed by the

evaluation team. The evaluation committee’s decision will be based upon the

proposal in which the information is weight from the document and then analyze

for further assessment. If it involves such a high investment, the committee may

ask participated vendors to prepare a test environment where a “near-production-

setup” can be shown to the committee.

Actual verification through a proper set up or a “near-production-setup” is

very expensive. Many vendors cannot afford to have this kind of environment.

This limitation could caused the software installed may not fully comply with IS

Security policy and requirements. Sometimes the non-compliance issue may have

been overlook and assume complied by the team due to different understanding

within the same subject. Vendors can claim everything is complying with the

policy requirement during the evaluation phase in order to win the bid. However,

later they failed to do so during the implementation.

Page 23: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

6

1.3.2 Staff Constraint

IS Staff is expected to support the organization business objective by

successfully implementing a new software and technology. The technology is an

enabler to the organization goals and objectives. Every year, the number of

projects waiting to be implemented is very high. IS Security personnel are playing

a vital role in order to ensure the software installed is in compliance to the

organization IS Security Policy and Standard. A realistic number of people are

required to handle tremendous number of projects implemented in the

organization. However, the existing manpower is not sufficient and may not able

to work efficiently and effectively to support the current needs. Security

requirements is the responsibility of everyone in the organization and it is not the

responsibility of IS Security personnel alone.

1.3.3 Cost

There is potentially a high possibility to incur additional cost in getting the

vendors to comply with IS Security Policy. During the project implementation, it

is the responsibilities of the Project Manager to ensure the software installed is

comply with the IS Security Policy. Unfortunately, there are cases whereby

during evaluation it was noted as comply but it is not able to comply with it when

comes for actual implementation. This misunderstanding does happen and could

cause the organization to incur with more effort and money to get the system

comply with the stipulated policy.

Secure Software Assessment Model (SSAM) needs to be introduced to the

selected organization in order to overcome the above shortcomings. SSAM can ensure

the process of achieving IS Security compliance through self-assessment by the vendors,

Page 24: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

7

solution providers and the users themselves. The organization would only need to verify

the self-assessment from the vendors’ responses. However, as mentioned earlier in this

chapter, the outcome of the end product by using the assessment model may not

guarantee 100% compliance to the security policy, but it can anticipate for the

organization on the software assurance compliance level prior to the deployment.

1.4 The Objective

The selected organization for the case study has established a software evaluation

process and known as SDLC Phase 0. During this phase, it requires the project evaluation

team to produce a documented requirement or Request for Proposal (RFP). The RFP then

submitted to the potential vendors or the solution providers. This paper is going to

discuss on the above process in more detail in Chapter 2. Even though IS Security

personnel is expected to get involve in all evaluation projects, it is extremely difficult to

manage the project effectively and efficiently in term of monitoring the security

compliances. Hence, this study is formulated to:-

a. Understand the areas of a secure software assessment, particularly areas related to

the selected case study organization behavior;

b. Develop appropriate Secure Software Assessment Model (SSAM) which consists

of IS Security Requirement Baseline as a simple tools;

c. Integrate the Secure Software Assessment Model (SSAM) to the existing SDLC

Phase 0 (Evaluation phase) in the organization; and

d. The success in this integration will result to a prototype of Secure Software

Assessment Model.

There are many threats to user’s computer, ranging from remotely launched networks

services exploits to malicious code spread through emails, malicious code, and file

Page 25: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

8

downloads. Vulnerabilities in IT products are discovered on almost daily basis. Though,

it is impossible to ascertain a 100% non-vulnerabilities product, but to a certain degree,

assurance is a likely method to reduce the known threats and vulnerabilities in any IT

Products. Software Security Assurance is the process of ensuring that software is

designed to operate at a level of security that is consistent with the potential harm that

could result from the loss, inaccuracy, alteration, unavailability, or misuse of the data and

resources that it uses, controls, and protects. (Wikipedia, 2007 Wikipedia. Retrieved

October 2007, from http://en.wikipedia.org/wiki/Software_Security_Assurance). By

having SSAM, the organization is hoping to achieve the following:-

a. Provide a better snapshot on the level of IS Security Policy Compliance on the

intended software installation or intended project implementation;

b. Sufficient and efficient in monitoring project evaluation; and

c. Reduce the risk of extra cost incurred, due to additional scope or add-on in order

to comply with IS Security Policy;

1.5 Scope

1. The project scope is only covers to the organization head office located in Kuala

Lumpur, Malaysia. It is important to note that the organization has about 22,000

employees and more than 500 branches nationwide. However, the scope of this

study is mainly covering a software acquisition by the IS Sector.

2. The main custodian of the process would be the IS Security Department.

However, the baseline requirement will be the responsibility of each evaluation

project team to update in accordance to their current needs and situation.

3. The scope for this analysis and implementation is to focus on the activity of the

Organization’s SDLC Phase 0. Detail activity on SDLC Phase 0 will be discussed

later in Chapter 2.

Page 26: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

9

4. The development of Secure Software Assessment Model (SSAM) will be based

on the organization’s IS Security Policy and the development of Information

Security Baseline Requirements. The selected policy available are as below:-

Information Security Policy

1. IS Security Policy 2. Policy on General Systems

Security and Controls on ID and

Password

3. Security Policy for Overseas

Branches

4. Local Administrator Policy

5. Notebook Policy 6. Desktop Policy

7. Anti Virus Policy 8. Internet Usage Policy

9. Firewall Policy 10. Email Usage Policy

11. Enterprise Security Network

Architecture Policy

12. Wireless Communication Policy

13. Database Policy 14. Remote Access Policy

15. VPN Policy 16. PKI Guideline

17. Encryption Policy 18. Backup Policy

Table 1.2: IS Security Policies

Currently the organization is enforcing about 18 policies of IS Security. It

is not the entire policy requirement is included in the baseline, however most of

the critical requirements from the policy are reflected in the checklist. Hence, the

baseline requirement is capable to act as the reflection of the organization’s

policy. By having the baseline requirements, the organization is only required to

give out the baseline to the “outsiders” without revealing the internal policy.

Through the baseline requirement, vendors who participate in the organization

Page 27: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

10

tender must response to the queries. The IS Security baseline (As per Appendix

A) can always be updated with a proper versioning control in place.

1.6 Project Importance

The proposed SSAM is expected to establish visibility and manageability of software

installed within the organization. The benefits would be:-

1. Detection of a problem to the current infrastructure, design, policy, and setup.

2. Risk clarification and prioritization on the mitigation process can be done in

order to support business objectives; and

3. Increase the understanding of threat and vulnerabilities to the potential product

implement at the organization.

Page 28: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

11

1.7 Project Plan

In order to achieve the desired result, figure 1.2 below conceptually lay out major

activities to be performed for project completion. The key activities are divided into 4

phases as below:-

Phase 1: Project Identification and scoping

Phase 2: Literature Review and relevant documents

Phase 3: Model Analysis and designing the IT Security Baseline

Phase 4: Pilot Implementation

Phase 1:

Phase 2: Liter re Review & relevant documents

Phase 4 Pilot Implementation

Phase 3: Mode nalysis and designing IT Security

: project

identification & scoping atu l A

Baseline

• identify problem

e

• performing literature review • Analysis and integrate • Implementation

ss • identify scope of thplementation im

• identify relevant supp

• performing review on ganization policies, or

guidelines, template and relevant documents

•Review effectivene

•Document

existing SDLC Phase 0 wiSecure Software Assessment

•Design the IT Security seline

th

other orting Ba

•Design the Baseline templatdocuments e

and scoring – MS Excel 2000

Figure 1.2: Project Activities

Page 29: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

12

1.8 Summary

.

Software Assessment is mostly regarded as decision making on Information

Technology investment. Unfortunately, a selection process on the “to be implemented”

investment proposal is not straightforward as it may seem. The planned activities on the

evaluation or assessment are initiated to manage conformance in term of business

requirement, technical requirement as well as security requirement. As per selected

organization in the case study, SDLC Phase 0 is the main framework use to initiate the

outcome. Software Assessment or Evaluation is defined as the assessment of software

product’s characteristics in accordance to the specific procedures. During the assessment,

the fit or criteria between the software product and the organization needs of that product

must be determined upfront. This fit concerns both explicit and implicit needs about the

product. This paper presents a proposed software evaluation model with security in

minds. The outcome of the end product from this evaluation or assessment model may

not guarantee a 100% of compliance to the security requirements. However, it might be

able to pre-empt the organization on the assurance level for compliance before the

software is deployed. In addition to that, risk mitigation can be done at this juncture to

minimize the cost due to non-conformance product.

Page 30: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

62

REFERENCES Alan W. Brown and Kurt C. Wallnau (1996). A Framework for Systematic Evaluation of

Software Technologies. 5-40. Software Engineering Institute, CMU, 19996

Ann Brown (2005). IS Evaluation in Practice. 169-178. The Electronic Journal

Information Systems Volume 8 Issue 3.

David Carney (1998). Evaluation of COTS Product: Some Thoughts on the Process. 1-7.

SEI Interactive 9/98.

Dieter Gollman (2006). Computer Security. 170-184. (2nd Edition) John Wiley and Sons

Ltd.

Federic Copignneaux and Sylvain Martin (1998). Software Security Evaluation Based on

a Top down Mc Call like Approach. 414-418. French Ministry of Defense.

Ha Lin, Ahh Lai and Rebecca Ulrich (2006). COTS Software Selection Process. 8, 12-

14,18. Sandia National Laboratories.

John Kelsey (2005). Voting System Testing and Evaluation. 1-16. NIST, Computer

Security Division.

John Rushby (1995). Formal Methods and their Role in the Certification of Critical

Systems. 9-38. FAA Digital Systems Validation Handbook.

Lawrence G. Jones and Rick Kazman (1999). Software Architecture Evaluation in the

DOD Systems Acquisition Context. 1-6. SEI Interactive.

Page 31: UNIVERSITI TEKNOLOGI MALAYSIAeprints.utm.my/id/eprint/48100/1/MohdNazerApauMFC2007.pdf · 2017-08-13 · konsisten dan telus di dalam pasukan penilaian adalah penting bagi memastikan

63

Michael S. Bandor (2006). Quantitative Methods for Software Selection. 1-13.

CMU/SEI-2006-TN-026

R. Kazman, Mark Klein and Paul Clements (2000). ATAM: Method for Architecture

Evaluation 3-15. SEI: CMU.

Ray C. Williams, George J. Pandelious and Sandra G. Behrens (1999). Software Risk

Evaluation (SRE) Method Description. 33-59, 73-81. Software Engineering

Institute, CMU, 1999.

Syntegra (2006). Common Criteria. Common Criteria Project Sponsoring Organization,

May 1998

Teade Punter, Rini van Solingen and Jos Triekens (1995). Software Product Evaluation.

3-10. Eindhoven University of Technology, Faculty of Technology

Management, section Information and Technology.