7
United States Department of the Interior BUREAU OF SAFETY AND EKMRONMENTAL ENFORCEMENT Gulf ofMexico OCS Region 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394 In Reply Refer To: GE 1035A Mr. Paul Sevin Dauphin Island Gathering Partners 5300B Highway 188 Coden, Alabama 36523 Dear Mr. Sevin: April 26, 2017 Reference is made to Dauphin Island Gathering Partners's (Dauphin) right-of-way (ROW) application, dated April 3, 2017 and received by this office on April 19, 2017, for Pipeline Segment Number (PSN) 11355, ROW No. OCS-G17720. Specifically, Dauphin requests to modify Pipeline Segment Number (PSN) 11355 by reversing the flow direction of the pipeline segment. The table below describes the Pipeline Segment pertaining to the aforementioned application: PSN Size (inches) Length (feet) Service Origin Termination 11355 24 316.997 (fed) 342,899 (total) Gas Condensate F/S Boundary Mobile Block 821 Platform A Main Pass Block 225 Pursuant to 30 CFR 250.1000(b), your application is hereby approved. You shall submit written notification to this office within 30 days of the completion of the pipeline modification. This notification shall include the date the modification was completed and an indication that the modification was completed as approved. Sincerely, (for) Bryan A. Domangue Acting Regional Supervisor Regional Field Operations

United States Department of the Interior · Reference is made to Dauphin Island Gathering Partners's (Dauphin) right-of-way (ROW) application, dated April 3, 2017 and received by

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: United States Department of the Interior · Reference is made to Dauphin Island Gathering Partners's (Dauphin) right-of-way (ROW) application, dated April 3, 2017 and received by

United States Department of the Interior BUREAU OF SAFETY AND EKMRONMENTAL ENFORCEMENT

Gulf ofMexico OCS Region 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394

In Reply Refer To: GE 1035A

Mr. Paul Sevin Dauphin Island Gathering Partners 5300B Highway 188 Coden, Alabama 36523

Dear Mr. Sevin:

April 26, 2017

Reference is made to Dauphin Island Gathering Partners's (Dauphin) right-of-way (ROW) application, dated April 3, 2017 and received by this office on April 19, 2017, for Pipeline Segment Number (PSN) 11355, ROW No. OCS-G17720.

Specifically, Dauphin requests to modify Pipeline Segment Number (PSN) 11355 by reversing the flow direction of the pipeline segment.

The table below describes the Pipeline Segment pertaining to the aforementioned application:

PSN Size (inches)

Length (feet)

Service Origin Termination

11355 24

316.997 (fed)

342,899 (total)

Gas Condensate

F/S Boundary Mobile

Block 821

Platform A Main Pass Block 225

Pursuant to 30 CFR 250.1000(b), your application is hereby approved.

You shall submit written notification to this office within 30 days of the completion of the pipeline modification. This notification shall include the date the modification was completed and an indication that the modification was completed as approved.

Sincerely,

(for) Bryan A. Domangue Acting Regional Supervisor Regional Field Operations

Page 2: United States Department of the Interior · Reference is made to Dauphin Island Gathering Partners's (Dauphin) right-of-way (ROW) application, dated April 3, 2017 and received by

GATHERING PARTNERS

April 35 2017

COVER LETTER ONLY

United States Department of the Interior Bureau of Safety and Environmental Enforcement GulfofMexico OCS Region 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394

Attention:

Re:

Ms. Gobert,

Pipeline Section Ms. Angie Gobert

Pipelme Modification Application - Reverse Flow Dauphin Island Gathering Partners Pipeline Segment # 11355

R E C E I V E D APR 19 2017

Office of Fieid Operations Pipeline Section

SEE)

Attached, please find a permit application, area maps, flow schematics and receipt for fee payment for another Reverse Flow application just as we did in May and December of 2016. The reverse flow allows our offshore producers to continue flowing their wells while our Mobile Bay Facility and downstream customers are down for necessary repairs. Our reverse flow in May and December of 2016 was a great success as we encountered NO problems throughout the duration of the reverse flow.

Thanks you for your assistance. Should you require any additional information regarding this matter, please contact me at 225-335-0791

DAUPHIN ISLAND GATHERING PARTNERS

Paul E. Seyii

ore Operations Technical Supervisor

©COPY

5300B Highway 188 251-873-5011 Voice

Coden, Alabama 36523 251-873-4010 Fax

Page 3: United States Department of the Interior · Reference is made to Dauphin Island Gathering Partners's (Dauphin) right-of-way (ROW) application, dated April 3, 2017 and received by

Oauphiffl

Island GA THERING PARTNERS

April 3,2017

United States Department of the Interior Bureau of Safety and Enviromnental Enforcement GulfofMexico OCS Region 1201 Elmwood Park Boulevard New Orleans, LA 70123-2394

Attention: Pipeline Section Ms. Angie Gobert

Re: Pipeline Modification Application - Reverse Flow Dauphin Island Gathering Partners Pipeline Segment # 11355

Ms. Gobert,

As per BSEE requirement, this letter and attached drawings shall serve to notify the BSEE/Pipeline Section that Dauphin Island Gathering Partners (DIGP) is requesting approval for our appUcation for modification of pipeline segment # 113 55 to reverse flow for a period of approximately one (1) week within the window of June 15,2017 thru July 15, 2017. Currently segment #11355 begins at MP-225"A" platform and ends in Federal/State waters at our AST-73 platform. From this point it continues into our Mobile Bay Processing Facility in Coden, AL The purpose of the reverse flow is to provide flow assurance for customers impacted by pipeline work being performed downstream of our Mobile Bay Processing Facihty. The reversed flow will deliver gas into the TETCO Pipeline Segment # 10824, beginning at MP-225 "A" piatform and ending in Venice, LA. To accommodate this event, two (2) check valves will be pinned open on our MP-225 "A" Platform and block valves will be closed at our Mobile Bay Gas Processing facihty inlet. The check valves will have signs indicating they have been pinned in the open position.

An Application fee receipt of $ 4169.00 is attached

Dauphin Island Gathering Partners 24" Pipeline Segment No. 11355

Pipeline Modification Scope of Work

Attached with this permit application are area maps and receipt for fee payment. Thanks you for your assistance. Should you require any additional infonnation regarding this matter, please contact Paul E. Sevin at 225-335-0791

DAUPHIN ISLAND GATHERING PARTNERS

Brian S. Frederick

Vice-President, Planning and Corporate Development

©COPY 5300B Highway 188 f j T l r * « „ Coden, Alabama 36523 251-873-5011 Voice SC C ^ f j P Y' 251-873-4010 Fax

Page 4: United States Department of the Interior · Reference is made to Dauphin Island Gathering Partners's (Dauphin) right-of-way (ROW) application, dated April 3, 2017 and received by

r ay .guv - ivcv-cipi ± agv-

Paygov Receipt

Your payment is complete Pay.gov Tracking ID: 261JQPMD Agency Tracking ID: 75216307258 Form Name: Pipeline ROW Modification Application Application Name: BSEE Pipeline ROW Modification Application - BY

Payment Information Payment Type: Debit or credit card Payment Amount: $4,169.00 Transaction Date: 03/31/2017 04:38:53 PM EDT Payment Date: 03/31/2017 Region : Gulf of Mexico Contact: Pauil Sevin 225-335-0791 Company/Co No: Dauphin Island Gathering Partners, 0187 Pipeline Segment No.: 11355 Originating Area/Block: Main Pass MP, 225 Terminating Area/Block: Unnamed or Other, 0

Account Information Cardholder Name: Paul Sevin Card Type: Master Card Card Number: ************ 1634

Email Confirmation Receipt Confirmation Receipts have been emailed to: [email protected]

(c C O P Y

Page 5: United States Department of the Interior · Reference is made to Dauphin Island Gathering Partners's (Dauphin) right-of-way (ROW) application, dated April 3, 2017 and received by

-PASS" AREA EAST

CURRENT FIOW PATH

OF SEGMENT H 11355

REVERSE FLOW PATH

OF SEGMENT #11355 FLOWING INTO SEGMENT tf 10824

DAUPHIN ISLAND GATHERING PARTNERS PIPEUNE MODIFICATION - REVERSE FLOW SEGMENT # 11355 & SEGMENT « 10824 MAY-JUNE 2015

( C C O P \

Page 6: United States Department of the Interior · Reference is made to Dauphin Island Gathering Partners's (Dauphin) right-of-way (ROW) application, dated April 3, 2017 and received by

12 M

A 1

I)

M

ii

PSHLand Automated SDV Departing 20" Line

TO 'ArMOS.

KAH-4100 20" DEPARTING CAS PIPELINE

MAWP = 1440|

' --

I? 11

it

14

!9

tt 1» n

s G ;'-a

H

8

•2

SI

PIPELINE = 1760J

iBi-Directionair

PSHL and Automated SDV for Incoming 24" Line

<AX-445) FSO LINE

(IEMP 0,0,S.)

Check Valve to be Pinned open

KAH-4?QD DEPARTING

OIL PIPEUNE UPOG 6"

KAH-4S00 DEPARTING OIL PIPELINE

MPOO 18"

Denotes Platform Limits

16501 d L HEADER^- - '

•-

a

a

H

5*

a

B

M • za a

KAQ-44QQ B' INCOMING OIL P/L FROM ORYX VK-826

KAQ-4451? 10' INCOMING OIL P/L FROM AMOCO VK 915

DESIGN PRESSURE 3349|

IvourrES G C T W I A W ; . I i f lAFAVEnE-HOmW

PHWE; 337-2M-9026 FAJC 337-2M-3725

6/lS/iB

10/M

9/M

If*

REVISIONS )-itH<API

GFNERAL AUDIT 4 PHA RPVISIONS

REVISED TITLE BLOCK LOGO & 6' KICKER LINE

KAH-4200 DEPARTING OIL P/L BACK IN SERVICE

AND KAH-4500 DEPARTING OIL P/L (O.O.S.)

ADDED E.G. IL PIG LAUNCHER PIPING

REMOVE COMPRESSOR CAE-2100

DauphJn Island > GATHERING PARTNERS

P.O. NO.

l 0 * ^ CRL/BD

MAIN PASS 225 "A"

OESCRIPnON

PROCESS/SAFETY ANALYSIS FLOW DIAGRAM

oic 9* moAus/aa. DA it

4/98

DWC NO. HP-225-A-M2-00t

CAD NO 225om0ld.dvrg

Page 7: United States Department of the Interior · Reference is made to Dauphin Island Gathering Partners's (Dauphin) right-of-way (ROW) application, dated April 3, 2017 and received by

OLANKCT CAO

FUEL CAS

8" 2Mrf ^ y | A ^ l n w

2"222C« l i re i r o m toard l r f i p ipel i re. SDW to shut of f fuel to platfomr In the event ot an ESD.