Unit C3Jacek Truszczynski

10/06/2010

Energy Star Board 10 June 2010

Page 2: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 2NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Page 3: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 3NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Overview

.EPA's Enhanced Testing and Verification Programme: overview

.Possible continuation of the EU Energy Star Programme: presentation of options and discussion

Page 4: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 4NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Background (EPA)

. Increased scrutiny of voluntary programs» Proliferation of green standards – national, international, media, retail» Concern over “greenwashing”» Inspector General Reports at EPA and DOE» General Accounting Office ENERGY STAR Investigation. New Partnership Agreement» “Verification of compliance with program requirements will be

increased and efforts will be enhanced to identify and address product performance issues.”

» “Verification of ENERGY STAR Qualifying Products will be enhanced in two ways:

• All products will be required to be tested in an accredited laboratory and qualifying product information be submitted to the government before the product can be qualified as ENERGY STAR

• Enhanced ‘off-the-shelf’ product testing will be instituted across the full suite of ENERGY STAR covered product categories through a combination of EPA/DOE testing, manufacturer funded/EPA-DOE administered testing, or other third party testing.”

Page 5: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 5NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Page 6: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 6NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Key elements (EPA)

. Testing and reporting prior to qualification (all products)» Ensure that EPA has testing information on all

products prior to labeling» Require test data from accredited labs that is

representative of the product in the marketplace.Continued testing after qualification (10-30%)» Verify that products continue to meet the ENERGY

STAR requirements regardless of changes in the production process

» Provide consumers with confidence that ENERGY STAR products are delivering the savings they expect.Both to be carried out by CB

Page 7: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 7NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Timeline (EPA)

Key Milestones

May 3: Draft AB requirements

May 17: Draft Lab requirements

June 4: Draft Qualification and Verification requirements

July: Finalize all requirements; begin accepting AB and CB applications

July-Dec: Recognize ABs, CBs, and labs

Sept: Finalize Partner Commitments and resign all agreements

Dec 31:Require qualification in recognized labs for all new ENERGY STAR products; phase-in retesting requirements for existing products

Page 8: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 8NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Expectations towards us (EPA)

.2 Options» Host Country institute changes in product

qualification that harmonizes with EPA enhanced testing requirement and share data with EPA

» Have EPA manage the qualification of products using the new testing requirements and export data back to host country

Page 9: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 9NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Possible options

.Continue with full involvement

.Continue under new terms

.Replace Energy Star with other instruments

Page 10: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 10NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Continue with full involvement

. Third-party verification - use labs accredited under Ecolabel? » Ecolabel specifications for office equipment do not

require 3rd-p verification on the energy aspect ->lack of accredited labs to do the testing

.More market surveillance» Resources?» Are these products a priority for m. surveillance?

Page 11: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 11NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Continue under new terms

.Have EPA manage the qualification of products using the new testing requirements and export data back to host country» Approach already applied for e.g. in the case of

Canada» EPA does not exclude accrediting labs outside of the

US (using for e.g. recognised schemes such as TCO in the case of computers; the primary reference will be accreditation with ISO/IEC 65)

» Provisions on public procurement would probably need to be dropped

Page 12: Unit C3 Jacek Truszczynski 10/06/2010 Energy Star Board 10 June 2010

| 12NOUVELLE LÉGISLATION EUROPÉENNE POUR ÉCONOMISER L’ÉNERGIE

Replace Energy Star with other instruments

.Is it desirable in light of calls for strengthened international cooperation?

.Is it feasible for office equipment?

.Timeline