Sheet1 Page 1 DETAIL SURVEY WORKS No Description Unit Qty 1 Lsum 2 Mob / Demob of Land Survey team party day 3 Horizontal Control km 4 Vertical Control km 5 Detail survey and spot level survey hec 6 km 7 km 8 9 10 11 Total Land Survey Fees UTILITIES DETECTION AND MAPPING No Description Unit Qty 1 2 Mob / Demob of Land Survey team 3 m sq 4 Total Utilities Detection Fees Preparatory works – purchase of CP, Control Horizontal profile @ 25m interval along the Cross section survey @ 25m interval along the Horizontal profile @ 10m interval along the Cross section survey @ 10m interval along the Horizontal profile @ 25m interval along the Cross section survey @ 25m interval along the Provision of digital data in 3D and hardcopy Preparatory works – purchase of CP, Control Area of Interest as shown on the plan utilities plan at 1 : 1000 scale

UNDERGROUND UTILITIES MAPPING COSTING

Embed Size (px)

DESCRIPTION

SAMPLE BILLS OF QUANTITIES TO CALCULATE COST FOR CONDUCTING UNDERGROUND UTILITIES MAPPING WORKS.RATES DEPEND ON LOCATION, ACCESSIBILITY, ETC

Citation preview

Page 1: UNDERGROUND UTILITIES MAPPING COSTING

Sheet1

Page 1

DETAIL SURVEY WORKSNo Description Unit Qty

1 Lsum2 Mob / Demob of Land Survey team party day

3 Horizontal Control km4 Vertical Control km5 Detail survey and spot level survey hec

6 Horizontal profile @ 25m interval along the road network km7 km

89

10

11

Total Land Survey Fees

UTILITIES DETECTION AND MAPPING

No Description Unit Qty12 Mob / Demob of Land Survey team

3 m sq

4

Total Utilities Detection Fees

Preparatory works – purchase of CP, Control points,

Cross section survey @ 25m interval along the road

Horizontal profile @ 10m interval along the drainage Cross section survey @ 10m interval along the drainage

Horizontal profile @ 25m interval along the jajaran Sg Cross section survey @ 25m interval along the jajaran Sg

Provision of digital data in 3D and hardcopy plots on A1

Preparatory works – purchase of CP, Control points,

Interest as shown on the plan

1000 scale

Page 2: UNDERGROUND UTILITIES MAPPING COSTING

Sheet1

Page 2

DETAIL SURVEY WORKSRate Fee

743 1 party daydepend berapa team

2000 kira jumlah laluan jalan + 1km utk ikatan

520.1 kira jumlah laluan jalan + 1km utk ikatan

743

20% dari Item 3 – 10

UTILITIES DETECTION AND MAPPING

Rate Fee

dan kita boleh anggar per m run