Sheet1
Page 1
DETAIL SURVEY WORKSNo Description Unit Qty
1 Lsum2 Mob / Demob of Land Survey team party day
3 Horizontal Control km4 Vertical Control km5 Detail survey and spot level survey hec
6 Horizontal profile @ 25m interval along the road network km7 km
89
10
11
Total Land Survey Fees
UTILITIES DETECTION AND MAPPING
No Description Unit Qty12 Mob / Demob of Land Survey team
3 m sq
4
Total Utilities Detection Fees
Preparatory works – purchase of CP, Control points,
Cross section survey @ 25m interval along the road
Horizontal profile @ 10m interval along the drainage Cross section survey @ 10m interval along the drainage
Horizontal profile @ 25m interval along the jajaran Sg Cross section survey @ 25m interval along the jajaran Sg
Provision of digital data in 3D and hardcopy plots on A1
Preparatory works – purchase of CP, Control points,
Interest as shown on the plan
1000 scale
Sheet1
Page 2
DETAIL SURVEY WORKSRate Fee
743 1 party daydepend berapa team
2000 kira jumlah laluan jalan + 1km utk ikatan
520.1 kira jumlah laluan jalan + 1km utk ikatan
743
20% dari Item 3 – 10
UTILITIES DETECTION AND MAPPING
Rate Fee
dan kita boleh anggar per m run