UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_I nn .tredu i n The purpose of this Tank Removal Report is to summarize historical activities involving underground storage tank #UT-47, located near Bldg . 324 , in Area I of the Rockwell International , Rocketdyne Division , Santa Susana Field Lab . i1 . Tom . r Tank Identification - UT-47 Previous Tank Identification - T102 Size - 1,200 gallon s Structure - Steel Contents - Diesel/Fuel oil Removal Date - August 26, 1987 Abandonment Permit # - 698 (a tt achment A) Tank Abandonment Checklist Lead Agency - VCEHD LUFT File # C9009 4 VCEI-ID Inspector - Jerry Burke Photos Availabl e III, Illustration s Vicinity Map - (a tt achment B) Site Map - ( attachment C ) IV. Discussio n UT-47 was located in Area I of SSFL, immediately south of the Instrumentation laboratory, Building 324 . It was buried approximately seven to ten feet underground between the buildings and the Area I Service Road . The tank was reportedly installed in 1959 and was used to store fuel oil to operate powe r • generators during natural gas curtailment . The tank was excavated and removed on August 26, 1987 as part of Rocketdyne's Tank Removal Program . A soil sample was collected from the bottom of the excavation and analyzed by the Rockwell International, Analytical Chemistry Laboratory . Diesel was reported at a concentration of 1,700 parts, per million . Records indicate that soils containing diesel fuel were removed at the time of the tank removal . Following the results to the soil sample, the site was referred to the VCEHD Leaking-Underground Fuel Tank--(LI FT) program- (attachmv ent D) .. Consequently, Rocketdyne engaged the services of Groundwater Resourc e Consultants, inc . (GRC) to prepare a "Preliminary Site Assessment Work Plan, HDMSe00024198

UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

UNDERGROUND STORAGE TANK REMOVAL REPORTUT-4 7

I_I nn.tredu i n

The purpose of this Tank Removal Report is to summarize historical activitiesinvolving underground storage tank #UT-47, located near Bldg . 324 , in Area I ofthe Rockwell International, Rocketdyne Division , Santa Susana Field Lab .

i1 . Tom . r

Tank Identification - UT-47Previous Tank Identification - T102Size - 1,200 gallon sStructure - SteelContents - Diesel/Fuel oilRemoval Date - August 26, 1987Abandonment Permit # - 698 (attachment A)Tank Abandonment ChecklistLead Agency - VCEHDLUFT File # C90094VCEI-ID Inspector - Jerry BurkePhotos Available

III, Illustration s

Vicinity Map - (attachment B)Site Map - (attachment C)

IV. Discussion

UT-47 was located in Area I of SSFL, immediately south of the Instrumentationlaboratory, Building 324 . It was buried approximately seven to ten feetunderground between the buildings and the Area I Service Road . The tank wasreportedly installed in 1959 and was used to store fuel oil to operate powe r

• generators during natural gas curtailment .

The tank was excavated and removed on August 26, 1987 as part of

Rocketdyne's Tank Removal Program . A soil sample was collected from thebottom of the excavation and analyzed by the Rockwell International, AnalyticalChemistry Laboratory . Diesel was reported at a concentration of 1,700 parts,per million. Records indicate that soils containing diesel fuel were removed atthe time of the tank removal .

Following the results to the soil sample, the site was referred to the VCEHDLeaking-Underground Fuel Tank--(LI FT) program- (attachmv ent D) ..Consequently, Rocketdyne engaged the services of Groundwater ResourceConsultants, inc . (GRC) to prepare a "Preliminary Site Assessment Work Plan,

HDMSe00024198

Page 2: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

Tank #47, Building 324", dated September 25, 1990 (attachment E) . Results tothe subsurface sampling were submitted to VCEHD on March 8, 199 1(attachment F) .

Based on the GRC soil sampling results and a VCEHD correspondence, datedMarch 26, 1991, no further action is recommended (attachment G) .

HDMSe00024199

Page 3: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

Attachments

. .. . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . .. . . . .. . . . . .. . . . . . . . . . . . . . . . . . . . . . .. . . . . .. . . . . . . . . . . . . . . . . . . . . . .. . . . . .. . . . .. . . . . . . . . . . . . . . . . . . . . . . .. . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . .. . . . . .

. . . . . . . . . . . . . . . .. . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . .. . . . .. . . . . .. . . . . . . . . . . . . . . . . . . . . . .. . . . . . ..

HDMSe00024200

Page 4: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

ENVIRONML 1AL rscrtt; 1 I' ATTACHMENT A

DATE

AEr. ICOMPLETE THE FOLLOWING FOR EACH TANK TO BE

ABANDONED

CONTENT S

TANK CONSTRUCTION (Steel, Fiberglass, Etc .) PRESENT AND PREVIOUSLY J

9nAbandon0Joint Agency Application For permit 7UNQERCI OUNO HA •

i der round Hazardous Materials Storage Tankr'

ZA-Rp fhS MATEK IAL STORAGECATION FOR PERMIT TO ABANUUIAPPLI TAN

K

'Anti LOcATUO

OWNER sv1 +~ fC0IYTACT

Santa SUS'-' Field Lab . tc; wontszr

llFktt lCs At)r1tiE$S t Iumbs . saat• Chy end

6633 Canoga Ave . ."Canzna Pat-k, CA 91304

OPERATOR

3 a /C,_4 7

Cm am Z* Cadet

730 i'tountain View Aven ue , (J? tnarJ C1hyw ~ 1L7~'

untrYE d.Suite 1Q lenura jc~4`1E77

Sentry - 674 Coountry

PREVIOUS OWNER AND OPERATORS TANK(S)

OWNERIOPERATO R

NO.SIZE

d C R Ddtet

fue] _C' 4

oeEsttmat

See Conditions for Approval on Back of Form

❑ . Denied . Reason for Denial :

1t4SPfCFOR

DISTWSUTION : White --EH Csnary-Crntractor Pink _Appkant Goldenrod fire Dept .

HDMSe0002420 1

Location O all tan s, plpt 5 R Nearest intersection or roadATTACH A PLOT PL.A k Property tinesn and secondary

SHOWING '

Overfill protectionsystem're moved

Leak, detection system4

€,iat•ng equipment and equipment to becontainment ❑ E ui meet summar y

ScaleNorth arrow

St6HATt1r1E5 . Uf .ARYLICAT+Y 4R fjEKFIIWATtYE . .^~.

a t?ci Abandon in Place G__Pemo`alOFFICE USE ONLY APPLICATION : ppr6v

Page 5: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

0 403

APPROXIMATE LOCATIONOF FORMER UST# UT-47 `I

71 3

APPROXIMATE LOCATIONOF FORMER UST# UT-43

3 8

I

--------------APPROXIMATE LOCATIONOF FORMER UST# UT-44

i0

APPROXIMATE LOCATION,OF FORMER UST# UT-45

90

9

3 0

322 3 0

30 2

S 266

030 5

9

408

WE0

SSFL . AREA I

UNDERGROUND FUEL OtL TANK

7

-4

Page 6: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

{{ load I.I,

i t ~ } e q317 /~

4n. . .. . .. . . . . ~ . ..I .. . .. ... . r . .. . WkW. . .W. . ~ .~, _~

_ _ .. ~ .. : ... . .. . .. . .., .., ~

.. . ~ . ~. i •. /~' r _,__ t- _ . _y

~.H ~4n~

{vfl o

34 •~ ~6 "91719 7-7\~

}'C.IMf.LL 7 l d ` JV O f/t i ,~ e ~ri sit

. airp I r~ . .Issn

aos

ATTACHMENT C

CANYON AREA •INAOTIYEf , I _

. - _ ._ ._ . -I . - f 1I _

LEGEND

BU ILDINGS voo . 2oo.3o0 5 400 SERIES )

STRUCTURESt7oo S 9 00 SERIES }

WATER TANKS(Soo SERIES )

AREAS (500 SERIES )

p ACTIVE WELLS OR WATER TANKS

0 INACTIVE WELLS SCALE IN FEET

0 400 000 12000

06K 1439 6055 .F-C.SSFL.MAP-MASTE R

11/12164 8119

Page 7: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

ATTACHMENT D

RESOURCE MANAGEMENT AGENCYEnvironmental Health Department

U cyf VEntura Donald WCKeeop

for the disposal of this soil is not on file . A copy of the

Rocketdyne Division--''Rockwell Internatio

6633 Canoga AvenueCanoga Park, CA 9130 3

The Ventura County Environmental Health Division (VCEHD)- hasreceived Rocketdyne's letter dated April 27, 1990, regarding the

underground tank abandonments . Rocketdyne's request for cleanclosure at sites requiring the submission of additional soilanalysis or cleanup documientation can not be approved at this time .

An evaluation of soil analysis indicates six sites may not be

clean.

The sites where tanks were reported leaking will be referred to theLeaking Underground Fuel Tank (LUFT) program of this office forreview of the information provided . A determination will be madeas to what work is necessary to close backfilled sites . Any

cleanup work must be approved in order to consider site closure .

Based on the submittals, several tanks have been included underabandonment records on file . Further site evaluation is needed toconfirm the correction of tank no 48 to tank no . 53, as discussed

March 20, 1990 ; as we as reconcile the number or tanks remove d

from buildings no. 9, 55, and 59 .

The following is a listing of eachregarding their current status :

Environmental Unit

w

Gary Colbert, Environmental Engineer

analysis received shows contamination . Referred to LUFT .Removed from the building #005 area as tank #403 . Soi l

Tank #1 :

2 . Tank 13 :

Removed from the building #009 area as tank #401 . Soi l

analysis shows contamination" ~aas "present . Remediat`an wasundertaken with VCEHD approval . The hazardous waste manifes t

manifest should be submitted to this office .

o5?2801 South Victoria Avenue, Suite 304 Ventura , CA 93003 (805 ) 654-3

HDMSe00024204

Page 8: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

3 . Tank #3 6

states a hole was observed in the tank . Soil analysis are notRemoved from the building #459 area. The abandonment repor t

on file. A copy ofthe soil analysis should be submitted to

this office or samples be taken and analyzed .

Removed from near building 1324 as tank #102 . The soilanalysis showed contamination existed . Referred to LUFT .

Tank #39 ,

contamination was present. This site is referred to LUFT .

and 41 :

Removed from near building #351 . Soil analysis indicate some

6. Tanks #22, 42, and 51 :

Removed August 31, 1987 under abandonment permit #698 . These

tanks were not suspected 'of leaking at the time of removal .

7 . Tanks #48, 51, and

Unable to verify the location of these tanks near buildings204, 206 , and 207 respectively . Further site evaluation i s

needed .

Call to arrange an inspection of sites requiring further evaluationor if you have any questions . You can contact me at ( 805) 654-5038between the hours of 8:00-9 :30 a .m . or 3 :30-5 : 00 p .m ., Monday

through Friday .

UNDERGROUNW-VANK PROGRAMENVIRONMENTAL HEALTH DEPARTMENT

HDMSe00024205

Page 9: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

GROUNDWATER RESOURCES CONSULTANTS, MC

t is recommended that three soils borings be drilled in the immediat e

No groundwater monitoring wells are recommende d

e at thi s

It does not appear likely that shallow perched groundwater will be

encountered in the immediate vicinity of the former Tank site ;

2 . Groundwater in the Chatsworth Formation is probably at a depth o f

at least 75 feet and possibly as much 105 feet at the site ;

3 . There

and siltstone) between the former location of the tank

and of the saturated zone the Chatsworth Formation;

There are existing monitor wells around the site which woul d

detect movement of contaminated groundwater ( Figure 1) .

The three soils borings would be advanced with a flight auger drillin g

rig . The approximate locations of the proposed soil borings are shown i n

Figure 2 . The purpose of the soil borings would be the collection of soi l

samples which would indicate the presence and/or extent of fuel component s

in soils . The auger borings would be advanced until auger refusal, that

vicinity of Tank #47 .

is probably at least 65 to 95 feet of bedrock (i .e ., lithi-

fled sandstone

until unweathered Chatsworth Formation is encountered . If perched ground

HDMSe00024206

Page 10: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

GROUNDWATER RESOURCES CONSULTANTS, INC_

water is encountered during drilling , one of the borings would be completed

as a monitor well. The monitor well would be constructed

according to th e

d immediately before aAll drilling tools would be thoroughly cleane

boring is started . All casing and screen would be cleaned prior to instal-

L,t alation in borehole . Drilling equipment and casing would be cleaned wi

high pressure steam washer . Representative samples of cement, bentonite and

filter media would be retained for 90 days for possible analysis for con-

taminating or interfering constituents . The well would be completed at land

surface within a vault with a steel lid. The well identification number an d

well type would be affixed on the exterior of the vaul t

with bentonitegrout . - All slurry grouts for borehole abandonment would b e

All borings which are not completed as monitor wells would be sealed

emplaced by the tremie method .

Drill cuttings would be managed as described in Appendix B. All work

contained in Appendix.Fl anwould be conducted according to the Site Safet y

lifornia registered geologistCald be described by aC . All borings wou

using the Unified Soil Classification Syste

During auger drilling, soil samples would be collected at a ,maximu m

five foot interval until auger refusal . Details of sampling procedure ,

sample handlingprotUGOI, and sample analysis methods are

8

HDMSe00024207

Page 11: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

GROUNDWATER RESOURCES CONSULTANTS, INC

Appendix D . If perched groundwater is encountered and a boring is completed

as a monitor well, groundwater samples would be collected acc9rding to pro-

sl'LeAfter the results of the investigation have been compiled, a

evaluation report would be prepared . The report would include soil baring

logs, a map of soil borings locations including locations of any undergroun d

utilities discovered during the underground ocator results

analyses of soil samples , and recommendations for additional actions ,

9

HDMSe00024208

Page 12: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

#ilkRocketdyne DMaion

Rock,*t trsematiofst Corporation Rockwell6633 Canoga Avenue ~tltE'r11310Ti9~

Canoga Park Cahfomia 9130 4

Tetex : 698478ROCKETDYN CNPK

CERTIFIED - RETURN RECEIPT REQUESTE D

08 march 1991 In R:-,fly Refcr To 9IRC03398

County Of VenturaResource Management AgencyEnvironmental Health Department

801 South V ictoria Avenue , Suite 304

Ventura, CA 9300 9

Attention . Mr. Michael McFadden

Subject : Transmittal of Chain-of-Custody and Analyses forSoil Investigations on Tank #47 and Tank # l

Gent] eme n

As per your request , please find enclosed the Chain -of-Custody and Sample

Analysis information for the soil investigations conducted on Tank #47

(Building 324) and Tank 4 1 (Building 005) for Rockwell International

Corporation . Rocketdyne Division by, Groundwater Resources Consultants

(GRC) .

Should you have any questions please call Ms . Bonnie L _ Burns at (818) 713-

5325 . Thank you for your consideration in these matters .

ROCKWELL INTERNATIONAL CORPORATION

Rocketdyne Division

La I1amS . RDirectorEnvironmental Contro l

Energy Conservatio n

C CRWQCB, Mr. Joshua Workma

DHS, Mr. Dennis DickersonEPA, Ms. Karen Schwinn

HDMSe00024209

Page 13: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

OAS CliROMA`r~nc .Ana }tt carTeChnoIogies

- EPA 8020 (BENZENE

REAGENT BLAN K

ETHYLBENZENE TOLUENE, XYLENES)012188ATI I .D .

DATE EXTRACTEDCES

RACTCLIENT GROUNDWATER RESOUR DATE AXT D

PROJECT * 8640 UNITSSSFLUROCKETDYNELL / TION FACTORPROJECT NAPE ROCKWE DIL

KBLANCLIENT I D D . . ~.__~.__._..__..___..__-~____-~.

~_ RESULTS-----------------

<0 .00 5

BENZENE <0 .005

12/17/90

12/21/9 0

MG/KG/ A

TOLUENE <0.005ETHYLBENZENE <0.01 0

XYLENES (TOTAL)

SURROGATE PERCENT RECOVeRIE~a

TRIFLUOROTOLUENE (3 90

HDMSe0002421 0

GRAPHY --

Page 14: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

j A5 C~sRGI',ATOCRA'H`~ - RESULTS

/_,~, i, A,atyt ;colTechnotogies ncNKREAGENT BLA

D (BENZENE, ETHYLBENZEPdE, TOLUENE,XYLENES)

01218 8EPA S

GROUNDWATER RESOURCES DATE EXTRACTED 12/ 7 90DA'T'E ANALYZED : 12/21/9 0CLIENT U13I5 MG/KGPROJECT 864 0PROJECT NAME ROCKWELL/ROCKETOYNE SSFL DILUTION FACTOR N/A

-____r-------------NT BLANK_~_-

D REAGECLIENT I - ---------________..r___-_-___-

--.-_-..___.. _.._____ RESULTSy.. .._. ._ ..___ _..-_______COMPOUNDS ------------------------ -------

-- - <0.00 5-------•---

BENZENE <0

.005

TOLUENE <0.005

ETHYLBENZENE <0 .01 0

XYLENES (TOTAL)

SURROGATE PERCENT RECOVERIES

9 0TRIFLUOROTOLUENE (%)

HDMSe00024211

Page 15: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

AnolyticotTechnologies. ► nc: QUALITY CONTROL DATA

EPA 8020 (BENZENE, ETHYLBENZEN

CLIENTPROJECT #PROJECT NA

REF 1 . D

GROUNDWATER RESOURCES

8640RQCKWELL/R©CKETDYNE SSFL

01218807- --

DUP .DUP .SPIKED % SPIKED %

AMPLE CONC .S RESULT SPIKED SAMTPLE KEC

. SAMPLE REC . RPD

.-------------------------------------------------------

compoUNDS 4-1. 00 057---- r, -------- <0.005 0 .5 .

joBENZENE <0 .005 0 . Avis O .

TOLi3ENE

Recovery = (Spike Sample Result -- Sample Result) x 100

Spike Concentration

(Spiked Sample - Duplicate Spike)

RPD (Relative % Difference)Resin Result Sample Result 100-

Average of Spiked Sample

HDMSe0002421 2

--------------------------

ATI Y .D . : 01218 8

TOLUENE, XYLENES )

DATE EXTRACTED 12/17/9 0

DATE ANALYZED 12/19/9 0

SAMPLE MATRIX SOIL

UNITS MG/ KG

Page 16: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

/,1\ AnalvitcQilech 'i010gies,1nc. QUALITY CONTROL DATA

CLIEPROJECT #PROJECT NAM

REF I .D

DATE EXTRACTED

GROUNDWATER RESOURCES DATE ANALYZE D

8640 SAMPLE MATRIXFLROCKWELL/ROCKETDYNE SS UNITS

01218818

DUP

%. SPIKED % SPIKE DSAMPLE CONC RP

SPIKED SAMPLE REC SAMPLE REEC C .------RESULT---------------------------------------

n

-------COMPOUNDS r, r, 110 1 2

gyp005 0 . 500 0 .49 98----_----y-_ -- _< . UU u . 5UU 0 .5u 1

(Spike Sample Result

Spike concentrationSample -Duplicate Spike)

RPD (Relative % Difference) (Spiked Result Sample Result x 100-----------------

-

l-

spiked Sampleo fAverage

HDMSe00024213

Page 17: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

Anatylic0ITeCh fO16gieS,1nc. QUALITY CONTROL DATA

CLIENTPROJECTPROJECT NAME

REF 1 .0

ETiiYLBENZENE , TOLUENE ,

GROUNDWATER RESOURCES

864fl:FL

ROCKWELL/ROC3:KETDYNE SS

01218825

DUP . DUP .

SPIKED %SAMPLE CON'- . RPDSAM"LE REC _RESULT SPIKED SAMPLE REC>.

COMPOUNDS 49-_ ..-. 0~-_ 0 •---- --_ --------- <t nc 0 .500 0.49 9 8

nr~7-1~t"~VETOLUENE

<0 .005 0 .500 U - to 100 0 .5 0

Recove (Spike Sample Result - Sample Result) X 100

spike Concentration

le - Duplicate Spike)Samp% (Spiked Sample Result

1 0 0D (Relative D-_..-----------

Average of Spiked Sampl e

ATI I .D .

XYLENES)

01218 8

DATE EXTRACTED : 12/17/9 0

DATE ANALYZED 12/22/9 0

SAMPLE MATRIX SOIL

UNITS : MG/KG

HDMSe00024214

Page 18: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

)Anolyt ca!Technologies ,4nC. QUALITY CONTROL DATA

CpMPp?TNDS

12/17/9012/18/9 0SOILMG/KG

DUP: DUP .

NC SPIKED SPIKEDSAMPLE CO

RESULT SPIKED SAMPLE REC .SAMPLE REC . RPD----------------

-----------------------

Recovery = (Spike Sample Result - Sample Result) X 100

Spike Concentration

Sample - Duplicate Spike)RPS (Relative % Difference} (Spike

dResult Sample Result

10 0

DATE EXTRACTEDESGROUNDWATER RES0 RC DATE ANALYZED

8640 SAMPLE MATRIXF

0121880 7

ROCKWELL/ROCKETDYNE SS L UNITS

x

Average of Spiked Sample

HDMSe00024215

Page 19: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

„ ~\ Anoiytic €3eChflO~OgieS,lnC. QUALITY CONTROL DATA

CLIENTPROJECT #PROJECT NAMEREF I .D .

OURCES DATE EXTRACTED : 12/17"'190RESGROUNDWATER DATE ANALYZED 12/18/9 0

8640ROCKWELL/ ROCKETDYNE SSFL

SAMPLE MATRIX S 0IUNITS MG/KG

21881801

SAMPLE COOING . SPIKED %

COMPOUNDS RESULT SPIKED SAMPLE REC- ------ -------------------

--------------------

- iYDRC .RBGNSW L

<5 .0 500 460

DUP . DUPSPIKED %SAMPLE REC. RPD

--- - - le Result)Samp-------..-.. X 100

Spike Concentratio n

RPD (Relative % Difference) _ (Spiked Sample - Duplicate Spike)Result Sample Result

-------------------------------- x 100

Average of Spiked Sample

HDMSe00024216

Page 20: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

Ana[ytico=TechnotOgies,inc: QUALITY CONTROL DATA

ATI J .D . : 01218 3

NS

rE:

TCLIENCTPROJE

PRO3ECT NAME

EpA g{1 TESTPA 8015-ODORS (FUEL HYDRDCr.RBD )

Mt3D DATE EXTRACTED

GROUNDWATER RESOURCES DATE ANALYZED

8640 SAMPLE MATRIXROCKWELL/ROCKETDYNE

SSFLUNITS

: 0121882 5: .

12/17/90

12/19!9 0

SOI L

MG/y,

DUP . OUP .

%IKED % SPIKEDSAMPLE CONC . S PRESULT SPIKED SAMPLE REC

.SAMFLE gEC-RPD

UNDSCOMPO-------------------------

(Spike Sample-Result Sample-

Result)x

100

Reccve rY =

Spike Concentration

le - Duplicate Spike)mS paS ikedRPD (Relative Difference) { P Result Sample Result 100

--------------- ----------d Sampleikeof Sp

HDMSe00024217

Page 21: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

)~, Ano icaITeChfOIOgieS, E CHROMATOGRAPHY -- RESULTS

ATI I .D . : 0121880 1

TEST EPA 8020 (BENZENE, ETHYLBENZENE, TOLUEN:

CLIENTPROJECT #PROJECT NAME

CLIENT I . DSAMPLE

XYLENES )

DATE SAMPLED 12/12/9 0

DATE RECEIVED 12/17/9 0

DATE EXTRACTED : 12/17/9 0

DATE ANALYZED 12/19/9 0

UNITS : MG/ KGDILUTION FACTOR : 1

------------------------------------------ -------------------

____..__.,. . ..---- RESULTS

COMPOUNDS

BENZENE <0.005TOLUENE <0.0 0 5ETHYLBENZENE <0.010XYLENES (TOTAL)

SURROGATE PERCENT RECOVERIES

TRIFLUOROTOLUENE

GROUNDWATER RESOURCES864 0ROCKWELL/ROCKETDYNE SSFL005-1 (4-4-5 )

MATRIX SOIL

HDMSe00024218

Page 22: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

H

AnalytiCOlTeChnOlOgie5 ,~$LS CHROMATOGRAPHY - RESULTS

ATI I : 0121880 2

T' .: EPA 8020 (BENZENE, ETHYLBENZENE , TOLUENE, XYLENES )

CLIENT GROUNDWATER RESOURCESDATE SAMPLE DDATE RECEIVED

t 12/12/ L12/17/9 0

PROJECT # 8640 DATE EXTRACTED : 12/17/9 0

PROJECT NAME RQCKWELL/ROCKETt3YNE SSFLDATE ANALYZED 12/19/9 0

CLIENT I .D . 005-1 (8-8 .5)UNITS MG/ KG

SAMPLE MATRIX SOIL DILUTION FACTOR : 1

------------------RESULTS

COMPOUNDS --- --------- ----------------------------

BENZENE <9 .00 5:vi IV'z14E <0 . 005

ETHYLBENZENEXYLENES (TOTAL)

<0 .010

SURROGATE PERCENT RECOVERIES

HDMSe00024219

Page 23: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

AN AnolvkOTechn0l0C9ieS, ~p.S CHROMATOGRAPHY RESULTS

TE : EPA

CLIENTPROJECT #PROJECT NAMECLIENT I .D .SAMPLE MATRIX

------------

COMPOUNDS

BENZENE <0 . 00 5

ETHYLBENZENE <0.010

020 (BENZENE, ETHYLBENZENE

GROUNDWATER RESOURCES

8644ROCKWELL/ROCYETDYNE SS

5)005-1 (10 10

SOIL

AL)SURROGATE PERCENT RECOVERIES

ATI I .D . i 0 1 218803

DATE SAMPLED c 12/12/9 0

DATE RECEIVED . 12/17/9 09 01 72 //DATE EXTRACTED : 1

12/ 9/9 0DATE ANALYZED

UNITS : MG/KGRDILUTION FACTO

--------------------------------------

0 5

101

HDMSe0002422 0

<0 . 0<0 .005

Page 24: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

`fAS CHROMATOGRAPHY - RESULTS

ATI I D . : 0121880 4

EPA 8020 (BENZENE, ETHYLBENZENE, TOLUENE, XYLENES

CLIENTPROJECT #PROJECT K.CLIENT I . D-

LE MATRIX

GROUNDWATER RESOURCES DATE SAMPLED 12/12/90DATE RECEIVED 12/17/9 0354U DATE EXTRACTED : 12/17/9 0

E SST LROCKWELL/ROCKETDYN DATE ANALYZED 12/19/90005-2 ( 4'4 .5 TITS : MG/K G

-----------------------------OUNDSCOMP- - - - - - - - - - - - - - - - - - - - - -

BENZENETO ijU ENEETHYLBENZENE

<0 .00 5<0 .005<0 .00 5

<0 .01 0

SURROGATE PERCENT RECOVERIES

TRI FLUOROTOLUENE (t)106

HDMSe0002422 1

XYLENES (TOTAL)

Page 25: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

ATI I .D . 0121880 5

T EPA 8020 (BENZENE, ETHYL3ENZEN

CLIENTPROJECTPROJECTCLIENTSAMPLE

: GROUNDWATER RESOURCES

864 0ROCKWELL/ROCKETDYNE SSFL

005-2 ( 8-8 .5 )SOIL

DATE SAMPLED 12/12/9 0DATE RECEIVED 12/17/90

DATE EXTRACTED 12/17/9 0

DATE ANALYZED 12/19/9 0

UNITS MG/KG

-------------------------------------

DILUTION FACTOR I

RESULTS----------------------------------

'0 .005TOLUEv <0.00 5ETHYLBENZENE <0 .010XYLENES (TOTAL)

SURROGATE PERCENT RECOVERIES

TRIFLUOROTOLUENE (%) 107

HDMSe0002422 2

t1ENE, XYLENES )

<0 .005

Page 26: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

ATI I .D . : 0121880 7

EPA 8020 (BENZENE, ETHYLBENZENE, TOLUEN

CLIENTGROUNDWATER RESOURCE S

864 0PROJECTPROJECT NAME

FE SSL

CLIENT I .D . 005-3 (8- 8 .5 )

SAMPLE MATRIX SOIL

COMPOUNDS

BENZEN :TOLUENE

RESULTS------

---------------------------------------

<0 .00 5

ETHYLBENZENEXYLENES (TOTAL)

<0 .00 5<0 .010

SURROGATE PERCENT RECOVERIES

TRIFLUOROTOLUENE M101

HDMSe0002422 3

XILENES )

DATE SAMPLED 12/12/9 0

DATE RECEIVED : 12/17/9 0

DATE EXTRACTED 12/17/9 0

DATE ANALYZED 12/19/9 0

UNITS MG/KG

DILUTION FACTOR

Page 27: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

& nyt~cOiTethno{t>gie t̀S CHROMATOGFcAPHY - RESULTS

ATI T .D . 0121882 5

ET}YLBENZENE , TOLUENE, XYLENES )

CLIENTPROJECT #PROJECT NAMECLIENT I .D .

SAMPLE MATRIX

GROUNDWATER RESOURCES DATE SAMPLED

:12/12/90

DATE RECEIVED 12/17/9 0

DATE EXTRACTED 12/17/90864 0RQCKWELLfR ©CKETi?YNE SSFL DATE ANALYZED : 12/20/90

0 7TE/005-3 ( s-8 .5) DUPLICA UNITS MG/ KG

SOIL DILUTION FACTOR 1-----------

_-__...._ ..__-------------------------------------- RESULT SCOMPOUNDS __ . ____--__- -_-- --_____----_- ..__ ., --_..__..__-__-

------------------

BENZENETI',• tT E

<0 .005<0 .00 5<o .ou :

ETHYLBENZENE <0.010XYLENES (TOTAL)

SURROGATE PERCENT RECOVERIES

79TRIFLUOROTOLUENE

HDMSe00024224

Page 28: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

1. ., 1,' Ano corechno ogles CHROMATOGRAPHY RESULTS

ATI I . D . : 0 121880 1

T Si MOD EPA 8015-CDOHS(FUEL HYDROCARBONS)

PLED 12/12/9 0

CLIENTGROUNDWATER RESOURCES

DATE SAMDATE RECEIVED : 12/17/9

PROJECT 8640 MATE EXTRACTED 12/17/9 0

PROJECT NAMEROCKWELL/ROCKETDYNE S S

DATE ANALYZED : 111 1 f v

CLIENT I .D . 005-1 (4-4 .5) UNITS MG/KG

SAMPLE MATRIX SOIL DILUTION FACTOR 1

------------

COMPOUNDS

FUEL HYDROCARBONSO^ARBON RA GZR}

-----------------------------RESULTS

----------------------------<5 . 0

vHYv TED USINGHYDROCARBONS QUANTITA

-------------

HDMSe00024225

Page 29: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

kESt3 LTSi slh eno ogAna yticof'tet rAS CHRCMAToGRAPHY -

AT :

MOD EPA 8015-CDOHS (FUEL HYDROCARBONS )

CLIENT GROUNDWATER RESOURCE S

ECT 4 : 864 0PROJPROJECT NAME ROCWYELL/ ROCKETDYNE S S

- 58 . )CLIENT I .D. 005-1 ( 8

SAMPLE MATRIX : SOIL

RESULTSCOMPOUNDS -----------

12/19/90MG/KG

-----------------------

FUEL HYDROCARBONS<5 .0

HYDROCARBON RANGE _HYDROCARBONS QUANTITATED USING

I .D . : 0121880 2

DATE SAMPLED 12/12/90

DATE RECEIVED 12/17/9 0

DATE EXTRACTED 12/17/9 0

DATE ANALYZEDUNITSDILUTION FACTOR

HDMSe00024226

Page 30: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

AnalyticalTechnOlOgie5 5 CHROMATOGRAPHY -- RESULTS

ATI I .D . : 0121880 3

: MOD EPA 8015-CDOHS (FUEL HYDROCARBONS )

GROUNDWATER RESOURCESCLIENT

CT # 8 b 4 0EPR©J SSFLPROJECT NAME ROCKWELL/ROCKETDYNE

CLIENT I .D . : 005-1 (10-10 .5)

SAMPLE MATRIX SOIL

DATE SAMPLED t 12/12/9 0

DATE RECEIVED 12/17/9 0

DATE EXTRACTE DXTR

12/17/9 0YZEDDATE 2/19/9 0

UNITS :

DILUTION FACTOR :MG/K G

------------------------------------------------------------------_--- ---__----------- RESULTSCOMPOUNDS

FUEL HYDROCARBONS

DROCARBON RANGEHYHYDROCARBONS QUANTITATED USING

HDMSe00024227

Page 31: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

02Q HOMlsn aaLyllsrr na SIatUS

aun~ H

T

06/6T/ZT06 /CT /Zr

° -- _ __ _ _ _-----S,Lrlns3H

-------------------------

-dolov3NaZ+T,rala

Q33X'IM 3 xa'tt3soVa a,1a

t36/LT/ ZT : Q3AI3osa 3SYQ

06 /Z T /ZT : (37Ic W S 3LYsx~x~o

SaQ-ifl0S32I 2i3s~i'MaPIll) :

s ©sdv0oaaxH `i am) SHOfl3-ST0B vd3 cow - -11

ssznsar . xHa x~y oaHO Sse, ouq)Gip lOuy it

. 3OH Ha~HYoSHVg~oozaAH zan t

SQNnodrAV. J

T0S . XI2is aldWYSA00 : ' C[ - I SN3I'Io

- ir) 7( ~L SS 3l+i7~QZ3~I'o)i/ZZaM}Iao2

: 3H~K So3 Hd

tI~98 ; ~ Zo3~'a2~d

-----------------------

Page 32: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

p!Y - RESULTSAnONTIco Iv x pg' fjp 5 CHF(UMATOGR

ATI I . D : 0121880 5

MOD EPA 8015 -CDOHS (FUEL HYDROCA" SONS )

CLIENT GROUNDWATER RESOURCESDATE SAMPLEDDATE RECEIVED

12/12/9 012/17/9 0

PRUJECT 8640CXETDYNE SSFL

BATE EXTRACTED :D

12/17/9 0

PROJECT NAME ROCKWELL/R© ATE ANALYZEDD X2/1 1 0

ID :CLIENT . . p05-2 (8-8 .5}UNT :IS MG/ KG

S >LE MATRIX SOIL DILUTION FACTOR 1

----------------------------

COMPOUNDSRESULTS

-------------------------

FUEL HYDROCARBONSHYDROCARBON RANGE

HYDROCARBONS QUANTITATED

<5 .0

HDMSe0002422 9

USING

Page 33: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

IN Anolvticalechnologies CHROMATOGRAPHY -- RESULTS

ATI I .D . : 0121880 6

JEL HYDROCARBON S

CLIENT GROUNDWATER RESOURCE S864 0PROJECT It -

PROJECT NAME: ROCKWELL/ROCKETDYNE SSF'

5}4-Q «CLIENT I . D : 005-3 (SAMPLE MATRIX : SOIL

DATE SAMPLED 12/12/9 0

DATE RECEIVED 12/17/9 0

DATE EXTRACTED 12/I7/90

DATE ANALYZED 12/19/90

UNITS MG/KG

DILUTION FACTOR 1----------------------

------------------------ RESULTSCOMPOUNDS --------------------------------------

-------------

FUEL HYDROCARBONS

Hy~DnOCARBCN RANGENGHYDROCARBONS QUANTITATED USI

HDMSe00024230

Page 34: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

Anaiyt icaiTechnologiesds CHROMATOGRAPHY RESULTS

ATI I .D . 0121880 7

CLIENTPROJECT #PROJECT NAMECLIENT I•DSAMPLE MATRIX

EL HYDROCARBONS }

GROUNDWATER RESOURCES

8 64 0ROCKWELL/ ROCKETDYNE SS FL

O O5y-3 (9-8-5 )SOIL

----------------

COMPOUNDS------------

1JEL HYDROCARBON S

OCARBON RA GEHYDR D USINGYDROCARBONSQUANTITATE

-------------------------

HDMSe0002423 1

DATE SAMPLED : 12/12/9 0

DATE RECEIVED 12/17/9 0

DATE EXTRACTED : 12/17/9 0

DATE ANALYZED : 12/18/9 0

UNITS : MG/K G

DILUTION FACTOR 1----------------------------------

RESULTS

Page 35: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

I

Anol icalTechnofo9ies S CHROMATOGRAPHY - RESULTS

T:S'1 MOD EPA 8015-CDOHS (FUEL HYDROCARBONS )

CLIENTGROUNDWATER RESOURCES

DATE SAMPLEDDATE RECEIVED

• $640 XTRACTE DPROJECT #PROJECT NAME ROCKWELL/ROCKETDYNE SSFL DATE E

DATE ANALYZED

CLIENT I .D . 005-3 (8-8 .5) DUPLICATE/O7UNITS

SAMPLE MATRIX SOIL DILUTION FACTO R

FUEL HYDROCARBONS

I""UROG PBON RANGE

------------------------ -------

a ~

HYDROCARBONS QUANTITATED USING

HDMSe0002423 2

12/ 12/9012/17/9012/ 11/9012119/9

.0

MG/ KG

--------------------------------

RESULTS

Page 36: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

$ca TechnoIogiess€j( CHROMATOGRAPHY - RESULTS

ATI I

ST EPA 8020 (BENZENE, ETHYLBENZENE, TOLUENE, XYLENES)TE 99

CLIENTPROJECT #PROJECT NAMECLI i NT I . D .

SAMPLE MATRIX

BENZENE

DATE SAMPLED J .4 / 1- -.,/GROUNDWATER RESOURCES DATE RECEIVED 12/17/908640 DATE EXTRACTED 12/17/90ROCKWELL/ROCKETDYNE SSFL nATR ANALYZED 12/19/9 0324-1 (4-4.5) UNITS MG/KG

SOIL DILUTION FACTOR 1

OLU'ENE

<0 .005<0 .00 5<0 .005<0 .01 0

SURROGATE PERCENT RECOVERIES

TRIFLUOROTOLUENE (%)

HDMSe0002423 3

THYLBENZEN EXYLENES (TOTAL)

Page 37: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

HROMAT©GI- Arn a - .:.

ATI I . D . : 01218809

------------------------

RESULTS

gE, ETHYLBE232ENE, TOLUENE,_ XYLENES )

DATEVCLIENT GROUNDWATER RESOURC-ES DATE RECEIED

XTRACTEDPROJECT 8640 DATE E

WELL/ROCKETDYNE SSFL NALYZEDDATE AE = ROCKPROJECT NAM

DILUTION FACTOR-----------

COMPOUNDS ------------------------------------------------

-

BENZENE <0 .005

TOLUENE <0 .00 5

ETHYLBENZENE

XYLENES (TOTAL}

<0 .01 0

SURROGATE PERCENT RECOVERIES

12/13/9 012/17/90.2/17/902/22/9 0

MG/KG

90

HDMSe00024234

Page 38: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

Iytco1Techgiesd5 cHROMATOGRAFH' - RESULTS

ATI I .D . : 01218810

TEST EPA 8020 (BENZENE

CLIENTPROJECTPROJECT N .CLIENT I .D .SAMPLE MATRIX

ETHYLBENZENE , TOLUENE , XYLENES )

DATE SAMPLED 12/13/9 0GROUNDWATER RESOURCES

864 0ROCKWELL/ROCKETDYNE S

324-1 (12-12 .5 )

SOIL

DATE RECEIVED 12/17/90

SFL DATE EXTRACTED 12/17/90ED 12/19/90ZDATE ANALY

MG/KGUNITSDILUTION FACTOR : 1

------------------------- ------

- - - - - -- - - ----------

COMPOUNDS

BENZEN ETOLUENEETHYLBENZENEXYLENES (TOTAL)

RESULTS-------------------------------------------

<0 .00 5

<0 .00 5<0 00 5<0 .01 0

SURROGATE PERCENT RECOVERIES

TRIFLUOROTOLUENE

HDMSe00024235

Page 39: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

:oy,ATOGRAPH' - RESULTS01218811

CLIENTPROJECT #

020 (BENZ gpTE SAMPLEDENE ETHYLBEN

ZENE TOLUENE, XYLENES )

PROJECT NAME

CLIENT I .D .

IXSAMPLE MATR

BENZENEUENE

ATER RESOURCES DATE RECEIVEDGROUNDW86413 DATE EXTRACTED

YNE SSFL ANALYZEDDATEROCKWELL/RQCKETUTS5'-15.5) UNI324-1 (1 ILUTION FACTORDsoil,

E`HYLBENZENE

XVLENES (TOTAL)

LT5U

SURROGATE PERCENT RECOVERIES

RES

<0 .005c1) .00 5<0 .00 5<001 0

TRIFLUOROTOLUENE (%)

HDMSe00024236

Page 40: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

Anelytho(TeChnObgie ~ CHROMATOGRAPHY -- RESULTS

CLIENTPROJECT #PROJECT NAMECLIENT S .D .

PLE MATR:

ATI I .D . : 0121881 2

BENZENE , ETH?LBENZENE , TOLUENE, XYLENES )

ROCKWELL/ROCKETDYNE SSF L

324-1 (19-19 .5 )SOIL

DATE SAMPLED : 12/ 13/9 0DATE RECEIVED 12/17/9 0DATE EXTRACTED 12/17/9 0DATE ANALYZED : 12/19/9 0UNITS : MG/KGDILUTION FACTOR : 1

COMPOUNDS RESULTS

----------------

- -----------------------------------------------------------------<

BENZENETOLUENE

0 .00 5

<0 .005<0 .005<0 .01 0

SURROGATE PERCENT RECOVERIES

TRIFLUOROTOLUENE (%) 103

HDMSe0002423 7

ETHYLBENZENEXYLENES (TOTAL)

Page 41: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

CHROMATOGRAPIiY : - RESULTS

ATI I .D . : 0121881 3

TEST : EPA 8020 (BENZENE, ETHYLBENZENE, TOLUENE

CLIENTPROJECTPROJECT NAMECLIENT I . D

SAMPLE MATRI X

COMPOUNDS

BENZENETOLUENEETHYLBEN Z ENEXYLENES (TOTAL)

13/50DATE SAMPLED 12 /

GROUNDWATER RESOURCES DATE RECEIVED 12/17/906

8640 EXTRACTED : 12/17/9DATE ENAFL 0YZED 12/19/9ROCKWELL/ROCKETDYNE S

D ATEANA.LKGMG/324-1 (24-24.5) UNITS :

SOIL DILUTION FACTOR

SURROGATE PERCENT RECOVERIES

TRIFLUOROTOLUENE

<0 .005

10 . 0 0 5<0 .005<0 .01 0

102

HDMSe00024238

Page 42: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

2An01ytcaTechnoIogtess CR©MATOGR PHY - RESULTS03 21582 4ATI I . D .

MOD EPA 8015-CDCHS(FTTEL HYDROCARBONS)

0DATE SAMPLED I2 / 13 / 9 C}DD : 12/ 1 ; / 9ATE RECEI ECLIENT GROUNDWATER RESOURCE S

PR03 ECT $ fi 4 4 DATE EXTRACTED : 12 / 17 / 9 ddCKTELL/ROCKEI'DXNE SSFL ATE ANALYZED : 12/9/90

E HRPROJECTT NAM S :MG/KG3 (24--24 . 5z 324^ UNITDZ . .CLIENTSAMPLE MATRIX SOIL DILUTION FACTOR :

----------- -- -----

COMPOUND S---------------Tt7tL HYDROCARBONS

TATED USINGHYDROCARBONS QUANTI

HDMSe00024239

Page 43: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

AnohftIcOTechnologiess CHROMATOGRAPHY - RESULTS

ATI I . D . 01218a14

ETHYLBENZENE, TOLUENE, XYLENES )

CLIENT GROUNDWATER RESOURCESor-A n

RR©E ROCKWELL/ROCKETDYNE SSPROJECT NAME -45 )- .3242 (4CLIENT I .D .SAMPLE MATRIX SOIL

COMPOUND S

BENZENETOLUEN EETHYLBENZENE

DATE SAMPLED 12/13/9 0

DATE RECEIVED 12/17/90

DATE EXTRACTED 12/17/9 0

DATE ANALYZED 12/19/9 0

UNITS MG/KG

DIACTORLUTION `I

----------------------------------------

-----------------------------------------------

SURROGATE PERCENT RECOVERIES

<0 .00 5<0 .00 5< o . 00 5<0 .010

98TRIPLUOROTOLUENE (%)

H D M Se00024240

XYLENES (TOTAL)

Page 44: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

ETRYLBENZENE , TOLUENE, XYLENES )

CLIEN TPROJECT

PROJECT N

CLIENT I . DSAMPLE MATRIX

ROUNDWATER RESOURCES

8640 SS `LROCK TELL/ROCKETDYNE

324-2 (8-8 .5)SOIL

DATE EXTRACTED 12/I /DATE ANALYZED 12/19/9 0

UNITS : 14iG/x

DILUTION FACTOR

COMPOUNDS

SURROGATE PERCENT RECOVERIE S

TRIFLUOROTOLUENE O102

HDMSe0002424 1

-------------------------- <0 .00 5BENZENE <0.005TOLL;ENE <0.005ETHYLBENZENE <0.01 0XYLENES ( TOTAL)

DATE SAMPLED 12/13/90DATE RECEIVED 12/17/9 0

7 90

Page 45: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

L\ Anolvkol;echnologi

T

fS CHROMATOGRAPHY - RESULTS

MOD EPA 8015-CDOHS

CLIENTPROJECT #PROJECT NAMECLIENT I-D .SAMPLE MATRIX

(FUEL HYDROCARBONS)

DATE SAMPLEDGROUNDWATER RESOURCES DATE RECEIVED

864 0 DATE EXTRACTEDROCKWELL/ROCKETDYNZ SSFL DATE ANALYZED

324-2 ( 12-7.2.5) UNITSSOIL DrI1T"rTrN FACTOR =

-------------------

i-UNrS----------------

HYDROCARBONSHYDROCARBON RANGE

HYDROCARBONSQUANTITATED USING

RESULTS

12/13/9017/ 912/17/9 0

.2/17/9012/15/90

MG/ KG

--------------

------------------

<5 .0

------------

HDMSe00024242

Page 46: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

)1.,4,ncilytic--OtTelChnOlOg~IeSdgk,~5 CHROMATOGRAPHY - RESULTS

ETHYLBENZENE,BENZENE(0

CLIENT GROUNDWATER RESOURCES

PROJECT 8640 'ELL/R©CXETDYNE SSFLK rCAME RO

4 EPA 80 2

CLIENT N 324-2 (12-12 .5)32 4CLIENT T

ASA2€PLEMATRIX SOIL

BENZENE'OLC?_NEETHYLBEN ZEN E.XYLENES (TOTAL)

----------

SURROGATE PERCENT RECOVERIES

DATE SAMPLED 12/ 13/9 0

DATE RECEIVED 12/17/9 0

DATE EXTRACTED 12/17/9 0MG/1 9E AXTALYZED : 12/19/9©PAT

UNITSFACTORpILUT_ .._ -

-------------------- -

RESULTS -----

<0_00 5<0 .005<0 .00 5<0 .01 0

75TRI 'LUOROTOLUENE ( )

H D M Se00024243

Page 47: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

Ana,y l c jyechnotogies5 CHROMATOGRAPHY - RESULTS

ATI I . D . : 0121881 7

CLIENTPROJECT 4PROJECT NAMECLIENT I . DSAMPLE MATRIX :

8015-CDOHS (FUEL HYDROCARBONS)

RESOURCES

864 0ROC TELL/ROCKETDYNE SSFLSOIL (15-15 .5 )

SOIL

DATE SAMPLED 13/9 012/13/9 0DATE RECEIVED : 12/17/9 0

DATE EXTRACTED 12/17/9 0

DATE ANALYZED : 12/19/9 0

UNITSDILUTION FACTOR

MG/KG

---------------------------_---- - --- -_- ----__--- RESULTS

COMPOUNDS

FUEL HYDROCARBONS

HYDROCARBON RANGEHYDROCARBONS QUANTITATE

HDMSe00024244

Page 48: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

EPA 8 02 0

CLIENTPROJECTPROJECT NAMECLIENT I .D .SAMPLE MATRIX

GROUNDWATER RESOURCES

864 0ROCKWELL/RCCKETDYNE SS`L

324-2 (15-15 .5 )

SOIL

DATE SAMPLED = /£i/ u

DATE RECEIVED : 12/17/90

DATE EXTRACTED 12/17/9 0

DATE ANALYZED 12/22/90

UNITS MG/KGDILUTION FACTOR I

RESULTS

BENZENET0-

TTt'AtEA.w

ETHYLBENZEN EXYLENES (TOTAL)

--------------

<0 .005<0 .00 5<0 .005<0 .01 0

09

H D M Se00024245

Page 49: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

2.LAnoIyco1TethnOO91e5s CHROMATOGRAPHY RESULTS

ATI I . D . : 0121881 8

(FUEL HYDROCARBONS )

CLIENTPROJECT #PROJECT NAMECLIENT I .D .SAMPLE MATRIX

ES: 12/13/90DATE SAMPLE D

GROUNDWATER RESOURC DATE RECEIVED 12/17/908640 DATE EXTRACTED 12/17/90

SS LROCKWELL/ROCKETDYNE DATE ANALYZED 12/18/90324-2 {19-19.5} UNITS MG/KGSOIL DILUTION FACTOR I

-----------------------, --__ .-__ --...._.._. . .._ RESULTS

COMPOUNDS -------------------------------------------------------- e 5FUEL HYDROCARBONS _

5c DRO AREOti RANGEHHYDROCARBONS QUANTITATED USING

HDMSe00024246

Page 50: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

AnoEyticolTechnoio9ies CHROMATOGRAPHY - RESULTS

ATI I . D . : 0121881 8

ETHYLBENZENE , TOLUENE,XYLENES )

DATE SAMPLED 12/13/9 U

CLIENTPROJECT #PROJECT NAMECLIENT I-D•SAMPLE MATRIX

WATER RES©URCES RECEIVEDUND DATEGRO8640 DATE EXTRACTED

ROCKWELL/ROCKETDYNE SSFL DATE ANALYZED

324-2 ( 19-19 .5) UNITSSOIL DILUTION FACTOR

<0 .005<0 .00 5BENZENE

TOLUENEETHYLBENZENE

XYLENES (TOTAL)

<0 .005<0 .010

SURROGATE PERCENT RECOVERIES

12/3.7/9 012/17/9012/20/90MG/ K G

103'T`RY F LUOROTOLUENE ( )

H D M Se00024247

Page 51: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

Ana~ytica~Tethnolr pies s CHROMATOGRAPHY - RESULTSILTEST MOD EPA 8015-CDOHS (FUEL HYDROCARBONS)

GROUNDWATER RESOURCESCLIENTPROJECT 4 864

0

PROJECT NAME ROCKWELI :./R©CKET1]YNE SSFL

CLIENT J .D . 324-2 (24-24 .5 )

SOILMATRIXSAMPLE

ATI Z .D . 01215819

DATE SAMPLED 12/1/9 0

DATE RECEIVED 1 2/17/9 0

DATE EXTRACTED 12/17/9 0

DATE ANALYZED : 12/19/9 0

UNITS MG/KG

DILUTION FACTOR 1

---------------------RESULTS

COMPOUNDS------------

FUEL HYDROCARBONS, .,, :, . AFBON RANGE.'U 'L .r^ •a ED USINGYDROCARBONS QUANTITAT

<5 .0

H D M Se00024248

Page 52: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

AA na yticarTechnologiests CHROMATOGRAPHY - RESULT S

MOD EPA 8 015-CDOHS (FUEL HYDROCARBONS )

GROUNDWATER RESOURCES DATE SAMPLED12/13/90

CLIENT DATE RECEIVED 12/17/90

PROJECT # 8640 DATE EXTRACTED 12/17/90PROJECT NAME ROCXWELL/ ROCKETDYNE SSF L

-2 ( 19-19 . 5) DUPLICATE/ 18 UN TEANALYZEDMG/ KG/ 0CLIENT I .D. 324

SAMPLE MATRIX : SOIL DILUTION FACTOR : 1

COMPOUNDS-------------

FUEL HYDROCARBONSHYDROCARBON R.2'GEHYDROCARBONS QUAWW i

---------------------------

RESULTS- - - - - - - - - - - - - - - --

H D M Se00024249

Page 53: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

ATI ZD . 01218819

YLBENZENE, TOLUENE , XYLENES )

CLIENTPROJECT

GROUNDWATER RESOURCE S

8640ROCKETDYNE SSFLROCKWELL]

324-2 ( 24--24 .5 )PROJECTCLIENTSAMP SOIL TION FACTOR : 1ULDI

RESULTS_..-- --------- ._------ -------COMPOUNDS . .._ .._~. .^__.. -_ . _--

---------- <u . 00 5BENZENE <r) 005

SURROGATE PERCENT RECOVERIES

TRIFLUOROTOLUENE (%)106

HDMSe0002425 0

TOLUE414E < 0 .NE 0?5ZEETHYLBEN

XYLENES (TOTAL) <0.010

DATE SAMPLED : 12/13/9 0

DATE RECEIVED 12/17/9 0

DATE EXTRACTED : 12/17/9 0

DATE ANALYZED 12/20/9 0

UNITS : MG/KG

Page 54: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

AnolysicoTechnolOgies s CHROMATOGRAPHY - RESULTS

01218 8

-CDOHS (F5MOD EPA 8(7 1

CLIENTGROUNDWATER RESOURCES

864QPROJECT tWELL/ROCKETDYNE SSFLICROMELTT NA

324-3 (5-5 .5)CLIENT I .D

LRIX SOIAMPLE MATS

----------------- RESULTS

CQMPOUNDS-------------

-----------------------

L-

HYDROCARBON S

HyL,,.ROCARSON RANGEHYDROCARBONS QLIANTI ATEU USING

<5 .0

HDMSe0002425 1

20ATI I . D

UEL HYDROCARBONS)

DATE SAMPLED 12/13/9 0

3/9

0

DATE RECEIVED 1;/

1

DATE EXTRACTED 12/1?/90

DATE NALYZED 12/19/9 0

UNITSMG/KG

DILUTION FACTOR = 1

----------------------------

Page 55: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

CHROMATOGRAPHY - RESULTS

ATI I .D . : 0121BB2 0

ETHYLBENZENE, TOLUENE, XYLENES

CLIE

PROJECTPROJECT NAMECLIENT I - DSAMPLE MATRIX

GROUNDWATER RESOURCE S

864 0

ROCKWELL/ROCKETDYNE

324-3 (5-SOIL

------------------ -------

COMPOUNDS

BENZENETOLLrEN EETHYLBEN1ENE

XYLENES (TOTAL)

DATE -ANALYZED

UNITS

12/13/91312/17/9012/17/9012/20/90MG/ KG

DILUTION FACTOR = 1

SURROGATE PERCENT RECOVERIES

DATE SAMPLEDDATE RECEIVED

SSFL DATE EXTRACTE D

<0 .00 5<0 .005<0 .00 5<0 .010

HDMSe00024252

Page 56: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

aITechnologies CHROMATOGRAPHY - RESULTS

ATI I . D . : 0121882 1

T,.ST :

CLIENTPROJECT #PROJECT NAME

CLIENT I .O •SAMPLE MATRIX

GROUNDWATER RESOURCE S

8640ROCKWELL/ROCKETDYNE

324-3 (10-10 .5 )

SOIL

-----------------

COMPCUN u a

rt EL HYDROCARBONS

gyDROCARBO ` RZUNc==HYDROCARBONS QUANTITATED 06

SSFL

DATE SAMPLED : 12/13/9 Q

DATE RECEIVED 12/17/9 0

DATE EXTRACTED : 12/17/9 0

DATE AN :LYZED 12/19/9 0

UNITS : MG/KG

DILUTION FACTOR 1

-------------------------------------------

RESULTS

HDMSe00024253

Page 57: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

L Anp iiCa'TeChn0l09 ieS CHROMATOGRAPHY -- RESULTS

A121882 3

• MOD EPA 8 015-CDOHS (FUEL HYDROCARBONS )

CLIENT GROUNDWATER

PROJECT # 8640

PROJECT NAME RdCKWELL/tOCKETI3YNE SSFLr n'sn 1

DATE SAMPLED 12/13/9 0

DATE RECEIVED 12"i'17/9 0

DATE EXTRACTED 12/17/9 0

DATE ANALYZED 12/19/9 0u l /V

uNiTSf -

SAMPLE MATRIX SOIL DILUTION FACTOR--__.._--

COMPOUND S--------------------------FUEL HYDROCARBONS

0N RANGECAI:P.I:YI ROHYDROCARBONS QUANTITATED USING

HDMSe00024254

Page 58: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

ica Tech no 4giPS, Inc . c«porate Onwes . 5550 Macer*

use Dave son cam. CA 92121 (19) 458-914ARa y

RECEIVED DE C

1991

Resourcest9TGroi2:". r.'Wa

1735 F.asr. Fort Lowell Road, Suite #4719Tucson, Arizona 8 5

Project Name: Rockwell/Rocketdyne SSFL

Proj ect No . : 8640

Attention : Chuck Dickens

Inc . ---received

OnDecember 17, 1990, Analytical Technologies ,

samples were &n yzed

for Analyses. Thel essamp tastwent --fours as

snt meor equivalent method

specified ivalegld "o yoh EPA metho "lesswit for than

schedule . The sy~of sepleaattachedectionlue below the eit.l

findicates a va ncthe s p e crossret f-hethe attached ssee

The results of these analysesand the quality control data are

enclosed .

PtUz p trickRichard M . AmanoLaboratory manager

t manager

HDMSe00024255

Page 59: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

CLIENT : GROUNDWATER RESOURCES PROJECT NO. : 8640

PROJECT NAME : ROCKWELL/ROCKETDYNE SSFL

ANALYSISREFERENCE/METHOD

--------------------------------------------------------------------

ETHYLBENZENEBENZENE ,,TOLt7ENE, & XYLENES GC/PID EPA 802 0

EPA 8015 (MODIFIED) /CDOHS METHOD

-

HDMSe00024256

Page 60: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

It

8640

_ . . . .+ .rwersn c

ROCKWELL/ROCXETDYNE SSFL

= -DATE RECEIVED 12/17/9 0

REPORT DATE 01/02/9 1

ATI I .D . : A12 1

-- __- CRIPTIONr DESATI#CLIENT- - - - --_--_--

05 005-2 (8- 806 005-3 (4-4n7 005-3 (9-8

.4- 4(108 324-

0 9 324-1 (8-85 )

4 324 -1 012 .12 .5). )55324 ..1 (15-11 1

1213

---------------------------

------------------------. ..---- .-----_--- -_-___ _

005-1 (4-4005-1 (8- 8005-1 (10-005-2 (4-4

324-1 (19-19 .5 )324-1 (24-24 . 5

14 324-2 (4-4 .5 )

15 324-2 (8-3 .5 )

16 324-2 (12-12 .5)

17 324-218 324-2 (19-19 .5)

19 324-2 (24-24 .5)

20 324-3 (5-5 .5)21 324-3 (lo-la,s )

2 324-3 (15-15 .5)

23 324-3 (20-20 .5)

24 324-3 (24-24 .5 )

25 005-3 (8-8 .5) DUPLICATE/0726 . 324-2 (19-19 .5) DUPLICATE/18

MATRIX DATt; UU "UTL

Sn 'T, 2 9t)14/1 f- L 12/12/9 0

SOIL 12/12/9 012/12/9 0

SOIL

SOIL12/12/90

T.Cof 12/12/9 0

SOIL 12/12/9 050IL

12/13/90 ,12/13/9 0

SOIL1`/13/ 9 0

SOIL.12/ 1 3/9 0

SAIL0

12/13/90SOIL

SOIL 12/13/9 0

SOIL12/13/9 0

SOIL 12/13/9 0

SOIL 12/13/9 0

SOIL 12/13/9 0

SOIL12/13/9 0

SOIL 12/13/90

SOIL12

/ 13/90'

SOIL 12/13/90

SOIL 12/13/9 0

SOIL12/13/9 0

SOIL12/13/9 012/12/9 0

2SOIL 12/1 /9 0SOIL

ATI STANDARD DISPOSAL PRACTICE

will-be disposed of in twenty-one (21) days from

this project

-----

of this from report . If an extended storage period is required, please ,Thethe dat

e samples

control department before the scheduled disposal date . 3, a :leour sampcontact=

,, t

HDMSe0002425 7

5 }5}4 .5 )

"W 1

8

Page 61: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

CHAIN OF Cis . :., ~)DY RE QOR [

PROJECT N .

PROJECT IrAANAG `t4'A I14

SAMPLERS

SAMP

(7 30

0

091,07

DATE

SAMPLED

PR rN UMUtR

TYPE a LUMBER OF CONTAINERS

ANALYSES REQUI R

T71 I Y,

#~ t t

i

1

l11 REMARIC9/CQNp I

pi 'o t )• QzSri ft, Btt

is Ae ele►' C,M i-VAI- A! it e <

Inpit 4 >r L

Q

20

SHIP TO,

EMARKS, PRESERVATIVES,

SPECIAL HANDLIN G

ki~ateApg

Tu j OF SAMPE S

INVOICE 10 1

dw,SEND RESULTS AND GROUNDWATER RESOURCES CONSULTANTS, INC .

4SUITER1735 E . FORT LOWELL D ., TUCSON,ARIZONA 8571 9

(602) 326-1898

Page 62: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

CHAIN OF GUST 'Y RECUfl)

1=

7

YItv

-1 i

3

(3

PROJECT N A

PROJECT

SAMPLERS

ANA G

SAMPLEPw

'F'~ "a I% j It i

RECEIVED BY '

SHIP TO*

?~II I I

.

it

REMARKS, PRESERVATIVES,

SPECIAL . HANDLIN G

_ ..-- ,,.tom Tour REMARKS /CONDITICV OF SAMPL S

SEfID RESULTS ANDINVOICE TO,

I'R0~

TYPE B NUMBER OF CONTAINERS

/I _/ 7- 'reGROUNDWATER RESOURCES CONSULTANTS, INC .

1735 E . FORT LOWELL RD ., SUITE 4TUCSON, ARIZONA 8571 9(602) 326-1898

Page 63: UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7...UNDERGROUND STORAGE TANK REMOVAL REPORT UT-4 7 I_Inn.tredu i n The purpose of this Tank Removal Report is to summarize historical activities

ATTACHMENT G

RESOURCE MANAGEMENT AGENCYEnvironmental Health Division

Director:ount!J ven `ura WKa e

Rockwell International Corporation

6633 Canoga Avenue

Canoga Park, California 91303

File #C9009 4

ROCKWELL/SANTA SUSANA FIELD LAB, BUILDING 324, TANK 47, WCOLSE Y

CANYON, SIMI VALLEY, CALIFORNIA

This letter confirms the completion of site investigation andremedial action for the underground storage tanks at the above

site. With the provision that the information provided to thisagency was accurate and representative of existing conditions, itis our position that no further action is required at this time .

Please be advised that this letter does not relieve you of anyliability under the California Health and Safety Code or rater Codefor past, present, or future operations at the site . Nor does it

relieve you of the responsibility to clean up existing, additionalor previously unidentified conditions at the site, which cause orthreaten to cause pollution or nuisance or otherwise pose a threatto water quality or public health .

Additionally, be advised that changes in the present or proposeduse of the site may require further site characterization and

mitigation activity. It is the property owner's responsibility to

notify this agency of - any changes in report content, futur e

contamination findings, or site usage .

ou have any questions regarding this matter , please contactIf yMichael C . McFadden of the LUFT program staff at (8 0 5) 654-3522 ,

between the hours of 8 :00-9 : 30 a .m. or 3 :30-5 :00 p . :

through Friday .

bOUGLAS A . BEACHUNDERGROUND . TANKS - PROGRAM

HEALTH DIVIS

DB/MCM/po/3roc'k e 1

Donna Schimick, SWRCBJoshua Workman, LARWQCS

H D M Se00024260