ELASTOMER SEALS FEBRUARY 2012 CONFIRMED MINUTES CONFIRMED MINUTES FEBRUARY 20 – 24, 2012 SHERATON SAN DIEGO HOTEL & MARINA SAN DIEGO, CALIFORNIA These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency. MONDAY, FEBRUARY 20, 2012 1.0 OPENING COMMENTS / INTRODUCTIONS – OPEN 1.1 Call to Order / Quorum Check The Elastomer Seals Task Group (SEAL) was called to order at 8:00 a.m. 20-Feb-12. A quorum was established with the following representatives in attendance: Subscriber Members/Participants Present (* Indicates Voting Member) NAME COMPANY NAME Hal Abel Raytheon Pete Atwell Airbus David Barnes Honeywell Aerospace * Michelle Brunet The Boeing Company * Brent Clothier Cessna * Kent Defranco Lockheed Martin * Jeff Kingsley USAF Proxy for Marc Gauge * Manuel Koucouthak is Honeywell Aerospace Chairperson / Proxy for Ben Shaw Leah Markowitz Honeywell Michelleni Moragi Goodrich Doug Steinke Honeywell * Bob Teegarden Honeywell Aerospace Estrella Watson Goodrich Other Members/Participants Present (* Indicates Voting Member) NAME COMPANY NAME 1

UNCONFIRMED MINUTES - Performance Review …cdn.p-r-i.org/wp-content/uploads/2016/08/11100921/ELAST... · Web viewYES NO 10.2.4 Does the supplier have a procedure that describes the

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: UNCONFIRMED MINUTES - Performance Review …cdn.p-r-i.org/wp-content/uploads/2016/08/11100921/ELAST... · Web viewYES NO 10.2.4 Does the supplier have a procedure that describes the

ELASTOMER SEALSFEBRUARY 2012

CONFIRMED MINUTES

CONFIRMED MINUTESFEBRUARY 20 – 24, 2012

SHERATON SAN DIEGO HOTEL & MARINASAN DIEGO, CALIFORNIA

These minutes are not final until confirmed by the Task Group in writing or by vote at a subsequent meeting. Information herein does not constitute a communication or recommendation from the Task Group and shall not be considered as such by any agency.

MONDAY, FEBRUARY 20, 2012

1.0 OPENING COMMENTS / INTRODUCTIONS – OPEN

1.1 Call to Order / Quorum Check

The Elastomer Seals Task Group (SEAL) was called to order at 8:00 a.m. 20-Feb-12.

A quorum was established with the following representatives in attendance:

Subscriber Members/Participants Present (* Indicates Voting Member)

NAME COMPANY NAME

Hal Abel RaytheonPete Atwell AirbusDavid Barnes Honeywell Aerospace

* Michelle Brunet The Boeing Company* Brent Clothier Cessna* Kent Defranco Lockheed Martin* Jeff Kingsley USAF Proxy for Marc

Gauge* Manuel Koucouthakis Honeywell Aerospace Chairperson /

Proxy for Ben Shaw

Leah Markowitz HoneywellMichelleni Moragi Goodrich Doug Steinke Honeywell

* Bob Teegarden Honeywell AerospaceEstrella Watson Goodrich

Other Members/Participants Present (* Indicates Voting Member)

NAME COMPANY NAME

Gilbert Alba Lisi-AerospaceKathy Alonso United Seal and RubberArshad Hafeez QuaLease Ltd.John Dickinson Parker Hannifin Corp.Peter Holden Precision Polymer Eng.

* Dorothy Kern Parker HannifinScott Kronabetter Micro -TronicsJohn Lane Integral ProductsJessica Mattison Parco, Inc.William McFadden Bryant Rubber Corp.Dan McMillen Parco, Inc.Mike Nosek Micro -Tronics

1

Page 2: UNCONFIRMED MINUTES - Performance Review …cdn.p-r-i.org/wp-content/uploads/2016/08/11100921/ELAST... · Web viewYES NO 10.2.4 Does the supplier have a procedure that describes the

ELASTOMER SEALSFEBRUARY 2012

CONFIRMED MINUTESDavid Ravani Simrit-Intl. Freudenberg-NOKManuel Rebelo Freudenberg-NOKMark Travis Micro -TronicsSalvador Vazquez Hutchinson Seal

PRI Staff Present

Keith Purnell

It was verified only subscriber members were in attendance for closed portion of the meeting.

The Antitrust and Nadcap Personal Code of Ethics and Conflict of Interest were reviewed with the Task Group in the OPEN, CLOSED and Joint meeting.

The voting membership was reviewed, attendance roster was circulated and proxy votes were recorded.

The voting records and meeting attendance for SEAL TG Voting Members, Subscriber and Supplier, were reviewed for compliance to the requirements for maintaining membership. The requirements state that to maintain membership, a member must not be absent without approved alternate representation from three consecutive regular Nadcap Task Group meetings and the member, or approved alternate representation, shall not miss a vote on 2 consecutive letter ballots. The Task Group Chairperson is allowed to waive these requirements if other circumstances warrant retention.

All Voting Members met the requirements for meeting attendance and voting on letter ballots.

1.2 First Time Attendees

First time attendees include: H. Abel, G. Alba, Alonso, W. McFadden, D. McMillen, M. Moragi, M. Rebelo, E. Watson.

1.3 New Voting Members

This was the second SEAL TG meeting attended by Brent Clothier of Cessna. B. Clothiersubmitted a written request to become a SEAL Subscriber voting member.

Motion made by M. Koucouthakis and seconded by J. Kingsley to approve B. Clothier as a subscriber voting member. Motion Passed Unanimously.

ACTION ITEM: K. Purnell to process the completed m-frm-01 for B. Clothier and update the SEAL TG Voting Membership. (DUE DATE: 16-MAR-12)

2.0 AGENDA REVIEW / MEETING EXPECTATIONS – OPEN

The agenda for the meeting was reviewed. Attendees were given the opportunity to identify expectations to be addressed during the week of meetings. Expectations beyond agenda items included adhering to subscriber or industry requirements when reviewing checklists for revision and gaining a better understanding of how ISO/IEC 17025 is used by the Non Metallic Material Test Task Group (NMMT).

3.0 APPROVAL OF OCTOBER 2011 MEETING MINUTES – OPEN

The minutes from the October 2011 SEAL TG meeting and action items were reviewed.

Motion made by J. Kingsley and seconded by K. Defranco to approve the minutes from the October 2011 Nadcap meeting as written. Motion Passed Unanimously.

2

Page 3: UNCONFIRMED MINUTES - Performance Review …cdn.p-r-i.org/wp-content/uploads/2016/08/11100921/ELAST... · Web viewYES NO 10.2.4 Does the supplier have a procedure that describes the

ELASTOMER SEALSFEBRUARY 2012

CONFIRMED MINUTES4.0 PRI STAFF REPORT – OPEN

Staff Engineer, K. Purnell, presented the PRI Staff Report that included Auditor Status, SEAL TG Metrics, Most Common NCR’s, Latest Changes, Future Nadcap Meeting Dates and Locations, Staff Delegation Metrics, 2012 Audit Failure Criteria, Open vs. Closed Meetings and New Meeting Agenda Format. (Attached)

The latest Audit Failure data was reviewed and the new numbers were compared to the existing Failure Criteria. There were three initial audits and 7 reaccreditation audits in 2011. For reaccreditation audits, the total number of NCR’s per day would have been reduced from 3 to 2 and the number of Major NCR’s per day would have been reduced from 2 to 1. The Task Group discussed the new failure numbers and decided to keep their existing failure criteria. Decision was based upon the limited number of audits performed and the new AC7115 Revision B checklist being recently released. At the next meeting the Task Group requested to review Failure Criteria based upon three years of data to see how it compares with their existing data. The new agenda format was reviewed and it was preferred over the existing format.

Motion made by K. Defranco and seconded by J. Kingsley to maintain the Task Groups existing failure criteria. Motion Passed Unanimously.

ACTION ITEM: K. Purnell to provide M. Graham with the Task Group’s approved Failure Criteria for inclusion in the next revision of NOP-011 Appendix A. (DUE DATE: 30-MAR-12)

ACTION ITEM: K. Purnell to add Failure Comparison based upon three years of data to the June SEAL TG meeting agenda. (DUE DATE: 30-MAR-12)

5.0 SSC REPORT – OPEN

K. Purnell presented the attached Supplier Support Committee Update that included an overview of the SSC Leadership Team, how the SSC helps suppliers, current SSC activities and their new supplier initiatives. For additional information please review the SSC minutes posted on the www.pri-network.com website.

6.0 AUDITOR CONFERENCE PRESENTATION TOPICS AND MATERIAL DEVELOPMENT – OPEN

SEAL TG Auditor Conference will tentatively be on Sunday October 21, 2012 in Pittsburgh PA.Draft SEAL Auditor Conference outline is below.

Most Common NCR’s & NCR Data Analysis for ConsistencyReview of NCR’s and Associated Checklist Paragraphs Quality/Understandability of Write-Ups and Reports1 HOUR Conducted by K. Purnell

AC7115 Review of the Most Recent Checklist Revision, Suggested Improvements, Clarifications1-1/2 HOUR Conducted by M. Koucouthakis & K. Purnell,

Review of Latest Specification Changes1 HOURS Conducted by M. Koucouthakis

3

Page 4: UNCONFIRMED MINUTES - Performance Review …cdn.p-r-i.org/wp-content/uploads/2016/08/11100921/ELAST... · Web viewYES NO 10.2.4 Does the supplier have a procedure that describes the

ELASTOMER SEALSFEBRUARY 2012

CONFIRMED MINUTES AMS CE Update

Review of the Latest Activities of the AMS-CE Standards Committee1/2 HOUR Conducted by M. Koucouthakis

Job Audit Selection, Subscriber and Industry StandardsSelecting Job Audits for Initial & Reaccreditation Audits1 HOURS Conducted by M. Koucouthakis & K. Purnell

Subscriber Issues and Mock Audit1/2 HOUR Conducted by Subscribers

Review Latest Task Group InitiativesNon-Metallic Material Test Audit QuestionsDevelopment and Fabric Reinforced Audit Checklist 1-1/2 HOUR Conducted by K. Purnell and M. Koucouthakis, Sub-team for Training of Fabric Reinforced

Question and Answer SessionOpen Discussion, Current Wants and Needs of the Auditors1 HOUR Conducted by K. Purnell and Subscribers

7.0 MIXING FACILITIES – OPEN

SEAL TG discussed Nadcap accreditation of custom mixing facilities. Quality system requirement would be AS9100 or AC7004. Additional questions will be added to the mixing section of the AC7115 checklist for effective audit of mixing subcontractors. Questions are to include dates, times, how audit was conducted, auditor qualifications, question to address if a compounder modifies any of the compound ingredients has their customer been notified.

ACTION ITEM: SEAL TG to determine if AC7004 would be an acceptable quality system for Mixers since no QPL listing would be required for Mixers. (DUE DATE: 31-MAY-12)

ACTION ITEM: K. Purnell to Draft audit questions for effective audit of mixing subcontractors that includes dates, times, how audit was conducted, auditor qualifications, question to address if compounder modifies any of the compound ingredients has their customer been notified and audit handbook clarifications. (DUE DATE: 31-MAY-12)

ACTION ITEM: M. Koucouthakis to take mixing facility topic to the AMS-CE committee for consensus and inclusion in an AMSCE document. (DUE DATE: 7-MAY-12)

8.0 FABRIC REINFORCED PARTS CHECKLIST DEVELOPMENT – OPEN

The SEAL TG reviewed and incorporated suggested changes in Draft AC7XXX dated 20 Feb 2012 Fabric Reinforced Elastomeric Components Audit Checklist. (Attached)

ACTION ITEM: K. Purnell to e-mail Draft AC7XXX for Fabric Reinforced Elastomeric Component to the Task Group meeting attendees for review and comment. (DUE DATE: 16-MAR-12)

ACTION ITEM: SEAL TG attendees to e-mail comments on Draft AC7XXX for Fabric Reinforced Elastomeric Component to [email protected] & [email protected] . (DUE DATE: 13-APR-12)

9.0 OPENING COMMENTS – CLOSED

It was verified only Subscriber members were in attendance and a quorum was established. The Antitrust and Nadcap Personal Code of Ethics and Conflict of Interest were reviewed.

4

Page 5: UNCONFIRMED MINUTES - Performance Review …cdn.p-r-i.org/wp-content/uploads/2016/08/11100921/ELAST... · Web viewYES NO 10.2.4 Does the supplier have a procedure that describes the

ELASTOMER SEALSFEBRUARY 2012

CONFIRMED MINUTES10.0 MEMBERSHIP STATUS – CLOSED

Nadcap Membership status was reviewed. All members met the meeting attendance and voting requirements specified in NTGOP-001 Paragraph 5.2.5.

11.0 AUDITS AND AUDITORS – CLOSED

SEAL audits scheduled for the next 12 months were reviewed so Subscribers could identify audits for observation.

12.0 STAFF DELEGATION – CLOSED

Staff Engineer Keith Purnell met the minimum criteria of having at least 10% of findings reviewed by the Task Group Primes with at least a 90% concurrence rate. Staff Engineer maintains delegated status.

13.0 NEW BUSINESS – CLOSED

No new business was discussed.

14.0 CHECKLIST VISION – OPEN

Nadcap Checklist Vision Criteria was reviewed:

The establishment of audit criteria that is based upon industry standards (where not ambiguous) and includes requirements common amongst subscribing prime contractors (where the specifics of meeting that requirement may vary).

The program shall include provisions for auditing of Prime unique/specific requirements. Quality system questions shall be utilized to test for compliance and not for existence of quality

system elements. Expanded usage of job audits shall be considered to accomplish these initiatives. The Nadcap accreditation program shall promote continual improvement philosophies through

non-prescriptive means for compliance and address recurring industry issues and quality improvements through the relevant standards making bodies.

SEAL TG drafted an Aerospace Recommended Practice (ARP) for the manufacture of elastomeric products. Draft was reviewed and several changes to the document were suggested. K. Purnell is to e-mail the revised Draft to attendees for review and comment. Attendees are to e-mail comments to M. Koucouthakis and K. Purnell using track changes by 30 March 2012. M. Koucouthakis is to review the proposed changes then ballot Draft to the AMS-CE committee by 16 April 2012. The ARP was needed to define critical manufacturing requirements.

ACTION ITEM: K. Purnell to e-mail Draft ARP for Manufacture of Elastomeric Products to the SEAL TG meeting attendees for review and comment. (DUE DATE: 9-MAR-12)

ACTION ITEM: SEAL TG meeting attendees to e-mail comments on Draft ARP for Manufacture of Elastomeric Products using track changes to [email protected] and [email protected] (DUE DATE: 30-MAR-12)

ACTION ITEM: M. Koucouthakis to review proposed changes and ballot Draft ARP for Manufacture of Elastomeric Products to the AMS CE committee (DUE DATE: 16-APR-12)

ACTION ITEM: M. Koucouthakis to request AMS CE committee define the term fabricator, compounders, lot and batch also raise question on labeling of elastomeric parts.(DUE DATE: 16-APR-12)

15.0 AC7115 JOB AUDIT REVIEW FOR EXPORT CONTROL (EC) COMPLIANCE – OPEN

5

Page 6: UNCONFIRMED MINUTES - Performance Review …cdn.p-r-i.org/wp-content/uploads/2016/08/11100921/ELAST... · Web viewYES NO 10.2.4 Does the supplier have a procedure that describes the

ELASTOMER SEALSFEBRUARY 2012

CONFIRMED MINUTESAC7115B checklist was reviewed for EC compliance. Changes to be incorporated in the next revision are: delete question 6.2, delete attaching procedures to questions 8.20, 9.6, and 9.11; in Job Audits delete Part Description and Processing Specification. Add auditor instruction for EC compliance.

ACTION ITEM: K. Purnell to update AC7115 with above changes and auditor instructions for EC Compliance. (DUE DATE: 16-APR-12)

16.0 OVERVIEW OF SEAL AND NMMT PROGRESS ON CAPTIVE AND INDEPENDENT ELASTOMERIC MATERIAL LAB AUDIT QUESTIONS – OPEN

There have been multiple conference calls between NMMT and the SEAL TG since the October meeting and all questions developed by the SEAL TG have been incorporated into the NMMT checklists.

17.0 IDENTIFY IF ANY AC7115 CHANGES ARE REQUIRED TO IDENTIFY CAPTIVE LAB QUESTIONS IN AC7122/1, AC7122/2 AND AC7122/4 – OPEN

Captive Laboratory questions were reviewed but no additional questions were required.

18.0 DRAFT AN MOU FOR USE OF NMMT AC7122/1 AC7122/2 AND AC7122/4 – OPEN

A Draft MOU was discussed; questions raised were:

Is there a quality system requirement for captive labs? Is the SEAL supplier captive lab audited by SEAL TG issued an AC7122 cert or AC7115B with material test lab scope? Are the test classifications certified to AC7122? Questions will be discussed in the joint meeting between NMMT and SEAL.

19.0 IDENTIFICATION AND PRIORITIZATION OF SEAL TASK GROUP INITIATIVES – OPEN

Independent Laboratory Audit Questions – MOU with NMMTCaptive Laboratory Audit Questions – Use of AC7122 ChecklistFabric Reinforced Seals ChecklistCreate New ARP to Address Fabric Reinforced SealsMixing Facilities - Take Question of Audit Mandate to AMS CE April 2012 M. KoucouthakisSeal Fabricators – AMS-CE to Define the Term Fabricator, Compounders, Lot, Batch, LabelingValue Added Distributors – Low PriorityARP for Seal Manufacturing Add Audit Verification Questions to AC7115B & AC7XXX to Address External Audits of Subcontracted Activities (e.g. Mixing, Scrim Coatings)Labeling of Elastomeric Parts

20.0 NEW BUSINESS – OPEN

No new business was discussed.

21.0 AGENDA ITIEMS FOR NEXT MEETING – OPEN

SEAL TG will meet Monday, Tuesday and Wednesday until Noon.Review Auditor Conference TopicsMixing Facilities Update

6

Page 7: UNCONFIRMED MINUTES - Performance Review …cdn.p-r-i.org/wp-content/uploads/2016/08/11100921/ELAST... · Web viewYES NO 10.2.4 Does the supplier have a procedure that describes the

ELASTOMER SEALSFEBRUARY 2012

CONFIRMED MINUTESFabric Reinforced ChecklistARP for Fabric ReinforcedMOU with NMMTMTL Lab Test QuestionsSubcontractor Audit QuestionsReview RAIL Action Items

22.0 REVIEW ROLLING ACTION ITEM LIST (RAIL) – OPEN

The SEAL TG reviewed all Open Action Items. For specific details, please see the current Elastomer Seals Rolling Action Item List posted at www.eAuditNet.com, under Public Documents.

23.0 MEETING FEEDBACK – OPEN

Meeting location closer to restaurants and internet in meeting rooms was suggested.

24.0 JOINT MEETING WITH SLT AND NMMT TASK GROUPS FOR DEVELOPMENT OF AC7122 TESTING CRITERIA FOR ELASTOMERIC MATERIALS – OPEN

NOP-005 Cross Commodity Agreements

Rebekah Braun gave a presentation on the subject of Memorandums of Understanding (MOU).

24.1 Joint Meeting with Elastomer Seals Task Group (SEAL) - Development of testing criteria for Elastomers

There were a few questions about the details that needed to be placed in the MOU.

What does NMMT have for Quality Requirement?o AS9100 for part and material manufacturers (AC7122-P and AC7122-R) and ISO 17025

for an independent labs (AC7122-I). How would the audit work?

o SEAL would utilize the AC7122 Base Document and any associated Slash Sheets (AC7122/1, AC7122/2, etc) to audit Elastomeric Testing that is being performed at the Captive Laboratories associated with the Elastomers part manufacturers. The SEAL TG would manage any resulting NCRs and grant AC7115 and AC7122-P accreditation accordingly.

o NMMT would also use the AC7122 Base Document and any associated Slash Sheets to audit Elastomeric Testing that is being performed at an Independent Test Lab. The NMMT Task Group would manage any resulting NCRs and grant AC7122-I accreditation accordingly.

24.2 Rolls Royce Test of AC7115 and Elastomer Seals Testing Questions

Tara Campbell provided feedback on the Rolls Royce test of the AC7115 and new AC7122 Elastomer Seals Testing questions. Generally speaking, the checklist was sound but a little jumpy in the general section. The testing lab review went well and the questions were leading into the right directions, but there were some disconnects within the standard and the labs procedures.  So the testing of the testing questions went very well.

ACTION ITEM: PRI to provide a copy of AC7122 (base document) to the SEAL TG. (DUE DATE: 2-Mar-12)

7

Page 8: UNCONFIRMED MINUTES - Performance Review …cdn.p-r-i.org/wp-content/uploads/2016/08/11100921/ELAST... · Web viewYES NO 10.2.4 Does the supplier have a procedure that describes the

ELASTOMER SEALSFEBRUARY 2012

CONFIRMED MINUTES

ACTION ITEM: SEAL TG to review the sections in AC7122 that are applicable to P - Part Manufacturers Captive Laboratories and identify if there are concerns with applying any of these requirements to SEAL TG Suppliers. Also, review the job audit criteria to determine if the requirements are acceptable (i.e. one job audit per slash sheet) (DUE DATE: 25-Jun-12)

ACTION ITEM: PRI to review the details in the MOU between SEAL and NMMT and make necessary revisions. Share final draft of MOU at June Nadcap meeting. (DUE DATE: 30-Apr-012)

ACTION ITEM: PRI to add a Training Topic to the October Auditor Training to address the Elastomer specific training to the NMMT Auditors and Base Document AC7122 training to SEALS Auditors.  Discuss logistics at June Nadcap meeting. DUE DATE: 25-Jun-12)

ACTION ITEM: PRI to revise the AC7122 Slash documents (/1-/5) to identify the new Class materials.  What is the next class material (DUE DATE: 25-Jun-12)

ADJOURNMENT – 22-Feb-12 – Meeting was adjourned at 11:50 a.m.

Minutes Prepared by: Keith Purnell, [email protected]

***** For PRI Staff use only: ******

Are procedural/form changes required based on changes/actions approved during this meeting? (select one)

YES* NO

*If yes, the following information is required:

Documents requiring revision: Who is responsible: Due date: