UNCLASSIFIED 1
Presented by:Dr. Richard A. RusselSCNC Chief Architect
Northrop Grumman Mission [email protected]
ISCNISCNTop Down and Bottom UpTop Down and Bottom Up
Architecture ImplementationArchitecture Implementation
Space Internet Workshop 2004Space Internet Workshop 2004
UNCLASSIFIED 2
Integrated Satellite Control Network (ISCN) Notional Vision
Establish an interoperable, shared ISCN based on ground elements of current DoD, NASA, NOAA, and other networks augmented by Governm ent
sponsored space-based assets
M D A/TM DM ilitarySatcom
N ationa l
N avigation
Environm enta l
R elay
D edicatedC iv il G N
C ivil D edica tedD epartm ent o f D efense (D oD ) D ed icated M ission C enters
AFS C N Sate llite O perations C enter (SO C s)
D edicatedD oD G N
Shared G round N etw ork (G N ).
See F igure 4 for D eta ils
R &D
Space Based R elay (SBR ),TC S, and TD R SS Technology O ptions
M ulti-band (U SB / SG LS), Phased Array, M ulti-C ontact, Autom ated and R em ote ly C onfigured Antennas, Softw are P rogram m able Transceivers,C entra lized NM S, P riority driven for Scheduling, M onitoring, M anagem ent,and autom ated fault m anagem ent
S030550
UNCLASSIFIED 3
Overview
• ISCN can be developed by a combination of Top-down and Bottom-up architecture development and planning
• Top-Down
• The AFSCN is the first space system that has been fully characterized using the architecture views per the DoD Architecture Framework (DODAF)
• SCNC Architecture Team is developing the ISCN views as part of FY05 task
UNCLASSIFIED 4
Overview
• Bottom-Up
• SCNC has developed an AFSCN Roadmap that characterizes all projects down to requirements, cost and schedule – this is being used for POM inputs by SMC/RN and AFSPC/DR
• The Roadmap will sequence all projects leading to ISCN by a realistic sequencing of projects based on technical and fiscal constraints, and the relationship to current legacy installations
UNCLASSIFIED 5
SCNC Progress to Date – AFSCN DoDAF ProductsTop Down
FY02 ViewsFY03 ViewsFY04 Views
UNCLASSIFIED 6
OV-2 View: AFSCN Operational Node ConnectivityTop Down
UNCLASSIFIED 7
OV-5 View: AFSCN Activity ModelTop Down
UNCLASSIFIED 8
SV-1 View: AFSCN System Interface DescriptionTop Down
UNCLASSIFIED 9
SV-3 View: AFSCN Systems2 MatrixTop Down
Dat
a D
istr
ibut
ion
Sub
syst
em
Mis
sion
Con
trol
C
ompl
ex/S
OC
Tes
t D
river
S
yste
m
OS
R N
etw
ork
Man
ager
WA
NIU
M
ultip
lexe
r
BII
DC
C
OS
R
Ant
enna
S
ubsy
stem
Data Distribution Subsystem X XMission Control Complex/SOC XTest Driver System XOSR Network Manager X X XWANIU Multiplexer XBII X XDCC X XOSR X X X XAntenna SubsystemControl and Status Subsystem X XInteroperability EnhancementsTT&C Subsystem X XPerformance Evaluation (SNAP)ESDOAS XCUE UserNon-CUE User X
CMOC CMOC
Resource Management SegmentSatellite Control Users
Communications Segment
Range Segment
Communications Segment Range Segment
Command and Control Segment
Command and Control Segment
UNCLASSIFIED 10
TV-1/TV-2 Views: AFSCN Combined Top Down
Service Area Service Mandated Standard/ Emerging Standard
Current Standard Near-Term Standard Mid-Term Standard Far-Term Standard
Communication Services
Analog Facsimile Standards
EIA/TIA-465-A , Group 3 Facsimile Apparatus for Document Transmission, Jun 95
Resource Management Segment - OAS: Same as mandated standard
Resource Management Segment - OAS: TBD
Communication Services
Analog Facsimile Standards
EIA/TIA-466-A , Procedures for Document Facsimile Transmission, May 97
Resource Management Segment - OAS: Same as mandated standard
Resource Management Segment - OAS: TBD
Communication Services
Bootstrap Protocol IETF RFC 1542, Clarifications and Exts for the Bootstrap Protocol, 27 Oct 93
Range Segment: Same as mandated standardResource Management Segment - OAS: TBD
Resource Management Segment - OAS: Same as mandated standardResource Management Segment - ESD: TBD
Resource Management Segment - ESD: TBD
Communication Services
Bootstrap Protocol IETF RFC 951, Bootstrap Protocol, 1 Sep 85
Range Segment: Same as mandated standardResource Management Segment - OAS: Same as mandated standard
Resource Management Segment - OAS: Same as mandated standardResource Management Segment - ESD: TBD
Resource Management Segment - ESD: TBD
UNCLASSIFIED 11
Current Works on DoDAF Products - FY04Top Down
• Maintain “As-is” Architecture– Incorporate any baseline changes– Add new DoDAF Products
• SV-2 System Communication Description• SV-6 System Information Exchange Matrix
• Provide “To-Be” ~2011 Architecture– Uses AFSCN Roadmap as Driver– Uses “As-is” Architecture as starting point– Will show operational, system and technical
architecture changes
UNCLASSIFIED 12
ISCN Roadmap Architecture EvolutionBottom Up
S 030552
User Spacecraft
H um anSpacefligh t
O ther U serC onste lla tions
N ational S cience W eather M ilita ry G P S C onste lla tion
RF Link
DedicatedUser
Assets
Data F low s(e.g. TT&C,
Payload)
U ser C ontro lC enters
(D oD , C iv il,and C om m ercia l
S O C s/M O C s)
WAN
Data F low s(e.g. TT&C,
Payload)
WAN
Contro l andStatus F low s
(e.g. Schedules, Vectors)
RF Link RF Link
Space B ased R e lay
Range Segm entSupport TT&C and
M ission Payload Data
WANContro l andStatus F low
(e.g. Schedules)
A FS C N O C N(S A FB )
A FS C N B C N(O A FS )
Network M anagem ent Segm entEnhance O rbita l Analysis and
Network M anagem ent
Current AFSC N Architecture
• R ange Segm ent: In itia l RTS upgradessta rted ; fu ll upgrade s ta rted .
• N etw ork M anagem ent Segm ent: O ASfo llow -on started
• C om m unications Segm ent: W AN IU sstill in use a t legacy system s; O S com pleteD ISN backbone in p lace.
• U ser Serv ices in S G LS ; enable S O C m igra tion aw ay from C C S.• In teroperability
R
study phase underw ay.
AFSC N RTSAssets
Range Segm ent
WANContro l andStatus F low
(e.g. Schedules)
Network M anagem ent Segm entIncreased Interoperability
AFSCN Space O perationsArchitecture
• R ange Segm ent: RTS upgrades underw ay.• C om m unications Segm ent: Increased capab ility per userrequ irem ents; W A N IU s m ay still be in p lace for legacyS O C s support.
C om m ercia l augm entation .• Support in SG LS and U S B .•
• SB IR S S Q PS K support.• O AS Phase 3 and 4 in progress.• IP N e ts in p rogress.• C C S is decom m issioned, O A S backup in p lace .• ES D 3 .0 com plete .• U pgraded com m unica tions and tim ing.• R B C Transportab le in p lace.• Enhanced capability to hand le peak load ing.• EV C F upgraded.• O ffline testbed and tra in ing .
C iv ilAugm entation
C om m ercia lAugm entation
C iv il C om m erc ia l
NavigationS ignals forTracking
M issionPayload
Data
RF Link
Range Segm ent
Contro l andStatus F low
(e.g. Schedules)
N etw orkM anagem ent S egm entIn te roperab le , R obust,and H igh ly A u tom ated
AFSCN and Partia l ISCNArchitecture
• R ange Segm ent: In te roperab ility across D oD , c iv il, and com m ercia l.
• Space S egm ent: G PS Tracking.• C om m unications Segm ent: C onnectiv ity /peering across D IS N , (G IG ),
N AS A, N O A A, and com m erc ia l netw orks.• C ustom ers/U ser: S ing le , standard based in te rface to S O C s/M O C s.• Phased a rray A C TD .• ISS com plete .• O AS Phase 3 and 4 com p lete .• R em ote opera tions in p lace .• W AN IF in progress, TC S and G IG in te roperab ility.• D LT rep lacem ent com ple te .• N M S w eb enab led and d istribu ted da tabase .
RF Link
ISCN C om pliantA rchitecture
Space Segm ent
AssetsG round Space
Segm ent
AssetsG round
A FS C N O C N(S A FB )
C om m erc ia l C iv il
WAN
Contro l andStatus F low
(e.g. Schedules)
N etw orkM anagem ent S egm entIn te roperab le , R obust,and H igh ly A u tom ated
N S S A O C N(S A FB )
C om m erc ia l C iv il
WAN
Range Segm entSupport TT&C and M ission Payload Data
• R ange Segm ent: In te roperab ility across D oD , c iv il,and com m ercia l. • Space S egm ent: D ep loyed space based re lay, In itia l
• C om m unications Segm ent: C onnectiv ity /peering across D IS N , (G IG ),c iv il, and com m erc ia l netw orks.• W AN IF com plete .
m ulti-contactan tenna capab ility.• N etw ork M anagem ent Segm ent: Federa ted scheduling system .
• Start o f phased a rray:— M ulti-band— S im u ltaneous m ulti-con tact— R adar tracking w h ile com m unicating• R B C com ple te .• Au tom ated scheduling in tegrated w ith rem ote opera tions.
Space-B asedR e lay
Tracking S egm ent
P artia lly D ep loyedSpace R e lay
AFSCN RTSAssets
DLTs U pgradedD LTs
AFSC N RTSAssets
C iv ilAugm entation
C om m ercia lAugm entation
U pgraded D LTs
AFSC N R BCAssets
C iv ilAugm entation
C om m ercia lAugm entation
U pgraded D LTs
A FS C N O C N(S A FB )
A FS C N B C N(O A FS )
C om m unications
Support TT&C and M ission Payload Data
Unattended O perations C apability
UNCLASSIFIED 13
AFSCN RTS Block Upgrade (RBC) Site Ordering Plan Bottom Up
RBC SITE ORDERING CHARTAs of: 21 August 2003
[Replace 46-ft Ant,New Location Low Power HPA Option 3rd Side]
Transportable #1
DGS-B Core
TTS-B Antenna
[Replace 46-ft Antenna]
TTS-A Core
[Replace 60-ft Antenna, New Location]
TTS-C Antenna
[Replace 10m Antenna]
TTS-B Core
TTS-C Core[Oldest ARTS Core]
TTS-A Antenna
[Replace 46-ft Antenna]
Operational Comm Segment Upgrade
POC: Major Ramphis Ruiz/SMC/RNAI, (310) 363-3169, [email protected]
Prioritized Site Order Doctrines:1) Follow proposal and new contraints2) Oldest to newest antenna replacement3) Consider AFSCN Loading
Prioritized P3I RBC Candidates:High - Timing Upgrade (PD-0001)
- RFI Monitor (PD-0198, shown)- HPA Dev/Retrofit (PD-0144/0145, shown)- SQPSK Demod for ARTS (PD-0162)- RBC IDF to WANIU Comm (PD-0189/0204)- Video Downlink (PD-0197)
Med. - Integrated DLT Capability in RTS (PD-0195)- CASA (PD-0196)
Low - USB High Power (PD-0194/0199)
Other RBC-Related Projects:1) Offline RBC Simulator/Trainer2) Offline High Fidelity RBC Test Article
[Maintain downtimeseparation to retain
Eastern Hemisphereintegrity]
Thule Thule Thule Thule Thule Thule Thule Thule Thule Thule Thule Thule Thule
Typhoon Typhoon Typhoon Typhoon Typhoon Typhoon
Typhoon Typhoon
Typhoon Typhoon Typhoon TyphoonAFSCN PEAK LOADING
Thule ThuleThule
Thule Thule Thule
Thule ThuleThule
A. Sakamoto/SCNC SAE21 August 2003Version 1.6
TyphoonTyphoon
Site Order Constraints:1) No Transportable @ Thule due to winds (if no radome)2) 2 CONUS sites before Non-CONUS3) Minimum station downtime4) No GTS construction during typhoon season5) AFSPC/DRNS constraints:- No MUE capability degradation- No 2 sites down simultaneously- Meet SQPSK rqmts (SBIRS/NOPS)1
- No two HP sites down at same time- Maintain range capabilities (RBC vs. ARTS)
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
Trans #1HPA
CTS-AHPA
GTS-BHPA
Typhoon
Pre-Install
Install
Key:
3600 Funds
Potential Topics for Analysis:1) Baseline Loading w/ new order2) TCS-D or DGS-B?3) NHS-A swap w/ CTS4) HPA options for DGS-B
2 Yr Construction Lead Time @ Diego
TTS-A Antenna
TTS-C Antenna
TTS-B Antenna
DowntimeEstimatesareapproximate
[Replace Last 60-ft Antenna, HPUE, New Location]
Typhoon
DRAFTDRAFT
SBIRSGEO #1Launch
3600 Funding Only
Site PreparationActivities and/orDev Activities
Ant and Core Install
Transportable #2 w/ HPA [Use for AFSCN Operations]
[Replace 46-ft Antenna at old NHS-A site]
Resource
Ops Resource
RBC Resource
Gov’t GFEOperationalResource
[Replace 11m (Youngest) Antenna, New Location]
Transportable #12
[New Ant. Location,Expand Core Facility]
DGS-A Core and Antenna1
[Replace 46-ft Antenna]
VTS-B Core and Antenna2,6
NHS-A Core and Antenna
GTS-A Core and Antenna1,4
[Replace 10m Antenna]
[Replace 13m Antenna, HPUE, New Location]
TVCF Antenna & TSTR Core1 forOperation & Loading (@ LION or REEF)
TCS-A Core and Antenna1
TVCF Antenna & TSTR Core
[Replace 13m Antenna]
Transportvia Boat/Aircraft
S030511
Typhoon TyphoonTyphoon
[HPA Options underconsideration]
DGS-B CommSegment Upgrade
2 Yr Comm RFS
HTS-B Core and Antenna
2 Yr Comm RFS
[6-ft Ant]
EVCF
DSC NHS-A Antedo
TSTR ARTS Core1
Transportvia Boat/Aircraft
[HPUE] DSC NHS-A Antedo
TSTR ARTS Core1
Notes:1 - SQPSK rqmts based on site ordering is articulated in SBIRS PRD Rev-A (8/28/01):
a) Test/Early On-Orbit Test: Transportable (e.g., TSTR), NHS, VTS, DGS,TCS, and GTS
b) Operations: DGS, TCS, GTS, CTS, and HTS2 - Additional costs for an RBC transportable pad3- Add capability one per site by 10/1/06 (i.e., FY07 Start)4- Potential radome replacement5 - VTS-A FDE must be completed prior to CTS-A Legacy HPA install (i.e., start ofoperational down-time)6 - VTS-B ARTS Core will be kept at Vandenberg for compatibility testing (using asmall diameter antenna)
[Replace 10m Antenna]
TCS-B Core & Antenna1
Transportable #12
LION-D CommSegment Upgrade
2 Yr Comm RFS
VTS-AHPA
[3600 1st Article HPA(s)3080 Other HPAs]
[Replace 10m Datron Ant, New Location]
CTS-A Core and Ant.1
GTS-B Core and Ant.1
Test Bed
DGS-B Antenna1
[Replace 60-ft Ant, HPUE]
VTS-A Core and Antenna1
TVCF Ant
Transportvia Boat/Aircraft
Transportvia Boat/Aircraft
Thule
Thule Construction(Seasonal)
Typhoon Typhoon Season(Guam)
TestbedHPA
DGS ConstructionPlanning
PlanningWA
PlanningWA
PlanningWA
HTS-A Core and Antenna1
NHS-B Core and Antenna1
Transportable #12
VTS-A Core and Antenna1, 5
HPA Development & Production
TVCF Ant
3400 Funds 3400 Funding Only
HPA Study[PD-0187]
Option
RFI Monitor [PD-0198]
UNCLASSIFIED 14
Roadmap Timeline - Development Project Descriptions (PDs)Bottom Up
Segment Name PD No. WA No. FY02 FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15
Development PDs
ALL Interoperability PD-0037,0211 Effort includes studies, demonstrations, and proof of concept activities
Baseline End-to-End Netw ork Loading Study PD-0003 Study
Obscura Study PD-0205 Study
Automated IRON Database Management PD-0219 Study
CRSS PD-0221
DGS-B and LION-D Impacts PD-0226 Study
Popkin/Rational Integration PD-0227 Study
SA Tool for OCN Coordination PD-0228 Study
Information Assurance PD-0004 Study
I&TSF PD-0043
ISCN Concept Refinement PD-0052 Study
RBC Loading Analysis PD-0053 Study
Next Generation Architecture Optimization F/O PD-0111 Study
NMS NMS Evolution Study PD-0026 Study
OAS F/O Phase 2 PD-0024
OAS Phase 3 PD-0190
OAS Backup PD-0182 Note - DR to define requirement
OAS Training Suite Relocation PD-0223
OAS Phase 4 - Guards PD-0074
ISS PD-0029
NMS Enhancement PD-0191
CS AFSCN Comm Segment Evolution Study PD-0039 Study
RBC Physical Interface IP Connectivity PD-0186
KAFB External Comm Connectivity PD-0020
Determine Bandw idth for RBC PD-0224
Timing Comm Mod Kit Development and Installation PD-0202,0203
VAFB External Users Connectivity PD-0047
TCA/TDRSS Augmentation PD-0057 Study
WANIF PD-0097
Comm S&P Studies - Far Term PD-0105 Study
C&CS SOC Interface Evolution PD-0008
CCS Database Rehost PD-0231 Study
Current POM Cycle
UNCLASSIFIED 15
NMS – Enabler of ISCNBottom Up
• Enterprise “Services” Subsystem (composed of “Services” and “Interface” hosts)
• “Status” Subsystem (all AFSCN status in one place)
• “Remote” Subsystem (extends EMS reach out to the remote sites)
• EMS-capable Workstations (simple browser-capable PCs bring the power of the enterprise solution to all user groups)
UNCLASSIFIED 16
Development of Interoperable Data Transfer Standards Bottom Up
• Prototyping designs for future AFSCN interfaces that enable use of Internet protocols, while maintaining DoD-unique performance requirements
• Verifying emerging international ground segment standards for Air Force operations; providing inputs to evolve these standards
Air Force
NOAA
NASA
packet switched network• Global Information Grid• Internet• leased commercial carrier
international standards
CCSDS SLElega
cy s
eria
l int
erfa
ces
DoD RTS Civil RTS Commercial RTS
Army
Navy
DoD SOC Civil SOC
UNCLASSIFIED 17
ISCN Candidate SitesBottom Up
UNCLASSIFIED 18
Excerpt from Dr. Shiang Liu brief
Phased Array Future Technology Provides Simultaneous Contact CapabilityBottom Up
UNCLASSIFIED 19
ISCN Site Ordering Planning ProcessBottom Up
DSC NHS-A Antedo
TSTR ARTS Core1
VTS-A Core and Antenna1
[6-ft Ant]
[Replace 10m Datron Ant, New Location]
[Replace 46-ftAnt,New Location(confirm this), LowPower HPA Option
3rd Side]
Transportable #1
Test Bed
DGS-B Core
HPA Prod(incl. VTS-A)
[3600 Funding]
RFI Monitor[3600 Funding]
[New Ant. Location, Expand Core Facility]
TTS-B Antenna
[Replace 46-ft Antenna]
[Replace 10m Antenna]
TTS-B Core
[Replace 60-ft Antenna, New Location]
TTS-C Antenna
[Replace 10m Antenna]
TTS-A Core
TTS-C Core[Oldest ARTS Core]
TTS-A Antenna
[Replace 11m (Youngest) Antenna, New Location]
[Replace 46-ft Antenna]
Transport viaBoat/Aircraft
VTS-B Core and Antenna
[Replace 46-ft Antenna]
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16
Transportvia Boat/Aircraft
Comm Segment Upgrade
Estimated CostsCONUS, Fixed Site $5M Core
$12.3M Antenna, FacilitiesTotal $17.3M
Non-CONUS, Fixed Site $5.2M Core$15.8M Antenna, Facilities
Total $21M
Transportable $20M
Site Order Doctrines1) Oldest to newest antennareplacement2) Follow proposal and newcontraints3) Consider AFSCN Loading
P3I Candidates:1) Timing Upgrade2) RFI Monitor (Done by FY07)3) Phased-Array Antennas
[Maintain separation to retainEastern Hemisphere integrity]
[HPUE]
[Replace 60-ft Ant, No Radome, HPUE]
[Potential Resource]
Thule Thule Thule Thule Thule Thule Thule Thule Thule Thule Thule Thule Thule
Typhoon Typhoon Typhoon Typhoon Typhoon Typhoon Typhoon
Typhoon
Typhoon Typhoon Typhoon Typhoon Typhoon
AFSCN PEAK LOADING
Typhoon Typhoon
Thule ThuleThule
Thule Thule Thule
Thule ThuleThule
TyphoonTyphoon
Site Order Constaints1) No Transportable @ Thule due towinds (if no radome)2) 2 CONUS sites before Non-CONUS3) Minimum station downtime4) No GTS construction duringtyphoon season5) AFSPC/DRNS constraints:- No MUE capability degradation- No 2 sites down simultaneously- Meet SQPSK rqmts (SBIRS/NOPS)1
- No two HP sites down at same time- Maintain range capabilities
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
Trans #1 HPA
VTS-A HPA
CTS-A HPA
GTS-B HPA
TVCF Ant
DGS-A Core & Antenna1
VTS-B Core and Antenna
HTS-A Core and Antenna1
HTS-B Core and Antenna
Typhoon
Analysis Req’d:1) Baseline Loading w/ new order2) TCS-C, Guam-C, or DGS-B?3) NHS-A swap w/ CTS4) Need HPA for DGS-B
2 Yr ConstructionLead Time
TTS-B Antenna
TTS-C Antenna
TTS-A Antenna
[Replace Last 60-ft Antenna, HPUE, New Location]
GTS-A Core and Antenna1
Option - Use TVCF/TSTR Instead
Option: Legacy Trans - NoConstruction Costs
DSC NHS-A Antedo
TSTR ARTS Core1
VTS-A Core and Antenna1
CTS-A Core and Ant.1
GTS-B Core and Ant.1
Typhoon
TVCF Antenna & TSTR Core1 at Diego Transportable #12
DGS-B Antenna1
Transportable #2 w/ HPA [Use as Emergency Spare Until Needed]
[Replace 46-ft Antenna]NHS-B Core and Antenna1
NHS-A Core and Antenna
[Replace 13m Antenna, HPUE]
NHS-A Core and Antenna
Transportable #2 at NHS
[Replace 10m Antenna]
[Replace 13m Antenna]
TCS-B Core and Antenna1
TCS-A Core and Antenna1
Notes:1 - SQPSK rqmts based on site ordering is articulated in SBIRSPRD Rev-A (8/28/01):
a) Test/Early On-Orbit Test: Transportable (e.g., TSTR),NHS, VTS, DGS, TCS, and GTS
b) Operations: DGS, TCS, GTS, CTS, and HTS2 - Additional costs for transportable pad @ DGS
EVCF
[Need HPA]
Transportable #1 [Save money on transport]
ISCN IntegrationStudy
Phased ArrayRTS Block
Change ContractAward
Phased Array Contract Preps
FY17 FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32
FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
FY03 FY04 FY05 FY06 FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
OctJan Apr Jul
FY18 FY19 FY20 FY21 FY22 FY23 FY24 FY25 FY26 FY27 FY28 FY29 FY30 FY31 FY32
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Jan Apr JulOct
Pre-Install
Install
3600 Funds Downtime Estimates areapproximate1wk = Transportables1 mon = Legacy HPAInstall/Integration/Test
3600 Funding Only
Site PreparationActivities and/orDev Activities
Ant and Core Install
Resource
Ops Resource
RBC Resource
Gov’t GFEOperationalResource
NOAA NMSUpgrades PD-
0058
GPS NMSUpgrades PD-
0084
NASA NMSUpgrades PD-
0085
Commercial NMSUpgrades PD-
0086
NSCN NMSUpgrades PD-
0091
NOAA CommUpgrades PD-
0082
GPS CommUpgrades PD-
0083 NASA CommUpgrades PD-
0072
CommercialComm Upgrades
PD-0073
NSCN CommUpgrades PD-
0088
NOAA antennainteroperability
PD-0065
GPS antennainteroperability
PD-0067
NASA antennainteroperability
PD-0064
Commercialantenna
interoperabilityPD-0086
NSCN antennainteroperability
PD-0091
NOAA CCSUpgrades PD-
0094
GPS CCSUpgrades PD-
0081NASA CCCSUpgrades PD-
0080
Commercial CCSUpgrades PD-
0095
NSCN CCSUpgrades PD-
0104
NSCN RTSIntegration
Finnegayan,Guam
NSCN RTSIntegration
Prospect Harbor,ME
NSCN SOCIntegration
PT Magu, CA
NSCN SOCIntegration
Schriever AFB
GPS RTSIntegration
Kwajalein Atoll
GPS RTSIntegration
Diego Garcia
GPS RTSIntegration
Ascension Is.
GPS RTSIntegration
Cape Canaveral
NOAA RTSIntegration
Poker Flats, AK
NOAA RTSIntegration
Pt. Burrow, AK
NOAA RTSIntegration
Wallops, VA
NOAA RTSIntegration
Suitland, MD
NOAA SOCIntegration
Suitland, MD
NOAA SOCIntegration
Greenbelt, MD
NASA Space(TDRS) RTSIntegration
White Sands, NM
NASA Space(TDRSS) RTS
IntegrationBlack Is.
NASA Space(TDRSS) RTS
IntegrationGuam
NASA RTSIntegration
Wallops Is., Va
NASA RTSIntegrationMerit Is., Fl
NASA RTSIntegration
Wallops Is., Va
NASA RTSIntegrationMcMurdo,Antartica
Phased Array DemoAF Space Battlelab
Multi-contact Antenna(Full Dome Phased Array - ACTD)
PD-0163
WANIFPD-0097
OAS Phase 3 (NMS)PD-0190
ISSPD-0029
OAS Phase 4 - GuardsPD-0074
NMS EnhancementPD-0191
Phased Array ArchitectureDevelopment
Commercial RTS#1 Upgrade
(TBD)
Commercial RTS#2 Upgrade
(TBD)
Commercial RTS#3 Upgrade
(TBD)
Commercial RTS#4 Upgrade
(TBD)
PARBCArchitecture
PARBC 1st Article NRE
VTS (A, B, C, D)Phased Array Upgrade
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
Thule
Typhoon
EVCFPhased Array Upgrade
DGS (A, B, C, D)Phased Array Upgrade
CTS A, B, C, DPhased Array Upgrade
GTS A, B, C, DPhased Array Upgrade
TCS A, B, C, DPhased Array Upgrade
HTS A, B, C, DPhased Array Upgrade
TTS A, B, C, DPhased Array Upgrade
VTS-GFE & Comm
Upgrade
EVCFGFE & Comm
Upgrade
DGSGFE & Comm
Upgrade
CTSGFE & Comm
Upgrade
GTSGFE & Comm
Upgrade
TCSGFE & Comm
Upgrade
HTSGFE & Comm
Upgrade
TTSGFE & Comm
Upgrade
Assumptions:Phased Array can support 4simultaneous 2-way links
Phased Array can support SGLS/USB/X bands
ISCN SITE ORDERING CHART
S
IR
E
OR
O L N EM U N I
•OO
Z A
L
E Y W
EM
S
VIAM INVENIENTUSVIAM INVENIENTUS
Version 0.0As of 11 Sept 2003
SCNC WORKING DRAFTSCNC WORKING DRAFT
RBC Site Ordering Phased Array Site Ordering
Interoperability Site OrderingAnd Implementation Projects
UNCLASSIFIED 20
The Way Ahead
• ISCN Roadmap• DoDAF Architecture Products (Future
ISCN/Midterm)• Network Management Segment Evolution
– Integrated Scheduling System– Enterprise Management System– Guards
• Comm Evolution to IP WAN-based infrastructure• Development of interoperable data transfer
standards• Architecture Sustainment Roadmap
UNCLASSIFIED 21
• Establish ISCN Site Ordering Task Force to prioritize and coordinate integration of antennas and control nodes
• Architect Project Descriptions that implement the interoperability of the antennas with the control nodes based on DoDAF architecture and Roadmap– Implement low hanging fruit
• Submit updated POM/PBC input that accounts for the ISCN plan
Way Ahead Recommendations