    WATER-BASED MUD REPORT No. 9

    Operator : KHALDA Field/Area : UNAS Depth/TVD : 6505 ft / 6481 ft

    Report For : Eng/ Ahmed A. Tay Description : Development Bit depth : 0 ft

    Well Name : UNAS-10 Location : Western Desert Spud Date : 10/9/2012

    Contractor: EDC Rig Name : EDC # 61 Date : 10/17/2012

    Report For : Eng/ Hany Mud Type : KCL-SALT/POLYMER Activity : POOH

    DRILLING ASSEMBLY CASING MUD VOLUME (bbl)

    ft, 4.5-in DP 20.-in @28 ft (28 TVD) Hole CONTINENTAL CONTINENTAL

    644 ft, 4.5-in HWDP 9.625-in @2805 ft (2805 TVD) 674 6.5x12 in 6.5x12 in

    59 ft, 6.5-in DC Active Pits 0.119 0.119

    16 ft, 6.5-in JAR 238 0@97% 0@97%

    85 ft, 6.25-in DC Total Circulating Volume gal/min

    3 ft, 6.5-in XOS 912 psi

    Nozzles 13x6 TFA 0.778

    Bit 8.5-in Hughes- Q606X 100

    PRODUCTS USED Last 24 hr

    Sample From PIT @ 23:00 F.L @ 10:00 Products Conc. Products Size Unit Cost Amount

    FlowLine Temp F 135 M-I BAR (BIG BAG) 4.82 CAUSTIC SODA 25. KG BG $8.12 3

    Depth/TVD ft 6505/6481 6505/6481 M-I GEL API 7.12 DUO-VIS 25. KG BG $238.13 2

    Mud Weight /Temp lb/gal 9.80@85 9.750@85 CAUSTIC SODA 1.34 UNIPAC SUPREME UL 25. KG BG $133.50 2

    Funnel Viscosity s/qt 53 52 SODA ASH 1.29

    Rheology Temp F 135 135 DUO-VIS 1.33

    R600/R300 80/54 80/54 UNIPAC SUPREME UL 2.96

    R200/R100 42/31 42/31 ASPHASOL D 2.76

    R6/R3 8/6 8/6 POTASSIUM CHLORIDE 21.61

    PV cP 26 26 SALT 35.64

    YP lb/100ft 28 28 D-D 0.33

    10s/10m/30m Gel lb/100ft 7/10/14 7/10/14 DEFOAM A 0.28

    API Fluid Loss cc/30min 3.3 3.3 CALCIUM CARBONATE 15.72HTHP Fluid Loss cc/30min .0@ .0@ POLY-SAL HT 4.11

    Cake APT/HT 1/32" 1/ 1/

    Solids %Vol 11 10

    Oil/Water %Vol 2/87 2/88

    Sand %Vol Tr Tr Type Model/Size Hrs Used

    MBT lb/bbl 7.5 7.5 Brandt Shaker I 180/180/180/180 12

    pH / Temp 10.0@80 10.0@80 Brandt Shaker II 180/180/180/180 12

    Alkal Mud (Pm) 0.75 0.75 Brandt Degaser

    Pf/Mf .35/.55 .35/.55 Brandt Desander

    Chlorides mg/L 84000 84000 Brandt Mud Cleaner 210/210

    Hardness (Ca++) mg/L 320 320 518 Centrifuge DE - 1000 11

    KCL %Wt 6. 6.

    TANK BBLS TANK BBLS

    Suction 1 95 Reserve 2 100Suction 2 95

    Setling 48 Slug Tank

    Reserve 1

    Last Survey Drill String 6477

    Formation Annulus 505

    Lithology Below Bit 674 35

    Prepared 100 bbls HI-VIS.

    Cont'd drilling 8.5'' hole F/ 6000 ft T/ 6505 ft (TD) with average losses = 8 -/+ bbl/hr. Swept hole W/ 50 bbls

    VIS and circulated till shakers clean, POOH wiper trip to 2805 ft (CSG Shoe), Hole in good Condition. Wia

    on EDC to fix Wichita brake problem, ok. Cont'd POOH to surface with direction assymbly and L/D Moto

    and MW D @ RT.

    Rig Up/Service 5 Start Volume 1131 NaCl 2.4/ 27. np/na

    Drilling 10 Water Added KCl 2.3/ 20.9 Kp/Ka

    Tripping 7 Chemicals 1 Low Gravity (LGS) 6.2/ 56.3 Bit Pressure Loss %

    NPT Oil Added Bentonite 0.8/ 7.5 Bit HHP/HSI

    Circulation 2 Total Built 1 Drill Solids 3.7/ 33.8 Jet Velocity

    Testing Shakers 20 High Gravity (HGS) 0.1/ 1.4 Va Pipe

    Cementing Evaporation 15 Chemical Conc - / 15. Va Collars

    Drilling Cement Centrifuge Inert/React 4.5002 Cva Pipe

    Welding Conductor Formation 55 Average SG 2.62 Cva Collars

    BOP NU Dumped Ann. Pressure loss

    Tripping 30 DS Pressure loss

    WOB (Klbs) Circulation Total calc pressure loss

    RPM Total Lost 120 ECD at Shoe 9.80

    Average ROP Final Volume 1012 ECD at TD 9.80

    RIG PHONE WAREHOUSE PHONE DAILY COST CUMULATIVE COST

    6.

    MUD PROPERTY SPECS

    MUD PROPERTIES Last 24 hr PRODUCT CONCENTRATION

    7.25 Dec. @ 6434 f t, Azi: 214.54

    22 - 27

    50 - 60

    CIRCULATION DATA Last 24 hr

    Open hole length (ft)

    SOLIDS CONTROL EQUIPMENT Last 24 hr

    9.2 - 9.7

    533.3

    28

    Pump Make

    Pump Liner x Stk

    Pump Capacity bbl/stk

    Pump stk/min

    TANK VOLUMES

    Viscosity

    5 - 7

    9.80

    Drilled hole last 24 hrs (ft)

    Daily drilled volume (Cuttings)

    Summary data

    Water Loss

    Yp

    KCL

    3 - 4

    $46,482.94

    Drilling Parameters

    M-I ENGR / PHONE

    Ahmad El Sayed

    KHARITA @ 6010 ft.

    8.5" HOLE

    Hole Volume Details (bbl)

    Total Circulation stk/min

    $767.60

    MUD VOL ACCTG (bbl)

    Flow Rate

    Pump Pressure

    Bottoms Up stk/minReserve Volume

    TIME DISTRIBUTION Last 24 hrs

    Actual

    RHEOLOGY & HYDRAULICSSOLIDS ANALYSIS (%/lb/bbl)

    Silt.

    REMARKSREMARKS AND TREATMENT

    SURVEY DATA & LITHOLOGY

    Weight