Exercise Synchronization Working Group

Joint Staff, J-7/JEXDWJTSC 06-2

2 October 2006Camp Robinson, AR

2 October 2006

2

O NI

SFS OF

UN UNCLASSIFIED

Agenda

• Welcome (COL Slate)• NEP Status and Overview (COL Slate)• Introductions (All)• Working Group Objectives (Lt Col Miller)• Working Group (Lt Col Miller, All)

– Approved 5-Year Schedule for National Level Exercises– Review of FY 07/08/09/10/11

• POSITIVE RESPONSE 07-1• POSITIVE FORCE 07• NLE 1-08• JLOTS link in FY08 and beyond

– NEP Doctrine and Implementation Guidance for linked exercises• Unique Program Briefs (Various)

– BRONZE ARROW (CAPT Jones)– ODNI Intel Exercise Coordinator (Janet Parker)– DHS HSEEP Exercise Database (Bill McNally)– NSA Exercise Program (Keith Abernathy)

• Questions/Discussion (All)

2 October 2006

3

O NI

SFS OF

UN UNCLASSIFIED

Overview

What are we synchronizing?CEP: Chairman’s Exercise Program (POSITIVE FORCE, POSUITIVE RESPONSE, ELIGIBLE RECEVIER, NATOC CMX and US-Russian Missile Defense Cooperation

JEP: Joint Exercise Program (118 exercises in FY05; 111 in FY06)

HSEEP: Homeland Security Exercise and Evaluation Program (DHS-led program encompassing all exercises focused on homeland security based on HSPD-8

JEP(~110)NEP

(~1000)

CEP (5)

NLE(where programs intersect)

NEP

How are we synchronizing them?NEP: National Exercise Program (White House led program, functionally run through the Policy, Training, Exercise and Evaluation Policy Coordination Committee

2 October 2006

4

O NI

SFS OF

UN UNCLASSIFIED

Recent Progress

• Introduced concept at WJTSC 05-1 (Feb 05)– Met with COCOMs and interagency exercise planners to solidify possible framework

to integrate large scale exercise schedules

• Coordinated way ahead with DHS exercise leadership• Briefed National Exercise Scheduling Conference (Jun 05)• Developed concept at WJTSC 05-2• Further solidified process at WJTSC 06-1 (focused on FY 07/08/09)• JTIMS development continues to support synchronization• PTEE PCC takes on task of integrating the HSEEP and CEP/JEP under larger

umbrella summer 2005• NEXS conference summer 2006 continues to develop way ahead• WJTSC 06-2 will inform COCOMs and interagency on progress made with

NSC/HSC on Memorandum of Understanding• Expect fully integrated exercise schedule and codified process by 2008

2 October 2006

5

O NI

SFS OF

UN UNCLASSIFIED

The Five-Year National Exercise Program Schedule (DRAFT)

NLE 2-09TOPOFF 5 FSE; Pinnacle; Chairman’s Exercise Program; Ardent Sentry; Able Warrior; Ultimate Caduceus; Olympics National Special Security Event

NLE 1-07Positive Response; Vigilant Shield; Nuclear Weapons Accident

Catastrophic Assessment Task Force

NLE 1-10Chairman’s Exercise Program

NLE 2-10TOPOFF 6 Command Post Exercise; Ardent Sentry; Chairman’s Exercise Program

NLE 2-11TOPOFF 6 Full Scale Exercise; Ardent Sentry; Chairman’s Exercise Program

NLE 1-11Chairman’s Exercise Program

NLE 1-08TOPOFF 4 Full-Scale Exercise; Flexible Response; Global Lightning;Chairman’s Exercise Program; Vigilant Shield 08

NLE 2-08Earthquake;Ardent Sentry; Chairman’s Exercise Program

NSSENSSE

NSSE

Olympics in Vancouver

Elections InaugurationTransition Confirmation

Congressional Elections & Transition

NSSE

Congressional Elections & Transition

Catastrophic Assessment Task Force

Senior Officials Exercise

Senior Officials Exercise

FY 08 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

FY 07 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Senior Officials Exercise

FY 09 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 10 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 11 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

National Level ExerciseNational Special Security EventsSenior Officials Exercise

Elections InaugurationTransition Confirmation

(Prep for NLE 1-07(Nuclear)

(IED)(Prep for NLE 2-07)

(Nuclear)

(Prep for NLE 1-08)(Radiological

(Prep for NLE 2-07)(Earthquake)

(MANPADS)(Bio) (Prep for NSSE’s)

NLE 2-07Pinnacle;Positive Response;Ardent Sentry;Northern Edge;Ultimate Caduceus

(Prep for NSSE)

NLE 1-09CPX, TrainingAnd Orientationfor new Principles

Transition Training Program

(Prep for NLE 1-09)

(Prep for NLE 2-09)

(Prep for NLE 1-11)

(Prep for NLE 1-10)

(Prep for NLE 2-11)

(Prep for NLE 2-10) (Prep for NSSE)

2 October 2006

6

O NI

SFS OF

UN UNCLASSIFIED

Summary

• Ground swell of support for synchronization across the government

• Memorandum of Understanding in draft at White House

• DOD is lead for authoring implementation guidance

• A truly “National” Exercise Program (NEP) is near– National Level Exercises (NLEs) begin in FY07

2 October 2006

7

O NI

SFS OF

UN UNCLASSIFIED

Way Ahead

• PCC 5 October – Prepare NEP/5-Year calendar for the PC– Schedule the PC

• Promulgate the Implementation Guidance (by Dec 06)– MOU to the field

• Leverage WJTSC and DHS’ Exercise Synchronization Conferences to keep the program on track

2 October 2006 8

O NI

SFS OF

UN UNCLASSIFIED

Introductions

2 October 2006

9

O NI

SFS OF

UN UNCLASSIFIED

Working Group Objectives

• Coordinate 5-year schedule

• Solidify plans for Dec 06, Mar 07, Oct 07

• Coordinate overall themes for NLEs

• Discuss “linked exercise” doctrine to support implementation guidance for NEP

• Review other programs to help synchronize exercises across the USG

2 October 2006

10

O NI

SFS OF

UN UNCLASSIFIED

Working Group

• Review 5-year schedule

• Review FY 07/08/09/10/11

• NLE review

• JLOTS link

• NEP doctrine and implementation discussion

2 October 2006

11

O NI

SFS OF

UN UNCLASSIFIED

The Five-Year National Exercise Program Schedule (DRAFT)

NLE 2-09TOPOFF 5 FSE; Pinnacle; Chairman’s Exercise Program; Ardent Sentry; Able Warrior; Ultimate Caduceus; Olympics National Special Security Event

NLE 1-07Positive Response; Vigilant Shield; Nuclear Weapons Accident

Catastrophic Assessment Task Force

NLE 1-10Chairman’s Exercise Program

NLE 2-10TOPOFF 6 Command Post Exercise; Ardent Sentry; Chairman’s Exercise Program

NLE 2-11TOPOFF 6 Full Scale Exercise; Ardent Sentry; Chairman’s Exercise Program

NLE 1-11Chairman’s Exercise Program

NLE 1-08TOPOFF 4 Full-Scale Exercise; Flexible Response; Global Lightning;Chairman’s Exercise Program; Vigilant Shield 08

NLE 2-08Earthquake;Ardent Sentry; Chairman’s Exercise Program

NSSENSSE

NSSE

Olympics in Vancouver

Elections InaugurationTransition Confirmation

Congressional Elections & Transition

NSSE

Congressional Elections & Transition

Catastrophic Assessment Task Force

Senior Officials Exercise

Senior Officials Exercise

FY 08 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

FY 07 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Senior Officials Exercise

FY 09 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 10 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

FY 11 Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

Senior Officials Exercise

National Level ExerciseNational Special Security EventsSenior Officials Exercise

Elections InaugurationTransition Confirmation

(Prep for NLE 1-07(Nuclear)

(IED)(Prep for NLE 2-07)

(Nuclear)

(Prep for NLE 1-08)(Radiological

(Prep for NLE 2-07)(Earthquake)

(MANPADS)(Bio) (Prep for NSSE’s)

NLE 2-07Pinnacle;Positive Response;Ardent Sentry;Northern Edge;Ultimate Caduceus

(Prep for NSSE)

NLE 1-09CPX, TrainingAnd Orientationfor new Principles

Transition Training Program

(Prep for NLE 1-09)

(Prep for NLE 2-09)

(Prep for NLE 1-11)

(Prep for NLE 1-10)

(Prep for NLE 2-11)

(Prep for NLE 2-10) (Prep for NSSE)

2 October 2006 12

O NI

SFS OF

UN UNCLASSIFIED

NLE 1-07POSITIVE RESPONSE 07-1

(linked to NORAD-USNORTHCOM’s exerciseVIGILANT SHIELD 07)

4-14 Dec 06

Joint Staff, J-7

Joint Exercise Division

August 2006

2 October 2006

13

O NI

SFS OF

UN UNCLASSIFIED

Exercise Overview

• Three Phased Exercise• Phase 0 (16-27 Oct)

– N-NC Crisis Action Planning (CAP)• TPFDD validated following Phase 0

– Normal duty hours• Any support outside of N-NC pre-coordinated

• Phase 1 (4-8 Dec)– NUWAX– Force Flow (Notional) supporting CONPLAN 3310– JTF-NCR Crisis Action Planning

• 9 Dec – 42 day time bridge• Phase 2 (9-14 Dec)

– Execution of CONPLAN 3310– COOP and NMCS Devolution

2 October 2006

14

O NI

SFS OF

UN UNCLASSIFIED

Objectives

• Exercise national and operational level Command and Control during a Nuclear Weapons Accident– Exercise DoD Role in ESF-15 during Nuclear Weapons Accident

• Exercise Full COOP/JEEP of OSD, Joint Staff, and Service Staffs• Exercise Full Devolution of National Military Command System (NMCS)• Exercise BMD Decision Process and Authorities, including SecDef and

CJCS roles and responsibilities (consistent with pending CJCS EXORD and current resource constraints)

• Exercise INFOCON Decision Process• Exercise Ability to Operate in a Degraded Communications Environment• Examine Strategic Communications in a HLD crisis situation• In the Maritime Domain, Exercise Final MOTR procedures

– COCOM to COCOM hand-off of maritime threats– Air-to-Ship CONOPs and ROE to test gaps and seams

2 October 2006 15

O NI

SFS OF

UN UNCLASSIFIED

POSITIVE FORCE 07(linked to multiple COCOM exercises)

14-21 Mar 07

Joint Staff, J-7

Joint Exercise Division

August 2006

2 October 2006

16

O NI

SFS OF

UN UNCLASSIFIED

Exercise Overview

• CJCS-sponsored worldwide command post exercise (CPX) linked to combatant command and theater exercises 14-21 Mar 07

• Exercise the national defense community’s strategic decisions that mobilize, deploy and sustain large-scale military operations during an escalating crisis in South East Asia

• Conduct “free play;” staff analysis and recommendations consider real world impact of force/lift availability, global commitments, an escalating crisis scenario and its impact in multiple theaters

• Focused on national level decision making• Create scenario events that evaluate development of strategic

communications• Evaluate the effort Computer Network Operations have on

making timely mobilization and deployment decisions

2 October 2006

17

O NI

SFS OF

UN UNCLASSIFIED

Exercise Objectives

For an emerging operational contingency, exercise and evaluate plans, policies and procedures to …

• Conduct adaptive planning across the Joint Planning and Execution Community

• Conduct global force management to allocate and source forces

• Conduct reallocation of intelligence, surveillance and reconnaissance capabilities to support enhanced indicator and warning collection

• Prioritize and allocate transportation and sustainment resources

• Conduct strategic communications planning and execution

• Conduct information operations

• Coordinate political-military activities with other federal departments and agencies

2 October 2006 18

O NI

SFS OF

UN UNCLASSIFIED

NLE 2-07 (linked to POSITIVE RESPONSE 07-2NORAD-

USNORTHCOM’s ARDENT SENTRY 07, NORTHERN EDGE 07 and USTRANSCOM’s exercise ULTIMATE

CADUCEUS 07)7-18 May 07

Joint Staff, J-7

Joint Exercise Division

August 2006

2 October 2006

19

O NI

SFS OF

UN UNCLASSIFIED

Exercise Overview

• Linked Exercise– NORAD-USNORTHCOM Exercise ARDENT

SENTRY 07 is designed to train NORAD-USNORTHCOM in Homeland Security and DSCA.

• Note: Canada is a full partner in the development and execution of ARDENT SENTRY 07.

– Exercise NORTHERN EDGE 07 is designed to exercise Joint Task Force Alaska.

• Note: Responsibility for NORTHERN EDGE alternates between NORTHCOM and PACOM.

– USTRANSCOM Exercise ULTIMATE CADUCEUS 07 is designed to exercise patient movement procedures.

2 October 2006

20

O NI

SFS OF

UN UNCLASSIFIED

Major Scenario Elements

• Land, Air and Maritime Scenarios– Terrorism in Alaska, modeled on DHS National Planning

Scenario #11– IND in major metropolitan area (Indianapolis, IN)

• DHS National Planning Scenario #1

• Exercise simulated state concept

• Full Deployment of CCMRF

– Air Threat Tracking and Response– Maritime Threat Tracking and Response– Post landfall hurricane at STARTEX

• Included to validate ARNORTH OCP

2 October 2006 21

O NI

SFS OF

UN UNCLASSIFIED

NLE 1-08(links exercises TOPOFF 4 FSE, POSITIVE

RESPONSE, FLEXIBLE RESPONSE, GLOBAL LIGHTNING, VIGILANT SHIELD)

October 2007

Joint Staff, J-7

Joint Exercise Division

August 2006

2 October 2006

22

O NI

SFS OF

UN UNCLASSIFIED

Major Scenario Elements

• Land, Air and Maritime Scenarios– Terrorism in Alaska, modeled on DHS National Planning

Scenario #11– IND in major metropolitan area (Indianapolis, IN)

• DHS National Planning Scenario #1

• Exercise simulated state concept

• Full Deployment of CCMRF

– Air Threat Tracking and Response– Maritime Threat Tracking and Response– Post landfall hurricane at STARTEX

• Included to validate ARNORTH OCP

2 October 2006

23

O NI

SFS OF

UN UNCLASSIFIED

Linked Exercise Doctrine

• Design:– CDC ROE, objectives hierarchy, training audience, comm architecture,

control structure integration• Planning:

– Conferences, MSEL databases, collaborative planning environment, syndicate leads, SMEB requirements, FTX integration, etc.

• Execution– Who runs the exercise? Who releases MSELs? Who runs JECG

meetings? Who changes the baseline scenario? Who is the final decision maker? JFCOM resources (OT, Senior mentors, etc)?

• Analysis and Evaluation:– Who runs AARs, who attends, how are they layered, scheduled,

briefed?• Other Issues:

– JELC, terms of reference, JTIMS versus NEXS,

2 October 2006 24

O NI

SFS OF

UN UNCLASSIFIED

Unique Program Briefs

2 October 2006 25

O NI

SFS OF

UN UNCLASSIFIED

BRONZE ARROW

CAPT Jones

USSOCOM

2 October 2006 26

O NI

SFS OF

UN UNCLASSIFIED

DNI Intelligence Community Exercise Coordinator

Janet Parker

Office of the Director of

National Intelligence

2 October 2006 27

O NI

SFS OF

UN UNCLASSIFIED

DHS HSEEP Exercise Database

Mr Bill McNallyDirector of Exercises and TrainingNational Preparedness Task Force

(DHS)

2 October 2006 28

O NI

SFS OF

UN UNCLASSIFIED

NSA Exercise Program

Mr Keith Abernathy

2 October 2006 29

O NI

SFS OF

UN UNCLASSIFIED

Questions / Discussion

2 October 2006

30

O NI

SFS OF

UN UNCLASSIFIED

Summary

• Ground swell of support for synchronization across the government

• Memorandum of Understanding in draft at White House

• DOD is lead for authoring implementation guidance

• Exercise synchronization is near

2 October 2006 31

O NI

SFS OF

UN UNCLASSIFIED

Backup Slides

2 October 2006

32

O NI

SFS OF

UN UNCLASSIFIED

Benefit of Synchronizing

• Deconflict and compliment government-wide exercise schedules• Coordinate senior leader participation• Efficiently use staff time

– Provide down time to train and update TTP– Incorporate lessons learned into SOP (update doctrine and

policy)– Optimize time to plan future exercises

• Minimize exercise fatigue• Facilitate functional COCOM planning• Build process to help communicate aspects of the exercise program

– Are large scale, interagency exercises focused on HD, on security cooperation, on GWOT … where is the focus?

– What should the focus be?• Provide better rationale for exercise participation decisions• Meet the intent of SecDef guidance to reduce exercises

2 October 2006

33

O NI

SFS OF

UN UNCLASSIFIED

Exercise Synch Initiative

• Establish National Security Exercise Program to facilitate more realistic interagency exercises and improve US national response to crises– Codify annual exercise events

• Establish coordinated, 5 year schedule for strategic-national level exercises • Improve DOD/interagency synchronization: Conduct Chairman’s sponsored

exercises with the interagency based on strategic-national level priorities such as:

• Selectively increase the level of participation and realism in strategic-national level exercises by including principals from participating departments and agencies

GWOT COCOM Seams Information Sharing

Strategic Communications

Info AssuranceCounter Insurgency

Operations

Counter Proliferation

Stabilization and Reconstruction Ops

Other Issues

2 October 2006

34

O NI

SFS OF

UN UNCLASSIFIED

Progress and Way Ahead

• Synchronized 5 year forecast during March Worldwide Joint Training and Scheduling Conference (WJTSC), with DHS and interagency support

• Updated 5 year forecast during DHS’ June National Exercise Conference, with DOD/JS support

• Brief scheduled to PTEE/PCC . . . take NSEP and calendar to DC – Establish NSEP doctrine and solid dates for annual events

• Update/refine 5 year calendar during October Worldwide Joint Training and Scheduling Conference and report back to PTEE/PCC

• NSC/HSC directs the iterative process

2 October 2006 35

O NI

SFS OF

UN UNCLASSIFIED

Exercise Synchronization Working Group

Joint Staff, J-7/JEXDWJTSC 06-2

2 October 2006Camp Robinson, AR

2 October 2006

36

O NI

SFS OF

UN UNCLASSIFIED

National Exercise Program

Topic: National Exercise Program

Discussion: • Memorandum of Understanding in draft in White House staff• DOD has lead for coordinating the implementation guidance after MOU is signed

Issue(s):• Current US government (USG) exercises are not synchronized to create opportunities for strategic national level exercises • Lack of synchronization causes scheduling disconnects and prevents the participation of leadership at the national level

Impact: • Participation of senior leadership, efficient use of staff time to resolve issues and improve policy, resourcing for exercise events and long term planning all suffer from lack of top down synchronization

Desired Endstate:•Fully integrated, top-down driven NEP in FY 2007 and beyond

2 October 2006

37

O NI

SFS OF

UN UNCLASSIFIED

5-year Exercise Calendar

Topic: 5-year Exercise Calendar

Discussion: • 5-year exercise calendar is the cornerstone of a truly NEP• Policy, Training, Exercises and Evaluation Policy Coordinating Committee (PTEE PCC) is USG exercise synchronization focal point• 5-year exercise calendar reviewed/coordinated at every PTEE PCC

Issue(s):• Without an approved synchronized 5-year exercise calendar, overall NEP will not likely succeed

Impact: • Participation of senior leadership, efficient use of staff time to resolve issues and improve policy, resourcing for exercise events and long term planning all suffer from lack of top down synchronization

Desired Endstate:•Synchronized, coordinated 5-year exercise calendar updated at every DOD-hosted WJTSC and every DHS-hosted NEXS

2 October 2006

38

O NI

SFS OF

UN UNCLASSIFIED

DATABASE TEST/BUILDDATABASE TEST/BUILD

Event DesignEvent Design

PROPOSEDPROPOSEDCONTROLCONTROL

STRUCTURESTRUCTURE

IPCIPCAGENDAAGENDA

OUTLINEOUTLINE EX DIRECTIVEEX DIRECTIVE

COMMCOMMARCHITECTUREARCHITECTURE

INTELLINTELLARCHITECTUREARCHITECTURE

AARAARREQUIREMENTSREQUIREMENTS

CDCCDCCDCCDC

JTPJTPTRAININGTRAINING

OBJECTIVESOBJECTIVES

EXERCISEEXERCISEOBJECTIVESOBJECTIVES

SCENARIO/SCENARIO/ROAD to WARROAD to WAR

CONCEPTSCONCEPTS

JTPJTPTRAININGTRAININGAUDIENCEAUDIENCE

COMMANDER’SCOMMANDER’SFOCUSFOCUS

STATEMENTSTATEMENT

DRAFTDRAFTMOAMOA

SIM/MODELSIM/MODELASSESSMENTASSESSMENT

DRAFTDRAFTEXERCISEEXERCISE

DESIGNDESIGN

CCTICCTIREVIEWREVIEW

1. DESIGN STAGE1. DESIGN STAGE 2. PLANNING STAGE

2. PLANNING STAGE

4. EXECUTION STAGE

4. EXECUTION STAGE

6. EVALUATION STAGE

6. EVALUATION STAGE

5. ANALYSIS STAGE

5. ANALYSIS STAGE

IPCIPCIPCIPC

Event SupportEvent Support SITE SITE SURVEYSURVEY

DJTTDJTTTrainingTraining

PlanPlan

MPC AgendaPUBLISHED

*OPFOR CAMPAIGN PLAN*OPFOR CAMPAIGN PLAN

MSEL DEVELOPMENTMSEL DEVELOPMENT

COLLECTION MANAGEMENT PLAN DEVELOPMENT INITIATEDCOLLECTION MANAGEMENT PLAN DEVELOPMENT INITIATED

FPCFPCFPCFPC

DATABASE TEST/BUILDDATABASE TEST/BUILDDBDB

Test #3Test #3& Lock& Lock

DBDBBuildBuild

Test #2Test #2

3. PREPARATION STAGE3. PREPARATION STAGE

OPFORCampaign plan

Briefed

MSEL FinalPublished

JECGJECGTrainingTraining

EXECUTEDEXECUTED

AARAARObserver TngObserver TngEXECUTEDEXECUTED

COMEX COMEX EXECUTEDEXECUTED

DJTTDJTTTrainingTraining

EXECUTEDEXECUTED

MINIEXMINIEXEXECUTEDEXECUTED

CMPCMPDeliveredDelivered

CAMPAIGN EXECUTIONCAMPAIGN EXECUTION

MSEL EXECUTIONMSEL EXECUTION

COLLECTION MANAGEMENT EXECUTIONCOLLECTION MANAGEMENT EXECUTION

EventEventEXEX

EventEventEXEX

ROAD ROAD TO CRISISTO CRISISOUTLINEOUTLINE

EVENT EVENT MISSION MISSION ANALYSISANALYSIS

EventEventControl planControl planDELIVEREDDELIVERED

IssueIssueDefinitionDefinition

InternalInternalAfter After

Event ReviewEvent Review

MPCMPCMPCMPC

* OPFOR CAMPAIGN PLAN DEVELOPMENT* OPFOR CAMPAIGN PLAN DEVELOPMENT

MSEL DEVELOPMENTMSEL DEVELOPMENT

EVENT CONTROL PLAN DEVELOPMENTEVENT CONTROL PLAN DEVELOPMENT

MSEL MSEL DevelopmentDevelopmentConferenceConference

MSEL MSEL DevelopmentDevelopmentConferenceConference

EventEventControl PlanControl PlanPUBLISHEDPUBLISHED

AARAARObserverObserver

Training BRIEFEDTraining BRIEFED

MSELMSELSyncSync

WorkshopWorkshop

- Joint Event Life CycleJETA Questionnaire and CONOPS Received

Perform analysis for event correlationCoordinate JETA with Desk Officers

JETA Briefed at CDCSeeking event invitation

JETA briefsCoordinated w/working Groups (ops, log, C4I, AAR, etc)

Event Directors invite selected JETAs to MSEL/MPC

JETA MSEL development / MPC working group coordinationJETA Data Collection Plan developed and presented to WG

Event Directors select JETAs for participation in event.

Finalize JETA arrangements To the Exercise Directive

JETA participates in Event TestsTraining conducted as necessary

to support the test

JETA participates in event, reports progress status

daily to event directors

JETA Event analysisShared as applicable

GOAL – Get the JETA requiring training integration matched with the right training event

If a JETA withdraws from an event, the root causes will be assessed and if necessary, the JETA will re-enter the integration process for a new event