9
UKSP2 Stavelet Peter, Ashley, Martin DAY 2 (22/06/2012)

UKSP2 Stavelet

  • Upload
    amory

  • View
    36

  • Download
    0

Embed Size (px)

DESCRIPTION

UKSP2 Stavelet. Peter, Ashley, Martin DAY 2 (22/06/2012). Problem. No connectivity to EoS. Culplrit : crease here?. C onnectivity to EoS. Crease magnified. Temporary (and M ore Permanent) Solutions. Longer term: Roy is having another bottom layer tape plated today. - PowerPoint PPT Presentation

Citation preview

Page 1: UKSP2 Stavelet

UKSP2 Stavelet

Peter, Ashley, Martin

DAY 2 (22/06/2012)

Page 2: UKSP2 Stavelet

Problem

Culplrit: crease here?

No connectivity to EoS

Connectivity to EoS

Page 3: UKSP2 Stavelet

Crease magnified

Page 4: UKSP2 Stavelet

Temporary (and More Permanent) Solutions

Longer term: Roy is having another bottom layer tape plated today.We shall add a section of this on top of the stave to effect a more permanent repair

Page 5: UKSP2 Stavelet

Setup

Module is presently independently powered:• enables “reference point” for each module• helps decouple SP effects from those related to the shield configuration

Chain of Modules “STAR” power PCB

0V 2.5V

Page 6: UKSP2 Stavelet

ENC by 3PG at 1fCGain Offset ENC Output noise

20 105 30.2 636 10.7

21 105 30.1 621 10.4

30 106 33.2 621 10.6

31 106 33.0 632 10.7

Results at 9A CI from Tti TSX 1820P, 200V bias-Result for 9.5A, 200V in progress-Will then run 9A and 9.5A at 250V

Page 7: UKSP2 Stavelet

DTN @ 0.50fC

YES, REALLY!BEST DTN RESULT FOR A STAVE MODULE EVER!

Page 8: UKSP2 Stavelet

DTN @ ~0.33fC

Page 9: UKSP2 Stavelet

Plan

• Add two more modules (and semi permanent repair) next week– Test with independent power– Then chain SP of modules with wires

• Final module the week after that– Test with independent power– Then chain of modules SP with wires– Then chain of modules SP with bonds & tape