DESCRIPTION
UKSP2 Stavelet. Peter, Ashley, Martin DAY 2 (22/06/2012). Problem. No connectivity to EoS. Culplrit : crease here?. C onnectivity to EoS. Crease magnified. Temporary (and M ore Permanent) Solutions. Longer term: Roy is having another bottom layer tape plated today. - PowerPoint PPT Presentation
Citation preview
UKSP2 Stavelet
Peter, Ashley, Martin
DAY 2 (22/06/2012)
Problem
Culplrit: crease here?
No connectivity to EoS
Connectivity to EoS
Crease magnified
Temporary (and More Permanent) Solutions
Longer term: Roy is having another bottom layer tape plated today.We shall add a section of this on top of the stave to effect a more permanent repair
Setup
Module is presently independently powered:• enables “reference point” for each module• helps decouple SP effects from those related to the shield configuration
Chain of Modules “STAR” power PCB
0V 2.5V
ENC by 3PG at 1fCGain Offset ENC Output noise
20 105 30.2 636 10.7
21 105 30.1 621 10.4
30 106 33.2 621 10.6
31 106 33.0 632 10.7
Results at 9A CI from Tti TSX 1820P, 200V bias-Result for 9.5A, 200V in progress-Will then run 9A and 9.5A at 250V
DTN @ 0.50fC
YES, REALLY!BEST DTN RESULT FOR A STAVE MODULE EVER!
DTN @ ~0.33fC
Plan
• Add two more modules (and semi permanent repair) next week– Test with independent power– Then chain SP of modules with wires
• Final module the week after that– Test with independent power– Then chain of modules SP with wires– Then chain of modules SP with bonds & tape