Upload
uddipta-pratim-hazarika
View
225
Download
0
Embed Size (px)
Citation preview
8/19/2019 UK Insulation Process- UK Client
1/32
UK Process – Insulation, Boiler & Solar
UPH
8/19/2019 UK Insulation Process- UK Client
2/32
Contents
About
Insulation
Boiler
Solar
Type of Homes in UK
Post Code based dialing & multiple clients
Goernment Programs
!ultiple programs " some companies under one# ot$ers do not $ae %
Area 'ise differences also are t$ere " CSC( ) *on"CSC(
UK Process
Criteria
Script
!ultiple Products +eads for tomorro' and ,uture Pipeline
-.pectations from /(U
0aily (peration System
1or2 ,lo'
3eporting 3e4uirements
8/19/2019 UK Insulation Process- UK Client
3/32
Insulation – What is IT ?
Helps maintain home temperature-Hot in
Winters & Cool in Summers.
8/19/2019 UK Insulation Process- UK Client
4/32
Heat lost in diferent ways.
High energy loss means high energy bills.
There are diferent types o insulations to be done.
Insulation – Why is it required ?
8/19/2019 UK Insulation Process- UK Client
5/32
Insulation – Loft & Cavity
8/19/2019 UK Insulation Process- UK Client
6/32
Insulation – Cavity Wall
I a home was built ater 1!"#the $han$es arethat its e%ternal walls are made o two layers witha gap o $aity between them. Caity wall
Insulation 'lls that gap (eeping in warmth to sae
energy.
8/19/2019 UK Insulation Process- UK Client
7/32
Insulation- External wall
)%ternal Wall Insulation is a type o solid wall insulation whi$h is appliedto the outside o the outside walls o a house.
I a home was built beore 1!"# there is a high probability that the wallsare solid walls and not $aity ones.
They do not hae any $aity*gap and allows more heat to pass through.
When the insulation is done in internal walls then it is (nown as Internal
Wall Insulation & i it is done in outside walls then it is (nown as )%ternalWall insulation.
8/19/2019 UK Insulation Process- UK Client
8/32
Insulation- Loft
Heat rises and a +uarter o heat is lostthrough the roos. ,ot insulation proidesthermal insulation needs in the roo'ngsystem o a house.
8/19/2019 UK Insulation Process- UK Client
9/32
Types of Houses – UK
Insulation depends on arious types o houses. The types o houses to be dis$ussed are as ollows
1 /)T0CH)/ H2S) ! S)3I /)T0CH)/ H2S) 4 T)550C) H2S)
6 72890,W : ;,0T
8/19/2019 UK Insulation Process- UK Client
10/32
Types of Home – Detached
0 /eta$hed House doesn=t share any wallswith any other dwelling.
8/19/2019 UK Insulation Process- UK Client
11/32
0lso abbreiated as >Semi?@ it $onsists o pairso houses built side by side as units sharing a
party wall and in su$h a way that ea$h house=slayout is a mirror image o its own.
Types of Home – Semi Detached
8/19/2019 UK Insulation Process- UK Client
12/32
Terra$ed Houses are a row o identi$al mirror image houses sharing
sidewalls. The 'rst and last o these houses is $alled an )nd Terra$e.
The middle ones are (nown as 3id Terra$e.
3id Terra$e Houses are not suitable or Caity wall Insulation
Terra$ed houses are suitable or ,ot Insulation.
Types of Home – Terraced
8/19/2019 UK Insulation Process- UK Client
13/32
0 7ungalow is a residential building# whi$h iseither single story or a double story built intoa sloping roo.
Types of Home – Bungalow
8/19/2019 UK Insulation Process- UK Client
14/32
Flats & Maisonette
30IS88)TT) H2S)S / 8T H0A) ,;T I8S2,0TI8.
8/19/2019 UK Insulation Process- UK Client
15/32
Important points of Loft Insulation
1 I lot insulation is done more than B-1"years ago# then it +uali'es or a re insulation.
! 0ll the $urrent lot insulations are o !"-
4"" mm standard. So long as the insulationleel are below them# they +ualiy or newinsulation.
4 The lot should not be boarded to +ualiy ornew insulation.
6 I the lot is below the Doist# then only it $anbe done.
8/19/2019 UK Insulation Process- UK Client
16/32
Contd.
: Type o Eroperty- /eta$hed# Semi/eta$hed# 7ungalow or Terra$ed to be eligible.
8/19/2019 UK Insulation Process- UK Client
17/32
B Conerted ,ot When lot area is$hanged to ma(e it a un$tional room# then
it is $alled a Conerted ,ot. It is notsuitable or ,ot Insulation.
;lat roos don=t +ualiy or typi$al ,otInsulation
C8A)5T)/ ,;T ;,0T 5;
8/19/2019 UK Insulation Process- UK Client
18/32
Joist Level
;or $ases where ,ot Insulation was done B-1"years ba$( as( person to $he$( the lotinsulation leel. See the Foist leel and lotinsulation in the below images
8/19/2019 UK Insulation Process- UK Client
19/32
Boarded Loft
Home owners put apanel or board on thelot #as shown in the
pi$ture to ma(e it autiliGing spa$e. Thenit is (nown as7oarded ,ot.
0 boarded lot isnot suitable or lotinsulation.
8/19/2019 UK Insulation Process- UK Client
20/32
Important points of Cavity Wall Insulation 1 The $aity walls should be empty i.e.# the insulation should not
be done preiously.
! The walls should not be damp. /ampness must be $orre$ted
beore insulation.
4 Solid# $ladding or tiles would normally mean a timber rame orsteel rame house and the insulation $an=t be done.
6 I the $aity walls are built within last 1" years# then it is highly
li(ely that the are already insulated.
:Type o property /eta$hed# semi deta$hed# terra$ed orbungalow to be eligible.
8/19/2019 UK Insulation Process- UK Client
21/32
Important Points of Boiler Replacement
7oilers a$$ount or around :: o the )nergy7ills and repla$ing by a new energy eJ$ientone ma(es a big diferen$e on energy bills.
0 boiler should be at least more than : years
old to be 't or repla$ement. 0 $ondensing boiler is generally
more eJ$ient than a non $ondensingone. 3odel numbers o the boilers
are ne$essary to $he$( the eJ$ien$y. nly gas boilers are repla$eable
under ree s$heme while all boilersare repla$eable on 'nan$e.
8/19/2019 UK Insulation Process- UK Client
22/32
EFFICIENT MODELS(A-B)
NON EFFICIENT
MODELS (C-G)
EFFICIENCY SCALE OF BOILERS
8/19/2019 UK Insulation Process- UK Client
23/32
SOLAR PANEL INSTALLATION 2SI89 S,05
)8)59K ;5 9)8)50TI89 ),)CT5ICITK ;5H2S)H,/ 2S)S# 7K I8ST0,,I89 E08),S 8 TH)5;.
8/19/2019 UK Insulation Process- UK Client
24/32
I3E5T08T THI89S T L))E I8 3I8/ ;5 S,05 E08),I8ST0,,0TI8
8/19/2019 UK Insulation Process- UK Client
25/32
1 E5E)5TK SH2,/ 7) S2TH ;0CI89.
! IT SH2,/ 5)C)IA) 0/)M20T) 0328T ; /I5)CT S28,I9HT.
4 5; ; TH) E5E)5TK SH2,/ 8T 7) 7ST52CT)/ 7K 08K T5)) 572I,/I89.
6 IT SH2,/ 7) 0 EITCH)/ 5;.
: TH)5) SH2,/ 8T 7) 08K C8ST52CTI8 5 CHI38)K 8 TH)
5;.
8/19/2019 UK Insulation Process- UK Client
26/32
9508TS 08/ ;28/I893)CH08IS3
8/19/2019 UK Insulation Process- UK Client
27/32
1 )C )8)59K C3E08K 7,I90TI8 SCH)3) IS 0 2L 9AT.
SCH)3) T C055K 2T )8)59K);;ICI)8CK 3)0S25)S I8 ,WI8C3) 08/ A2,8)507,) H2S)H,/S 0C5SS 2L WITH 1"";28/I89 3)CH08IS3.
! )C SCH)3) E5AI/)S 1"" ;5)) C0AITK & ,;T I8S2,0TI8;0CI,ITK E5AI/)/ TH) E5E)5TK ;2,;I,,S TH) E5)- 3)8TI8)/
C5IT)5I0 & TH) ESTC/) M20,I;I)S ;5 TH) S03).
4 )C SCH)3) E5AI/)S ;5)) 7I,)5S T 0,, H2S)H,/S WH;2,;I,, E5)-3)8TI8)/ C5IT)5I0 .
6 CSC C0578 S0AI89 C3328ITK 7,I90TI8 ESTC/)S05) THS) ESTC/)S H0AI89 ,W I8C3) H2S)H,/S. TH)K7)C3) 35) )0SI,K ),I9I7,) ;5 ;5)) I8S2,0TI8 ,;T NC0AITK 3)0S25)S. IT IS 08 )C 7,I90TI8.
8/19/2019 UK Insulation Process- UK Client
28/32
: 95))8 /)0, 95))8 /)0, IS 0 ;I808CI89 3)CH08IS3 ;2L 9AT. WHICH E5AI/)S 2ET 1"" ;I808C) ;5 )8)59K
S0AI89 3)0S25)S ,IL) I8S2,0TI8S 08/ 7I,)5S. IT IS 0S)E050T) 3)CH08IS3 ;53 )C SCH)3).
8/19/2019 UK Insulation Process- UK Client
29/32
)C SCH)3) E5AI/)S ;5)) 7I,)5S T 0,,
H2S)H,/S WH ;2,;I,, E5)-3)8TI8)/ C5IT)5I0 08/I8 5)C)IET ; 8) ; TH) ;,,WI89 7)8);ITS
;2,;I,,I89 08K ; TH) ;,,WI89 7)8);ITS )8S25)S;5)) 7I,)5 5)E,0C)3)8T M20,I;IC0T8 0S E)5 HHC5 H3) H)0TI89 CST 5)/2CTI8 7,I90TI8@ WHICH IS
08 7,I90TI8 28/)5 )C SCH)3)
8/19/2019 UK Insulation Process- UK Client
30/32
8/19/2019 UK Insulation Process- UK Client
31/32
Erodu$t Summary
Product Type of Product Criteria Required
FreeInsulatio
n
Free LoftInsulation
•
3ore than 1"yrs ld• ,ot should be empty• ,ot should not be $onerted• Che$( i boarded or not
Free CaityInsulation
• Should hae neer been done beore• 3ust hae $aity walls or bri$( walls8o Solid Walls• There should not be $ladding or tiles onthe wall
Boiler
!""# Finance • The saing on energy bills will be usedor repayment N plus you get a newboiler with B-1" years o ree seri$es
Free in Bir$in%&a$ • 3ust be on 7ene'tsFree in ot&erareas
• 7ene'ts N ,ot Insulation N Solid wallsN 4 7/5
SolarCan 'e Free Fust as( whether the $ustomer is
interested in installing Solar Eanel P
Can 'e Paid
8/19/2019 UK Insulation Process- UK Client
32/32
Mueries Elease