2/3/091
UCSF Mission BayUCSF Mission BayNeurosciences Building Neurosciences Building -- 19A19A
Proposed DesignProposed Design
Regents Grounds & Buildings CommitteeRegents Grounds & Buildings CommitteeFebruary 3, 2009February 3, 2009
2/3/092
Neurosciences Building (19A)KEY BUILDING STATISTICS
Five story, 235,000 GSF (160,800 ASF) building
Wet laboratory, laboratory support, vivarium, clinical research and office uses
100 Principal Investigators
Construction start October 2009; complete by June 2011
Developer TeamDeveloper - Edgemoor/McCarthy Cook PartnersArchitect - Skidmore, Owings & MerrillGeneral Contractor - Clark ConstructionProperty Management - McCarthy Cook
2/3/093
CAMPUS PLAN
2/3/094
CAMPUS LANE
COLLEGIALITY AND CONNECTIVITY
19A
T
19A
2/3/095
GROUND FLOOR PLAN
172’
-0”
96’-0
”
2/3/096
TYPICAL FLOOR PLAN
2/3/097
CONTEXT
17C – HELEN DILLER CANCER RESEARCH BUILDING
24A/B/C – GENENTECH HALL 19B – ROCK HALL
17A/B – CARDIOVASCULAR RESEARCH BUILDING
2/3/098
VIEW FROM SOUTH
2/3/099
VIEW FROM SOUTH
BYERS HALL
ROCK HALL
2/3/0910
VIEW FROM SOUTHWEST
17C -HELEN DILLER
BYERS HALL
ROCK HALL
2/3/0911
+85’
+65’
+50’
+35’
+20’
+105’
NORTH ELEVATION
2/3/0912
SUSTAINABILITY – NATURAL VENTILATION
2/3/0913
Neurosciences Building (19A)LEED/Sustainability Items
LEED Silver Rating, MinimumLABS 21 ComplianceEnergy EfficiencyImproved Construction Materials Natural LightIndoor Air QualityRain Water Run Off