UB ENGINEERING LIMITED CONCEPT TO COMMISSIONING………& BEYOND Power Sector

UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Embed Size (px)

Citation preview

Page 1: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

UB ENGINEERING LIMITED CONCEPT TO COMMISSIONING………& BEYOND

Power Sector

Page 2: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Contents

Share in Power Generation

Major Power Projects Executed

Details of Prestigious Power Projects

Details of Balance of Plant Package

Completion Certificates

Display Plates

Page 3: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Share in Power Generation

Capacity (MW) Nos. MT

500 11 330,000

200 / 210 / 300 32 380,000

100 / 110 / 120 8 40,000

50 / 60 6 13,500

Capacity (MW) Nos. MT

500 2 30,000

200 / 210 / 300 21 145,000

100 / 110 / 120 3 4,500

50 / 60 3 3,000

Boilers

Steam Turbines

Page 4: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Capacity (MW) Nos. Type / Supplier

> 225 12 8No – Fr-9Fa

4No – Fr-9Fe

>100 & <225 24

8No – V94.2 – Siemens

12No – GE

4No – MHI Takasago

<100 33 GE, John Brown & Westinghouse

Capacity (MW) Nos. Supplier

2220 MW CCPP - Dabhol 6 Henry Voygt, U.S.A.

600 MW CCPP - Kawas 3 Hindustan Brown Boveri, India

750 MW CCPP – Hazira 3 Doosan, Korea

500 MW CCPP - Hazira 2 Doosan, Korea

600 MW CCPP - Gandhar 3 Kawasaki Heavy Industries, Japan

600 MW CCPP - Auraiya 4 MHI, Nagasaki

650 MW CCPP – Dadri 4 BHEL, India

Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc.

Gas Turbine

HRSG

Effort to install 1.3 Million Tons of equipment and steel on above Power Station are

equivalent to approx. 32,000 MW of Power to People.

Page 5: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Major Power Projects Executed

A – THERMAL :

2 x 500 MW Vindhyachal Power Project for NTPC

2 x 500 MW & 3 x 210 MW Anpara Power Project for UPSEB / Mitsui, Japan

2 x 500 MW & 3 x 200 MW Farakka Power Project for Ansaldo, Italy & BHEL

8 x 300 MW (Boilers) Sabiya Power Project, Kuwait for MHI, Japan

2 x 500 MW & 2 x 210 MW Chandrapur Power Project for BHEL

1 x 500 MW & 2 x 210 MW Korba Power Project for BHEL

1 x 500 MW Talcher Power Project for BHEL

2 x 250 MW Bathinda Power Project for BHEL

8 x 300 MW (Turbine) Az-Zour Power Project , Kuwait for Toshiba, Japan

B – HYDRO ELECTRIC :

4 x 250 MW Koyana Hydro Electric Power Project for Cegelec, France

8 x 125 MW Indira Sagar Hydro Electric Power Project for NHDC, Bhopal

10 x 125 MW Merowe Dam Hydro Electric Project, Sudan for Alstom Switzerland

Page 6: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Major Power Projects Executed

C – COMBINED CYCLE :

2220 MW CCPP Phase I & II at Dabhol Power Project for Bechtel, USA

600 MW CCPP at Gandhar, Gujarat for ABB/KHI

600 MW CCPP at Auraiya, UP, for MHI/MELCO, Japan

8x125 MW Siemens V94.2 Units at Az-Zour Power Project, Kuwait

208 MW CCPP at Kakinada, AP for Rolls Royce, UK

600 MW CCPP at Kawas, Gujarat for Alstom, France

330 MW CCPP at Kondapalli, AP for Encon Services Pvt. Ltd., Chennai

750 MW CCPP at Jebel Ali „L‟ , Phase-I Dubai for ETA Electric / Toshiba, Japan

370 MW CCPP at Utran, Surat, for Alstom, Noida

650 MW CCPP at Dadri for BHEL, Noida

500 MW CCPP at Hazira for Essar, Hazira

750 MW CCPP at Hazira for Essar, Hazira

Page 7: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Prestigious Power Projects

Client Bechtel International inc. USA

Location Dabhol, Maharastra

Description Mechanical power block erection for Dabhol Power Project Phase-i (740 MW) and

Phase-II (1480 MW) Fr.9FA, Fr.9FE

Work volume 30000 MT

Duration (months) 30

Peak strength 1100

Value (US$ Mns.) 6.670

Client Mitsubishi Heavy Industries, Japan

Location Sabiya, Kuwait

Description 8 X 300 MW Boilers

Work volume 40000 Mt

Duration (months) 48

Peak strength 1200

Value (US$ Mns.) 27.000

Client Bharat Heavy Electricals Ltd., Noida

Location Vindhyanagar, Madhya pradesh

Description 2 X 500 MW Boilers, ESP’S, Rotating machines at Vindhyachal Super Thermal

Power Plant

Work volume 59000 Mt

Duration (months) 54

Peak strength 1800

Value (US$ Mns.) 7.708

Page 8: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Prestigious Power Projects

Client Ansaldo SPA, Italy

Location Neyveli, Tamilnadu

Description EPC Services for 2 x 210 mw Thermal Power Station bop package

Work volume 7000 Mt

Duration (months) 30

Peak strength 700

Value (US$ Mns.) 20.303

Client Toshiba Corporation, Japan

Location Az-Zour, Kuwait

Description Turbines, Generators, Electrical & Instrumentation, 8 X 300 MW TG, GEW, C& EI

Work volume 30000 Mt

Duration (months) 36

Peak strength 780

Value (US$ Mns.) 18.000

Client Ansaldo, Italy

Location Farakka, West Bengal

Description 2 X 500 MW Boilers

Work volume 60000 Mt

Duration (months) 42

Peak strength 1800

Value (US$ Mns.) 4.890

Page 9: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Prestigious Power Projects

Client Ansaldo SPA, Italy

Location Neyveli, Tamilnadu

Description EPC Services for 2 x 210 mw Thermal Power Station bop package

Work volume 7000 Mt

Duration (months) 30

Peak strength 700

Value (US$ Mns.) 20.303

Client Toshiba Corporation, Japan

Location Az-Zour, Kuwait

Description Turbines, Generators, Electrical & Instrumentation, 8 X 300 MW TG, GEW, C& EI

Work volume 30000 Mt

Duration (months) 36

Peak strength 780

Value (US$ Mns.) 18.000

Client Ansaldo, Italy

Location Farakka, West Bengal

Description 2 X 500 MW Boilers

Work volume 60000 Mt

Duration (months) 42

Peak strength 1800

Value (US$ Mns.) 4.890

Page 10: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Project : 2 x 210 MW Neyveli Power Project

Owner : Neyveli Lignite Corporation

Owner‟s Consultant : MECON, Chennai

Client : Ansaldo Energia S.P.A., Italy

Contract value : RS. 15,250.00 LACS (US$ 34.66 Million)

Division of job : UBEL (Team Leader)

Supply, Erection, Testing & Comm. of Mech. Items Proj. & Site Management Services,

E & I Erection Works DCL Design, Engg. for total Supply, Erection, T & C of Fuel

Oil Handling Sys., complete Supply of Elect. & C&I Package, Project & Site

Management Services.

Detail Scope of Work : A) Supply :

Design, Engg. & Supply Condenser, Condensate Pumps, Condenser Tube cleaning

system HP/LP heaters, deareators, desuperheaters Condensate storage tanks &

various tanks Main steam & start up ejectors Closed cycle heat exchangers

Turbine lube oil purification system Instrument air & service air compressors

Chemical dosing system HVAC System Piping, fittings, valves, fitters for above

systems TG hall cranes, mill maintenance cranes LP piping, expansion joints

Insulation & painting Passenger elevator, hoists

Erection :

Erection of all UBEL supplied mech. Items Erection of all DCL supplied elect. C&I items

Erection of Ansaldo supplied equipment's like feed pumps, condensate extraction

pumps, HP piping & supports, bus ducts, panels, primary earthing, etc.

Erection turbine generator sets

Others :

Site management & project management services

Details of Balance of Plant Package (EPC)

Page 11: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Completion Certificates

Page 12: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million
Page 13: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million
Page 14: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million
Page 15: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million
Page 16: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Display Plates

Page 17: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

4X135 MW THERMAL POWER PLANT OF WPCL,WARORA, MAHARASHTRA

Page 18: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

ESP ERECTION FOR 2X600 MW TPP,CHENNAI

Page 19: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

HP DRUM ERECTION FOR PIPAVAV,GUJRAT

Page 20: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

LOWEING OF ROTOR (APX.480MT) OF 10X125MW MWEROWE DAM PROJECT,SUDAN-AFRICA

Page 21: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

BOILER ERECTION OF 550TPH AT JEBEL ALI CCPP,DUBAI

Page 22: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

HRSG MODULE ERECTION AT JEBEL ALI “L” POWER PLANT, DUBAI

Page 23: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

SIDE VIEW OF 500 MW BOILER AT FARAKKA, INDIA

Page 24: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

8 x 300 MW TURBINES AT AZ ZOUR POWER PROJECT, TOSHIBA

Page 25: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

1480 MW DABHOL CCPP, BECHTEL, UK.

Page 26: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

600 MW GANDHAR CCPP, ABB / KHI

Page 27: UB ENGINEERING LIMITEDubengineering.com/photo_gallery/1328250099Power.pdf · Up to 370 MW CCPP 33 TBW, BHEL, L&T, ALSTOM,TOSHIBA etc. Gas Turbine HRSG Effort to install 1.3 Million

Contact Us

Sahyadri Sadan | Tilak Road | Pune 411030 | India

Phone : +91 20 24333722 | 40161700 | Fax : +91 20 24338887 | 40161711

Email : Erection Division : [email protected]

EPC-Mechanical : [email protected] | [email protected]

EPC-Electrical : [email protected]

Fabrication Shop: [email protected]

International Business : [email protected]

UB Infrastructure Ltd. : [email protected]

Web : www.ubengineering.com