TURNER-KIEWIT JOINT VENTURE
Subcontractor Monthly Community Outreach
9:00-9:30 Breakfast & Networking
9:30-10:00 Presentation and Q&A
10:00-10:15 Business Introduction Opportunity
10:15-11:00 Meet & Greet
Introduction
David Crane
Sharon Somner
Jeff Bush
Andrew Cameron
Turner-Kiewit JV
$1.1B CAPITAL IMPROVEMENT PLAN (CIP)
MAJOR ELEMENTS
Maintain existing facilities to standards consistent with The Orlando Experience®
Modify and expand facilities to achieve ultimate North Terminal capacity of 45 MAP
Improve international processing to accommodate growth
Increase multi-modal transportation access
Develop facilities to generate non-aviation revenue and provide strategic redundancy
LEAD CONTRACTORS
$1.1B CAPITAL IMPROVEMENT PLAN (CIP)
TURNER-KIEWIT JOINT VENTURE
Subcontractor Monthly Community Outreach
South Airport
Intermodal Terminal Facility Complex
Greater Orlando Aviation Authority
Orlando International Airport
Turner-Kiewit JVProject Team
Field SupervisionProject EngineeringDocument Control
Field EngineeringConcrete SupervisionDocument Control
Project ControlsQuality ControlProject Engineering
Turner-Kiewit Joint Venture
CMAR for ITF & PDL
Intermodal Terminal Facility (ITF)Passenger Drop-Off Lobby (PDL)Rail Platform (Viaduct)
DBE Goal for Construction30% Goal
DBE Requirements
DBE Success Stories
• L & S Diversified 100%
• JMD Global 100%
• The Middlesex Co./Denson Construction 31%
• Baker Concrete/Shelby Erectors 30%
• Ardaman & Associates /Page One & Tierra 60%
Currently, The Middlesex Company, has teamed up with DensonConstruction Company and has 31% DBE PARTICIPATION! Ardaman& Associates has teamed up with Page One Consultants, Inc. andTierra to reach 60% DBE PARTICIPATION!! These are great successstories and we would love to spotlight your Company for meetingand exceeding its goals!
“Community Outreach” Networking Sessions• Specific details will be provided for bid packages
• Next Outreach – 11/17/2015
Assistance Programs • Prequalification Workshop
at Valencia College
Pre Bid Meeting/Matchmaking• Interior Finishes – November 2015
Outreach Efforts
“Stay tuned to the website”
www.tkgoaa.com
2 Steps
that can be implemented at the same time.
Prequalify with Turner-Kiewit JV thru the TKGOAA.com website online.
DBE Certification• Florida UCP is the Unified Certification Program for DBE’s.
• NAICS Codes- North American Industry Classification System Is the standard used by Federal statistical agencies in classifying business establishments for the
purpose of collecting, analyzing, and publishing statistical data related to the U.S. business economy.
The Turner-Kiewit Team is looking not only to meet GOAA’s Goals, but to Exceed them.
HOW TO BE A PART OF THIS PROJECT
This Project will be pursuing certification under LEED V4 Building Design& Construction. Every contractor associated with the project will beexpected to participate in the certification process.
Information regarding the goals and requirements associated with thecertification can be found both within your bid package (as a referencechart) and detailed within specification 018330.
Greater Orlando Aviation AuthoritySouth Airport APM Complex & South Airport Intermodal Terminal Project
Bolder and More Specialized
• Includes a focus on materials that goes beyond how much is used to get a better understanding of what’s in the materials being specified and the effects those components have on health and environment.
• Take a more performance-based approach to indoor environmental quality.
• Provides a clearer picture of water efficiency by evaluating total building water use.
• We have the opportunity to divert construction waste and debris away from landfills.
• As a construction team you play an important role in achieving project goals and obtaining LEED certification.
• Every team member will embrace the strong initiative of utilizing green building practices as our culture while constructing an environmentally friendly building.
Overview Schedule
Upcoming Bid Packages
• BP-12.13/BP-15.01 – Glazed Alum Framing Systems/Curtainwall
(Joint Procurement) – Due Wednesday, October 28, 2015 at 3:30 PM
• BP-12.34 – Electrical – Due Friday, October 30, 2015 at 3:30 PM
• BP-12.48 – Metal-Framed Skylights – Due Thursday, November 12,
2015 at 9:00 AM
Primes & 2nd tier Subcontractorworking on the project
• The Middlesex Corporation
• Denson Construction, Inc.
• Ongrade Contracting
• Bonn J. Contracting
• Shelby Erectors
• Finishing Systems, Inc.
• J. B. Webb & Associates
• Paul E. Walsh Trucking, Inc.
• T & T Construction, Inc.
• John B. Webb & Associates
• Ace Rebar
• HJ Foundations, Inc.
• John B. Webb & Associates
• Ace Rebar
• Walsh Trucking, Inc.
• Gracicarl Services, Inc.
• JMD Global Developers, LLC.
• L & S Diversified, Inc.
• Shelter’s Cleaning, LLC
• Baker Concrete• Shelby Erectors, Inc.
• Modular Building Systems International • Prime Electric, Inc.
• Wendt
• Adeb, Inc.
• Merit Fasteners
• Aerial Innovations
• Ardaman & Associates• Page One
• Tierra
• TK JV Self Perform• OLP
• Gulf Coast Reinforcing
• Shelters Cleaning, LLC
• Ken Sandlin Welding Contractors, Inc
• Lavender Lady Plumbing
DBE SubcontractorsDBE Primes
Remaining Packages
18 bid packages
12.44 Resinous Flooring
12.24 Resilient Flooring & Marking
12.12 Coiling Doors
12.21 Ceramic Tile
12.22 Acoustical Ceilings
12.27 Div. 10 Specialties/Toilet Accessories
12.30 Signage (int & ext)
12.18 Interior Glazing
12.29 Fountains
Interior Finishes
12.46 Point Supported Glass Canopy
12.47 Sunshade/Louvers
12.07 Ornamental Railings
12.16 Fireproofing
12.45 Automatic Entrances
12.41 Access Flooring
12.43 Asphalt Paving & Markings
12.26 Final Cleaning
12.42 Aluminum Walkway
iSqFt Site
Bid Package Parts
`
`
``
`
Questions?
Business Introduction OpportunityPrime Contractors, Vendors and DBEs
opportunity to speak