PROJECT REPORT
FOR
INTEGRATED HANDLOOM DEVELOPMENT
SCHEME
TUPUL CLUSTER,NUNGBA SUB-DIVISION,
TAMENGLONG DISTRICT, MANIPUR
SUBMITTED BY
DEPARTMENT OF COMMERCE & INDUSTRIES,
GOVERNMENT OF MANIPUR
---------
8/14/2019 Tupul - Project Profile
2/19
2
TUPUL CLUSTER
I N D E X
S.No. Particulars Page Nos.
1. Diagnostic Study Report 1 to 7
2. Action Plan 8 & 9
3. Annexure-A-I Selection of Implementing
Agency and Selection of Cluster for DiagnosticStudy
10 to 12
4. Geographical Locations of the Cluster (MAP) 13 A & B
5. Annexure-A-2- Basic Survey of Cluster 14 to 45
6. Annexure-A-3-Diagnostic Study report and
Action Plan for Cluster Development
46 to 49
7. Financial Outlay 50 & 51
8. Year-wise break up 3 years (Physical and
Financial)
52 & 53
8/14/2019 Tupul - Project Profile
3/19
3
DIAGNOSTIC STUDY FOR
TUPUL CLUSTER OF TAMENGLONG DISTRICT
UNDER INTEGRATED HANDLOOM DEVELOPMENT SCHEME
1. Introduction:
Cluster approach for a holistic development of micro, small and medium enterprises is
being attempted all over the world particularly in the developing countries including India
on a wider scale. The Development of identified handloom clusters in the second phase of
the implementation of Integrated Handloom Cluster Development Programme in the
country. Towards that end, a Diagnostic study has been conducted on behalf of the DCH by
Indian Institute of Entrepreneurship covering Tupul Handlooms Cluster in Tamenglong
District under Integrated Handloom Development Scheme.
The Primary aim of the Diagnostic study is to identify what ails in the cluster. The
detailed objectives of the cluster are detailed below.
To understand the current socio economic profile of the cluster To evaluate the current status of Handloom Cluster in terms of the product variety,yarn availability, the number of functional or non-functional looms, role of support
organization and prevailing infrastructure facilities.
To highlight the constrains faced by the cluster and suggest some action plans forfuture.
In order to fulfill the above mentioned objectives the primary survey in the cluster has
been conducted as well as diagnostic study by the Indian Institute of Entrepreneurship,
Guwahati, for understanding of the cluster is based on analyzing the value chain that
exists in the cluster. It includes the suppliers of raw material (backward linkage), the
Weavers (Producers), the traders/Exporters (Forward linkage), and support institutions/
organizations. The support institutions are the Government bodies and social
organization which held the various activities of the entire value chain. Generally, that
support organizations include the National Handloom Development Corporation(NHDC) Ltd., Weavers Service Centre, National Institution of Fashion and Technology
(NIFT), the Weavers Cooperative Societies and master weavers.
A meeting of prominent weavers, Master Weavers, Prominent weaving
community leaders, staff of the Cooperative Societies of cluster has been conducted
and held various discussions regarding availability of raw materials, production
capacity, product diversification, marketing, infrastructure facilities and the problems
being faced by them are noted below.
Types of product manufactured Raw material procurement Traditional preparatory work Dyeing and design facilities Use of t traditional looms Product market structure Competitive analysis Lack of working capital and availability of Finance.
2. Background of the Cluster:Ministry of Textiles, Govt. Of India have sanctioned 01 No. of cluster in Manipur in 1
st
phase for the year 2005-06 which was implemented through IIE, Guwahati and 04 Nos.
8/14/2019 Tupul - Project Profile
4/19
4
of clusters in 2nd phase for the year 2006-07 have also been sanctioned of which Tupul
cluster in Tamenglong District has been identified as one of them.
Evaluation of the Cluster:
Tupul is 40 Km. away from Imphal along the National Highway-53 under Nungba Sub-
Division of Tamenglong Revenue District. There is a plan for Central Station of
projected Tupul-Jiribam Railway Project. There is population of more than 4000 having
about 950 weaver households in the cluster of which about 400 weavers households are
affiliated to the Cooperative Society and remaining weavers are outside the cooperative
folds there are about 550 independent Weavers, 50 shed weavers, 500 wage weavers
and 20 master weavers. More than 98% of the looms are loin looms and remaining is
having fly shuttle frame looms. Of the total 950 looms in the cluster 66 % are working
and 44% are idle. In Tupul cluster 99% women weavers belongs to weavers community
of Kabui tribe Community (Schedule Tribe). In the cluster female weavers are 97%
and engaged in the occupation of the weaving industry in the major way even though
their contribution is either paid or poorly paid for the ancillary activities if performed
by her outside the family weaving.
The members of the weavers Cooperative Societies are accustomed to weavecotton and acrylic varieties, like, bed sheet, lungies, towels, mosquito nets, etc. Due to
deteriorated financial position of the Society member are not getting regular work from
the Society consequently a large number of weavers have diverted to the master
weavers.
The cluster covers 08 adjoining villages along the NH-53 and projected NH-
150. The cluster will cover up to the Noney town along the highway for greater
accessible. The cluster is very compact and possible for easy monitoring.
Major Players in the Cluster
In this cluster the Master Weavers are playing major role in providing employment to70% to 80% of the weavers in the cluster. They are supplying raw material in the shape
of warps. The weavers are simply put it on the loom and weaving and return the
finished goods, by taking their wages. There are problems of raw materials, dyeing,
common facilities etc. As such the weavers in the cluster are not doing their job
successfully.
The Officer on Special Duty (Handloom), Deputy Director of Handlooms and
Textiles, General Manager with his Project Manager (Handloom) and Secretaries of the
Societies are the in-charge of the Cluster for implementation of the Scheme.
Current Scenario of Cluster:
Particulars Tupul Cluster
Total looms 901
Looms covered under Cooperative fold 400
Looms covered under outside cooperative fold 550
Type of looms
a) Loin Looms 880
b) Fly Shuttle Frame Looms 21
8/14/2019 Tupul - Project Profile
5/19
5
Types of product manufactured : 49 No. of Women Weavers : 940 No. of Society : 04 No. of Societies working : 04 Turnover of the area : Rs.2030 lakhs Outstanding loan : Nil Products :Shawls, Mekhla, Bed sheets, Ladies wear,muffler, etc. Wage Rage : Rs. 45 to Rs. 56 Present loan amount : Nil Cash credit limit Rs. 110.0 lakh CC renewal for the year 2007-08 : Rs.105.00 lakhs
The annual turnover of the cluster is Rs.2030 lakhs and the last 5 years turnover is as
detailed below:-
1. 2002-03 Rs.1,060.00 lakhs
2. 2003-04 Rs.1,200.00 lakhs
3. 2004-05 Rs.1,100.00 lakhs
4. 2005-06 Rs.1,900.00 lakhs
5. 2006-07 Rs.2,030.00 lakhs
Socio-economic profile:
In this cluster the entire weaving activity is totally dominated by backward classes. The
98% of the weavers are BPL families. There is no un-employment in the industry. But
due to social and economic changes the youngsters are not being attracted for weaving
profession but opting for other professions. Since the area is the cluster covered under
agriculture and as there are many other employment opportunities, a few are also
switching to other professions.
3. Main Handloom Products:
Major products of the cluster are cotton and acrylic products. The varieties like Shawls,
Bed sheets, lungies, muffler, dress materials, mekhla (phanek), and school bags. The
entire stocks of the Coop.; Society are being marketed through society 05 depots which
are 28 showrooms in Manipur and Ema Market (a unique handloom venders) and
remaining handloom items produced outside coop. are being marketed through master
weavers. There are no professional dyers in the cluster and the raw material is being
supplied by the Departmental Raw Material and master weavers after grey yarn is dyed
and sized.
4. Powerlooms in the Cluster:
There are no power looms in the cluster.
5. Handloom Mark:
As the Government has introduced the Handloom mark scheme with a view to provide
collective identity to the handloom woven products and distinguish them from power
loom and mill products. All the societies and producers are being registered with the
Textile Committee, Ministry of Textiles for supply of Handloom Mark Labels.
8/14/2019 Tupul - Project Profile
6/19
6
6. Economic conditions of the weavers in the cluster:
The earning of the weavers families are average. Many welfare schemes are being
implemented by Govt. of Manipur as well as Govt. of India and as such the weavers
families are self sufficient and having proper security for their livelihood. The
following schemes have also been implemented as advantageous for the weavers.
a) Integrated Handloom Villages Development Schemeb) Project Package Schemec) Health Package Schemed) Mahatma Gandhi Bunkar Bima Yojanae) Housing cum-work shed schemef) Thrift fund com saving security schemeg) Deen Dayal Hathkargha Protsahan Yojanah) PMRY (Prime Minister Rojgar Yojana)
7. SWOT Analysis:
The Strengths/Weaknesses/Opportunities Threats (SWOT) analysis has beendone keeping in mind the historical background, geographical, social, economic and
Industry related core issues and conditions existing in the cluster.
Strengths:
Market, Product Development and Technology
There is good potential in the domestic market for the traditional items and otherproducts
There is good demand for tribal shawls products in all over India and abroad Local consumption is high Societies have many sales outlets in State and neighbouring States. Possibility of creating new product range beside the existing range to explore the
market
Ample scope for product diversification by developing new designs through skilledartisans
Having good handloom concentration Availability of skilled weavers Marketing /development Assistance is provided by Govt.
Weakness
Market, Product Development and Technology No local market No local raw material supplies No collective efforts related to marketing Internal competition for marketing of goods leads to differentiation in prices Though efforts were made for new design development, but it is only individual
basis
Dependence on few products No regular work for weavers Low productivity
8/14/2019 Tupul - Project Profile
7/19
7
No exposure to information Technology Low education level and poor economic condition of weavers Absence of weavers association No availability of sizing locally Inferior quality of dyeing Lack lf publicity There is no application of information technology modern management techniquesfor marketing the product design etc. Credit facilities from financial institutions.
Opportunities:
Brand Building for traditional saris and other products Scope for reduction in cost dyeing by modernization High demand to handloom products Availability of skilled weavers A common raw material Bank for Yarn, dyes and chemicals, silk yarn zari may be
provided for quality up gradation
Scope for increasing working looms. Introduction of various welfare schemes.
7.4. Threat :
Competition from Mill made products Ensuing globalization Decline in demand of traditional items Increasing demand for low cost power loom product Non up gradation of product technology may also affect sustainability Higher cost of products.
8. Justification for recommending the Cluster:
Highly concentrated and compact weavers in the cluster More than 60% of the total population in the cluster are weavers Women are well acquainted in weaving. Weavers can get continuous employment and thereby earn better wages Possible employment generation directly and indirectly There are 950 weavers in the cluster 75% to 80% of the weavers are working under Master Weavers Even though Societies are operating the cluster it is able to provide employment
only 20% of the weavers due to lack of working capital The relationship between weavers and master weavers are cordial All the weavers in the cluster are having their own looms in their own houses.
8/14/2019 Tupul - Project Profile
8/19
8
ACTION PLAN FOR IMPLEMENTATION OF THE CLUSTER DEVELOPMENT
APPROACH
------
I. Trust Building:
The following action, are to be implemented fro trust building among the weavers.
Exposures visit to successful clusters Conducting workshops at regular intervals Workshop on networking strategy has to be conducted Workshop on quality appraisal of woven fabrics has to be conducted
II. Quality Awareness:
Quality of the products are not up to the export standards because of less attention being paid
by the weavers and master weavers as they do not have technically qualified personal for
quality checking for their final products,. The y are to be educated properly to improve the
quality of their products. Therefore, it is proposed to arrange quality awareness campaign on
frequent intervals.
III Raw Material:
A Raw Material centre for supply of different counts of Yarn as required by the Weavers is
proposed for supply of yarn at the cluster head quarters under the scheme.
IV Common Facility Centre:
Infrastructure proposed for establishing a sizing and warping units ion the cluster head quarters
for preparation of pre-looms processing.
V. Dyeing:
There are no facilities for testing of dyeing fastness of the dyed materials. In many of the dye
houses they are not doing the yarn scouring which lead to uneven dyeing. They are using hard
water for dyeing which also causes uneven dyeing. The Dye houses needs to be modernized
with scouring and water softening plants.
VI. Design Development:
The services of the Weavers Service Centre will be taken for the development of new designs
And training of designers is need to create innovative designs as per the market requirement.
VII. Loom and Accessories:
All the weavers are having traditional pit looms. They require Jacquard, dobbies and
accessories top weave new designs and improved their productivity.
VIII Marketing:
The weavers in the cluster are not having any systematic marketing strategy. It needs initiation
of efforts to organize market promotion for cluster products through domestics market.
Therefore, it is propose to initiate actions as under:
8/14/2019 Tupul - Project Profile
9/19
9
Market survey is to be carried out for development of colour designs quality Geographical identification brand has to be registered Manipuri Handloom Establishment of market consortia Buyers and Sellers meets and also specialized retailers meets have to be conducted
at regular intervals
Training in value addition to the traditional saris has to be conducted Use if information technology
IX Finance:
The Tupul Weavers CS and Sale society is suffering due to lack of working capital. It is
therefore the members of the society have started working under Master Weavers and hence
margin money is proposed for their requirement.
Signature of the President/Secretary/Chief Executives
(Name & Designation)
Countersigned.
Director In/Charge of Handlooms
8/14/2019 Tupul - Project Profile
10/19
10
PART A
CLUSTER APPROACH
ANNEXURE-A-I
SELECTION OF IMPLEMENTING AGENCY AND SELECTION OF CLUSTER FOR
DIAGLOSTIC STUDY AND BASELINE SURVEY
A. Details of the Organization/Implementing Agency (IA):1. Name of the Organization (with full address) Director of Commerce & Industries,
Lamphelpat, Imphal, Manipur.
2. Registration number and date of Registration Govt. Department
3. Name & Designation of Office bearers with
Phone No., FAX No. and E-mail etc.
1. Shri Dhiraj Yumnam, Director (C&I).
2. Shri M. Rajen Singh, OSD(Handloom)
3. Shri K. Lamlee Kamei,
Dy.Director(HL)
Phone- 0385 2414220/469/418
4. Total number of regular manpower with theOrganization
179
5. Balance sheet and loss/profit account for the
last three years (enclosed)
Govt. Department
6. Experience if any in Textiles/Handloom
Sector
05-28
7. Byelaws/Resolution of the Organisation Not applicable
8. Previous experience in Cluster development Nil
9. Scoring of the IA as per the pattern for
grading.
Not applicable
B. Profile of the Handloom Cluster to be selected
1. Name of Handloom
Cluster and District.
Tupul, Nungba Sub-Division, Tamenglong District, Manipur
2. Geographical
location of the
cluster (enclosed
map of the cluster)
Tupul 40 Km. west of Imphal along NH-53 under Nungba Sub-
Division of Tamenglong District. 4391 sq. km., 24o
59 North and
93o
30 East. along NH-53 leading to Assam. Map enclosed.
3. Total number of
handlooms in the
cluster
901
3.1 Total Number ofweavers in the
cluster
Category Men Women Total
SC
ST 21 929 950
OBC
Minority
General
Total 21 929 950
8/14/2019 Tupul - Project Profile
11/19
11
4 Status of the weavers in the
cluster
Status Existing
Independent 150
With Master Weavers 190
With Primary Cooperatives 400
With Handloom Apex/Group
With Self Help Goups 50With NGOs 160
With exporters
Others
Total 950
5. Present economic
status of the cluster
as compared to 5
years back
(a)Economic level of
the weaver
Economy of the weavers is improving
slightly from Rs.45/- to 56/- per day.
(b) Product
diversification
Traditional patterns have been diversified
for fashion clothing.
(c) Infrastructure
faculties
Road connectivity between inter-villages
have been improved with PMSY, which
have easier for movability around thearea.
(d) Sales Turnover The sales turnover has improved from Rs.
1,060.00 lakh to Rs.2030.00 lakh from
2002-03 to 2006-07.
6. SWOT analysis of
the Cluster
Analysis in brief separately on the strength, weakness,
opportunities and threats.
a) Strengths a) There is good potential in the domestic market for thetraditional items and other products
b) There is good demand for tribal shawls products in all overIndia and abroad
c) Local consumption is highd) Societies have many sales outlets in State and neighbouring
States.
e) Possibility of creating new product range beside the existingrange to explore the market
f) Ample scope for product diversification by developing newdesigns through skilled artisans
g) Having good handloom concentrationh) Availability of skilled weaversi) Marketing /development Assistance is provided by Govt.
b) Weakness a) No local marketb) No local raw material supplies. 3. No collective efforts
related to marketingc) Internal competition for marketing of goods leads to
differentiation in prices
d) Though efforts were made for new design development, butit is only individual basis
e) Dependence on few productsf) No regular work for weaversg) Low productivityh) No exposure to information Technologyi) Low education level and poor economic condition of
weavers
8/14/2019 Tupul - Project Profile
12/19
12
j) Absence of weavers associationk) No availability of sizing locallyl) Inferior quality of dyeingm) Lack lf publicityn) There is no application of information technology modern
management techniques for marketing the product design
etc.
o) Credit facilities from financial institutions
c) Opportunities a) Brand Building for traditional saris and other productsb) Scope for reduction in cost dyeing by modernizationc) High demand to handloom productsd) Availability of skilled weaverse) A common raw material Bank for Yarn, dyes and chemicals,
silk yarn zari may be provided for quality up gradation
f) Scope for increasing working looms.g) Introduction of various welfare schemes
d) Threat a) Competition from Mill made productsb) Ensuing globalizationc) Decline in demand of traditional itemsd) Increasing demand for low cost power loom producte) Non up gradation of product technology may also affect
sustainability
f) Higher cost of products7. Justification for
recommending the
cluster for study
a) Highly concentrated and compact weavers in the clusterb) More than 60% of the total population in the cluster are
weaversc) Women are well acquainted in weaving.d) Weavers can get continuous employment and thereby earn
better wages
e) Possible employment generation directly and indirectlyf) There are 950 weavers in the clusterg) 75% to 80% of the weavers are working under Master
Weavers
h) Even though Societies are operating the cluster it is able toprovide employment only 20% of the weavers due to lack of
working capital
i) The relationship between weavers and master weavers arecordial
j) All the weavers in the cluster are having their own looms intheir own houses
8. Duration of the
study
5 Days
8/14/2019 Tupul - Project Profile
13/19
13
Certified that:
1. The proposal for release of Rs.106.93 lakh has been recommended by the State LevelProject Committee .For Baseline Survey and Diagnostic Study. The minutes of the
meting arte encloses.
2. There is no reason to believe that these organizations are involved in corrupt practice.3. Consolidated UC for earlier releases for the year nil has been sent vide State
Governments Letter No. nil dated nil is enclosed. It is also certified that no U.C. in
respect of the above grantee organization is pending.
4. Certified that the above particulars are correct.5. Certified that no complain(s) in respect of the above mentioned agency have been
received in the State in respect of disbursement of assistance released by the GOI and
State in the past.
Signature of the President/Secretary/Chief Executives
(Name & Designation)
Countersigned.
Director In/Charge of Handlooms
8/14/2019 Tupul - Project Profile
14/19
14
CLUSTER APPROACH
Annexure-A-3
DIAGNOSTIC STUDY REPORT AND ACTION PLAN FOR TUPUL CLUSTER
DEVELOPMENT
-----------
Sl.
No.
Parameters
1. Name of the
Cluster/Ward Village
Tupul under Nungba Sub-Division of Tamenglong District along the
NH-53.
Profile of the Cluster
2. Geographical location
of the cluster
Tupul 40 Km. west of Imphal along NH-53 under Nungba Sub-
Division of Tamenglong District. 4391 sq. km., 24o
59 North and
93o
30 East. along NH-53 leading to Assam. Map enclosed
3. Number of
handlooms
901
4. Type of handlooms in
the pocket
Loin Looms
5. Infrastructure
available
Weavers have their indigenous loom and managed in their
residential verandah.
6. Present skills of the
weavers
Capable of weaving various intricate traditional dewigns.
7. Number of handloom
weavers
8. Status of the weavers Existing Proposed to be covered
A) Number of Primary Weavers Coop. Societies 04
B) Number of Weavers in Cooperative fold. 400
C) Number of Master Weavers
D) Number of weavers with Master Weavers 190E) Number of NGOs working in handlooms
F) Number of weavers with NGOs
G) Number of SHGs working in Handlooms
H) Number of weavers with SHGs
I) Number of traders
9. Turnover of the pocket (Rs. in crore) Present Turnover Anticipated turn over
a) Domestic
b) Exports
Total
10. Average earning of the weaver per day (In
Rs.)11. Main handloom products of the pocket Shawls, Bed sheets, lungies, muffler, dress
materials, mekhla (phanek), and scholl bags
12. Number of Powerlooms in the pocket - Nil -
13. Whether handlooms of the pocket face
competition with Powerlooms
- No.-
Status of Pocket 5 years back
14. Economic condition of
the pocket in relation
to the position 5 years
(a)Economic
level of the
weaver
Economy of the weavers is improving slightly
from Rs.45/- to 56/- per day.
8/14/2019 Tupul - Project Profile
15/19
15
back from now (b) Product
diversification
Traditional patterns have been diversified for
fashion clothing.
(c) Infrastructure
faculties
Road connectivity between inter-villages have
been improved with PMSY, which have easier
for movability around the area.
(d) Sales
Turnover
The sales turnover has improved from Rs.
1,060.00 lakh to Rs.2030.00 lakh from 2002-03 to 2006-07.
SWOT ANALYSIS
15. a) Strength a) There is good potential in the domestic market for thetraditional items and other products
b) There is good demand for tribal shawls products in all overIndia and abroad
c) Local consumption is hightd) Societies have many sales outlets in State and neighbouring
States.
e) Possibility of creating new product range beside the existingrange to explore the market
f) Ample scope for product diversification by developing newdesigns through skilled artisansg) Having good handloom concentrationh) Availability of skilled weaversi) Marketing /development Assistance is provided by Govt
b) Weakness a) No local marketb) No local raw material supplies. 3. No collective efforts related
to marketing
c) Internal competition for marketing of goods leads todifferentiation in prices
d) Though efforts were made for new design development, but itis only individual basis
e) Dependence on few productsf) No regular work for weaversg) Low productivityh) No exposure to information Technologyi) Low education level and poor economic condition of weavers
j) Absence of weavers associationk) No availability of sizing locallyl) Inferior quality of dyeingm)Lack lf publicityn) There is no application of information technology modern
management techniques for marketing the product design etc.
o) Credit facilities from financial institutionsc) Opportunities a) Brand Building for traditional saris and other products
b) Scope for reduction in cost dyeing by modernizationc) High demand to handloom productsd) Availability of skilled weaverse) A common raw material Bank for Yarn, dyes and chemicals,
silk yarn zari may be provided for quality up gradation
f) Scope for increasing working looms.g) Introduction of various welfare scheme
8/14/2019 Tupul - Project Profile
16/19
16
d) Threats a) Competition from Mill made productsb) Ensuing globalizationc) Decline in demand of traditional itemsd) Increasing demand for low cost power loom producte) Non up gradation of product technology may also affect
sustainability
f) Higher cost of productsJustification for
recommending the cluster
16. Justification for
recommending the
cluster for
development
a) Highly concentrated and compact weavers in the clusterb) More than 60% of the total population in the cluster are
weavers
c) Women are well acquainted in weaving.d) Weavers can get continuous employment and thereby earn
better wages
e) Possible employment generation directly and indirectlyf) There are 950 weavers in the clusterg) 75% to 80% of the weavers are working under MasterWeaversh) Even though Societies are operating the cluster it is able to
provide employment only 20% of the weavers due to lack of
working capital
i) The relationship between weavers and master weavers arecordial
j) All the weavers in the cluster are having their own looms intheir own houses
Strategy
a) Cluster The Cluster identified in Tupul near Noney along NH-53 under
Nungba Sub-Division of Tamenglong District which is located 40Km. away from Imphal City.
b) Objectives of the
development
strategy
a) To evaluate the current status of the Handloom Cluster in terms
of the product variety, yarn availability, the number of active and
ideal looms role of support organization and prevailing
infrastructure facilities; b) To highlight the constrains faced by the
cluster and suggest some action plans for future.
Action Plan
18. Interventions
required for
development over a
period of 3 years,
with financial outlay
for each intervention
1 Formation of Consortium Rs.0.50 lakh
2. Raw Material support Rs.3.00 lakh
3. Skill up geradation Rs.4.50 lakh
4. Design Development Rs.24.00 lakh
5. Infrastructure Rs.7.00 lakh
6. Publicity & Marketing Rs.14.00 lakh
7. Basic Inputs Rs.22.18 lakh
8. Construction of workshed Rs.8.75 lakh
Total Rs.83.99 lakh
8/14/2019 Tupul - Project Profile
17/19
17
19. Project
Cost
Sl.
No
.
Name of the component Amount (Rs. In lakh weaverto be
coveredGOI State/
IA
Benef
iciaryTotal
1. Base line Survey, Diagnostic
study, Formation of SHGs
- - - - -
2. Consortium building 0.50 0.50
3. Raw Material 3.00 3.004. Skill up gradation 20
a) Training of Weavers 3.00 3.00
b) Training of Dyeing 1.00 1.00
c) Management Training 0.50 0.50
5. Design Development & Product
Diversification
a) Purchase of CATD 2.70 0.30 3.00
b) Engaging Designers 5.40 0.60 6.00
c) Paper design, sample,
assembling.
15.00 15.0
6. Infrastructure/CFC
a) CFC 4.50 0.50 5.00b) Dye House 1.80 0.20 2.00
7. Publicity & marketing
a) Advertising, Brochure,
Catalogue for 3 years
0.45
0.05
0.50
b) Exhibitions/Fairs for 3 years 5.40 0.60 6.00
c) Buyers-Sellers meets 3 years 2.70 0.30 3.00
d) Market Survey/Intelligence 1.00 1.00
e) Awareness and Exposure visit 3years
3.00
3.00
f) Development & Hosting of website 0.50 0.50
8. Project Management Cost
9. Basic Input
a) Margin Money 4.20 1.20 0.6 6.00 100
b) New looms 4.928 1.408 0.704 7.04 88
c) Dobby 2.80 0.80 0.4 4.00 100
d) Jacquard 2.10 0.60 0.3 3.00 50
f) Accessories 1.498 0.428 0.214 2.14 107
10. Construction of Workshed 8.75 8.75 35
Sub-total 59.726 21.986 2.218 83.93 500
11. Civil amenities
a) Approach roads 10.00
10.0
0 b) Education 5.00 5.00 d) Drinking water facility 3.00 3.00 e) Crche centre(Child Day care
Centre) for children of the
weaver
2.00
2.00
f) Primary education for children
of the weaver
3.00
3.00
Sub-total 23.00 23.00 Grand total 92.726 21.986 2.218 106.93
8/14/2019 Tupul - Project Profile
18/19
18
20 Propose
d Action
Plan for
the
cluster
Year-wise action plan highlighting the physical and financial targets for 3 years
along with a brief project report should be enclosed.
1. The beneficiary has not availed of any similar assistance under any other scheme of theState or the Central Government
2. The Implementing Agency is functioning3. There is no reason to believe that these organizations are involved in corrupt practice.4. Consolidated UC for earlier releases in respect of the grantee organization under IHDS
has been sent vide State Governments letter No Nil dated Nil is enclosed. It is also
certified that no U.C. in respect of the above grantee organization is pending under
IHDS.
5. Certified that the above particulars are correct and are verifiable from Books ofaccounts of the grantee agency.
6. Certified that no complaint(s) in respect of the above mentioned agency have beenreceived in the State in respect of disbursement of assistance released by the GOI and
State in the past.7. Certified that the Implementing agency(s) has obtained necessary approval from the
Banks/financial institutions for credit linkages, wherever required.
8. Certified that the Implementing Agency has furnished the requisite details in the9. Proforma A-2 (Baseline Survey of Cluster), enumerating, interalia, the names of the
individual weavers, components required and the assistance required thereof etc. and is
verifiable from records.
10.The proposal has been recommended by the State Level Project Committee on. . The minutes of the meting are enclosed.
(Signature)President/Secretary of Organization
Countersigned.
Director In-charge of Handlooms & Textiles.
8/14/2019 Tupul - Project Profile
19/19
YEAR-WISE FINANCIAL OUTLAY BREAK UP FOR UTILIZATION OF THEFUNDS TUPUL CLUSTER
-------DISTRICT: TAMENGLONG
(Rupees in lakh)
Sl.
No
Name of the Component 2007-08 2008-09 2009-10 TOTAL
PHY FIN PHY FIN PHY FIN PHY FIN1. Base line Survey, Diagnostic
study, Formation of SHGs
2. Consortium building 1 0.5 1 0.5
3. Raw Material 1 1 1 1 1 3
4. Skill up gradation 0 0
a) Training of Weavers 10 1.5 5 0.75 5 0.75 20 3
b) Training of Dyeing 20 1 20 1
c) Management Training 20 0.5 20 0.5
5. Design Development & Product
Diversification
0 0
a) Purchase of CATD 1 3 1 3
b) Engaging Designers 1 2 1 2 1 2 3 6
c) Design Paper, sample, assembly 5 5 5 15
6. Infrastructure/CFC 0 0
a) Common Facility centre 1 5 1 5
b) Dye House 1 2 1 2
7. Publicity & marketing 0 0
a) Advertising, Brochure,
Catalogue for 3 years
1 0.5 1 0.5
b) Exhibitions/Fairs for 3 years 1 2 1 2 1 2 3 6
c) Buyers-Sellers meets for 3 years 1 1 1 1 1 1 3 3
d) Market Survey/Intelligence 1 1 1 1
e) Awareness and Exposure visit 3 yrs 1 1 1 1 1 1 3 3 f) Development & Hosting of website 1 0.5 1 0.5
8. Project Management Cost 0 0
9. Basic Input 0 0
a) Margin Money 30 1.8 40 2.4 30 1.8 100 6
b) New looms 40 3.2 24 1.92 24 1.92 88 7.04
c) Dobby 50 2 25 1 25 1 100 4
d) Jacquard 20 1.2 15 0.9 15 0.9 50 3
e) Accessories 53 1.06 27 0.54 27 0.54 107 2.14
10. Construction of Workshed 15 3.75 10 2.5 10 2.5 35 8.75
Sub-total 270 40.51 150 22.01 140 21.4 560 83.93
11. Civil amenities
a) Approach roads 1 5.00 1 5.00 2 10.00
b) Education 1 5.00 1 5.00
d) Drinking water facility 1 3.00 1 3.00
e) Crche centre(Child Day care
Centre) for children of the weaver
1 2.00 1 2.00
f) Primary education for children
of the weaver
1 3.00 1 3.00
Sub-total 55 18.00 1 5.00 56
Grand total 275 58.51 151 27.01 140 21.41 566 106.93