Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
B 05-07-2016 User manual TubeLock® MOB MJN A 17-06-2013 User manual TubeLock® SHV KSH LV KSH Rev: Date: Description: Prepared by: Checked by: QA Approval: Final Approval:
Document no.: Global Gravity – User manual Global Gravity TubeLock®
User manual Responsible: SHV
Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705 www.globalgravity.com
User manual - 2 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
Table of contents 1 General information ................................................................................................................................................................................ 3 1.1 Introduction ................................................................................................................................................................................................ 3 1.2 Purpose ..................................................................................................................................................................................................... 3 1.3 Contact ...................................................................................................................................................................................................... 3 2 Personal protective equipment (recommended by Global Gravity) ................................................................................................... 4 3 System data ............................................................................................................................................................................................. 5 4 Layout ....................................................................................................................................................................................................... 6 4.1 Package assembly .................................................................................................................................................................................... 6 4.2 Exploded view ........................................................................................................................................................................................... 7 4.3 Component overview ................................................................................................................................................................................. 8 4.4 Stacked layout ........................................................................................................................................................................................... 9 5 Packing instruction ............................................................................................................................................................................... 10 6 Slings / Stacking .................................................................................................................................................................................... 16 7 Placing on the drilling rig ..................................................................................................................................................................... 18 8 Service .................................................................................................................................................................................................... 21 9 Handling ................................................................................................................................................................................................. 22
User manual - 3 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
1 General information
1.1 Introduction TubeLock® is a transport, lifting and storage device designed for safe handling of drill pipes, casing and tubular normally called OCTG (Oilfield Casing and Tubular Goods). This system is designed for use with:
Forklift Lorry Vessels Cranes
1.2 Purpose The purpose of instruction manual is to ensure that the TubeLock® will be assembled correctly and used in the right way for both lifting, storage and general handling.
1.3 Contact Global Gravity ApS Lillebæltsvej 42 6715 Esbjerg N, Denmark CVR 33950705 Main number: +45 76 56 99 00 Mail address: [email protected] Homepage: www.globalgravity.dk
User manual - 4 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
2 Personal protective equipment (recommended by Global Gravity)
Item: Description: PPE 01 Safety helmet during crane handling due to:
Falling objects Personal hazards Mechanical hazards
02 According to local regulation
03 According to local regulation
04 Fall protection equipment when using TubeLock® in heights due to: Fall hazards
05 Safety shoes due to: Mechanical hazards Falling objects Personal hazards
06 Gloves due to: Personal hazards
User manual - 5 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
3 System data
Configuration 4½” Tubing Range 1-3 Lb/ft 13,5 SWL 6,0 ton Load test 2 x SWL DNV certification 2.22 CE marked Yes Slings standard EN 818-4 Lifting scepters 4 left + 4 right / package Shackles Green pin 4,75 ton Number of tubular 18 pcs. / package Material Aluminum Bolt tensioning (M 20) 150 Nm Distance between packages 140 mm
User manual - 6 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
4 Layout
4.1 Package assembly
User manual - 7 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
4.2 Exploded view
Right Lifting sceptre
Locking mechanism
TubeLock® Sling
TubeLock® lifting profile
Locking mechanism
User manual - 8 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
4.3 Component overview The TubeLock® system comes in four different standard versions, from 1-layer models up to 4-layer models.
Right Lifting sceptre
Left Lifting sceptre
TubeLock® lifting
profile
M20 Bolt
TubeLock® Sling
1 Layer model
4 4 8 8 2
2 Layer model
4 4 12 16 2
3 Layer model
4 4 16 24 2
4 Layer model
4 4 20 32 2
User manual - 9 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
4.4 Stacked layout
END VIEW TOP VIEW
SIDE VIEW
User manual - 10 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
5 Packing instruction Assembly template (Recommended for use with TubeLock® package assembly)
No.: Description: Sketch:
A-01 The Template is for packing only not intended for transportation of tubular.
Template is to ensure correct distance between profiles.
This is the standard TubeLock® assembly frame if this is not used please see the pictogram on the TubeLock® profile for guidance
The Template must be located on a plan surface.
A-02 The template comes with 4 bridges where 4 x TubeLock® profiles can safely be placed
The bridges must be installed on the template according to the applicable configuration.
Always use 4 profiles when packing Tubular.
User manual - 11 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
No.: Description: Sketch:
A-03 Locking pins (8 pcs.) must be installed in each side of every bridge.
A-04 A TubeLock profile to be placed on each of the 4 bridges.
User manual - 12 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
1 3
No.: Description: Sketch:
A-05 Ensure that all threaded holes are in activated position (2 holes for each profile – Total 8 pcs.)
A-06 The lifting scepters must be installed 4 blue and 4 green
The lifting scepter must be installed with the locking mechanism away from the profile, and then turned 180˚ into locked position.
ACTIVATED POSITION DEFAULT POSITION
180˚
2
User manual - 13 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
No.: Description: Sketch:
A-07 Tubular must be placed in the TubeLock profile
Ensure that the tubular is located correct in the cutout.
A-08 4 TubeLock profiles must be installed on the top of the tubular.
User manual - 14 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
No.: Description: Sketch:
A-09 8 assembling bolts must be mounted between the bottom and the top TubeLock profile.
Ensure that all threaded holes in the buttom profile are in activated position.
A-10 The locking mechanism
Old Version: Must be pushed into the lifting scepter.
New Version: Put the key through the keyhole, and then while placed in the round part of the keyhole, turn the key 90˚ into locking position.
When key is in locking position the safety split must be installed in the profile.
90˚
Key
User manual - 15 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
No.: Description: Sketch:
A-11 8 assembling bolts must be tensioned to 150 Nm with a torque wrench.
Next layer of tubular can now be laid out according to A-07 etc.
A-12 When the tubular is packed and secured in one package, the tubular is ready for stacking.
It is optional, if chain slings will be fitted now or a later stage before lifting.
User manual - 16 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
6 Slings / Stacking
No.: Description: Sketch:
B-01 When mounting TubeLock® slings:
Always use the most outer lifting scepters (Closest to the tubular ends).
Ensure that shackles are locked and pins are mounted.
B-02 A two-part crane sling must be attached to the TubeLock® lifting eyes on the TubeLock® lifting slings.
Sling angle may not exceed 60˚.
Max. 60˚
User manual - 17 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
No.: Description: Sketch:
B-03 Arranging sling during stacking.
1. The slings must be located to the same side (as shown on sketch).
2. The next package can be stacked with the slings located to the other side (as shown on sketch).
3. The next package can be stacked with the slings located to the same side a package 1 (as shown on sketch).
Note: Whichever comes first - Max total weight per stack = 35T If weight of tubular is unknown, each TubeLock® package is to be calculated as 6T.
- Max total height per stack = 2,5m
2
3
1
Sling Direction
User manual - 18 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
A
7 Placing on the drilling rig
No.: Description: Sketch:
C-01 Side view: Stacking of TubeLock® system seen from the side.
The principle is to offset each package.
Once placed the first layer, the next layer must be offset to the side and hereafter back again.
C-02 Top view: When placing the packages on the rig.
Packages must be placed as shown on sketch, to get the benefit of shifting tubular from package to package.
IMPORTANT! See explanation of detail A – Next Page
User manual - 19 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
Detail A (C-02)
No.: Description: Sketch:
C-03 Packages must be placed with the distance of 140mm between each other.
This distance makes it possible for free movement of lifting scepters and to ensure that the package can be stacked with the earlier explained method.
If ≤ 140mm the lifting scepters will jam.
If ≥ 140mm shifting between packages is not possible.
C-04 It’s important to place the first layer of packages correctly.
When unlocking the lifting scepters, attention must be given to the 140mm, explained in C-03.
It is recommended using the TubeLock® spacer to insure the right placing.
User manual - 20 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
No.: Description: Sketch:
C-05 Once the packages are set according to above recommendations, it is possible to walk on top of the tubular and start to dismantle the packages, working from the top down.
Remove sling and shackles.
Loosen all bolts and remove them.
Remove TubeLock® profiles.
User manual - 21 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
8 Service TubeLock® is a lifting system approved according to DNV 2.22 Equipment must always be checked before use, and at least once a year by an authorized company – Every 5 years, equipment must undergo NDT. On delivery TubeLock® is approved for lifting use. Approval mark indicating, last inspection month, can be found on the profiles and lifting sceptres – See figure below.
For service purpose – It is only allowed to use original spare parts (OEM) unless otherwise has been agreed, with manufacturer’s representatives.
User manual - 22 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
9 Handling
No.: Description: Sketch:
D-01 To prevent accidents to fingers we recommend using the TubeLock® 7.
D-02 TubeLock® 7 is ideal for handling lifting scepters:
Unlock lifting scepters. Lock lifting scepters. Placing lifting scepters. Removing lifting scepters.
180˚
User manual - 23 - Global Gravity ApS ● Lillebæltsvej 42 ● DK 6715 Esbjerg N ● CVR: 33950705Rev. B www.globalgravity.com
No.: Description: Sketch:
D-03 2x TubeLock® 7 can be used for ergonomic changing of profiles.
Moving TubeLock® Profile using TubeLock® 7.