Upload
roland-grant
View
212
Download
0
Embed Size (px)
Citation preview
TST WG Progress Report at TP 19
Group Name: TPSource: TST WG Chair, JaeSeung Song (KETI)Meeting Date: 2015-09-07 to 2015-09-11Agenda Item: TP19, Item 10, Reports from Working Groups
TP-2015-0834-WG6_TST#19_status_report
Items for INFORMATION Draft output of TST ad-hoc sessions on oneM2M
certification Q&A (TP-2015-0818R01) The Q&A slides will be submitted to SC or SC Certification
Ad-Hoc for their information Any comments are welcome!!
TP-2015-08342
Items for INFORMATION 1st oneM2M Interoperability Test Event: – Participants: 22 companies with DUT (Device Under Test)– Organization: ETSI & TTA– Date: after TP #19 (14.Sep ~ 16.Sep)– Scope: HTTP, CoAP and MQTT bindings interoperability– Location: ETSI– Report will be available after the event
TP-2015-08343
Items for INFORMATION Call for Interoperability Events: – Regular oneM2M Interoperability Events (twice in a year)– TTA&ETSI kindly volunteer to host 2nd Interoperability Event on May
2016 (before or after TP)– Plan to have multiple regional/vertical interop. events– Please contact the TST leadership to discuss interoperability events
TP-2015-08344
1st 2nd 3rd 4th 6th Regular events
Regional
Verticals
2015 2016 2017
Items for INFORMATION Meeting objectives summary • Prepare 1st oneM2M Interoperability Event DONE• Handle input documents to TS-0013 DONE • Handle input documents to TS-0015 & TS-0017 & 0018
DONE• Consensus on the Test Purpose format and its contents
DONE• Feedbacks on the addressed technical questions of
certification issues DONE• Handle input documents to Application Developer TR
DONE
TP-2015-08345
Highlights Improve the maturity of TS-0013 (interoperability testing)
enough to be used for "1st oneM2M Interoperability Event" next week. (95%)• Plan to freeze on TST #20
Good progress on the template for Test Purpose and Application Developer Guide TR• A consensus on a template for describing Test Purposes• Application developer guide (skeleton, use case, and high level
architecture)
TP-2015-08346
Next Steps Keep improving the maturity of TS-0013 (Interop.)
and freeze it on TP #20 Keep working on developing conformance test
specifications in particular PICS and TSS&TP Provide a summary of feedbacks from different
member companies on certification related technical questions to SC Certi-Ad-Hoc
Prepare input contributions after the Interop. event if issues are identified
TP-2015-08347
Action Items Status# Action Item Description Owner Status
A-WG6-TP18-001 CRs to reflect the latest agreed test description
Jiaxin Yin, Bob Flynn, Mahdi Ben Alaya, Laurent Velez
DONE
A-WG6-TP18-002 Collect feedbacks on certification related technical questions
JaeSeung Song DONE
A-WG6-TP18-003 Investigate TS-0008&0009 v1.2.0 vs v1.1.0
Bob Flynn DONE
TP-2015-08348
Next Meetings / Calls
• Conference Calls– TST#19.1: 01. Oct, 2015, UTC 13:00-15:00– TST#19.2: 27. Oct, 2015, UTC 13:00-15:00
• Face-to-Face– 1st Interoperability Event: September 14-16, Sophia Antipolis, France– TST#20.0: November 09-13, Beijing, China
TP-2015-08349