SOPAC Trip Report 1 63 October 19 9 3 TRIP REPORT Kiribati 12- 25 September 1993 by Leslie Allinson Computer Systems Manager Prepared for: South Pacific Applied Geoscience Commission

Trip report Kiribati, 12-25 September 1993

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

SOPAC Trip Report 1 63

October 19 9 3

TRIP REPORT Kiribati

12-25 Septem ber 1993

by

Leslie Allinson Computer Systems Manager

Prepared for: South Pacific Applied Geoscience Commission

TRIP REPORT Kiribati

12 - 25 September 1993

Leslie Allinson Computers Systems Manager

1 October 1993

Visit the Ministry of Environment and Natural Resources Development (MENRD), Bairiki, Taraw a PURPOSE

Kiribati.

Maximise the investment of the equipment procured under the EC funded Lome 3 Mari ne Resources Program. Ensure that the equipment was integrated into the existing infrastructure. In particular, the Minerals, Fisheries Licensing, Economic, Environment, Finance and Administration Units at headquarters Bairiki. Provide an Information System for the Department through integration of software and hardware and prepare a forward plan Provide clear and concise documentation to describe the Information System Identify new areas of SOPAC assistance and determine existing areas where modification is required.

REPORT The visit was initially for 5 working days but was extended to 10 due to problems with flight informati provided by the Air Nauru agent in Tarawa and Air Nauru's unpredictable schedules. An activity log is provided as Attachment A.

The Ministry has one of the more sophisticated computer based information systems in the region which has been mainly due to the requirement for management of the fisheries resource and in particular the fisheries licensing system. This licensing is handled by the Fisheries Licensing and Surveillance Unit at the Ministry headquarters in Bairiki, Tarawa, and revenue from foreign fishing vessel licenses generated an income of some 12 million Australian dollars in 1992.

There are some 10 computers at the Ministry headquarters, with the Licensing System being operated on 2 desktops and 1 deskside computer. Data entry is carried out on one desktop while data is transferred by disk or link cable to the other two units for analysis and system development. The existing system is unsatisfactory as the data sharing is inefficient and the data lacks integrity. There is an obvious and urgent need for a network which will be headquarters wide to allow all units based at that location to have ready access to Ministry data as well is provide resource sharing, in particular printers.

The deskside computer had been purchased with the objective of using this unit as the network server but at present it is being used as a stand alone unit.

An initial analysis showed that a network could be implemented as well as providing necessa ry additional equipment which included a high performance desktop computer, colour notebook computer, low cost laser printer and low cost colour printer where the total cost was of the order of AUD 38,000. It was discovered that it would be far more effective to present the upgrade as a two phase project where each phase was under AUD 20,000 in order that government funds could be released without undue bureaucratic procedures.

Following consultation with relevant staff the upgrade proposal was provided and is included wi copy of covering letter as Attachment B.

1

It was discovered that the deskside system had been purchased from Singapore and had been delivered with incorrect configurations and two days were spent rectifying faults.

The majority of the time was spent assisting Naomii Biribo in using Maplnfo for sand and gravel data analysis and Johnny Kirata in using Maplnfo for fishing activity analysis. A report was provided with a covering letter as Attachment C.

SUMMARY MENRD headquarters have an upgraded and consistent computer system as well as a clearly defin forward plan for future development of their information system. Continuing support by SOPAC in this area was stressed.

Future sharing of national baseline data will be acheived through cooperation with the Public Works Department, Lands and Survey Department as well as all Divisions within this Ministry.

Relocation of the PEACESAT terminal from Tanaea to Bairiki will reduce communications costs for MENRD and later for SOPAC when that facility is installed.

The EC funded equipment has been a timely addition to a Ministry who have a firm commitment using an information system to assist in the operation and planning of the organisation.

Cooperation with FFA was undertaken

CONTACTS Ministry of Environment and Natural Resources Development PO Box 64, Bairiki Tarawa Republic of Kiribati

Mr Nakibae Teuatabo, Secretary Mr Tekabu Tikai, Deputy Secretary Mr Peter Tong, Senior Resource Economist Ms Tererei Abete, Environment Coordinator Mr Johnny Kirata, fisheries Licensing Officer Ms Naomi Biribo, Minerals Officer

Otintaai Hotel PO Box 270, Bikenibeu Tarawa Republic of Kiribati

Tel: (686) 21099 Fax: (686) 21 120

Tel: (686) 28084 Fax: (686) 28045

this file: ..\tvl\r-9309.doc

2

ATTACHMENT A -Activity log

Erratic behaviour with system configuration software

Sunday 14 September Suva - Tarawa Air Nauru

3

Tuesday 14 September Install following software:

Software McAfee v 106 MS DOS 6 MS Word 2.0c MS Excel 4.0 MS Powerpoint 3.0 MS Access 1.0 MS FoxPro 2.5 MS Project 3.0 Maplnfo 2.1 +data MapBasic 2.1 Geographic Calculator ABC Flowcharter Norton 7.0 PKware 2.01 Statistica for Windows

~

i i

DOS6.0 license

iatives of

d to lo ere able include

es we ll

Minerals Y note 1 note 1 note 1 note 1 note 1 Y note 1 note 2 Y Y Y note 1 note 1 note 2

Licensing Y Y Y Y Y Y Y Y Y Y

Y Y Y

note 1 installed at SOPAC note 2

The latest McAfee ver 106, was selected as the anti-virus sentinel in preference to MS I (Central Point) anti-virus software as the Kiribati government has purchased a country site which guarantees upgrades.

Learnt that Saturday Air Nauru flight would not be operating and contacted SOPAC with altern Friday and Monday via Tuvalu with Air Marshalls.

Imported a file BETIO.DXF into Maplnfo. This file had been supplied by Robert Smith. Ha into Autocad 386 12 on my Compaq notebook to find projection, limits and units before we w to get a successful import. Recommend that all DXF files which are supplied by SOPAC projection, limits and units of measure in an associated read me file.

Commenced discussion with Naomi and Johnny re the strategy for the upgrade proposal

Wednesday 15 September Assisted Naomi with placing data into her Tarawa Maplnfo map. Several Maplnfo featur demonstrated.

installed at SOPAC, upgraded at MENRD

When opening files with data from external applications, the latitude data should be degrees negative South of equator. negative westings 0.0 to -360.0 but not both.

If column headings are used in external data such as Excel or Base then Maplnfo will select columns for latitude and longitude in Create Points if the columns are named XCOORD respectively.

Use open file with type set as Excel or dBase. Use check box to select column names above selected area. When creating points set multiplier to 1.

Once points are created from an external application data file and changes are required Mapinfo file must be closed and the associated *.MAP file deleted before another attempt to create points.

Longitude should be decimal eastings, 0.0 to

4

When working with data created from an external application file (i.e. TEST1.XLS) the data is not editable. The solution is to save with another name and work with that copy. Maplnfo will only allow data editing when using its own data files (i.e. TEST1 .DAT).

Used Merge from Clipboard and Merge from Columns to amalgamate polygons into regions.

When more than one polygon is merged into a region the centroid of the region is the centroid of the last polygon selected for the merge.

The centroid of a polygon is the mid point of the extents.

It is not a simple procedure to unmerge a set of polygons. The most effective method is to export the map in MIF format and edit the MIF file. Attention will be needed to the attribute data MID file as there is a one to one relationship between each record in the MID file and each region in the MIF file.

Contacted ACE Technology for quotations for information system upgrade.

Thursday 16 September Met with Nakibae Teuatabo, Secretary, and discussed the need for and benefits from an informati n system upgrade to a network. Also recommended that the PEACESAT terminal be relocated from Tanaea to Bairiki as the telecommunications bill of the Ministry is averaging AUD 7,000 per month and the PEACESAT terminal is inaccessible and under utilised at Tanaea. The inaccessibility was evident as during the entire week it was not possible to get a connection on PEACESAT to talk with FFA. The phone at Tanaea is either not answered or if a call is booked on PEACESAT nothing is carried out by the Tanaea staff. If there was ever to be cost savings through rationalisation of staff within the Ministry then Tanaea is an obvious area for attention.

Further work with Maplnfo using sand and gravel extraction data. The limitations of Maplnfo were demonstrated and it was shown that there are cases where it is equally effective to use a single map with multiple Excel graphs rather than multiple maps. The main limitation of Maplnfo is the time required to produce a map from a given data set which is identical in format to other maps and this is especially true where output is to a non colour device such as the HP Laserjet 4 and fill areas have to be differentiated by shading. This is Analyze -> Shade by Value -> Customise where screen shades do not match the printed output. Light grey shades and hatching must be used as mid to dark grey shades print as black.

Inventory of computer equipment made.

Fax with quotations received from ACE.

The first draft of the upgrade recommendations report prepared and discussed. Johnny Kirata Friday 17 September

provide Organisation section.

Investigated problems with Fisheries Management Information System (FMIS) which was written in Saturday 18 September

dBase 4 by FFA. There were many faults and many modifications required. Unclear how many of the faults were due to original code or due to incorrect modifications of code.

It was decided that further investigations needed over weekend.

It was noted that Air Nauru came through Tarawa on schedule despite advice to the contrary.

Sunday 19 September Investigated options for modifying FMIS.

5

Monday 20 September Contacted Air Nauru who claimed that they were never advised that Saturday flight was scheduled.

Complete rewrite in Access

Continue making modifications in dBase 4 Port to FoxPro 2.0 for DOS and modify Port to FoxPro 2.5 for Windows and modify

Keep tables in Xbase and use existing dBase 4 system for data entry and simple reporting while

Fixed problems with automatic zoning software and investigated how this could be integrated in to FMIS.

e

Use of Maplnfo as opposed to Arclnfo stressed as "right level" for small Pacific Island countries.

Final of report with addition of recommendation for provision of analogue telephone line for mode transfer in both HQ Bairiki and Tanaea offices.

At least 2 hours spent at Air Nauru office changing tickets. Not an efficient use of time. Worked on Thursday 23 September

Maplnfo analysis with Fisheries and Minerals and demonstrated to users the ability to share data among applications.

Friday 24 September Completed grid creation program and analysis of 1990 purse seine data by catch and effort for 5, 1 and .25 degree square grid. Produced manuallreport on the procedure for creation and analysis. Demonstrated this to Naomi and Johnny and sent copy of manual and software with covering letter to FFA to be hand delivered by Johnny when he meets next week in Honiara in preparation for Cairns Vessel Management System conference.

Saturday 25 September Tarawa -Suva, Air Nauru.

6

ATTACHMENT B - Upgrade proposal and covering letter

23 September, 1993

Mr Nakibae Teuatabo Secretary,

Our ref: Kiribati - IT Assistance

Ministry of Environment & Natural Resources Development PO Box 64 Bairiki. Tarawa Republic of Kiribati

Dear Sir

Please find attached, recommendations for upgrading the Information System of your Ministry. In vi of Forum Fisheries Agency's involvement in the fisheries sectors of your Ministry and in particular their assistance in information system development for the Fisheries Licensing Unit, I have provided them a

A copy of this proposal with associated spreadsheet, the latest User's Manual and Maplnfo Powerpoin t

copy of this proposal.

presentation files have been copied to the Minerals Unit's Compaq Prolinea hard drive under directory C:\DOC.

Thank you for the kind assistance and hospitality provided to me by your staff during my visit, in particular Ms Naomi Biribo and Mr Johnny Kirata. Please do not hesitate to contact me should you require any further information or assistance and I look forward to meeting with yourself and staff from your Ministry at the SOPAC annual session next month in Fiji.

Yours sincerely

Leslie Allinson Computer Svstems Manager

encl.

cc. The Director Forum Fisheries Agency PO Box 629 Honiara Solomon Islands

Recommendations for upgrade of the Information System Ministry of Environment and Natural Resources Development

Tarawa, Republic of Kiribati

Server Local Area Network

Hub /

Desktop computers

modem Plotter Printer

WlDE AREA NETWORK

LA.--

Leslie Allinson Computer Systems Manager

23 September, 1993

SOPAC SOUTH PACIFIC APPLIED GEOSCIENCE COMMISSION

Tel: (679) 3813771381139 Postal Address: SOPAC Technical Secreta Fax: (679) 370040 Tlx: 2330 SOPACPRO FJ

t Private Mail Bag, GPO

Street Address: Mead Road, Suva Fiji

CONTENTS

1. ACKNOWLEDGEMENT .................................................. 2. INTRODUCTION ............................................ ....................... 3. OBJECTIVES .................... ................................................... 1 4. ORGANISATION .......................................................................

....................... 2 4.2. Structure ............................. ...................................... 2

~

2 ........................................................................

5. UPGRADE ... ......................................................................................

5.2. Implementation ............................................................ ..................... 5.2.1. Phase 1 .................... 4

5.2.1.1. Hardware se ................................................. 5 5.2.1.2. Hardware network - hub,nic,cable .................................... 5

5.2.1.4. Hardware printer 5.2.1.5. Software network ................................... 5

5.2.2. Phase 2 ............................................... 5 5.2.2.1. Hardware portable - Secretary ......................................... 6

5.2.2.3. Hardware printer ........................................

5.2.2.5. Hardware memory ....

5.2.2.9. Training ............................. 7 5.3. Timing

5.3.1. Phase1 .......................................................................................... 8 5.3.2. Phase 2 ........................................................................

5.4. Maintenance .............................................. 5.4.1. Hardware ..................................... 5.4.2. Software ...............

5.5. Suppliers .........

6.1. Phase 1 .................................................................. 6.2. Phase 2 ...................... ............................ 6.3. Recommendations ... ...................................................................... 1 1

ATTACHMENT A - SUMMARY AND DETAILED COSTS ................................................. 1 2 ATTACHMENT B - INVENTORY ...................................................................................... 16 ATTACHMENT C - DIAGRAM OF REGIONAL NETWORK .............................................. 18

6. SUMMARY ....................

I

1. ACKNOWLEDGEMENT

The author wishes to acknowledge the invaluable assistance provided by the Europe a n Community under the South Pacific Marine Resources Program which has provided the computer based equipment for the Ministry of Environment and Natural Resource Development as well as supporting the travel for this visit.

2. INTRODUCTION

Member countries need access to up-to-date tools which will provide accurate and timely information to assist in policy making and which will allow for the maximum economic benefits to be achieved through the responsible management of their natural resources.

The area of Information Systems is one of the most important of these tools for analysing the large amount and various types of data which comprise the input to the government sectors of the Pacific Island states responsible for the economic living and non living resources which include fisheries, mineral and hydrocarbon resources as well as water resources and environmental monitoring.

An upgraded Information System can achieve outputs and outcomes which are detailed in the following section while the mission statement, staff and structure of this organisation are covered in the organisation section. A description of the specific tools which comprise the upgrade is outlined in the Implementation section.

~

This report was prepared during a visit to the Ministry as a follow up to the provision o f t he EC funded computer equipment for the Minerals Unit where the equipment was shipped at the conclusion of the Resource Assessment Workshop held at SOPAC in June 1993.

3. OBJECTIVES

The tools required should have the ultimate goal of creating the following outputs:

. Organised and accessible databases

Interpreted satellite images Interpreted aerial photographs Summary reports

These outputs should result in the following outcomes:

Accurate analysis of living and non living resource exploitation data. Comprehensive Regional Geographical Information System (GIS)

Maps including navigation, bathymetry, EEZ, gravity and interpreted seismic reflection

Accurate and timely information for fisheries resource management Suitably trained and experienced member country staff Access to timely, accurate and integrated GIS data by member Governments Baseline studies Development of project data sets Monitoring of environmental effects of development Increase in industrial and scientific activities Enhanced information flow Resource potential information

1

d. e. Local fishing industry development f. g. Wildlife conservation h. Forestry growth i. Animal husbandry j. Meteorological observation and monitoring

Fisheries and other marine resources development

Atoll agriculture and farming development

MINISTRY OF ENVIRONMENT AND NATURAL RESOURCES DEVELOPMENT

Organisation Chart

Secretary

I Oeputy Secretary

t 4.3. staff

The Ministry and its Divisions have a total of 209 staff. The headquarters and its 5 Uni s have provision for 22 staff while the Fisheries, which is the biggest Division under the Ministry, has provision for 84 staff. The other two Divisions, Agriculture and Meteorology each have 82 and 21, respectively.

4.4. Project background and justification

The Divisions and Units of the Ministry are not located in the same building or are . However, in the headquarters at Bairiki, Tarawa, the heads of Divisions are located along with several Units of the Ministry. These Units are responsible for various functions of the Ministry and would be major computer users in their respective fields. Sharing of information and hardware among computer users of these Units is essential to maximise benefits. The following Units would greatly benefit from the installation of a Local Area Network (LAN).

The Economic Plannning Unit is responsible for the sustainable development of the nation in the areas of fisheries, agriculture and mining. The Unit, which is presently manned by only two economists, has the task of identifying, preparing, appraising and monitoring all development projects where timely appraisal and monitoring of these projects demands continuous effort. Considering the limited manpower of the Unit, such tasks can only be achieved effectively through the use of essential tools such as computers.

The Environmental Unit is responsible for ensuring that new projects will meet accepted environmental standards through environmental impact studies while ensuring that developed projects maintain the same standards through regular monitoring. This unit through specific overseas expertise can effectively evaluate any potential negative impact to Kiribati's fragile environment. However, these available databases of environmental information and resource group/personnel are only accessible through the use of computers.

The Fisheries Licence and Enforcement Unit is the major revenue earner of the Ministry. It is this Unit in which Government heavily relies on for revenue earnings to balance its budget. The Unit makes its money by selling fishing and other related rights to foreign interests. The amount charged as licence fees is calculated on a fair return of the value of the harvested catch. Analysis of catch and effort data along with price and market information has enabled the Ministry to determine what are fair return rates and sustainable levels of harvest. Timely evaluation of the fishery and output reports were essential for the management of the unit. It was for that objective that computers hardware were installed in the unit and robust systems developed in available applications to facilitate the process.

The Adm inistration and Accounts Unit administers the expenses of the Ministry and its Divisions and Units. This consists of recording and monitoring recurrent expenditure on a timely basis, reconciling the accounts of those items under the Ministry's provisional vote and recording revenues earned by the activities of various Units Timely and accurate financial reports are also submitted to planners to assist in their projections.

The increasing demand for more data to be processed and analysed in a shorter time as well as the sharing of information has made upgrading of the present computer facilities of the Ministry essential. The upgrade will result in faster machines with larger data storage capacity and networking of existing and new hardware which will meet this requirement.

5

5. UPGRADE

This section describes the benefits from and implementation rationale and timing for the proposed upgrade. Cost are summarised as well as being fully detailed in attachment A.

5.1. Benefits

The benefits from the upgrade are as follows:

resource and data sharing through a peer-to-peer and then a server based network. the high level of security offered by a server based network. maintenance of regional standards adopted by the resource management sector o f member country governments. acquisition of new equipment which will replace old equipment which has become unusable due to either failure or insufficient performance and storage to run the current software. adherence to Windows based applications which provide ease of learning and Use through a consistent graphical interface.

me

~

5.2.1.Phase 1

~

5.2. Implementation

A two phase implementation is necessary to allow rational upgrades within the Ministry where the existing equipment inventory is provided in Attachment B.

This phase should achieve resource and data sharing within the Ministry through a peer-to- peer network and the addition of a further 486 desktop computer. The peer-to-peer network is shown in Figure 1 and summary costs are is listed in Table 1. Detailed costs are provided in Attachment A.

Figure 1 - Peer-to-peer network

Hub

Desktop computers

Plotter Printer

4

Table 1 - Phase 1 upgrade -summary by equipment

AUD USD Hardware server upgrade 4,845 3,126 Hardware network - hub,nic,cable 6,640 4,284 Hardware desktop - Licensing Officer 5,500 3,548 Hardware printer 1,600 1,032 Software network 250 161 Freight estimate 6% TOTAL

1,130 729 19,965 12,881

Details of each summary line item are as follows.

5.2.1.1 Hardware server upgrade The HP deskside computer will become the Ministry server but requires additioi storage capacity and memory to enable it operate Novel Netware 3.11. The stora should be increased through the addition of a second SCSl hard drive with 2 capacity while the existing memory requires upgrading to 12 MB through the addition of a further 8 MB SIMM.

This item includes procurement of all the network components as well as provision f or funding the actual wiring of the building. The wiring is very straight forward and could be carried out in house or by a Kiribati Telecom technician. All equipment is included in order with the exception of cable ducting. If this is required than standard Telecom ducting could be used.

The Licensing Officer requires his own desktop computer for current Ministry duties a s well as administration of the network.

A low cost HP Laserjet 4L, 4 pages per minute, printer is required for the Minerals U n it which will replace the current HP Laserjet 4, 8 pages per minute, which can be used as a shared network printer for the entire Ministry.

Microsoft Windows for Workgroups will provide a low cost peer-to-peer network and will provide resource and data sharing but without the security features available unde r Novel Netware which will be procured under phase 2.

5.2.1.2. Hardware network - hub,nic,cable

5.2.1.3. Hardware desktop - Licensing Officer

5.2.1.4. Hardware printer

5.2.1.5. Software network

n 5.2.2.Phase 2 This phase provides for a file server based network which offers resource and data shari g but with the security of data through Netware services. The addition of a modem will allow for users to access the network remotely and to connect to SOPAC, other regional organisations and international data services via the public switched telephone network, packet switching and the PEACESAT satellite network. There is already a PEACESAT node at Tanaea and it is recommended that the terminal be relocated to the Ministry headquarters at Bairiki. It is also recommened that direct access to analogue telephone lines be provided at both Tanaea and Bairiki for data exchange by modem between these two sites.

5

This equipment for this phase should be reviewed prior to seeking quotations as although the anticipated date for procurement is only 9 months from the time of this report the field of information technology is rapidly changing.

Figure 2 shows the server based network at the Ministry and an overall diagram of th e network is shown in Attachment C. The summary costs are shown in Table 2 and detailed costs are included in Attachment A.

Figure 2 - Server based network Database

Server

Desktop computers

modem Plotter Printer

WIDEAREANETWORK

Table 2 - Phase 2 upgrade - summary by equipment

Hardware portable - Secretary Hardware backup Hardware printer Hardware digitiser Hardware memory Software network Software general Consumables Freight estimate 6% TOTAL

AUD USD 6,668 4,302 4,520 2,916 1,280 826

850 548 200 129

3,000 1,935 1,150 742

980 632 1.119 722

19,767 12,753

5.2.2.1. Hardware portable - Secretary The Secretary requires a portable system which will comprise a colour notebook computer and inkjet printer. The current choice is the Compaq Contura 486/25CX with 210 MB hard drive while the printer is the HP portable deskjet. Both the above may change by the time the order is placed and the selection will be subject to the review.

6

DAT tape backup hardware and software is required to backup the central file serve r which in turn is used as a backup device for every user of the network.

A low cost HP 550C colour A4 printer is needed for production of maps showi n g

The Minerals Unit requires a digitiser to digitise existing maps for subsequent storag e ,

fisheries and mineral resource activities.

manipulation and representation of resource data. While an A2 size unit will eventually be needed it is considered more cost effective to use an A3 size at present,

5.2.2.2. Hardware backup

5.2.2.3. Hardware printer

5.2.2.4. Hardware digitiser

An additional 2 MB of memory is needed for each of the two HP 386SX 16 M z computers with currently 2 MB memory to enable them to run Windows successfully in

This item is the Novel Netware server based operating system which has the securi t y

Enhanced Mode.

5.2.2.6. Software network

and flexibility for a Ministry based network.

le

5.2.2.5. Hardware memory

5.2.2.7. Software general Microsoft Project is necessary for sound project planning and implementation whi both Core1 Draw and FoxPro require upgrading the latest versions. All the above ate Windows based applications.

5.2.2.8. Consumables Backup DAT tapes and printer jet cartridges.

Training is essential for the System Administrator and should be carried o u t immediately prior to installing the server based operating system, Novel Netware. This has not been included as a line item cost as it is not known at this time in what form the training will consist of and where the training will be. The options for the training are:

1. Netware System Administration course carried out at accredited site.

5.2.2.9. Training

Location: Connecting Point, Honolulu

~

Computech, Suva Datamatic, Brisbane AUD 3,500 approx. Fees, airfares, expenses cost:

~

2. Self paced training using video tapes and books. Location: MENRD. Kiribati cost: AUD 600

The most cost effective method for training would be option 2 at it would allow, at no additional cost, a second staff member, in particular the Minerals Officer, to be able to handle System Administration tasks in the absence of the Fisheries Licensing Officer

The funding source for any of the above would be:

1. Donor agency through a regional organisation such as SOPAC, SPREP or FFA.

7

Aug 1994 Setup network

Sep 1994 Phase 2 complete

5.4. Maintenance

5.4.1. Hardware All hardware equipment recommended should have 12 months minimum warranty. In the !

impossible to obtain upgrades in remote island locations through the supplier or from the manufacturer. It is again recommended that software and hardware be purchased from a single supplier where practical.

Suppliers of computer equipment who have provided excellent service to member countri

5.5. Suppliers

at competitive prices are listed below.

All equipment ACE Technology Australia Pty Ltd Suite 217, 2-6 Crofts Avenue Hurstville NSW 2220 Australia PO Box 398, Hurstville NSW 2220

John Mamacan, Managing Director

All equipment and Netware training Connecting Point Nuuanu Shopping Plaza 1613 Nuuanu Avenue Honolulu Hawaii 96817 U.S.A.

Mike Klein, President Dave Trachsel, Technical Support Joe Langdon, Training and Support

Memory Worldwide Technologies 437 Chestnut Street Philadelphia PA 19106 USA

Steven May, Sales Representative

Portable equipment Travelling Computers Pte Ltd 109 North Bridge Rd #06-21 Funan Centre Singapore 0617

Hannah Seah, Sales Manager

Tel: (61) 2 5808377 Fax: (61) 2 5804123

Tel: (1) 808 523 0040 Fax: (1) 808 531 5244

Tel: (1) 215 9224640 Fax: (1) 215 9220116

Tel: (65) 3362040 Fax: (65) 33641 52

9

The Ministry of Environment and Natural Resource Development is responsible f o r

6. SUMMARY

management of the fisheries resource and, in particular, that sector exploited by foreign fishing fleets which resulted in revenue earnings of approximately AUD 12.9 million in 1992. This benefit can be expected to grow at 5 percent per annum through responsible monitoring and management of this resource by negotiated agreements which can only be achieved with access to accurate and timely data.

The earnings from foreign fishing represented 40 percent of the total revenue income for the Government of the Republic of Kiribati in 1992 and it is essential that the Ministry maintain an up-to-date information system through appropriate and cost effective upgrades of hardware and software tools which will improve productivity without any increase in staff.

It should again be stressed that computers have a finite lifetime and like vehicles require replacing every three years. This is especially true of computers which are currently over three years old as they usually have 286 processors with 20 or 40 MB hard drives and EGA monitors. These models have insufficient processor power, hard drive storage or video resolution to be able to run Windows applications which are the accepted standards in the public and private sectors.

The upgrade will provide resource and data sharing within the Ministry and can be achieved in two phases.

6.1. Phase 1

Provide a peer-to-peer network and other tools necessary for enhanced operations of t Ministry where the costs are summarised in Table 3.

he

~

Table 3 - Phase 1 upgrade summary

Hardware Software Consumables Freight estimate 6% TOTAL

AUD USD 18,585 11,990

250 161

1,130 729 19,965 12,881

6.2. Phase2

Provide a server based network and other tools necessary for enhanced operations of the Ministry where the costs are summarised in Table 4.

Table 4 - Phase 2 upgrade summary

Hardware Software Consumables Freight estimate 6% TOTAL

AUD USD 13.518 8,721 4,150 2,677

1,119 722 19,767 12,753

980 632

10

1. Funding be identified for phase 1 of the upgrade and the equipment be procured as so o n

6.3. Recommendations

as possible.

3. The Fisheries Licensing Officer be responsible for implementing both phases of t h e

2. Provision be made for the funding of phase 2 of the upgrade.

upgrade.

4. The Fisheries Licensing Officer be responsible for the System Administration of t he

5. The Fisheries Licensing Officer undertake relevant training in network operations a nd

proposed network.

administration and that the timing for this training be immediately before the main system is implemented.

6. The Minerals Officer be trained in System Administration when Phase 2 is implemented.

7. The PEACESAT terminal at Fisheries, Tanaea, be relocated at the Ministry Headquarte in Bairiki and a access to analogue telephone lines be provided at both Tanaea a Bairiki to facilitate data exchange via existing modems.

NOTES All costs are given in both Australian and US dollars using an exchange rate of 1 AUD 0.6452 USD.

=

11

ATTACHMENT A -SUMMARY AND DETAILED COSTS

RECOMMENDATION FOR UPGRADE OF INFORMATION SYSTEM MINISTRY OF ENVIRONMENT AND NATURAL RESOURCES DEVELOPMENT

PHASE 1 UPGRADE - DETAILED EQUIPMENT LIST NO. ITEM SUPPLIER

HARDWARE SERVER UPGRADE 1 Fujitsu 2.0 GB SCSl disc 1 Mounting kit HP 486/33T for Fujitsu 1 Extra 8MB RAM HP 486/33T 1 NIC Intel EtherExpress 16 bit Thinlan

HARDWARE NETWORK - HUB,NIC,CABLE 1 EtherTwist Hub Plusll2 + mod adaptor

10 NIC Intel EtherExpress 16 bit 10Base-T 3 Xircon adapters parallel port to 10Base-T 1 Cable Thinlan 100 m 1 Cable 1OBase-T 300 m 1 RJ-45 connectors 100 pack

10 Thinlan crimp connectors 5 Thinlan tee connectors 5 Thinlan terminators 1 RJ-45 crimp tool 1 Thinlan crimp tool

10 Wall plates twin RJ-45 10 Wall plates single RJ-45 1 Cabling costs

HARDWARE DESKTOP - LICENSING OFFICER

1 Compaq Prolinea 486DX2/66 1.44M, 340M HDD, IM VRAM, 4M RAM mouse, DOS, Windows

1 Extra 4M RAM 1 NEC 4FG 15" monitor

HARDWARE PRINTERS 1 Extra 4 MB RAM Laserjet 4 1 HP 4L laser printer and cable

SOFTWARE NETWORK 1 MS Windows for Workgroups, 3.5"

CODE

AT AT w-r AT

AT AT AT AT AT AT AT AT AT AT AT AT AT

AT

wr AT

w-r AT

AT

UNIT TOTAL AUD AUD

4,000.00 4,000.00 35.00 35.00

600.00 600.00 210.00 210.00

4,845.00

1,560.00 1,560.00 200.00 2,000.00 490.00 1,470.00 100.00 100.00 300.00 300.00 100.00 100.00

8.00 80.00 8.00 40.00 8.00 40.00

50.00 50.00 50.00 50.00 20.00 200.00 15.00 150.00

500.00 500.00 6,640.00

3,900.00 3,900.00

400.00 400.00 1,200.00 1,200.00

5.500.00

400.00 400.00 1,200.00 1,200.00

1,600.00

250.00 250.00 250.00

18,835.00 TOTAL

12

PHASE 1 UPGRADE - SUMMARY BY EQUIPMENT AUD USD

Hardware server upgrade 4,845 3,126 Hardware network - hub,nic,cable 6,640 4,284 Hardware desktop - Licensing Officer 5,500 3,548 Hardware printer 1,600 1,032 Software network 250 161 Freight estimate 6% 1,130 729 TOTAL 19,965 12,881

P

EXCHANGE RATES - 16 SEP 1993 1 AUD = 0.6452 USD

13

PHASE 2 UPGRADE - DETAILED EQUIPMENT LIST

UNIT TOTAL AUD AUD

5,900.00 5,90000 11800 11800 650 00 650 00

6,668.00

2,880 00 2,880.00 1,640 00 1,640.00

NO. ITEM

~

HARDWARE PORTABLE - SECRETARY 1 Compaq Contura 486/25CX 210M HDD 1 Microsoft mouse seriallminiDlN 1 HP portable jet printer and cable

HARDWARE BACKUP 1 HP DAT 5G internal SCSl unit 1 Arcserve software 20 user, 3 .5

1,280.00 1,280.00 1,280.00

HARDWARE PRINTER 1 HP 550C colour jet printer

HARDWARE DIGITISER 1 GTCO A3 Digitiser 4 button cursor

50.00 200.00 200.00

3,000.00 3,000.00 3,000.00

650.00 650.00 250.00 250.00 250.00 250.00

1,150.00

195.00 780.00 35.00 35.00

55.00 55.00 55.00 55.00

HARDWARE MEMORY 4 Industry standard 1M SlMM for HP386/16N

~

~

~

~

SOFTWARE NETWORK 1 Novel1 386 3.1 1 premium 20 user, 3.5"

SOFTWARE OTHER 1 Microsoft Project 3.0, 3 .5 1 Microsoft FoxPro for Windows upgrade 1 Correl Draw 4.0 upgrade

55.00 55.00 980.00

CONSUMABLES 4 DAT media 2GB (5 pack) 1 HP 550C inkjet cartridge black 1 HP 550C inkjet cartridge cyan 1 HP 550C inkjet cartridge magenta 1 HP 550C inkjet cartridge yellow

TOTAL 18,648.00

SUPPLIER CODE

TC AT AT

AT AT

AT

AT

VVT

AT

AT AT AT

AT AT AT AT AT

14

PHASE 2 UPGRADE - SUMMARY BY EQUIPMENT AUD USD

Hardware portable - Secretary 6,668 4,302 Hardware backup 4,520 2,916 Hardware printer 1,280 826 Hardware digitiser 850 548 Hardware memory 200 129 Software network 3,000 1,935 Software general 1,150 742 Consumables 980 632 Freight estimate 6% 1,119 722 TOTAL 19,767 12,753

EXCHANGE RATES - 16 SEP 1993 1 AUD= 0.6452 USD

SUPPLIER CODES AT ACE Technology, Australia WT Worldwide Technologies Co., USA TC Travelling Computers, Singapore

PHASE 1 UPGRADE SUMMARY

Hardware Software Consumables Freight estimate 6% TOTAL

AUD USD 18,585 11,990

250 161

1,130 729 19,965 12,881

PHASE 2 UPGRADE SUMMARY

Hardware Software Consumables Freight estimate 6% TOTAL

AUD USD 13,518 8,721 4,150 2,677

980 632 1,119 722

19.767 12.753

15

ATTACHMENT B - INVENTORY

MINISTRY OF ENVIRONMENT AND NATURAL RESOURCES DEVELOPMEN

NO. ITEM PART UNIT NO. AUD

HARDWARE - FISHERIES LICENSING, BAlRlKl

EQUIPMENT INVENTORY - SEPTEMBER 1993

1 HP 486/33T deskside 4M RAM 512K VRAM

1 Monitor 1 4 SVGA 800x600 1 HP 486/25N 4M RAM 512K VRAM 170M HDD 1 Monitor 1 4 SVGA 800x600 1 HP 386/20N 4M RAM 512KVRAM 120M HDD 1 Monitor 14" SVGA 800x600 1 HP 386/16N 2M RAM 512KVRAM 50M HDD 1 Monitor 1 4 SVGA 800x600 1 HP 386QS16S 2M RAM 80M HDD 1 Monitor 1 4 VGA 800x600 1 Archive 250M tape backup 1 Printer HP Laserjet 2 1.5M RAM 1 Printer HP Laserjet 3P 1M RAM

440M SCSl HDD 1.44M 1.2M FDD

HARDWARE - MINERALS AND ENVIRONMENT, BAlRlKl 1 Computer Compaq 486DW33 8M RAM

1 Monitor 1 5 NEC 4FG 1024x768 1 T4400 LCD notebook 2M RAM 80M HDD 1 Canon BJ-20 1 HP Laserjet 4 2M RAM

1M VRAM 240M HDD 1.44M FDD

HARDWARE - ECONOMICS AND FINANCE, BAlRlKl 1 HP 386/16N 2M RAM 512KVRAM 50M HDD 1 Monitor 1 4 VGA 800x600 1 HP 386QS16S 4M RAM 160M HDD 1 Monitor Ergo Ulta SVGA 1 5

HARDWARE -ADMINISTRATION, BAlRlKl 1 HP 386/16N 2M RAM 512KVRAM 50M HDD 1 Monitor 14" VGA 800x600 1 T4400 LCD notebook 2M RAM 80M HDD

6,000

500 4,000

500 3,000 500

1,000 400 700 200 400 600

1.000

TOTAL AUD

6,000

500 4,000

500 3,000 500

1,000 400 700 200 400 600

1.000 18.800

3,300 3,300

1,300 1,300 2,500 2,500

600 600 3.000 3.000

10,700

1,000 1,000 200 200

1,000 1,000 800 800

3,000

1,000 1,000 200 200

2,500 2,500 3,700

16

HARDWARE - FISHERIES, TANAEA 1 HP 386QS16S 2M RAM 80M HDD 1 Monitor 14" VGA 800x600 2 HP 286112 1M RAM 40M HDD 2 Monitor 14" VGA 800x600 1 Toshiba T3300 notebook LCD 6M RAM 80M HDD 1 Printer HP Laserjet 2 1.5M RAM

SOFTWARE, ALL DIVISIONS 2 Microsoft DOS 6 2 Microsoff Windows 3.1 2 Microsoft Word for Windows 2.0 2 Microsoft Excel 4.0 2 Microsoft Powerpoint 4.0 2 Microsoft Access 1 .O 1 Maplnfo for Windows 2.1 1 Surfer for Windows 1 Core1 Draw 2.0 2 Norton Utilities 7.0 2 FastLynx 2.0

ACCESSORIES 1 UPS IKVA 1 UPS 600VA

TOTAL

SUMMARY BY EQUIPMENT

Hardware - Fisheries Licensing, Bairiki Hardware - Minerals & Environment, Bairiki Hardware - Economics & Finance, Bairiki Hardware -Administration, Bairiki Hardware - Fisheries, Tanaea Software Accessories

AUD 18,800 10,700 3,000 3,700 1,700 7,320 1,600

700 700 200 200 200 400 200 400

2,000 2,000 600 600

1,700

100 200 150 300 400 800 400 800 400 800 200 400

1,220 1,220 1,000 1,000 1,000 1,000

200 400 200 400

7,320

1,000 1,000 600 600

1,600

46,820

USD 12,129 6,903 1,935 2,387 1,097 4,723 1,032

TOTAL 46.820 30.206

EXCHANGE RATES - 16 SEP 1993 1 AUD= 0.6452 USD

17

ATTACHMENT C - DIAGRAM OF REGIONAL NETWORK

SOPAC REGIONAL DATA CENTRE Server Database

LOCAL AREA NETWORK

Desktop computers

WIDE AREA NETWORK

Field survey

Member country information systems

18

ATTACHMENT C - Use of Maplnfo for fisheries analysis and covering letter

24 September, 1993

Colin Brown Surveillance Officer Forum Fisheries Agency PO Box 629 Honiara Solomon Islands

Our ref: F

Dear Colin

I have been visiting the Ministry of Environment and Natural Resources Development, Tarau Kiribati, as a follow up to providing the Ministry and in particular the Minerals Unit with a computer system under the EC funded Regional Marine Resources Program.

I understand that you sent some data up for Johnny to investigate analysing under Maplnfo f r Windows 2.1. Well I think the data, presumably on disk, is going backwards and fowards between Tanaea and Bairiki as the by the time the person responsible for delivering the same arrives at Bairiki sufficient time has elapsed to forget to undertake the delivery. And so the disk goes back to Tanaea

I got some 1990 purse seine data off Johnny which presumably has been sent from the Multilateral Treaty Unit at FFA as an Xbase file. I was able to "degree square" it after modifying the file and then geocoding it into Maplnfo.

I'ts all swings and roundabouts whether Maplnfo is better than FMS or vica versa. The crunch is that Maplnfo is rich with data analysis features but doesn't have the performance and tight data coupling of FMS running on the mini and it doesn't have the performance of FMS under Windows. But it is far more flexible. I have not seen the latest FMS for Windows but unless there were dramatic enhancements to printing/plotting and support for OLE (Object Linking and Embedding so you can copy and paste, cut and paste, link and embed objects) then Maplnfo is slightly better. The main disadvantage of Maplnfo is the graphics and database that make up this GIS (Geographical Information System) take their toll on the CPU and you need lots of horsepower to make it perform. You need at least a 486DX2 66 and I am waiting on delivery of a 586 60 to see whether it starts to

Anyway, I had a day to kill thanks to Air Nauru so I wrote some code to create user defined grids

move along. Ideally you need a mid range workstation such as an HP 725 which runs Windows NT.

which you can import into Maplnfo and then use as the analysis layer or layers.

I wrote a brief manual which I have enclosed a copy as well as a disk with the simple FoxPro program to create the MIF and MID files used by Maplnfo.

In

Files on disk:

GRIDMAKE.PRG Source code to make grids GRIDIKI.' 1 degree square grid for Kiribati West (Maplnfo file set) GRIDSMAL.' 2 5 degree square grid for Kiribati West (Maplnfo file set) EEZ." SOPAC notional EEZs (Maplnfo file sets) Kl-2.' Purse seine data - 1990 (Maplnfo file sets). (This is the modified database)

Maplnfo Workspaces FISH3.WOR Catch 1 deg square FISH4.WOR Effort 1 deg square FISH5.WOR Effort .25 deg square FISH6.WOR Catch .25 deg square

TO-MAP.PRG

I think you will find Maplnfo very easy to use and it should be an invaluable tool for data analysis.

All the very best

Source code used to modify KI-ZDBF

Les

encl

Analysis of Fisheries Data using Mapinfo for Windows 2.1

Effort by 1 deg square Purse Seine. 1390

Leslie Allinson Computer Systems Manager

24 September, 1993

SOPAC SOUTH PACIFIC APPLIED GEOSCIENCE COMMISSION

Tc (679) 3813771381139 Fax: (679) 370040 Tlx: 2330 SOPACPRO FJ

Postal Address: SOPAC Technical Secreta Private Mail Bag, G

Street Address: Mead Road, Suva Fiji

Data from foreign fishing vessels is received by the relevant authorities in the form of BACKGROUND

logsheets which contain detailed fishing activity and are submitted at the completion of a fishing trip. Data may also be received from the vessel in the form of electronic reports which contain summary information such as brief catch data for that day or the past week.

It is necessary to analyse both the logsheet data (historical data) and the electron ic data (near real time data) in order to effectively manage this resource. Analysis of tabular data is critical especially where revenue, in the form of license fees, from catch has to be distributed amongst owners of various areas or zones but it is equally important to be able to display the data spatially on geographical maps.

Authorities responsible for managing fisheries resources will perform the analysis on computer systems and many have developed in house software for graphical representation of this data

The development of such software has been necessary as well as the continuin g need to maintain such software due to the unavailability of suitable applications. The Forum Fisheries Agency developed such a mapping system in 1985 and it has been upgraded and maintained since that date and is currently available in a Unix and a Microsoft Windows version.

The Unix version has the advantage of performance and the ability to integrate with a Regional Fisheries Management Information System which is currently stored in an Oracle database. The disadvantage is lack of portability as the mapping portion of the system is both hardware platform and hardware output device specific.

The Windows version has the advantages of performance, consistency of us e r interface and full portability. The disadvantages are the restrictive nature of the underlying data formats and inadequate printing and plotting features.

USING MAPINFO As previously stated, the above systems were developed as there was no readily available commercial applications. However, since the introduction of Windows 3.1 and its acceptance by users as a standard interface as well as the availability of computers with sufficient performance to run Windows acceptably, it has become economical for software developers to produce specialist applications and one Of these has been Maplnfo for Windows 2.1.

This application is essentially a Geographical User Interface (GIS) which provides for tabular data (attributes) to be associated with graphical data (objects) and allows for data to be imported from or linked with mainstream applications such as Excel 4.0, dBase, FoxBase and FoxPro as well as major databases such as Oracle, Sybase and Informix.

While Maplnfo has a full set of features for display and analysis of data it is necessary for the end user to provide the reference data whether this be in the form of street maps, state maps or maps of the world.

1

SOPAC has prepared and will distribute the following maps:

1. Coastal outlines of the Forum member countries from Defence Mapping Agency data.

2. Notional Exclusive Economic Zones (EEZs) of the Forum member countries fro m SOPAC data. It should be noted that while SOPAC has assisted FFA in the preparation of its delimitation maps in Maplnfo format, SOPAC does not distribute these due the anomalies on many adjacent borders which are in dispute by the countries. However, it is anticipated that these disputes will be resolved by the end of 1994 and a set of agreed EEZs or Provisional Treaty Lines (PTLs) can be provided in Maplnfo format where adjacent borders are coincident.

The data from the above sets, in particular 1 and 2, is sufficient for representing t he

3. Bathymetry data from GEBCO files.

reference or baseline data for display of fishing activity. However, it is necessary to aggregate fishing activity by areas smaller that an EEZ and it was found that the most effective method was to produce a grid of square cells and use these for thematic mapping. It should be noted that Maplnfo is provided with several grids to represent lines of latitude or longitude but these are made up of lines and not closed polygons which are necessary for performing analysis.

A simple FoxPro program was created (see Attachment A) which produces a pair o f Maplnfo Interchange Format (MIF) files which can be imported into Maplnfo add subsequently used as a grid for analysis. The user can specify any cell size in decimal degrees, the X and Y origins and limits (again in decimal degrees), and the name of the output files.

The overall size of the grid rectangle and the size of cell should be no larger than necessary to minimise processing time when performing the analysis as well as creating and importing the grid data. For example, a 15 x 15 degree grid with 0.1 degree cell size will take a several minutes to create, a total storage of 1.5 MB add take several minutes to import as well as several minutes for an analysis against 3,000 record database.

DETAILED INSTRUCTIONS: To produce Maplnfo Interchange Files 1. 2. DO GRIDMAKE 3. Input your selections 4. 5. Exit FoxPro 6.

To import Maplnfo Interchange Files. 1. Run Maplnfo 2. Select Table menu 3. Select Import 4. Save as same name

Run FoxPro. (FoxPro for DOS or Windows)

The files will be created

Optionally move the files to Maplnfo working directory

5.

6.

This will create files with extensions DAT,ID,MAP,TAB in addition to the original MID and MIF files Analysis can now be performed using shading or colour in the cells to represent activities.

The data for the analysis was provided by the Ministry of Environment and Natur a l THE DATA

Resources Development (MEND), Bairiki, Kiribati, to demonstrate the feasibility of using Maplnfo for analysis of fishing activity. The data was purse seine activity for 1990 and had been sent to MERND from FFA as an Xbase table. It was necessary to add two fields, XCOORD and YCOORD and update these with decimal degrees calculated from the LAT and LON fields in each record. Maplnfo needs decimal degrees where positive is North of equator and East of 0 degrees (0 - 360 degrees). Another field, TOTAL, was added to store the sum the weight of all species. Unused fields were then deleted. This enabled the data to be geocoded using the XCOORD and YCOORD with multipliers of 1.

When using small cells, such as 0.25 degree over a 15 x 15 degree grid it is more

However, the grids can be used in other applications such as forestry where

effective to use colour than shading (see cover sheet and Attachment B).

SUMMARY Essentially, the ability to create a grid of cells of any size cell and area of grid allows fisheries applications to use Maplnfo more effectively.

traditional raster systems are employed thus allowing Maplnfo to provide more flexibility to users.

3

ATTACHMENT A - Listing of GRIDMAKE.PRG

**ff* . * f* f f***** f f********t***************** .**********************

* Name : GRIDMAKE.PRG Function: Create MapInfo Interchange Format (MIF) file which can

used to create grids squares or cells made up of closed polygons for subsequent analysis with the Analyze menu Option of MapInfo.

* Grid size - integer 1..10,15,20,25.30 * X,Y origin - decimal degrees

X length and X length

* Inputs: The user is requested to enter the following:

File name Outputs : File: Cmn>.MIF

File: <nnn>.MID f Author : Les Allinson * Date : 24 Sep 1993 * Mods : . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

1

* initialise

SET TALK OFF CLOSE DATA CLEAR mnrec=O mntrig=O

Display information

? "This FoxPro program will crei ? "grid squares or cells made up of ? "The MIF file can subsequently be ? I,,,

* Map lor mport

rchange Format (MIF) ~ of" Tons . to MapInfo and used for analysis"

? "There is also a MID file created which contains the associated X and Y data which are" ? "the centroids of each cell. This will assist in layer analysis" ? I,,,

? "You will be required to enter the following information" ? I,,,

? '' Grid size in degrees. Examples 0.5,1,5, 10" ? I' Grid X origin. Examples 100,160,200" ? I' Grid X limit. Examples 120,170,220" ? 'I Grid Y origin. Examples -20,0,-10" ? It Grid Y limit. Examples -1O,lO, 45" ? It Output file name. Examples MYGRID10,GRIDS" ? I,,,

? "Notes:" ? Degrees are decimal and positive North and East. Do not use negative longitudes" ? 'I The MIF and MID extensions will be added automatically to output files" ? I,,,

ACCEPT "Enter grid size in degrees (0 to quit) : to mgridsize ? I,,,

mgridsize = VAL(mgridsize1 IF mgridsize = 0

ENDIF

ACCEPT "Enter X origin in decimal degrees (longitude) : ** to mxorigin ? I , , ,

mxorigin = VAL (mxoriginl IF mxorigin c 0

DO abort

? "Unreasonable value for X origin" DO abort

ENDIF

ACCEPT '"Enter X limit in decimal degrees (longitude) : I* to mxlimit ? , , I 7

mxlimit = VAL(mxlimit1 IF mxlimit-mxorigin c mgridsize

? "Unreasonable value for X limit" DO abort

ENDIF mum-xgrid = CEILING((mx1imit-mxoriginl/mgridsizel

ACCEPT "Enter Y origin in decimal degrees (latitude): *' to myorigin

4

? I,,,

myorigin = VAL (myorigin) IF myorigin c -90 .OR. myorigin > 90

? "Unreasonable value for Y oriain" - DO abort

ENDIF

ACCEPT "Enter Y limit in decimal degrees (latidude) : 'I to mylimit , I,,,

mylimit = Val (mylimit) IF mylimit-myorigin c 1

? "Unreasonable value for Y limit" DO abort

ENDIF mnum_ygrid=CEILING( (mylimit-myorigin)/mgridsize)

ACCEPT "Enter outut file name without extension: to mfile mfilel = UPPER(mfile)+'.MIF' mfile2 = UPPER(~~~~~)+'.MID' ? I , , ,

IF FILE(mfile1) .OR. FILE(mfile2) ? mfile+" already exists" DO abort

ENDIF

open output files

mhandlel = FCRFATE(mfile1) IF mhandlel < 0

*

? "Could not create file "+mfilel DO abort

ENDIF

mhandle2 = FCRFATE(mfile2) IF mhandle2 < 0

? "Could not create file "+mfile2 DO abort

ENDIF

* Write MIF header

DO wfile WITH 1,'Version 2" DO wf ile WITH 1, 'Delimiter "+CUR ( 3 4 1 + " , " +MR ( 3 4 ) DO wfile WITH 1,'CoordSys Earth Projection 1, 0" DO wfile WITH 1,"Columns 2" 00 wfile WITH 1." X Float" DO wfile WITH I," Y Float" DO wfile WITH 1,"Data"

get xy of top left corner of top left cell

mstart = morigin mystart = myorigin+(mnum_ygrid'mgridsize)

* get xy of top left corner of bottom right cell

mend = mstart + ((mnum_xgrid-l)*mgridsize) myend I mystart - ((mnum_ygrid-l)*mgridsize)

? "Creating file., , ''

* write grid square regions

FOR my = mystart TO myend STEP -mgridsize

*

f

FOR mx = mstart TO mend STEP mgridsize DO wfile WITH 1,"" DO wfile WITH 1,"Region 1"

DO wfile WITH l,STR(m,6,2)+" "+STR(my,5,2) DO wfile WITH l,sTR(m+mgridsize,6,2)+" "+STR(my,5,2) DO wfile WITH l,STR(m+mgridsize.6,2)+" "+STR(my-mgridsize DO wfile WITH l,STR(mx,6,2)+" "+STR(my-mgridsize.5,2) DO wfile WITH 1, STR(mx, 6.2) +" "+STR(my, 5.2) DO wfile WITH 1," Pen (1.2.0)"

DO wfile WITH 1," 5"

2)

DO wfile WITH 1," Brush (2,16777215,16777215)" DO wfile WITH 1," Center "+sTR(mx+(mgridsize/2) ,6,2)+" "+STR(my- (mgridsize/2) .5,2)

* write MID file

5

DO wfile WITH Z,STR(mx+(mgridsize/2) ,6,21 t", "+STR(my- (mgridsize/Z), 5,2)

* display progress f

mnrec = mnrec + 1 mntrig = mntrig + 1 IF mntrig = 100

? "Cells created",mnrec mntrig = 0

ENDIF ENDFOR

ENDFOR

? "Total cells created",mnrec

* close files

= FCLOSE(mhandlel1 ? mfilel+" created"

= FCLOSE (mhandle21 ? mfile2c" created"

* clean up

*

* RELEASE ALL CLOSE ALL ? '"finished" RETURN TO MASTER

* Common abort procedure

PROCEDURE abort RELEASE ALL CLOSE ALL ? "aborting GRIDMAKE" CANCEL

Write to one the two output files

PROCEDURE wfile PARAMETERS mfilen0,mrec DO CASE

*

*

CASE mfileno = 1 write-out = FPUTs(mhandle1,mrec) IF write-out = 0

? "Could not write to file "+mfilel DO abort

CASE mfileno = 2 ENDIF

write out = FPoTS(mhandle2,mrecl IF write-out = 0

-

? "Could not write to file "+mfile2 DO abort

ENDIF ENDCASE RETURN

Eof: gridmake

6

ATTACHMENT B - Maplnfo screens with fisheries data

Pulse seine. 1990

1500 to 2000 (51 1000 to 1500 (61 500 to 1000 (651

all others 115501

7