Page 1: Tree Types & Installation Methods

TREE TYPESand

INSTALLATION METHODS

James Pappas DevonJamie Patrick-Maxwell FMCRay Guillory FMC

Page 2: Tree Types & Installation Methods

2Deepwater Subsea Completion Systems

Page 3: Tree Types & Installation Methods

3

Contents

• Trends• Technology• Design Variables• Subsea Configurations• Drivers• Tree Types• Current & Future Technology• Installation Methods

Page 4: Tree Types & Installation Methods

4

Subsea Equipment Trends

19601960--19901990

19901990’’ss

20002000’’ss

15,000 psi 20,000 psi High Temperature

10,000 psi

1,000 to 5,000 psi

Page 5: Tree Types & Installation Methods

5

1980BonitoRJS-39189m

VG5,605 ft

VG5,605 ft

FMC6,080 ftFMC6,080 ft

FMC2,561 ftFMC2,561 ft FMC

3,368 ftFMC3,368 ft

FMC1,613 ftFMC1,613 ft

FMC619 ftFMC619 ft

Kvaerner961 ft

Kvaerner961 ft

1983PiraúnaRJS-232

293m

FMC1,256 ft

FMC1,256 ft

1985MarimbáRJS-284

383m

1992MarlimMRL-9781m

1988PlacidGreen

Canyon 31684m

VG2,244 ft

VG2,244 ft

1994MarlimMRL-41027m

1997Marlim Sul

MLS-31709m

1997Shell Mensa

1618m

FMC5,308 ftFMC5,308 ft

1999RoncadorRJS-4361853m

1988MarimbáRJS-376D

492m

2000PetrobrasRoncador

1877m

VG6,157 ft

VG6,157 ft

2004Shell

Coulomb2307m

Cameron7,209 ft

Cameron7,209 ft

2002MarathonCamden

Hills2197m

1980BonitoRJS-39189m

Deepwater Installations Trends

FMC7,570 ftFMC

7,570 ft

Page 6: Tree Types & Installation Methods

6

Installation Vessels

Jack-up

Semi- submersible

Drill Ship

Dynamically Positioned (Thrusters)Semi-Submersible> 4000

Dynamically Positioned (Thrusters)Drill Ship> 2000

Mooring (Anchors)Semi-Submersible400-4000

Spud Can or MudmatJack-up< 400

Type of MooringSurface VesselWater Depth (Feet)

Page 7: Tree Types & Installation Methods

7

Host Facilities Geographic TrendsExisting Popularity

TLP/Spar

Subsea to Platform

Subsea to FPSO

Gulf of Mexico Brazil

North Atlantic

West Africa

High

High High High

High

Med Med

Med

Med

LowLow

Med

Page 8: Tree Types & Installation Methods

8

Subsea Tree & Control Module Trends

Page 9: Tree Types & Installation Methods

9

Early Trees …

Archives from Various Operating Companies and Entities

Shell Dry Chamber Tree

Texaco Tartan Stacked Valve Tree

Page 10: Tree Types & Installation Methods

10

My Career Early Trees …

Main Pass 261 #1 FMC CM-1 Mudline Tree

VK 739 #3 Kvaerner Side Valve Tree

VK 739 #2 (Pecten) Dril-Quip Vertical Tree

GC 157 (Shell Manatee) #1 Vertical Tree

Page 11: Tree Types & Installation Methods

11

1994 1996-1998 2000

Deep Water Tree Technology

1992

Page 12: Tree Types & Installation Methods

12Tree Interfaces that Govern DesignWell– Tubing Size, Pressure,

Temperature, Material Class

• Controls– Direct, Piloted, Electro/Hydraulic

• Flowlines– Pipeline Size, Pressure, Connection

Type

• Wellhead– Mudline, Clamp Hub, Mandrel,

Different Vendors

WellheadFlowline Connection

Controls

The Well

Optimum Subsea Tree Configuration Driven by Reservoir RequiremenOptimum Subsea Tree Configuration Driven by Reservoir Requirements ts

Page 13: Tree Types & Installation Methods

13Fundamental Subsea ConfigurationsVXT

(TH in Tubing Head)

HXT and EHXTVXT

(TH in the wellhead)

Tubing Hanger Subsea

Wellhead

Tubing Head

• The type of completion defines where the tubing hanger resides

• Anything above the tubing hanger can be removed without disturbing the well

Page 14: Tree Types & Installation Methods

14

Typical Tree Decision Drivers

• Financial driver is “installed CAPEX”

• Lower well count projects that cannot justify expense of open water completion riser

• High drive wells or multilaterals (have need for large bore ≥ 7”)

• Complex reservoirs or frequent workovers requiring tubing retrieval

• ESP technology• Batch drilling/completion and/or

requirement for drill thru systems

• Financial driver is “life-of-field OPEX”

• Large well count projects (or portfolios of projects) that can justify and benefit from investment in open water completion riser system

• Lower drive wells (smaller bore)• Simple reservoirs or low

frequency of tubing retrieval workovers

• High pressure - difficult well control issues

Horizontal Tree Vertical Tree

Page 15: Tree Types & Installation Methods

15

Subsea Trees by Water Depth

Diverless Tree(Guideposts/Guidelines) Guidelineless (GLL)

Tree (Funnels)

Diver Assist Tree

Mudline Tree

DiverlessFloating Vessel800-2500

GuidelinelessFloating Vessel2500

Diver AssistFloating Vessel200-800

Mudline – Diver AssistJack-up< 400

Type of TreeSurface VesselWater Depth (Feet)

Page 16: Tree Types & Installation Methods

16

TreeConfigurations

10K Vertical Shallow Water Tree 10K Vertical Deep Water Standard

10K Standard EHXT15K Standard EHXT15K Enhanced Vertical Tree

Page 17: Tree Types & Installation Methods

17Comparison of Traditional and Enhanced Vertical Trees

Traditional VXT Enhanced VXT

ROV Tree Cap

Slim ODTubing Hanger

Tubing HeadWith AnnulusIsolation Valve

FlowlineU-Loop

Tubing HangerInstalled inWellhead

Page 18: Tree Types & Installation Methods

18Traditional Vertical Tree with Tubing Hanger Completion in Wellhead

• Eliminates Need for Tubing Head

• 18-3/4” Dual Bore Tubing Hanger Features Integral Annulus Valve

• 14-1/2” TH and Adapter Sleeve used on Competitor Wellheads

• Trip Saving ROV Tree Cap• Guideline or Guidelineless

Configurations• BOP Setup Required for TH

Orientation

Page 19: Tree Types & Installation Methods

19

4” x 2” 5K Dual Bore GL Tree

EG MAGY “C”

Page 20: Tree Types & Installation Methods

20

Enhanced Dual BoreVertical Tree

5” x 2” 5,000 psi5” x 2” 10,000 psi

EVXTTM-DB

Enhanced Slim BoreVertical Tree

4” x 2” 10,000 psi5” x 2” 15,000 psi

EVXTTM-SB

Shell Std”

Total Girassol

Page 21: Tree Types & Installation Methods

21GLL 10K Enhanced Vertical Treeand Tubing Head Stack Section View

Tree Valves

Page 22: Tree Types & Installation Methods

22

ROV Tree Cap

Subsea Control Module

Vertical Hubfor Well Jumper

Tree Assembly

Tubing HeadAssembly

Tubing Hanger

GLL 10K Enhanced Vertical Tree System

Page 23: Tree Types & Installation Methods

23

GLL 10K Enhanced Vertical Tree

ROV Tree Cap

Tree Cap ParkingSlot

Subsea Control Module

Hydraulic FlyingLead Receptacles

Tree Connector

FlowlineConnector

Page 24: Tree Types & Installation Methods

24

10K EVXT Tubing Head

Annulus AccessValve

Hub for TreeFlowline Connector

Vertical Hub forWell Jumper

Flowline HubLatch/Release

Page 25: Tree Types & Installation Methods

2510K Concentric SlimboreTubing Hanger

Alignment Key

Running Tool Latch ProfileLocking Mandrel

National HydraulicCouplings

Tronic Wet-MateElectrical Connectors

Lock Ring

Dual ElastomerSecondary Seals

Plug Profile

Tubing SuspensionThreads (4” to 5 1/2”)

Split Protective SleeveFor Couplings

Page 26: Tree Types & Installation Methods

26

• Run subsea with tree

• Weighs less than 100 lbs in water

10K ROV Tree Cap

Page 27: Tree Types & Installation Methods

27

10K Enhanced Vertical TreeStack Views

Page 28: Tree Types & Installation Methods

28

15K Enhanced Vertical Tree System

Vertical Hubfor Well Jumper

Tree Assembly

Tubing Hanger

ChokeSCM

Tubing HeadAssembly

Capable of handling BOP’s directly

Page 29: Tree Types & Installation Methods

2915K EnhancedVertical Tree

18 ¾ - H4 RE-ENTRY HUB

PRODUCTION SHUT IN VALVE

PRODUCTION WING VALVE

PRODUCTION MASTER VALVE

MANF / SLED MQC PLATE

PROD. MQC PLATE

CHOKE

EROSION DETECTOR BLOCK

TREE CHEMICAL INJECTION VALVE

TREE CHEMICAL INJECTION VALVE

TREE CONNECTOR

DOWNHOLE FUNCTIONS ROV PANEL

Page 30: Tree Types & Installation Methods

3015K EnhancedVertical Tree

SUBSEA CONTROL MODULE

FLOWLINE CONNECTOR

ANNULUS WING VALVE

ANNULUS CROSSOVER VALVE

PRODUCTION SHUT DOWN VALVE

ANNULUS MASTER VALVE CONNECTOR /

SCSSV ROV PANEL

ANNULUS SWAB VALVE

TREE CAP PARKING RECEPTACLE

Page 31: Tree Types & Installation Methods

31

15K Tubing Hanger Assembly

Page 32: Tree Types & Installation Methods

3215K ROV Tree Cap

Page 33: Tree Types & Installation Methods

33

Enhanced Horizontal Tree System

5” x 2” 10,000 psi5” x 2” 15,000 psi

Page 34: Tree Types & Installation Methods

34

Enhanced HXTTraditional HXT

Comparison of Traditional and Enhanced Horizontal Trees

Both Crown Plugs Installed inExtendedTubing Hanger

Internal Tree CapTubing Hanger

Page 35: Tree Types & Installation Methods

35Enhanced HorizontalTree EHXT®

85,000 lbs

14.5’ x 14.5’footprint x 12.5’ tall

Page 36: Tree Types & Installation Methods

36

10K & 15K ROV Tree Cap

Page 37: Tree Types & Installation Methods

37EHXT Tubing Hanger Features

Tubing Hanger

CrownPlug

Page 38: Tree Types & Installation Methods

3810K & 15K EHXT EH-5 Radial Penetrator

• Enables 9 downhole control lines through 2 EH-5 Penetrators

– Hydraulic, chemical, electrical

Tubing Hanger

Tree Spool Body

EH-5 Penetrator

FemaleCoupler

MaleCoupler

Welded Tubing Connections on Ends of Radial Penetrator Stems

Page 39: Tree Types & Installation Methods

39

15K EHXT

134”(3.40m)

153”(3.88m)

Length166”

(4.22m)

Page 40: Tree Types & Installation Methods

40

5K HXT WireLineLess w/ ESP

Petrobras

Page 41: Tree Types & Installation Methods

41

5K HXT with ESP Features

ROVTreeCap

TubingHanger

WithDual Ball Valve

Page 42: Tree Types & Installation Methods

42

5K EHXT with Retrievable Choke ModuleChoke

Module

TREE

Page 43: Tree Types & Installation Methods

43

5K EHXT Retrievable Choke Module

•MEG Flow Meter•Wet Gas Meter•Water Cut Meter•Choke•Tree Connector•Manifold Connector•Two Sand Detectors•Suite of Dual PT/TT Sensors

Page 44: Tree Types & Installation Methods

44Electric Tree with Redundant Battery System

StandardElectricConnectors

BatteryPack

Page 45: Tree Types & Installation Methods

45

Electric Choke Control Retrofit

• Reported production gain of 1900 bbl/d

• Fully open to fully closed 45 seconds.

Page 46: Tree Types & Installation Methods

46Electric FlowControl Valves

• Electric Actuators position control and fast operation

• Electric Actuators for subsea processing systems

Page 47: Tree Types & Installation Methods

47

Boosting and Processing

Tordis Subsea Separation System

Page 48: Tree Types & Installation Methods

48

Installation Methods and

Systems

Page 49: Tree Types & Installation Methods

49

Vertical Tree on Drill Pipe

Page 50: Tree Types & Installation Methods

50

Horizontal Tree On Drill Pipe

Page 51: Tree Types & Installation Methods

515” x 2” 5K GLL Dual Bore Tree, LMRP, EDP & Completion Riser

Page 52: Tree Types & Installation Methods

52Heave Compensated Landing System (HCLS)

Tree overboarding

Tree being moved off Laney deck

Tree lowering into water

HCLS buoy deployment

Page 53: Tree Types & Installation Methods

53HCLS Tree Installation Boat to Crane

Buoys

Tree

Page 54: Tree Types & Installation Methods

54

HCLS Tree Installation Crane to Overboard

Page 55: Tree Types & Installation Methods

55

HCLS Tree Installation Crane to Boat

Page 56: Tree Types & Installation Methods

56

HCLS Tree Installation Buoys Overboard

Page 57: Tree Types & Installation Methods

57HCLS Tree Installation Sling

Page 58: Tree Types & Installation Methods

58

HCLS Tree Installation Landout

Page 59: Tree Types & Installation Methods

59

Rig Winch Tree Installation Boat Offload

Page 60: Tree Types & Installation Methods

60

Rig Winch Tree Installation Rig Deployment

Page 61: Tree Types & Installation Methods

61Rig Winch Tree Installation

Page 62: Tree Types & Installation Methods

62Rig Winch Tubing Head Spool Deployment

Page 63: Tree Types & Installation Methods

63

• Run on monobore riser

• Controlled by SCM during installation

Subsea Tree Installation

Page 64: Tree Types & Installation Methods

64

Monobore Completion Riser Systems• 5” 10K & 15K

monobore riser systems

• Riser systems can be used for light well intervention on both vertical and horizontal trees

Page 65: Tree Types & Installation Methods

6515K MonoboreRiser

EDP

LRP

Tree

TubingHead

Page 66: Tree Types & Installation Methods

66

SurfaceTree

TensionJoint

Intermediate Joints

Lubricator Valve

LubricatorValve Reel Unit

To EDP/ LRP

5” 15K Completion Riser System

TaperedStressJoint

HPU

RiserControlStation

UmbilicalReel

Page 67: Tree Types & Installation Methods

67

THANKS!

One of my Earliest Trees – Happy Holidays, Y’all!

Me

QUESTIONS?

Tree

Page 68: Tree Types & Installation Methods

TREE TYPESand

INSTALLATION METHODS

James Pappas DevonJamie Patrick-Maxwell FMCRay Guillory FMC