24
TRANSITION PLAN Winter 2013-2014 Briefings Brussels, Belgium November 05-13 NMD/NOM/OPL/PLA

Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

Embed Size (px)

Citation preview

Page 1: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

TRANSITION PLAN Winter 2013 -2014Briefings

Brussels, Belgium November 05-13

NMD/NOM/OPL/PLA

Page 2: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

Performance driven process

• From 2012 delay targets set for a full year (previously targets were referring to the summer periods)

• Capacity planning process focuses on the whole year• Despite lower traffic levels during winter, large scale project implementations

can impact on the yearly delay targets

• Synchronisation needed between multiple project implementations

• Coordination of all constraints at network level

Page 3: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with
Page 4: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

Summary & lessons learnt

•Better recording of delays associated with the plan ned events, especially those which are subject to transition planning process;

•Advanced planning allowed improved preparation for each transition;

•Advanced coordination allowed early identification of conflicting areas;

•Good responsiveness of ANSP’s concerned including f lexibility on implementation dates;

•Shared operational experience from ANSP’s that had successfully implemented new ACC/System – provided encouragement also for ANSP’s pre-implementation;

•Good participation of ANSP’s in Transition Plan Mee tings.

Page 5: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with
Page 6: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

19/11/2013 - 6 -

LKAA – Prague New Sectorisation completed

LKAA PeriodImpact on network

performanceMitigation measures

TrainingSeptember 2013 –

October 2013None No

Implementation 17 October 2013 Low No

Transition phase

capas -20%

17 October – 21

OctoberLow No

Normal

operations21 October 2013 None No

Page 7: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with
Page 8: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

19/11/2013 - 8 -

LSAG – Geneva Stripless CH Step 2LSAG Period

Impact on network

performanceMitigation measures

Training 26 Aug - 4 Nov 2013 None No

Switch over 5 Nov 2013 Low No

Transition period 1

Capas -30% ACC+INI

Capas -20% APP

5 Nov 2013 Low No

Transition period 2

Capas -20% ACC+INI

Capas -20% APP

6 Nov – 13 Nov 2013

Changed on 11/11/13Low No

Transition period 3

Capas -10% ACC+INI

Capas -20% APP

13 Nov – 24 Nov 2013 Low No

Transition period 4

Capas -20% APP25 Nov – 10 Dec 2013 Low No

Normal operations 11 Dec 2013 None No

Page 9: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with
Page 10: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

19/11/2013 - 10 -

EDGG EBG 02 + 08 Paperless Strip System

EDGG Period

Impact on

network

performance

Mitigation

measures

TrainingJuly 2013 - September

2013Low No

Operational Weekend 1

Capas -20%19/20 October 2013 Medium Yes

Operational Weekend 2

Capas -20%02/03 November 2013 Medium Yes

Switch over 16/17 November 2013 Medium Yes

Transition period 1

Capas -20%

17. November -

29.November 2013Medium Yes

Transition period 2

Capas -10%

30. November -

13.December 2013Low/Medium Yes

Normal operations 14. December 2013 None No

Page 11: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with
Page 12: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

19/11/2013 - 12 -

EPWW Warsaw ACC New ATM SystemEPWW

Period

Impact on network

performanceMitigation measures

Training – shadow mode 20 Sept – 14 Nov 2013 Low/Medium No

Cut over 25 November 2013 High Yes

Transition period – Phase 1 -35% 25 Nov – 20 Dec 2013 High Yes

Transition period – Phase 2 -30% 21 Dec – 15 Jan 2014 High Yes

Transition period – Phase 3 -25% 16 Jan – 31 Jan 2014 High Yes

Transition period – Phase 4 -15-20% 1 Feb – 15 Mar 2014 Medium Yes

Transition period – Phase 5 -15% 16 Mar – 15 Apr 2014 Low/Medium Yes

Transition period – Phase 6 -10% 16 Apr – 31 Apr 2014 Low/Medium Yes

Transition period – Phase 7 -5% 1 May – 15 May 2014 Low Yes

Transition period – Phase 8 -0% 16 May – 25 May 2014 Low No

Normal operations 26 May 2014 No No

Page 13: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

Denmark/SwedenLatvia

EHAM – Amsterdam Excl UMMS and UK**EURR 11 / 12 EPWW

Denmark/SwedenLithuania

LFP. – Paris TMA Excl UMMS and UK**EURR 9 / 10 EPWW

Denmark/SwedenLatvia

EG – United Kingdom Excl UMMS and UK**EURR 7 / 8 EPWW

UkraineLO – Austria Excl ULLI and UMMSEURR 5 / 6 EPWW

HungaryUkraine

LE – Spain Excl ULLI and UMMSEURR 3 / 4 EPWW

UkraineLI – Italy Excl ULLI and UMMSEURR 1 / 2 EPWW

RemarksONLOADS

From U*** TO / FROMEU Restriction –Westbound / Eastbound

EU Restrictions needed daily 0900 – 1500 for ex Russ ian Federation Westbounds from 25/11/13 Until 15/01/ 14 then on Fridays and Saturdays only.Exception : Not applied 24/25/26, 31 December and 0 1 January .Use of EU restrictions will reduce delays by up to 50%. Will still have up to 8,000 minutes delay till mid January.

EU Restrictions for Eastbounds to Russian Federation – Cherry Picking or D-1 if requiredEmergency

Note: Time Parameters for UseReroute Scenarios – normal D-1 Pretactical CDMNote: Unplanned staff shortage(s) could result in h igher delays and need for Reroute Scenarios being u sedin Pretactical and Tactical.

Page 14: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

25th November 2013 – 12th January 2014ALL EURR

OFF POLAND Off Belarus Off Czech Rep Off Austria Off Slovenia On Ukraine On Hungary On Denmark On Sweden On Latvia On Lithuania

Mon 25 Nov 2013 -169 -139 -15 -9 -9 52 13 78 78 40 30

Tue 26 Nov 2013 -118 -100 -11 -6 -6 31 9 62 62 33 23

Wed 27 Nov 2013 -124 -99 -13 -10 -10 38 8 51 51 27 18

Thu 28 Nov 2013 -123 -101 -11 -8 -8 30 9 63 63 28 29

Fri 29 Nov 2013 -139 -114 -13 -8 -8 42 11 66 66 37 26

Sat 30 Nov 2013 -153 -116 -20 -14 -14 44 14 59 59 32 21

Sun 01 Dec 2013 -151 -124 -15 -9 -9 37 11 78 78 43 25

Mon 02 Dec 2013 -124 -97 -16 -9 -9 36 14 54 54 34 11

Fri 06 Dec 2013 -134 -111 -12 -9 -9 34 9 69 69 40 25

Thu 12 Dec 2013 -118 -95 -13 -8 -8 35 13 54 54 18 30

Fri 13 Dec 2013 -117 -95 -12 -7 -7 35 9 52 52 23 23

Sun 15 Dec 2013 -138 -107 -19 -11 -11 44 14 52 52 26 15

Wed 18 Dec 2013 -100 -82 -10 -6 -7 28 8 45 45 16 24

Fri 20 Dec 2013 -118 -94 -13 -9 -9 36 10 49 49 17 30

Sat 28 Dec 2013 -211 -146 -36 -22 -22 86 25 37 37 18 13

Thu 02 Jan 2014 -107 -84 -11 -7 -7 41 11 38 38 12 20

Sat 11 Jan 2014 -236 -171 -33 -23 -23 103 23 45 45 18 20

Sun 12 Jan 2014 -140 -109 -16 -11 -11 51 11 46 46 19 22

Page 15: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

19/11/2013 - 15 -

EPWA- Warsaw TMA

EPWA PeriodImpact on network

performance

Mitigation

measures

Recurrent training 18 July – 31 July Low No

Training – shadow mode20 September – 14

November 2013Low No

Cut over 25 November 2013 Low No

Transition period –

Phase 1 -25%25 Nov – 15 Dec 2013 Low No

Transition period –

Phase 2 -15%16 Dec – 15 Jan 2014 None No

Transition period –

Phase 3 – 5%16 Jan – 15 Feb 2014 None No

Transition period –

Phase 4 -5-0%15 Feb – 28 Feb 2014 None No

Normal operations 1 March 2014 - -

Page 16: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with
Page 17: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

19/11/2013 - 17 -

LSAZ – Zurich Stripless CH Step 2

LSAZ PeriodImpact on network

performance

Mitigation

measures

Training 16 Sept – 9 Dec 2013 None No

Switch over 10 Dec 2013 Low No

Transition period 1 -20% 10 Dec - 16 Dec 2013 Low No

Transition period 2 -10% 17 Dec - 27 Dec 2013 Low No

Normal operations 28 Dec 2013 None No

Page 18: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

New Sector Structure Munich South

18

FUE: GND-FL315 FUESSEN

FUE: GND-FL315 FUESSEN

ZUE: GND-FL315 Zugspitze

ZUE: GND-FL315 Zugspitze

STA: GND-FL315 Starnberg

STA: GND-FL315 Starnberg

NDG: GND-FL315

NDG: GND-FL315

Page 19: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

19/11/2013 - 19 -

New Sectors Munich South (EDMMCTAS)12/12/13 – 23/12/13-20% Capacity Reductions

1.ATFCM Measures

3544TegernseeEDMMTEG

3240ZugspitzeEDMMZUG

3442StarnbergEDMMSTA

3240FussenEDMMFUE

-20% CapacityNormal CapacityNameAIRSPACE

* Note EDMMNDG Normally combined with EDMMWLD known as EDMMCN2 belongs to the Cluster North.

Page 20: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with
Page 21: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with
Page 22: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

19/11/2013 - 22 -

Spring 2014 – Same Principles – Continuous Process

Croatia - LDZO Transition:

13 Feb – 15 Apr

New COOPANS

Azerbaijan - UBBA Transition:

March – July

New ACC

Spain - LECS Transition:

April

SACTA CF2 Upgrade

Germany - EDGG Transition:

19 Apr – 18 May

PSS EBG 03+04

Italy –

LIBB/MM/PP/RR

Transition:

01 May – 10 May

Airspace

Reorganisation

Page 23: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

19/11/2013 - 23 -

E conferences / Teleconferences

Pre EDGG

One Week in Advance

08/11/13 *

Not required

D-1 Update

15/11/13

Pre EPWW

One Week in Advance

18/11/13

D-1 Update

25/11/13 *

Page 24: Transition Plan Briefings Nov 2013 - publish.eurocontrol.intpublish.eurocontrol.int/sites/default/files/event/files/131112-FMP... · AIRSPACE * Note EDMMNDG Normally combined with

19/11/2013 - 24 -

AIM + NOP

Specific AIM for each ACC undergoing Transition wit h reference to NOP