10
TRAINING CALENDAR April — September 2015

TRAINING CALENDAR - LNTECC CALENDAR April ... S063 First Aid Training 1 July Delhi Kolkata S-1 to M1-A Response for a Medical Emergency - asics of First Aid T419 Safety in E&I and

Embed Size (px)

Citation preview

TRAINING CALENDAR

April — September 2015

PROGRAMME CATEGORIES

Technical Engineering

Quality Management System Supply Chain Management

Finance Accounts & Administration Information Technology

Environment Health & Safety General Management & Behavioral

Orientation Programmes Core Development Programmes

Code Programme Name Days Month Venue Participants Contents

T410

TL - Tower Erection & Stringing Methodology

2

April April May May June June July July

August August

Meerut Vijayanagaram

Jabalpur Angul

Bhopal Hospet

Srinagar Coimbatore

Agra Muzaffarpur

Non - Sup , S-Band,

Stringing Engineers &

Store keepers

Tower erection methodology - String-ing methodology - Field Quality Plan Requirements - Erection & stringing tools management - Store manage-

ment - Utilization of Tools and tackles

T547

Project Management (TL)

1

May Delhi

Nagpur GET / DET /

S Band Concepts of quality - Cost - Safety - Working capital - Control measures

T411

TL - Latest Survey Techniques

1

June Delhi

Nagpur Non - Sup &

S Band Use of Satellite Imaginary and soft-ware for survey / latest Techniques

L053 Legal Aspects of Contracts

Management

1

Sept Delhi

Nagpur

Tier 1 Legal Definition - important Clauses -

Arbitration

T412

Introduction of UPD & Project Management

2

June August Sept

Delhi Lucknow Kolkata

O-1 to M1-C

Introduction to UPD - Nature of Work -Activities- Funding Schemes - Pay-ment Terms - Challenges - SC Man-agement - Project Management -

RGGVY XI & XII Plan- Tools & Tech-niques - MPCS - JCR - Execution

Methodology - SOP

E001

Enhancing Project

Planner's Performance

1

June August Sept

Delhi Lucknow Varanasi Kolkata

S-2 to M1-C

Scheduling - JCR - Reconciliation - Pro-gress Reporting - Dash Boards - Con-

tracts Management

T413

Productivity Management in UPD jobs

1 August

Sept Delhi

Kolkata

S-1 to M1-C Productivity Concepts - Tools &

Techniques

A033

Contracts Management

1

August Sept

Delhi Chennai

M1-A to M2-C

Contracts Management - Project Management - Reconciliation -

Working Capital - Payment Terms

Basic Knowledge in

Implementation of 5S 1 June TLT, Pithampur

S-1 to M1-C / GETs / DETs

Basic Knowledge in Implementing 5S

Basics of CNC Machines &

their Operations 1 June TLT, Pondy

S-1 to M1-C / GETs / DETs

Basics of CNC Machines including its construction & working

- CNC Programming Software Funda-mentals- Troubleshooting of CNCs

Process of Furnace

Operation & Maintenance of Galvanizing

1 June TLT, Pondy S-1 to M1-C / GETs / DETs

Components of Furnace in detail incl. types of burners, valves etc.

- Working of furnace - Types of fuel used, ignition method employed - Troubleshooting of fur-nace—Cost Efficient ways of oper-

ating the furnace incl. control of fuel consumption

TECHNICAL

Code Programme Name Days Month Venue Participants Contents

T402 Study of Route and Tower Spotting & Optimization by Modern Techniques

1 April Nagpur S-1 to M1-A Route Study by GIS - Tower Spotting by PLS CADD

T506 Detailing of Transmission

Line Towers 2 June

TLTRS, Kanchi

S-1 to M1-A Tower Loading - Design - Various Accessories - Design Precaution during erection and stringing

Q381 Design Tips for Site

Execution 1 August Chennai S-1 to M1-A

Calculation - Use of prop setting - Understanding the GA drawings

T333 Engineering Concepts of

Substation Design 2 June

Hydera-bad

S-1 to M1-A PGETs / GETs /

DETs

AIS & GIS layout - Bus bar configura-tion- Protection - SCADA - Earthing & Lightning protection - Illumination -EHV/HV cabling -Fundamentals of OFC and related systems -Basic civil for electrical engineers

T414 Engineering Concepts of

Power Distribution at HV/LT level

2 August Lucknow S-1 to M1-A

PGETs / GETs / DETs

Design and component selection of 33/11 kV OH Power distribution - Overview of REC standard - Equipment selection including distribution transformer - RMU - Autorecloser - Sectionaliser - Smart metering - Power distribution SCADA - Precautionary measures while revamping of distribution lines - Earthing and lightning protection - HV and LV cable sizing - Basic civil for electrical Engineers

ENGINEERING

QUALITY MANAGEMENT SYSTEM

J021 QMS awareness Program -

TL BU 1 May HQ

QA/ QC engineers & S1-M1B

Requirements of - ISO 9001:2015 Standard - Under-stand the revisions w.r.t.2008 version - Understand document modification & re certification process

J113 Internal Auditors Training - QMS & Quality Require-ments in TL Construction

2 July Nagpur S-1 to M1-B

Concept - Fundamentals and Evaluation of Quality Manage-ment System - ISO 9001:2008 Requirements - Auditing Process and Case Studies - Stages of Au-diting and Auditing Skills & Qual-ity Requirements in TL

T330 Work Methods for Electri-

cal Installations 1 May Kolkata Site Engineers Concepts - Procedures - Checklist

J021 Quality Management

System – EHV SS & UPD 1 June Chennai HQ / Cluster Site

Awareness on QMS requirements

Code Programme Name Days Month Venue Participants Contents

T418 Safety in UPD Projects 2 April Kolkata S-1 to M1-C

Fundamental EHS Management Sys-tems - Safety During Project Opera-tion -Behaviour Based Safety - Elec-trical Safety - PTW - ERP

B233 Train the Trainers 2 May June

Kolkata Delhi

S-1 to M2-C

Behaviour Based Safety - Effective Trainer Skill - Effective Body Lan-guage - Planning & Preparation for training session - Non-verbal Com-munication

S260 Safety in APDRP Projects 2

May April July

August April

Kolkata Lucknow

Bangalore Delhi

Lucknow

O-1 to M2-C

Safe Work Procedures during Survey - Excavation - Foundation - Tower Erection - Stringing - Material Han-dling - Tools & Tackles Inspection - PTP LC Shut down - Case study

S232 Safety in Transmission

Line 2

June August

June Sept Sept May

Patna Hyderabad

Siliguri Delhi

Nagpur Kurnool

S-1 to M1-C

Fundamental EHS Management - Requirements before stringing activi-ty - Insulator hoisting safety - String-ing PTP procedure - LC shutdown procedure - Rough sag - Final sag procedures - Clipping - Jumpering

S063 First Aid Training 1 July Delhi

Kolkata S-1 to M1-A

Response for a Medical Emergency - Basics of First Aid

T419 Safety in E&I and UPD

Projects 2

Sept June

Kolkata Chennai

S-1 to M1-C

Safety During Project Operation - Behaviour Based Safety - Electrical Safety Requirements - Fundamental EHS Management Systems

S264 Behaviour Based Safety 1 August May

Mumbai Chennai

M1A - Above Positive Safety Culture creation to improve safety implementation

S107 Safety in Construction of EHV SS & UPD projects

2 July Chennai

Delhi Lucknow

S-1 to M1-A

EHS Management - Loss prevention Technique - LOTO - Shut down pro-cedures - Work at height - Excava-tion safety - Electrical safety - Mate-rial handling safety - Accident inves-tigation

T421 Safety in E&I 2 June July

Hyderabad Nagpur

S-1 to M1-A Safety in cable Tray erection - Cable laying - Panel erection

J113 Internal Auditors Training 2 August Chennai S-1 to M1-C

Understanding of Key elements of IMS - Internal auditing procedure - IMS requirements - Interview tech-niques during audit process - Audit Report preparation

B415 Capacity Building Training

for EHS Staff 2 May Delhi S-1 to O-2

L&T IMS system - Project specific work methodology - HIRA - Safety implementation methods

S277 Safety in EHV SS 2 May Mumbai S1 - M1-A Safety in Cable tray Erection - Cable Laying -Transformer Erection

ENVIRONMENT HEALTH & SAFETY

Code Programme Name Days Month Venue Participants Contents

163 Negotiation skills 1 June HQ O-1 to M1-C

Types of Procurement—Negotiation styles— Commercial Terms & Condi-tions - Domestic & Global procure-ment -when & how to negotiate, etc

C340 Logistics Management 1 August HQ O-1 to M1-C Importance of Logistics—Effective inventory control— INCOTERMS—Types of logistics

T416 Vendor Development

skills 1 Sept Chennai O-1 to M1-C

Criteria for vendor selection—Vendor evaluation—Factory assesment Development and partnering with Vendors for long term operations— Vendor Performance assessment.

FINANCE ACCOUNTS & ADMINISTRATION

SUPPLY CHAIN MANAGEMENT

F281

Programme on Indirect Taxes and Compliance Arising out of Recent

Changes in Budget

1

June June

August June

Delhi Varanasi Lucknow Nagpur Chennai

All Site Accountants

Basics of Indirect Taxes - Concept of Sales & Deemed Sales - Scheme of

Central Sales Tax Act & Its Implication - Tax Saving Exercise - Introduction of VAT - An Overview & Its implication -

F325 Basics of Site Accounts & IR & Administration Func-

tions 2 July Sept

Varanasi Lucknow

Lateral Recruit-ers of Site Ac-

countants, Stores Keepers,

Admin Staff

Overview of Accounts - Basics of Ac-counts - Bank Guarantee & Costing –

Insurance - Supply Chain Manage-ment - Stores Management - Client

Invoicing - ARRS – Client Ledger Rec-onciliation - Working Capital - Cash

Flow - Risk Mgmnt - Site Admin & IR

F122 Working Capital Management &

Inventory Management 1 July to Sept

Delhi Varanasi Lucknow Kolkata Chennai

Site Accountants

Importance of Cash Flow - Working Capital Cycle

MM03 Stores Management 1 June

Delhi Varanasi Lucknow Kolkata Chennai

S-1 to M1-A, GCTs

Purpose of Store Management – Store Procedures – Concepts of Stores Layout – Handling of Materials at Site

– Documentation Related to Store

T404 EIP - New Planning

Module 2

May June July

August

LNCL KKRO

Nagpur Delhi

Planning Engi-neer, Billing

Engineer & BU coordinator

Online Job Cost Report (JCR) - Daily Project Report (DPR) - Daily Execution Report (DER) - New Sub-contract module - Material Planning

INFORMATION TECHNOLOGY

Code Programme Name Days Month Venue Participants Contents

B102 Interviewing Skills 2 May Delhi M1-A & Above

Importance Of Skilled Interviewing - Writing An Ad - Behavioral Event Interview (BEI) - Under-standing Body Language - Preparation For Inter-view - Gaining Skills For Interviewing (Practice Video Recording) - Understanding Self Before An Interview - Practice Interviews - Types Of Inter-views - Test, Simulations, Presentations, Assess-ment Tests - Do And Don’ts In Interview - 2 Live Interviews With Candidates (Video Recording ) - Rating Candidates

B257 Lifestyle Modification

and Stress Management

2 May HQ S-1 to M1-C

Self-Awareness - Managing Psychological and Physical Health - Anger Management - Managing Stress - Yoga (Asana, Pranayama and Meditation) - Managing Relationships and Networking - Man-aging Personal Finance and Career

B148 Innovation &

Creativity 2 May HQ O-1 to M1-C

Understanding Creativity - Creative Thinking - Blocks - Creativity Enhancing Techniques

B263 Team Building 1 Aug HQ S-1 to M1-C

Concept of team building - Team vs. Group - Stag-es of team building - Characteristics of a good team leader - Managing conflict in a team - Developing a high performance team

D028 Supervisory

Development Programme

6

May July

Aug Sept

Chennai Mumbai Kolkata

Delhi Varanasi

S-1 & S-2

Overview of L&T - Changing Dynamics of Mgnt - Functional Interdependence - The Role of a Super-visor - Overview of WCM - Interpersonal Effective-ness - Site Admin - EHS - Leadership & Motivation - Finance- QMS - Risk Management - Basics of Costing - Team Building - Negotiation Skills - Time Management - IT / EIP - Contract Management

GENERAL MANAGEMENT & BEHAVIORAL

CORE DEVELOPMENT PROGRAMME

ORIENTATION PROGRAMMES

T017

Technical Orientation

Programme

17 6

July

Mysore Kanchi

GETS

Introduction to IC & BU - itsDepartments & Functioning - Hands on Training

T049 PGET Orientation

Programme 5 August HQ

PGETs /NICMAR

Introduction to IC & BU’s - its Departments & Functioning

ATL is the Learning Management System (LMS) of Larsen & Toubro. ATL offers world class

resources which enables to develop skills in order to compete internally and externally.

ATL can be accessed through http://atl.ltindia.com only by L&T employees while using their

PS Number as their login credentials.

For any queries, write to [email protected]

ATL- ANY TIME LEARNING (Anytime, Anywhere, At your place)